Sol_140P5326R0022.pdf
PDF 660 KB Posted
- Attached to
- GRSM ROAD STRIPING Federal contract opportunity
- Solicitation number
- 140P5326R0022
About this file
This is a federal construction solicitation for road striping services at Great Smoky Mountains National Park (GRSM) issued by the National Park Service, Southeast Regional Office (NPS, SER - North MABO). The solicitation number is 140P5326R0022, issued on July 16, 2026, with proposals due August 17, 2026, at 4:00 p.m. ET. This is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside competitive action; bidding contractors must have this SAM.gov designation or their proposals will be removed from consideration.
The contract is a firm-fixed-price construction award with four line items: BASE–Newfound Gap and Laurel Creek Road (010); BASE–Gatlinburg Bypass Road (020); ADDITIVE ITEM–Catalooche Entrance Road, Elkmont Road, and Tremont Road (030); and ADDITIVE ITEM–Foothills Parkway Sections, Townsend Entrance Road, and Wear Cove Gap (040). All items are lump-sum priced. The contractor must begin work within 10 calendar days of receiving notice to proceed and complete all work within 270 calendar days. A 20% bid guarantee (bid bond) is required at proposal submission. Performance and payment bonds of 100 percent each are required upon award per FAR 28.203-5. The contractor must use RS Means Master Format WBS with costs broken down by Division 1-50, including separate line items for overhead and profit. Proposals must include completed SF-1442 form, technical proposal (not exceeding 20 pages), capabilities and experience, subcontractor use and work history, past performance questionnaires (three relevant references from the past five years), and detailed cost proposals. The contracting officer is Marilia Mateo, and questions must be submitted by July 30, 2026, at 4:00 p.m. ET. Proposals are to be submitted via email to marilia_mateo@ios.doi.gov. No site visit is scheduled. The project delivery location is GRSM at 107 Park Headquarters Road, Gatlinburg, TN 37738. Evaluation criteria include technical approach (Factor A), past performance/experience/technical capability (Factor B), and cost proposals (Factor C), with non-cost factors significantly more important than cost. A copy of the completed SF-1442, signed and dated with Blocks 14-20c completed, is mandatory.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0002.pdf | ||
| Sol_140P5326R0022_Amd_0002.pdf | ||
| Sol_140P5326R0022_Amd_0001.pdf | ||
| A04_ATTACHMENT_001_-_SOW_Roadside_Striping_Parkwide.pdf | ||
| B03_ATTACHMENT_004_-_Wage_Rate_Determination_-_North_Carolina.pdf | ||
| B08_ATTACHMENT_002_-_Price_Schedule_Sheet.pdf | ||
| B03_ATTACHMENT_003_-_Wage_Rate_Determination_-_TN.pdf | ||
| B04_ATTACHMENT_006_-_Construction_Contract_Administration.docx | DOCX document | |
| B08_ATTACHMENT_005_-_Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P5326R0022
NPS, SER - North MABO 107 Park Headquarters Road Gatlinburg TN 37738
0044038033
PSN
Marilia Mateo 470-819-0933
07/16/2026
08/17/2026
10 270
Contractors are responsible for reviewing the solicitation in its entirety, specifically Sections L and
M, which cover how the proposal must be put together before submission and how they will be evaluated.
A past performance questionnaire is attached and should be distributed to past clients. Past clients are instructed to send the questionnaires directly to marilia_mateo@ios.doi.gov after completion.
Prospective contractors must provide the company's name and complete address, including street, city, state, zip code, phone number, email address, and SAM.gov UEI number on their proposal cover page.
Prospective contractors must also include the solicitation number in their proposals. A Bid Guarantee
(Bid Bond) is required to be submitted with your proposal at 20% of the bid total.
1 43
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
DOI, NPS, SER - North MABO 107 Park Headquarters Road Gatlinburg TN 37738
PSN
Marilia Mateo
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
Proposals for Road Striping at Great Smoky
Mountains National Park (GRSM) must be submitted via email to
Marilia_Mateo@ios.doi.gov. This solicitation is a Service-Disabled Veteran Owned Small-Business set-aside.
Contract Type: Firm-Fixed Price Construction
Solicitation #: 140P5326R0022
NO SITE VISIT IS SCHEDULED FOR THIS PROJECT
Questions Due Date: July 30th, 2026 by 4:00 pm
EST
Proposal Due Date: August 17th, 2026 by 4:00 pm
EST
Delivery: 06/30/2027
Delivery Location Code: 0011282998
NPS, Gt. Smoky Mountains NP
107 Park Headquarters Road
Gatlinburg TN 37738 US
Continued ...
Period of Performance: 09/15/2026 to
06/30/2027
00010 Road Striping Base -
Newfound Gap and Laurel Creek Road
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
00020 Road Striping Base -
Gatlinburg Bypass Road
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
00030 Road Striping Additive Item -
Catalooche Entrance Road, Elkmont Road, and
Tremont Road
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
00040 Road Striping Additive Item -
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
Foothills Parkway Sections, Townsend Entrance
Road, and Wear Cove Gap
Product/Service Code: Z1LB
Product/Service Description: MAINTENANCE OF
HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
TABLE OF CONTENTS
PART I – The Schedule A – Solicitation Form B – Bid Schedule
Price Schedule C - Description/Specifications D - Packaging and Marking E - Inspection and Acceptance
Inspection of Construction F - Deliveries or Performance
Commencement, Prosecution, and Completion of Work Performance of Work by the Contractor Suspension of Work
G - Contract Administration Data Administration Contacts Technical Direction Correspondence, Contract Payments, and Job Site Administration Subcontracting …………
H - Special Contract Requirements EO-Prohibition of Text Messaging While Driving Safety, Progress Meetings, and Payroll Operation of Facility During Construction, Work Hours……………………………… Use of Premises, Disposal, and Permits Quality of Work, Completion of Work, and Material Approval Submittals Archeological Findings……..……………………………………………………………………………………………………… 12 DOI Electronic Invoicing and Payment Requirements (IPP)
PART II - Contract Clauses I - Contract Clauses
Clauses Incorporated by Reference Release of Claims Liability Insurance
PART III - List of Documents, Exhibits, and Other Attachments J - List of Attachments PART IV - Representations and Instructions K - Representations, Certifications, and Other Statements of Bidders
Predecessor of Offeror ……………………………………………………………………………………………………………. 32 Federal Acquisition Supply Chain Security Act Orders – Representation and Disclosures ………… 32 Information Regarding Responsibility Matters ………………………………………………………………………… 34 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certification …………………………………………………………………… 35 Preparation of Proposals
L - Instructions, Conditions, and Notices to Bidders Technical Proposal Submission, Past Performance Cost Proposal, and Proposal File Format Use and Disclosure of Proposal Information ……… Service of Protest Site Visit (Construction) Solicitation Provisions Incorporated by Reference …………………………………………………………………… 37
M - Evaluation Factors for Award Evaluation Factors for Award
A – Solicitation Form
PROJECT TITLE: Road Striping
SITE LOCATION: Great Smoky Mountains National Park (GRSM)
NOTICE TO PROSPECTIVE OFFERORS
This solicitation is being set aside as a Service-Disabled Veteran Owned Small Business competitive action.
Bidding contractors must have this designation in their SAM.gov registration. If in review it is determined they lack this designation, the submitted proposal will be removed from consideration.
SUBMISSION OF DOCUMENTS: Your offer must include the following documentation and information:
1. Completed SF-1442
2. Technical Proposal
3. Capabilities and Experience
4. Subcontractor Use and Work History Together
5. Past Performance Questionnaires
6. Cost Proposal to include breakdown of the prime and subcontractor costs
PLEASE NOTE: The SF-1442 must be signed, and dated, and Blocks 14 through 20c must be completed.
SF-1442, ITEM 17, Offeror is cautioned to review acceptance time stated in Item 13d before completing this item. Proposals offering less than specified time will cause proposal to be rejected.
SUBMIT AN OFFER TO THE FOLLOWING EMAIL: marilia_mateo@ios.doi.gov
BONDING – Successful offeror will be required to furnish Performance and Payment bonds on Standard Forms 25 and 25A based on total contract amounts in the following ranges: 100 percent performance bond, 100 percent payment bond. Offerors are now advised that the Government will inspect, accept, and take possession of completed work and release the bonding on completion/acceptance of the work per FAR 28.203-5. Site
Superintendent for the project must be the prime contractor’s employee. No Exceptions will be made.
No site visit will be scheduled for this solicitation. All offerors shall prepare their proposals based solely on the information contained in the solicitation and any amendments issued.
Submit all questions regarding this solicitation to the Contracting Officer via email. You must submit questions by July 30, 2026, by 4:00 p.m. ET with subject line: “Questions 140P5326R0022”. Questions submitted after this time may NOT be considered. Answers to the questions submitted in writing will be posted to the solicitation as an amendment on or around August 6, 2026.
PROPOSALS ARE DUE August 17, 2026, AT 4:00 p.m. ET.
B – Bid Schedule mailto:marilia_mateo@ios.doi.gov
The contractor should provide all labor, parts, tools, equipment, supervision, and all incidentals necessary for the roadway striping and components within GRSM per the attached statement of work documentation.
Price Schedule
Proposal Submittal Instructions:
All proposals shall follow the RS Means, Master Format, WBS with costs broken down by Division 1 through 50 as applicable. Proposals shall also include a price for both the Total Direct Construction Cost (cost minus any markups) and the Total Net Construction Cost. Markups shall be broken down to include overhead, profit, bonding, and other as applicable. Sales taxes are not applicable.
Contract Line-Item Number
Contract Line Item
Quantity
Unit of measure
Unit Price
Total Price
010 BASE – Newfound Gap and Laurel Creek 1 Lump Sum
020 BASE – Gatlinburg Bypass Road 1 Lump
030 ADDITIVE ITEM – Catalooche Entrance Road, Elkmount Road, and Tremont Road
1 Lump
040 ADDITIVE ITEM – Foothills Parkway Sections, Townsend Entrance Road, and
Wear Cove Gap
1 Lump
TOTAL BASE PRICE:
TOTAL ADDITIVE PRICE:
TOTAL CONTRACT PRICE:
ESTIMATED COMPLETION DATE:
NOTE: Contractors must submit a complete cost breakout that includes both prime contractor and any applicable subcontractor pricing with their cost proposal. Overhead and profit must be a separate line item.
C – Specifications and Drawings
Statement of Work Attachment 001
D - Packaging and Marking
Payment and Postage Fees
All postage and fees related to submitting information forms, reports, etc., to the Contracting Officer (CO), Contract Specialist (CS), or the Contracting Officer’s Representative (COR) shall be paid by the contractor.
Marking
All information submitted to the CO, CS, or the COR shall clearly indicate the contract’s Contract Number for which the information is being submitted.
E - Inspection and Acceptance
52.246-12 Inspection of Construction. (AUG 1996)
F - Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar days after issuance of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-13 Time Extensions. (SEP 2000)
52.211-18 Variation in Estimated Quantity. (APR 1984)
52.242-14 Suspension of Work. (APR 1984)
G - Contract Administration Data Contracting Officer’s Representative (COR) for this contract will be determined at time of award.
Contracting Officer responsible for administering this contract:
Marilia Mateo Contracting Officer
National Park Service Con Ops East, South MABO
Work: (470) 819-0933 Marilia_Mateo@ios.doi.gov
Technical Direction
The performance of the required work shall be subject to the COR’s or designee’s technical direction and surveillance. As used herein, “technical direction” is direction to the Contractor which requires pursuit of certain lines of inquiry, filing in detail or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:
(a) Must be issued in writing consistent with the general scope of the work set forth in the contract.
(b) May not constitute a new assignment of work changes to the expressed terms, conditions, or specifications incorporated into this contract.
(c) Shall not constitute a basis for extension of the contract delivery schedule.
Nothing contained in this part authorizes the Contractor to incur costs more than the contract price or other limitations of funds set forth in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by representatives of the CO, unless before commencing such work, the Contractor:
1) directly notifies the CO.
2) requests a formal contract modification.
3) receives written authorization to proceed from the CO.
Correspondence
Any correspondence initiated by the Contractor shall include the Contract Number and shall be addressed to the Contracting Officer via email.
Contract Payments
The Contractor shall submit invoices to the COR for the percentage of work completed. Contractor and COR at the site must agree on the percentage of work completed.
Job Site Administration
The COR will be available at the site to inspect the work as it progresses. The COR is not authorized to make technical decisions or give technical directions. The Contractor or the Contractor’s Superintendent must contact the COR about the decisions and directions.
The Contractor shall have a competent superintendent (the “Contractor’s Superintendent”) who is (1) deemed acceptable to the Government; (2) authorized to act on the Contractor’s behalf; and (3) to always be present on the job site when contract work is being performed.
Subcontracting
The Prime Contractor shall complete a Standard Form (SF1413) for each subcontractor and submit the form to the Contracting Officer. No subcontractor shall be allowed on the site without an executed SF 1413. The Prime shall be held responsible for ensuring that their subcontractor’s DO NOT subcontract any portion of this work. The Prime Contractor is responsible to ensure that all subcontractors carry sufficient insurance in accordance with this contract.
H - Special Contract Requirements
Executive Order 13513 Prohibition on Text Messaging and Using Electronic Equipment supplied by the Government While Driving as Prescribed in Federal Leadership on Reducing Text Messaging While Driving
Prohibition on text messaging and using electronic equipment supplied by the Government while driving (OCT 2009)
This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government –supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government.
(End of order)
Safety
The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s) thereof; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA); Emergency Planning and Community Right- to-Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).
Progress Meetings
(a) The Contractor shall be available to meet with the CO or his/her representative at the job site during construction to discuss work progress.
(b) Meetings will be scheduled by the CO with timely notification to the Contractor.
(c) At the progress meetings, the Contractor shall give oral reports of the progress on the project to the CO. If the work is behind schedule, the Contractor shall be prepared to:
(i) discuss the work and any causes of work delay(s);
(ii) present a plan to bring the work back into conformance with the schedule; or, if necessary
(iii) to propose a revised work schedule.
Payrolls
The Contractor must furnish copies of his weekly payrolls to the CO. Payroll submission is required weekly, seven calendar days after the payroll period closes.
Operation of Facility During Construction
Construction activities must not interrupt the function and the facility’s daily operations during construction.
The contractor must coordinate with the COR for any temporary measures. All temporary measures employed shall be at the Contractor’s expense and shall be removed upon completion of the contract.
Work Hours
Normal work hours are from 7:30 a.m. through 4:00 p.m., Monday through Friday. Contractor will not be permitted to work at the job site on Saturday, Sunday, or legal holidays unless the CO authorized otherwise.
Use of Premises
(a) Before any location, other than shown in the photos or during the site visit, is accessed, written permission shall be obtained through the Contracting Officer. Such permission, if granted, will be without charge to the Contractor.
(b) Unless provided otherwise, the Contractor shall provide and maintain a sanitary working environment for the workforce at the site. Solid waste shall be disposed of in accordance with applicable federal, state, and local regulations.
Maximum Work Week
The maximum work week that will be approved is 40 hours. The Contractor’s proposed hours of work are to include daily starting and stopping times.
Excavation and Utility Clearances
The Chief of Maintenance, for each park, shall ensure that the Contractor is provided with necessary excavation and utility clearances. The Contractor shall request such clearances and staking in writing to the Contracting Officer no less than ten (10) calendar days before the date which he/she anticipates commencement of work. The Contractor will not proceed with excavation of any kind until such clearances have been issued. Clearances will be valid from the date of issue or completion of or otherwise directed by the issuing authority.
Disposal
Contractors will dispose of all debris, rubbish and non-useable material from the site and all federal property in a manner that meets federal, state, county, and local laws.
Contractor Employees
(a) The Contractor shall provide the Contracting Officer with the name of the responsible supervisor authorized to act for the Contractor.
(b) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.
(c) Contractor employees shall conduct themselves properly, efficiently, courteously, and professionally.
(d) The Contractor shall remove from the site any individual whose continued employment is deemed by the contracting officer to be contrary to public interest or inconsistent with the National Park Service.
Permits
The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required to perform work under this contract. The contractor shall follow federal, state, and local laws. Evidence of such permits and licenses shall be provided to the CO before work commences, or as requested. The contractor will always display the permits and license on the job site.
Quality of Work
Workmanship shall be of the highest quality and best practices of the trade. Contractor shall conform to all requirements of the state and county code, ANSI A 10.6 and applicable codes of the National Fires Protection Association. All replacement materials shall conform to the manufacturer specifications and standards.
Substitute items shall be equal to or better that the original material and must be approved by the Government.
Completion of Work
The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause “Commencement, Prosecution and Completion of Work”, FAR 52.211-10 (APR 1984) Section F.
Material Approval Submittals
The submittals contemplated by the clause herein entitles “Materials and Workmanship”, FAR 52.236-5 (APR 1984), Section I, shall be submitted to the Contracting Officer through the COR in 5 copies. The Denver Service Center Form (DSC-1) entitled “Transmittal USDI, National Park Service”, shall be used. Contractor shall re-submit any disapproved submittals within 7 calendar days of disapproval.
Archeological Findings
Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed and only by the Government. Should Contractor’s operations uncover, or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he will be compensated by an equitable adjustment under the General Provision of the Contract.
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: COR approved invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.
The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions https://www.ipp.gov/ via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
I - Contract Clauses
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. On request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/
1452.201-70 Authorities and Delegations (SEP 2011)
1452.203-70 Restrictions on Endorsements (JUL 1996)
1452.215-70 Examination of Records by the Department of the Interior (APR 1984)
1452.224-1 Privacy Act Notification (JUL 1996) Deviation
1452.236-70 Prohibition Against Use of Lead-based Paint (JUL 1996)
52.201-1 Acquisition 360: Voluntary Survey (SEP 2023)
52.202-1 Definitions (JUN 2020)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-7 Anti-Kickback Procedures. (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
52.203-16 Preventing Personal Conflicts of Interest. (JUN 2020)
52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)
52.204-1 Approval of Contract. (DEC 1989)
This contract is subject to the written approval of the Contracting Officer and shall not be binding until so approved.
https://www.acquisition.gov/
(End of clause)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020)
52.204-13 System for Award Management Maintenance. (OCT 2018)
52.204-14 Service Contract Reporting Requirements. (OCT 2016)
52.204-18 Commercial and Government Entity Code Maintenance. (AUG 2020)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.204-30 Federal Acquisition Supply Chain Security Act Orders-Prohibition. (DEC 2023)
(a) Definitions. As used in this clause-
Covered article, as defined in 41 U.S.C. 4713(k), means-
(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;
(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 (47 U.S.C. 153);
(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002);
or
(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.
FASCSA order means any of the following orders issued under the Federal Acquisition Supply Chain Security Act (FASCSA) requiring the removal of covered articles from executive agency information systems or the exclusion of one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201-1.303(d) and (e):
(1) The Secretary of Homeland Security may issue FASCSA orders applicable to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.
(2) The Secretary of Defense may issue FASCSA orders applicable to the Department of Defense (DoD) and national security systems other than sensitive compartmented information systems. This type of FASCSA order may be referred to as a DoD FASCSA order.
(3) The Director of National Intelligence (DNI) may issue FASCSA orders applicable to the intelligence community and sensitive compartmented information systems, to the extent not covered by paragraph (2) of this definition. This type of FASCSA order may be referred to as a DNI FASCSA order.
Intelligence community, as defined by 50 U.S.C. 3003(4), means the following-
(1) The Office of the Director of National Intelligence;
(2) The Central Intelligence Agency;
(3) The National Security Agency;
(4) The Defense Intelligence Agency;
(5) The National Geospatial-Intelligence Agency;
(6) The National Reconnaissance Office;
(7) Other offices within the Department of Defense for the collection of specialized national intelligence through reconnaissance programs;
(8) The intelligence elements of the Army, the Navy, the Air Force, the Marine Corps, the Coast Guard, the Federal Bureau of Investigation, the Drug Enforcement Administration, and the Department of Energy;
(9) The Bureau of Intelligence and Research of the Department of State;
(10) The Office of Intelligence and Analysis of the Department of the Treasury;
(11) The Office of Intelligence and Analysis of the Department of Homeland Security; or
(12) Such other elements of any department or agency as may be designated by the President, or designated jointly by the Director of National Intelligence and the head of the department or agency concerned, as an element of the intelligence community.
National security system, as defined in 44 U.S.C. 3552, means any information system (including any telecommunications system) used or operated by an agency or by a contractor of an agency, or other organization on behalf of an agency-
(1) The function, operation, or use of which involves intelligence activities; involves cryptologic activities related to national security; involves command and control of military forces; involves equipment that is an integral part of a weapon or weapons system; or is critical to the direct fulfillment of military or intelligence missions, but does not include a system that is to be used for routine administrative and business applications (including payroll, finance, logistics, and personnel management applications); or
(2) Is protected at all times by procedures established for information that have been specifically authorized under criteria established by an Executive order or an Act of Congress to be kept classified in the interest of national defense or foreign policy.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of any covered articles, or any products or services produced or provided by a source. This applies when the covered article or the source is subject to an applicable FASCSA order.
A reasonable inquiry excludes the need to include an internal or third-party audit.
Sensitive compartmented information means classified information concerning or derived from intelligence sources, methods, or analytical processes, which is required to be handled within formal access control systems established by the Director of National Intelligence.
Sensitive compartmented information system means a national security system authorized to process or store sensitive compartmented information.
Source means a non-Federal supplier, or potential supplier, of products or services, at any tier.
(b) Prohibition. (1) Unless an applicable waiver has been issued by the issuing official, Contractors shall not provide or use as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA orders as follows:
(i) For solicitations and contracts awarded by a Department of Defense contracting office, DoD FASCSA orders apply.
(ii) For all other solicitations and contracts DHS FASCSA orders apply.
(2) The Contractor shall search for the phrase "FASCSA order" in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders identified in paragraph (b)(1).
(3) The Government may identify in the solicitation additional FASCSA orders that are not in SAM, which are effective and apply to the solicitation and resultant contract.
(4) A FASCSA order issued after the date of solicitation applies to this contract only if added by an amendment to the solicitation or modification to the contract (see FAR 4.2304(c)). However, see paragraph (c) of this clause.
(5)(i) If the contractor wishes to ask for a waiver of the requirements of a new FASCSA order being applied through modification, then the Contractor shall disclose the following:
(A) Name of the product or service provided to the Government;
(B) Name of the covered article or source subject to a FASCSA order;
(C) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied or supplies the covered article or the product or service to the Offeror;
(D) Brand;
(E) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);
(F) Item description;
(G) Reason why the applicable covered article or the product or service is being provided or used;
(ii) Executive agency review of disclosures. The contracting officer will review disclosures provided in paragraph (b)(5)(i) to determine if any waiver is warranted. A contracting officer may choose not to pursue a waiver for covered articles or sources otherwise covered by a FASCSA order and to instead pursue other appropriate action.
(c) Notice and reporting requirement.
(1) During contract performance, the Contractor shall review SAM.gov at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (b) of this clause.
(2) If the Contractor identifies a new FASCSA order(s) that could impact their supply chain, then the Contractor shall conduct a reasonable inquiry to identify whether a covered article or product or service produced or provided by a source subject to the FASCSA order(s) was provided to the Government or used during contract performance.
(3)(i) The Contractor shall submit a report to the contracting office as identified in paragraph (c)(3)(ii) of this clause, if the Contractor identifies, including through any notification by a subcontractor at any tier, that a covered article or product or service produced or provided by a source was provided to the Government or used during contract performance and is subject to a FASCSA order(s) identified in paragraph (b) of this clause, or a new FASCSA order identified in paragraph (c)(2) of this clause. For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order.
(ii) If a report is required to be submitted to a contracting office under (c)(3)(i) of this clause, the Contractor shall submit the report as follows:
(A) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil. 17
(B) For all other contracting offices, the Contractor shall report to the Contracting Officer.
(4) The Contractor shall report the following information for each covered article or each product or service produced or provided by a source, where the covered article or source is subject to a FASCSA order, pursuant to paragraph (c)(3)(i) of this clause:
(i) Within 3 business days from the date of such identification or notification:
(A) Contract number;
(B) Order number(s), if applicable;
(C) Name of the product or service provided to the Government or used during performance of the contract;
(D) Name of the covered article or source subject to a FASCSA order;
(E) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied the covered article or the product or service to the Contractor;
(F) Brand;
(G) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);
(H) Item description; and
(I) Any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (c)(4)(i) of this clause:
(A) Any further available information about mitigation actions undertaken or recommended.
(B) In addition, the Contractor shall describe the efforts it undertook to prevent submission or use of the covered article or the product or service produced or provided by a source subject to an applicable FASCSA order, and any additional efforts that will be incorporated to prevent future submission or use of the covered article or the product or service produced or provided by a source that is subject to an applicable FASCSA order.
(d) Removal. For Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that is subject to an applicable FASCSA order.
(e) Subcontracts.
(1) The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (c)(1) of this clause, in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products and commercial services.
(2) The Government may identify in the solicitation additional FASCSA orders that are not in SAM, which are effective and apply to the contract and any subcontracts and other contractual instruments under the contract.
The Contractor or higher-tier subcontractor 18 shall notify their subcontractors, and suppliers under other contractual instruments, that the FASCSA orders in the solicitation that are not in SAM apply to the contract and all subcontracts.
(End of clause)
52.208-9 Contractor Use of Mandatory Sources of Supply or Services. (MAY 2014)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (JAN 2025)
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. (NOV 2015)
52.215-2 Audit and Records - Negotiation. (JUN 2020)
52.217-5 Evaluation of Options (JUL 1990)
52.217-8 Option to Extend Services (NOV 1999)
52.219-8 Utilization of Small Business Concerns. (JAN 2025)
52.219-14 Limitations on Subcontracting. (JAN 2026)
52.219-27 Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024)
52.219-28 Postaward Small Business Program Rerepresentation. (JAN 2025)
52.219-33 Nonmanufacturer Rule. (SEP 2021)
52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)
52.222-3 Convict Labor. (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation. (MAY 2018)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (JUL 2021)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-35 Equal Opportunity for Veterans. (JUN 2020)
52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020)
52.222-37 Employment Reports on Veterans. (JUN 2020)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010)
52.222-50 Combating Trafficking in Persons. (OCT 2025)
52.222-54 Employment Eligibility Verification. (JAN 2025)
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (JAN 2022)
(DEVIATION MAY 2026)
As prescribed in 22.1906 , insert the following clause:
Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022)
(a) Definitions. As used in this clause— United States means the 50 states, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.).
Worker – (1)
(i) Means any person engaged in performing work on, or in connection with, a contract covered by Executive Order 14026, and–
(A) Whose wages under such contract are governed by the Fair Labor Standards Act (29 U.S.C. chapter 8), the Service Contract Labor Standards statute (41 U.S.C. chapter 67), or the Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV);
(B) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541; and
(C) Regardless of the contractual relationship alleged to exist between the individual and the employer.
(ii) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).
(iii) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor’s Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.
(2)
(i) A worker performs on a contract if the worker directly performs the specific services called for by the contract; and
(ii) A worker performs in connection with a contract if the worker's work activities are necessary to the performance of a contract but are not the specific services called for by the contract.
(b) Executive Order Minimum wage rate.
(1) The Contractor shall pay to workers, while performing in the United States, and performing on, or in connection with, this contract, a minimum hourly wage rate of $15.00 per hour beginning January 30, 2022.
(2) The Contractor shall adjust the minimum wage paid, if necessary, beginning January 1, 2023, and annually thereafter, to meet the applicable annual E.O. minimum wage. The Administrator of the Department of Labor’s Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on https://www.sam.gov (or any successor website), and a general notice on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, that will provide information on the E.O. minimum wage and how to obtain annual updates. The applicable published E.O. minimum wage is incorporated by reference into this contract.
(3)
(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O.
minimum wage determination. Prices will be adjusted only for increased labor costs (including subcontractor labor costs) as a result of an increase in the annual E.O. minimum wage, and for associated labor costs (including those for subcontractors).
Associated labor costs shall include increases or decreases that result from changes in social security and unemployment taxes and workers’ compensation insurance, but will not otherwise include any amount for general and administrative costs, overhead, or profit.
(ii) Subcontractors may be entitled to adjustments due to the new minimum wage, pursuant to paragraph (b)(2). Contractors shall consider any subcontractor requests for such price adjustment.
(iii) The Contracting Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (b)(3)(i) of this clause, and will not provide duplicate price adjustments with any price adjustment under clauses implementing the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.
(4) The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
(5) A pay period under this clause may not be longer than semi-monthly, but may be shorter to comply with any applicable law or other requirement under this contract establishing a shorter pay period. Workers shall be paid no later than one pay period following the end of the regular pay period in which such wages were earned or accrued.
(6) The Contractor shall pay, unconditionally to each worker, all wages due free and clear without subsequent rebate or kickback. The Contractor may make deductions that reduce a worker’s wages below the E.O.
minimum wage rate only if done in accordance with 29 CFR 23.230, Deductions.
(7) The Contractor shall not discharge any part of its minimum wage obligation under this clause by furnishing fringe benefits or, with respect to workers whose wages are governed by the Service Contract Labor Standards statute, the cash equivalent thereof.
(8) Nothing in this clause shall excuse the Contractor from compliance with any applicable Federal or State prevailing wage law or any applicable law or municipal ordinance or any applicable contract establishing a minimum wage higher than the E.O. 14026 minimum wage. However, wage increases under such other laws or municipal ordinances are not subject to price adjustment under this subpart.
(9) The Contractor shall pay the E.O. minimum wage rate whenever it is higher than any applicable collective bargaining agreement(s) wage rate.
(10) The Contractor shall follow the policies and procedures in 29 CFR 23.240(b) and 23.280 for treatment of workers engaged in an occupation in which they customarily and regularly receive more than $30 a month in tips.
(c)
(1) This clause applies to workers as defined in paragraph (a). As provided in that definition–
(i) Workers are covered regardless of the contractual relationship alleged to exist between the contractor or subcontractor and the worker;
(ii) Workers with disabilities whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c) are covered; and
(iii) Workers who are registered in a bona fide apprenticeship program or training program registered with the Department of Labor’s Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship, are covered.
(2) This clause does not apply to–
(i) Fair Labor Standards Act (FLSA)-covered individuals performing in connection with contracts covered by the E.O., i.e. those individuals who perform duties necessary to the performance of the contract, but who are not directly engaged in performing the specific work called for by the contract, and who spend less than 20 percent of their hours worked in a particular workweek performing in connection with such contracts;
(ii) Individuals exempted from the minimum wage requirements of the FLSA under 29 U.S.C. 213(a) and 214(a) and (b), unless otherwise covered by the Service Contract Labor Standards statute, or the Wage Rate Requirements (Construction) statute. These individuals include but are not limited to-
(A) Learners, apprentices, or messengers whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(a) ;
(B) Students whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(b) ; and
(C) Those employed in a bona fide executive, administrative, or professional capacity (29 U.S.C. 213(a)(1) and 29 CFR part 541).
(d) Notice. The Contractor shall notify all workers performing work on, or in connection with, this contract of the applicable E.O. minimum wage rate under this clause.