A04_40585451_Scope_of_Work.docx

DOCX document 119 KB Posted

Attached to
Plan, Design & Fabricate Wade Curtis Exhibit Federal contract opportunity
Solicitation number
140P1422Q0072
Issued by
Department of the Interior National Park Service Intermountain Region

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service | Standard Exhibit Planning, Design, and Fabrication Specifications

SCOPE OF WORK

EXHIBIT DESIGN-BUILD SERVICES

WADE AND CURTIS CABIN EXHIBITS

8810 County Road 34, Maybell, CO 81640

1. PROJECT BACKGROUND

Dinosaur National Monument (DINO) is located on the southeast flank of the Uinta Mountains on the border between Colorado and Utah at the confluence of the Green and Yampa Rivers.

Its 211,000 acres encompass six distinct ecological zones and nearly one billion years of geologic time. Given the scale of time along with the complexity and remoteness of much of Dinosaur National Monument, it is difficult for most visitors to understand and appreciate many of the significant resources and stories of the monument on their own.

Gates of Lodore is a lightly developed area on the northern end of the monument. It is located approximately 80 miles from Craig, CO, the closest community with basic services It is the launch point for visitors who are rafting the Canyon of Lodore on the Green River. Visitors who raft or boat on the river are either on private, non-commercial trips or organized commercial trips operated by one the monument’s concessioners. At Gates of Lodore, there is a ranger station, campground, and boat launch point. Near the boat launch is the historic Wade and Curtis cabin which was used for many years as volunteer housing. The monument recently secured funding to restore/rehabilitate the small cabin as a visitor facility. This project will design and construct new exhibits to go into the rehabilitated cabin and outdoor exhibits near the boat ramp. These exhibits will provide an improved visitor experience to the area and introduce visitors to the general themes/resources that visitors will encounter on their river trips. This includes brief introduction to the river and canyon geology, ecology, and human history. It will also provide key safety messages for visitors launching on river trips.

The Wade and Curtis Cabin is listed as a historic structure on the National Register of Historic Places. A cabin rehabilitation project, which will remove non historic elements and modify the entrance to allow for accessibility, is planned for 2023, and will need to be coordinated with the new exhibits. Exhibits will need to be designed and installed in a way to not impact the historic fabric of the structure. Electricity for lighting and a couple of outlets is the only planned utility service that will be available in the restored cabin. Heating and cooling will not be available. Any materials or adhesives used will need to withstand heat and cold typical of northwest Colorado (-20 F in winter and 100 F in summer). The facility will not be staffed and visitors will be unmonitored when they are in the facility. Materials used in any exhibit panels, models, or replicas will need to be vandalism resistant. Gates of Lodore receives on average 10,000 – 13,000 visitors per year.

2. GENERAL REQUIREMENTS.

The project shall be the planning, design, fabrication, and installation of new exhibits for the historic Wade and Curtis Cabin at Dinosaur National Monument (DINO) approximately 50 miles from Maybell, Colorado and 80 miles from Craig, Colorado. The project includes coordination with the Contracting Officer (CO), Contracting Officer’s Representative (COR), monument staff and nearby affiliated tribes.

The contractor shall provide all services including labor, materials, facilities, and travel necessary to plan, design, fabrication, transport to site, and install all exhibit elements for the Wade and Curtis Cabin in accordance with the specifications as detailed in this contract and its attachments. Work shall include the planning, design, fabrication, and installation of all exhibit structures, graphic layouts, interactive elements, artwork, historical vignettes, sculpted models, and lighting design. Work shall also include comprehensive research for obtaining all necessary reference information and materials to design, specify, and provide comprehensive reference material for all the models, props, and artwork required in this contract. Work requires coordination, through the Contracting Officer’s Representative (COR), with staff at the monument, and Historic Preservation Training Center staff to coordinate the exhibit design/build effort with any necessary building infrastructure improvements. Work shall also accommodate the participation of the park’s affiliated American Indian tribes in the exhibit planning and design process. The monument is responsible for the removal of existing exhibits.

All work under this contract shall be performed in accordance with the terms herein, including all attachments. The government shall furnish, as appropriate, required data, materials, and access to project information necessary to perform the production of work as required.

2.1. Point of Contact

The contractor’s Project Manager (PM) shall be the primary point of contact between the contractor and COR. The contractor’s PM shall have full authority to act for the contractor on all matters relating to this contract, and shall perform the following work:

1. Be available to take or respond to telephone calls or electronic mail messages during normal hours of operation (8:30 am–5:00 pm local time).

2. Establish office procedures to ensure that messages are relayed to the Project Manager when out of the office or because of time zone differences.

3. Respond to emergency messages from the COR on the same day they are received. All non-urgent messages from the COR shall be responded to in no more than two (2) business days.

2.2. Quality Control

The contractor shall provide quality control to ensure that all elements of project work meet the requirements of the contract specifications and that all modifications are implemented. The Project Manager shall provide routine inspections of in-house and subcontracted work to ensure it meets contract specifications and shall oversee the quality of work produced and implemented at all phases of the project. Any work found not acceptable or compliant with the specifications shall be corrected prior to inspection or review by the COR.

2.3. Government Furnished Property

If government-furnished material is provided during the course of the contract, the contractor shall receive, inspect, and inventory all government-furnished materials and ensure that this material is forwarded to the appropriate unit or person within the contractor’s organization for use in the project. The Project Manager shall notify the COR via email within seven (7) days after receipt if government-furnished materials are not satisfactory for their intended purpose. The Project Manager shall notify the COR via email as soon as possible, but no later than three (3) business days, if government- furnished materials are lost or damaged while in the contractor’s possession. The contractor shall be responsible for the security and protection of government-furnished property or materials in connection with this contract. Following acceptance of all work by the government, the contractor shall return to the COR all government-furnished property.

2.4. Schedule

The contractor shall schedule, coordinate, oversee, and manage work produced and installed under this contract. Track work progress to ensure that the project is completed according to the schedule. Coordinate and confirm the dates for all submittals and meetings with the COR.

2.4.1 Status Reports

Provide a monthly status report to the COR that includes the status of the project, issues that affect the schedule and budget, and an updated schedule based on the information at hand.

2.4.2 Project Schedule

The contractor shall produce a detailed, complete project schedule listing all required submittals and their review times. The project schedule shall also include site visits, shop inspections, installation activities, and closeout submittals.

The contractor shall submit a preliminary project schedule to the COR for review and approval seven (7) working days prior to the post award meeting. The contractor shall update the approved schedule and resubmit to the COR three (3) working days prior to every project status meeting for the life of the project.

2.4.3 Installation Schedule

The contractor shall coordinate and confirm dates with the COR for shipment, delivery, and installation at the exhibit site.

2.5. Meetings, Travel, and Presentations

Meet with the CO, COR, and park staff as specified below. The contractor shall document all issues discussed and decisions made relative to the project. The contractor shall prepare and distribute to the COR a trip report or meeting minutes of all telephone conversations, site visits, in-person meetings, or other discussions related to the project.

Meeting Purpose
Location or Type
Required Contractor

Attendees Duration/Days on site

Project coordination, planning, comment discussion and reconciliation
Conference Call or Virtual Meeting
Project Manager, Exhibit Developer, and Exhibit Designer
Bi-weekly, 1-hour meetings

(or as needed)

Post-award meeting and Pre-design
At Park
Project Manager, Exhibit Developer, and Exhibit Designer
Three, 8-hour days, includes site visit to cabin
Schematic Design
At Park
Project Manager, Exhibit Developer, Exhibit Designer
Three, 8-hour days
Schematic Design 2
Virtual Meeting
Project Manager, Exhibit Developer, and Exhibit Designer
One, 2-hour meeting
Design Development 1
At park
Project Manager, Exhibit Developer, and Exhibit Designer
Two, 8-hour days
Design Development 2
Virtual Meeting
Project Manager, Exhibit Developer, and Exhibit Designer
One, 3-hour meeting
Design Development 3
At Park
Project Manager, Exhibit Developer, and Exhibit Designer
Two, 8-hour days
Production Design 1
Virtual Meeting
Project Manager, Exhibit Developer, and Exhibit Designer
One, 2-hour meeting
Production Design 2 field verification visit
At Park
Project Manager
One, 8-hour day
Production Design 2 Presentation
Virtual Meeting
Project Manager, Exhibit Developer, and Exhibit Designer
One, 2-hour meeting
Production Support Meetings
Conference Call or Virtual Meeting
Project Manager, and Exhibit Designer
Six, 1-hour meetings
Preliminary Shop Inspection
At contractor facility
Project Manager, and Exhibit Designer
Two, 8-hour days
Final Shop Inspection
At contractor facility
Project Manager
One, 8-hour day
Primary Installation
At Park
Project Manager, and Installation Crew (TBD)
TBD
Audio Description Installation
At Park
Project Manager, and Audio Describer
One, 8-hour day

2.6. Submittals

At any point in the exhibit planning and design process the COR may require informal submittals of the contractor’s work-in-progress to document the current status and level of production of the project.

The contractor shall coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward all submittals to the COR for review and approval. Receive all reviewed submittals and take appropriate action according to the approval or rejection by the COR, as follows:

2.6.1 Acceptance and Rejections

1. Accepted Submittals – The contractor shall ensure that all changes, revisions, or additions required by review comments are addressed and incorporated into future submittals.

2. Rejected Submittals - When submittals are rejected, the COR will notify the contractor, in writing, identifying the reasons for rejection. The contractor shall ensure that the submittal is completed and/or revised as required and resubmitted within the time scheduled by the COR. Reasons for rejection include:

· Incomplete Submittals – Acceptance of the submittal is delayed because required elements are missing. The contractor shall submit all missing elements.

· Unacceptable Submittals – The submittal is rejected due to poor quality of work or work that does not otherwise meet the established project goals. The contractor shall submit new material.

2.6.2. Submittal Format

1. Three (3) printed copies and one (1) electronic PDF copy of each document submittal is required.

2. Two (2) copies of graphic prints and material samples are required.

3. One (1) physical sample of models, mock-ups, and prototypes is required.

4. Submittals shall be sent via overnight delivery service unless otherwise specified in the scope of work below.

5. Both printed and electronic submittals shall be delivered seven (7) calendar days prior to scheduled presentation of material.

6. Any Microsoft Office submittals shall be provided in an accessible 508-compliant format.

2.6.3. Transmittal Sheet

The contractor shall include a transmittal in the form of a printed letter, PDF document, e-mail, or fax cover sheet along with all samples, proofs, prints, reports, digital files, digital images, and multimedia files, sent from the contractor to the COR. This includes all copies sent to the park or other copied recipients.

The transmittal shall include the following information:

· "From" (Contractor's name and contact information);

· "To" (COR's name);

· Date submittal was shipped;

· Project name and park name;

· Itemized list of contents; and

· List of copied recipients who received the same submittals.

2.7. Accessibility

Exhibits planned, designed, and fabricated for the National Park Service shall follow the latest published version of Attachment 4, Programmatic Accessibility Guidelines for National Park Service Interpretive Media. These Guidelines are a combination of best practices, NPS and Department of the Interior directives, and federal laws. Federal laws include the Architectural Barriers Act, Sections 504 and 508 of the Rehabilitation Act as amended, and the 21st Century Communications and Video Accessibility Act. The contractor shall be aware of and pursue principles of universal design throughout all phases of the design build process. Universally designed exhibits and environments can be accessed, understood, utilized and appreciated to the greatest extent possible by all users regardless of ability. Universal designs reflect not only accommodations to select groups, but approaches that are broadly inclusive and integrated into a larger whole to the benefit of all users. Principles of Universal design are detailed in Appendix C of Attachment 4, Programmatic Accessibility Guidelines for National Park Service Interpretive Media Accessibility requirements for visitors with specific disabilities shall be addressed within the designed and built exhibits. If the site or criteria of the project do not address accessibility as defined in the attachments, pose challenges to accessibility, a full description of required corrective actions shall be provided to the COR of the accessibility solutions. See Attachment 4, Programmatic Accessibility Guidelines for National Park Service Interpretive Media for requirements addressed under specific disabilities.

2.8 Design Parameters

The contractor shall plan and design exhibits for the Wade and Curtis Cabin in accordance with the project attachments, in close consultation with the COR and project subject matter experts, and the following:

2.8.1 Space Allocation

The contractor shall comprehensively evaluate the Wade and Curtis Cabin’s floorplan and pursue space alternatives with the goals of improving visitor flow, improving the interpretive experience, and improving the spatial and functional relationship between the exhibits.

The planning and design under this contract covers approximately 385 square feet of the Wade and Curtis Cabin’s interior space and approximately 200 square feet of the outdoor area including building signage. The distribution of the exhibit area and visitor services is not limited to its current configuration.

Specifically, the contractor shall plan and design the following areas in accordance with Attachment 13: DINO Wade and Curtis Cabin Space Allocation Plan and as follows:

· Primary Exhibit Area (approximately 385 sq. ft.)

· Outdoor Exhibit Area (approximately 200 sq. ft.)

2.8.2 Themes

The contractor shall work with the park to refine the following themes described below, into exhibit themes which shall inform the exhibit design:

1. Dinosaur National Monument’s scenic river canyons, world-class geologic resources, and biological diversity provide opportunities for people to encounter uncrowded wild landscapes and environments, understand and appreciate the complexity of ecosystems, contemplate their place in nature, and renew their sense of well-being.

2. The Green and Yampa Rivers serve as living laboratories in the Colorado River system to demonstrate the difference between controlled and natural-flowing rivers and their effects on ecosystems and their inhabitants. These rivers illustrate the past, present, and future struggles over how to manage life-sustaining water in the arid West.

3. For thousands of years, humans found both homes and challenges in the rugged and remote landscape of Dinosaur National Monument. Abundant cultural resources and rich histories allow reflection upon the kinship between ancient and modern cultures; the exploration, continuous occupation and use of this area; and the intertwined relationships of people and their environments in their quest for survival, discovery, and adventure.

4. In the 1950s, Echo Park’s wild beauty inspired and galvanized leaders in the conservation movement to defeat a proposal to build dams within Dinosaur National Monument. Their efforts not only protected the sanctity of the national park idea and marked a first step in the eventual passage of the Wilderness Act, but also continue to frame discussion over the use and stewardship of public lands.

2.8.3 Use Rights

The contractor shall acquire use rights and production quality copies of all third-party images and other intellectual property (IP) required to produce the graphic layouts in the exhibit as specified in Attachment 1, Exhibit Planning, Design, and Fabrication Specifications, Section 17. The contractor shall budget 10% of the planning and design budget for acquisition of use rights and production quality images and other IP used in the exhibits.

This will be a not-to-exceed (NTE) contract line item (CLIN) for the acquisition of images and usage rights, not including labor. All costs associated with this work will be reimbursed on an actual cost basis. Back up information will be required with invoices requesting payment for this work.

2.8.4 Production Budget

For this project, the contractor shall design to a Production Budget between $96,000 - $126,000.

1. The Production Budget shall include:

a. All costs for purchasing, fabricating, transporting, and installing all exhibit elements as specified in Attachment 1: Exhibit Planning, Design, and Fabrication Specifications and its references.

b. Related fabrication costs: project management, shop drawings, samples, packing, shipping, and project closeout.

c. Acquisition and installation of all exhibit-specific lighting.

d. Production of original artwork: illustrations, maps, and photographs.

e. Production or acquisition of all custom elements: topographic maps, architectural models, custom electronic elements, exhibit lighting, mechanical and electromechanical devices.

f. Production of the Exhibit Audio Description program, including script development and hardware purchase and installation.

1. The Production Budget shall not include:

a. Purchase and installation of house and architectural lighting.

b. Related infrastructure improvements such as carpet, paint, and electrical wiring.

3. DESIGN/BUILD SERVICES

3.1. General

The contractor shall provide all technical, professional, non-personal services, including all labor, materials, equipment, supplies, facilities, travel, management, and supervision necessary to provide DINO with exhibit design/build services for the Wade and Curtis Cabin. Work includes: the development of Schematic Design 1 & 2; Design Development 1, 2, & 3; Production Design; Production Support; Pre-Fabrication and Fabrication; Shop Inspections; Building Preparation; Installation; Primary Installation, Punch List, and Audio Description; and Closeout.

3.1.1. Specifications

The contractor shall perform all services required hereunder in accordance with this Statement of Work (SOW) and all attachments.

3.1.2. Design Considerations

In planning, designing, and fabricating exhibits for the Wade and Curtis Cabin, the contractor shall take into account as essential design considerations the following:

· life safety;

· barrier-free design;

· accessibility/universal and programmatically accessible design;

· sustainability;

· energy conservation;

· artifact conservation including daylight modulation from skylights, windows, and doors , if applicable;

· security provisions,

· integration and compliance with existing architecture where relevant;

· functionality, maintenance, durability, and other lifecycle requirements; and

· exhibit lighting which shall:

· address artifact and energy conservation

· address sustainability and maintenance;

· meet the functional needs of visitors in the exhibits space; and

· be by default LED track lighting unless otherwise indicated by design or functional requirements and approved by the COR.

3.1.3. Codes and Standards

All exhibits shall be designed in accordance with applicable codes, standards, design parameters or regulations noted in this or other sections of this contract, and in the location in which the exhibit shall be installed. In case of conflict between codes, standards, or regulations, the most stringent requirement shall apply.

1.Reference to standard specifications of any technical society, organization, or association, or to codes, manuals, or regulations of Federal or local authorities shall mean the latest standard, code manual, regulation, specification, or tentative specification adopted and published at least thirty (30) days prior to submittal of proposals, unless specifically stated otherwise.
2.Any code, standard, regulation, or specification listed below, in the attachments or otherwise referenced herein, that references the “authority having jurisdiction”, “local authority”, or “governmental authority” shall be interpreted to refer to the Contracting Officer as being this authority for purposes of interpreting/clarifying codes, standards, regulations, and specifications.

3.1.4. Post-award Conference Call

Upon award, the contractor shall participate in a project kick-off conference call to review contracting requirements and procedures with the project CO and COR.

3.2. Pre-Design

In Pre-design, the contractor shall gain a clear understanding of the project’s history, the park’s resources, and the roles of other project team members and stakeholders. Work in this phase focuses on preparing a solid foundation for all work that follows, ensuring that the project is logically structured, and its goals are understood and realistically attainable within the budget, schedule, and other specified parameters.

The contractor shall:

1. Review government furnished materials (all contract attachments).

1. The Project Manager, Exhibit Developer, and Exhibit Designer shall travel to DINO Quarry Visitor Center, in Jensen, UT, for the post-award meeting and exhibit planning workshop. The meeting shall consist of three, 8-hour days and the contractor shall complete the following work:

a. Orientation to park experience

b. Identify and document media and object resources at park

c. Orientation to and documentation of architectural space (1 day due to travel time)

d. Conduct Exhibit Planning Workshop, including:

· Analyze space and propose recommendations

· Review existing planning documents

· Review and/or develop design criteria

e. Review and/or develop themes, goals, and objectives, including:

· Define target audience

· Define the desired visitor experience

· Document results of workshop

1. Identify sources for existing media resources and develop Resource Package Abstract.

1. Develop Project Brief, including:

a. Current overview of project, including updated information and understandings

b. Interpretive themes and objectives

c. Identification and analysis of all project goals in terms of their effect on the development and successful completion of the exhibit

d. Analysis of the project budget, including review and/or development of a Class C Production Estimate

e. Analysis of the project schedule, and all other known parameters on the development and successful completion of the project.

f. Approach and solutions to programmatic accessibility including barrier-free design, as well as physical, experience-based, and content-based accessibility that are specific to the needs of this project.

3.3. Schematic Design

Work in this phase is organized into two (2) sub-phases: Schematic 1 (SD1) and Schematic 2 (SD2). Schematic 1 includes development of several alternative schemes for organizing both the interpretive content and physical layout of the exhibits. Schematic 2 includes development of a preferred alternative. Major stories, exhibit elements, and presentation techniques are illustrated and described.

3.3.1. Schematic Design 1

During this phase, the contractor shall:

1. Conduct Content Research, including:

a. Survey repositories of relevant resources

b. Develop Resource Package Level 1 Develop Schematic Design 1, including three (3) schematic design exhibit alternatives:

a. Bubble diagrams that identify themes and concepts, placed in relationship to each other and to the physical space

b. One (1) preliminary sketch for each alternative that communicates the overall design intent

c. A title for each alternative, with written descriptions of how each scheme accomplishes the established project goals, including working titles and narrative of all exhibit scenes

d. A project-specific narrative describing proposed preliminary Universal Design and programmatic accessibility approaches, including barrier-free design, as well as physical, experience-based, and content-based accessibility, and proposed approach for audio description

e. Class B Production Cost Estimate and life-cycle cost estimates for each alternative.

Present Schematic Design 1 / Conduct Design.

a. The Project Manager, Exhibit Developer, and Exhibit Designer shall travel to DINO Quarry Visitor Center, in Jensen, UT.

b. The meeting shall consist of two (2), 8-hour days. The Project Manager, Exhibit Developer, and Exhibit Designer.

Participate in a conference call to reconcile COR review comments and provide written documentation of all decisions made.

3.3.2. Schematic Design 2

During this phase the contractor shall:

1. Develop and submit Schematic Design 2 with Preferred Design Alternative including:

a. Written exhibit walkthrough

b. Overall design approach, including:

(i) Media style and appearance.

(ii) Revised Universal Design and programmatic accessibility approach.

(iii) Audio description narrative approach and Production Plan.

(iv) Floor plan with individual exhibit Scenes, Content Groups, and major elements identified.

(v) Overview of Electronic Programs.

(vi) Perspective view renderings that communicate design intent of each scene

(vii) When required in the individual task order, provide an animated walkthrough or physical scale model of the exhibition.

c. Resource Package Level 2, with its content integrated into exhibit walkthrough description

d. Class B Production Estimate and revised life-cycle cost estimates for preferred alternative.

e. Revised final Value Analysis Report Present Schematic Design 2, including a walkthrough or digital white-model of the exhibit as follows:

a. The contractor shall facilitate a 2-hour virtual meeting and conference call with screen-sharing capacity to present the Schematic Design 2.

b. The Project Manager, Exhibit Developer, and Exhibit Designer shall attend.

c. The contractor shall be responsible for purchasing the licenses required to host the online meeting.

Participate in a conference call to reconcile COR review comments and provide written documentation of all decisions made.

3.4. Design Development

Work in this phase is organized into three (3) sub-phases: Design Development 1 (DD1), Design Development 2 (DD2), and Design Development 3 (DD3). Design Development 1 builds on the plan approved in the Schematic Design phase. Its emphasis is on confirming all major elements of the design and includes continued content planning. Design Development 2 focuses on the two-dimensional exhibit content, including the first full drafts of graphic layouts and all exhibit text. Design Development 3 focuses heavily on developing all interpretive content in detail, with continued design refinement to ensure effective presentation of the content within the exhibit.

3.4.1. Design Development 1

During this phase the contractor shall:

Develop and submit the following:

a. Overview with narrative description, including interpretive purpose statements and objective, for each exhibit Scene and Content Group.

b. Perspective view renderings that communicate design intent of each Scene and Content Group.

c. Exhibit Design Drawings that shall serve as the basis for Production Design drawings in later phases.

d. Sample graphic layouts/graphic approach/typography.

e. Text Level 1.

f. Preliminary material, finish, and color selections.

g. AV Concept Treatment, and proposed program type and display format for each proposed Electronic Program.

h. Revised Audio Description Production Plan, to include proposed audio description trigger types, trigger locations, and Table of Contents main menu selections.

i. Preliminary Content Management Database including entries for the following:

AO - accessioned objects CE - custom elements, including any non-accessioned objects EE and EP - audiovisual and digital interactive elements IM - images LA - text labels

j. Updated Universal Design and programmatic accessibility approach and solutions

k. Updated Class B Production Cost Estimate and life-cycle cost estimate.

l. Fabricator-provided preliminary Constructability Report indexed to the Class B Production Cost Estimate, consisting of a narrative description of the exhibit design that:

· Evaluates the durability and feasibility of proposed/anticipated fabrication techniques and material selections.

· Identifies any improvements to the physical design that may reduce construction costs (ie, value engineering)

· Identifies any maintenance issues

· Identifies any overly complex designs that may require complex exhibit production and installation requirements.

Provide recommendations for any alterations that are needed to the facility to accommodate the new exhibition design (i.e., floor and wall treatments/colors). In order to coordinate with any exhibit area electrical upgrades, the contractor shall provide an electrical plan with the locations for electrical, conduit, and other building coordination needs; and, information regarding the electrical loads for all exhibit spaces to inform, and be coordinated with, the building renovation work.

Present Design Development 1 as follows:

a. The Project Manager, Exhibit Developer, Exhibit Designer shall travel to DINO Quarry Visitor Center, in Jensen, UT.

b. The meeting shall consist of two (2), 8-hour days. The Project Manager, Exhibit Developer, and Exhibit Designer shall attend.

Participate in a conference call to reconcile COR review comments and provide written documentation of all decisions made.

3.4.2. Design Development 2

Design Development 2 is an iterative phase that steps back from physical design decisions and focuses heavily on developing graphic treatments and interpretive content. During this phase the contractor shall:

1. Develop and submit the following:

a. Full draft of all graphic layouts.

b. Text Level 2.

c. Selected Exhibit Design Drawing sheets, as required to show major design changes requested at Design Development 1. The contractor shall coordinate with the COR and confirm which elements shall require additional Exhibit Design details at this phase.

Present Design Development 2 as follows:

a. The contractor shall facilitate a 3-hour virtual meeting and conference call with screen-sharing capacity to present Design Development 2.

b. The Project Manager, Exhibit Designer, and Exhibit Developer shall attend.

c. The contractor shall be responsible for purchasing the licenses required to host the online meeting.

Participate in a conference call to reconcile COR review comments and provide written documentation of all decisions made.

3.4.2. Design Development 3

During this phase the contractor shall:

1. Develop and submit the following:

a. Graphic Layouts Package, organized according to exhibit Scenes, to include:

Overview with narrative description, including interpretive purpose statements and objective, for each exhibit Scene and Content Group.

Perspective view renderings that accurately show the placement of graphic layouts within the three-dimensional exhibits.

Complete graphic layouts, showing full layouts as well as enlarged sections with text and image at legible size for review.

Text Level 3.

b. Exhibit Design Drawings, to include:

· Floorplans and elevations of site and existing conditions.

· Plan and elevation views of each Scene/Content Group, showing exhibit structures and all interpretive content with Content Management identification key numbers, and proposed colors, materials, and finishes.

· Proposed fabrication details, methods, or performance specifications for unusual exhibit structures.

· Reflected ceiling plan and proposed lighting plan.

· Data and electrical wiring plan, including locations of floor and wall outlets, junction boxes, switches, controls, and associated electronic elements.

c. Content Management Database to include the following reports:

Comprehensive Exhibit Plan AO - Accessioned Objects Schedules AO - Accessioned Objects Facsimile Sheets CE - Custom Elements Schedules CE - Custom Elements Facsimile Sheets EE - Electronic Equipment Schedules EP - Electronic Program Schedules GL - Graphic Layout Schedules IM - Image Schedules IM - Image Facsimile Sheets

d. Electronic Programs Report including:

Updated Audio Description Production Plan, to include audio description trigger types, trigger locations, and Table of Contents segment titles and sub-menu selections.

e. Content Specialties Reference Package – a first draft including an entry for any exhibit element that requires detailed subject matter, creative, technical, and/or artistic input. See Attachment 1, Exhibit Planning, Design, and Fabrication Specifications – Section 16, Content Specialties for typical categories of exhibit elements included in this Reference Package.

f. Material, finish, and color samples.

g. Updated and revised solutions for Universal Design and programmatic accessibility.

h. Updated Class B Production Cost Estimate and life- cycle cost estimate.

i. Final Constructability Report.

Provide updates to the DD1 recommendations for any alterations that are needed to the facility to accommodate the new exhibition (i.e., floor and wall treatments/colors), and electrical requirements (including loads).

Present Design Development 3 as follows:

a. The Project Manager, Exhibit Developer, Exhibit Designer shall travel to DINO Quarry Visitor Center, in Jensen, UT.

b. The meeting shall consist of two, 8-hour days. The Project Manager, Exhibit Developer, and Exhibit Designer shall attend.

Participate in a conference call to reconcile COR review comments and provide written documentation of all decisions made.

3.5. Production Design

Work in this phase begins the major transition of work from planning and design into fabrication. Production Design includes completion of all outstanding design and content development tasks, and the start of Pre-Fabrication tasks.

3.5.1 Production Design 1 – Design and Content Development

During this phase the contractor shall:

1. Develop and submit the following:

a. Graphic Layouts Package, organized according to exhibit Scenes, to include:

· Overview with narrative description, including interpretive purpose statements and objective, for each exhibit Scene and Content Group.

· Perspective view renderings that accurately show the placement of graphic layouts within the three-dimensional exhibits.

· Complete graphic layouts, showing full layouts as well as enlarged sections with text and image at legible size for review.

· Text Level 4.

b. Content Management Database to include the following reports:

· Comprehensive Exhibit Plan

· AO - Accessioned Objects Schedules

· AO - Accessioned Objects Facsimile Sheets

· CE - Custom Elements Schedules

· CE - Custom Elements Facsimile Sheets

· EE - Electronic Equipment Schedules

· EP - Electronic Program Schedules

· GL – Graphic Layout Schedule

· IM - Image Schedules

· IM - Image Facsimile Sheets

c. Electronic Programs Report including:

· Audio Description Production Plan, including:

· A diagram of exhibits indicating required power sources

· The types and locations of triggering hardware

· Table of Contents with segment titles and submenus.

d. Content Specialties Reference Package, including fully developed and revised entries for each exhibit element that requires detailed subject matter, creative, technical, and/or artistic input.

e. Acquire use-rights and production-quality copies of all third-party images and other intellectual property.

1. Present Production Design 1 as follows:

a. The contractor shall facilitate a 2-hour virtual meeting and conference call with screen-sharing capacity to present Production Design 1.

b. The Project Manager, Exhibit Designer, and Exhibit Developer shall attend.

c. The contractor shall be responsible for purchasing the licenses required to host the online meeting.

1. Participate in a conference call to reconcile COR review comments and provide written documentation of all decisions made.

3.5.2. Production Design 2 – Pre-Fabrication Tasks

During Production Design 2, the fabricator shall begin work on Pre-Fabrication tasks, based on the DD3 Exhibit Design Drawings and the PD1 Content Specialties Reference Package.

During this phase, the contractor shall:

1. Assess updates to the building or installation site, as needed:

a. The Project Manager, Exhibit Designer, and Fabricator shall travel to DINO Quarry Visitor Center, in Jensen, UT.

b. The meeting shall consist of one, 8-hour day. The Project Manager, Exhibit Designer, and Fabricator shall attend.

c. Conduct general project mid-process review, including inspection of the exhibit design drawings, building construction documents, and fabrication and installation work requirements.

1. Prepare and submit an Exhibit Production Plan, as follows:

a. Establish key project milestones and timeframes for review of content specialties, exhibit structures, and graphics for 25%, 40%, 80%, and 95% completion.

b. At each milestone, the contractor shall provide a revised exhibit production plan that reflects the current status of production.

c. The Exhibit Production Plan shall include the AV Production Plan, based on the PD Electronic Programs Report.

10. Provide field-verified Fabrication Shop Drawings, based on design intent and details of the DD3 Exhibit Design Drawings, and in accordance with the following requirements:

a. Modifications. The general design requirements developed during previous phases of work are intended to establish basic dimensions of units or modules, profiles, and sight lines of members. Within these limitations, the contractor shall be responsible for any modifications or additions as required to meet accessibility, durability, and safety standards as outlined in Attachment 1, Exhibit Planning, Design, and Fabrication Specifications. The contractor shall submit proposed modifications to the COR for review and approval prior to implementing changes. The contractor shall maintain the visual design concept and operational features as shown, including members’ sizes, profiles, and alignment of components.

b. Electrical. The contractor shall provide equipment specifications, and a lighting and wiring diagram for all exhibit lighting as designed during previous phases of work. Building wiring and power shall be completed by the park. The contractor shall be responsible for acquiring and installing new track and fixtures, and for connecting fixtures to park-provided power throughout the exhibits. The contractor shall ensure that all physical loads are supported by adequate equipment and/or mounting devices as dictated by the state of Colorado.

c. Object Mounts. The contractor shall include drawings of proposed replica object mounts, submitted in the form of shop drawings. The contractor shall propose and produce all necessary object mounts required by the design.

d. Engineering. A certified professional engineer (PE) shall review the structural design of any exhibit components to be installed by the fabricator that may pose a risk to life safety and shall provide a certified engineer’s stamp on the drawings.

2. Provide Electronic Equipment submittals including plan drawings, wiring diagrams, and catalog cuts.

3. Provide Material Sample Boards.

3.6. Production Support

Work in this phase includes creative and technical support during fabrication of the project. During exhibit fabrication, the Exhibit Designer shall provide input and clarify questions regarding the Production Design – Content and Design Development package. The Exhibit Designer shall participate in production reviews, which include the following:

1. Travel to the Preliminary Shop Inspection at the fabricator’s facility

2. Review of shop drawings

3. Participation in production conference calls.

3.7. Production

Work in this phase shall include production of all exhibit elements in accordance with the final design intent as described in the corrected Production Design documents Each fabrication task may require a sub-series of steps to complete, and the contractor is not required to complete tasks in the order outlined below. All tasks shall be completed in accordance with Attachment 1, Exhibit Planning, Design, and Fabrication Specifications—Section 27, Quality and Safety Standards for Fabrication. Fabrication tasks include the following:

3.7.1 Content Specialties

Content Specialties under this contract may include illustrations and artwork, new photography, natural history models, architectural and other cultural history models, life-sized figures, dioramas, reproduction historic objects, historic objects (accessioned or non-accessioned), maps and topographic models, and electronic programs.

1. Illustrations and Artwork. The production process for custom illustrations shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit the proposed illustration style, in accordance with the PD1 Content Specialties Reference Package, for review and approval.

c. Submit rough sketches of the illustrations, in the approved style.

d. Submit more refined sketches of each illustration, including color, that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

e. Submit 90% complete illustrations that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

f. Submit the final illustrations that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR. Incorporate the illustrations into the appropriate graphic layout files. Metadata shall be included in the final digital file and shall include information fields supplied by the COR, and found in Attachment 8, Sample Use Rights Letter.

2. New Photography. The production process for new photography shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit new photography for review and approval by the COR. Multiple rounds of review may be required.

c. Submit final photographic media at size and format required for production. Incorporate the photographic media into the appropriate graphic layout files. Metadata shall be included in the final digital file and shall include information fields supplied by the COR, and found in Attachment 8, Sample Use Rights Letter.

3. Natural History Models. The production process for natural history models shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit a rough pencil sketch of the model in the approved style, in accordance with the PD1 Content Specialties Reference Package, for review and approval.

c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

d. Submit a revision that shall incorporate any additional corrections, changes, modifications, or deficiencies identified by the COR.

e. Submit one (1) positive or other 3D draft of the model. Model samples shall be adequately sized to provide review of materials, colors, and finishes; and shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR during iterative review of the sketches.

f. Submit the final model that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

4. Architectural and Other Cultural History Models. The production process for architectural and cultural history models shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit a rough pencil sketch of the model in the approved style, in accordance with the PD1 Content Specialties Reference Package, for review and approval.

c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

d. Submit a revision that shall incorporate any additional corrections, changes, modifications, or deficiencies identified by the COR.

e. Submit one (1) positive or other 3D draft of the model. Model samples shall be adequately sized to provide review of materials, colors, and finishes; and shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR during iterative review of the sketches.

f. Submit the final model that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

5. Life-Sized Figures. The production process for life-sized figures shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit a rough pencil sketch of the figure in the approved style, in accordance with the PD1 Content Specialties Reference Package, for review and approval.

c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

d. Submit a revision that shall incorporate any additional corrections, changes, modifications, or deficiencies identified by the COR.

e. Submit one (1) positive or other 3D draft of a minimum 12” x 12” section of the figure that shall include material samples for all materials, colors, and finishes associated with the figure, such as clothing, hair, skin or fabric textures, associated props, and any other accoutrements. The sample shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR during prior reviews.

f. Submit the final figure that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

6. Dioramas. The production process for dioramas shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit a rough pencil sketch of the diorama components in the approved style, in accordance with the PD1 Content Specialties Reference Package for review and approval.

c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

d. Submit a revision that shall incorporate any additional corrections, changes, modifications, or deficiencies identified by the COR.

e. Submit one (1) 3D sample of a minimum 12”x12” section of the diorama that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR, and shall clearly show the final materials, finishes, textures, and styles in progress. The sample shall be shared for review at the Preliminary Shop Inspection.

f. Submit the final diorama that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

7. Reproduction Historic Objects. The production process for reproduction historic objects shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit a rough pencil sketch of the object in the approved style, in accordance with the PD1 Content Specialties Reference Package, for review and approval.

c. Submit a more refined sketch that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

d. Submit one (1) 3D sample of the object that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR, and shall clearly show the final materials, finishes, textures, and styles in progress.

e. Submit the final reproduction historic object that shall incorporate all corrections, changes, modifications, or deficiencies identified by the COR.

8. Historic Objects (Accessioned or Non-accessioned). The production process for historic objects shall be as follows:

a. Refer to the PD1 Content Specialties Reference Package for design intent, purpose, style, and other production details.

b. Submit an acquisition plan including catalog and contact information of collection or dealer, and photographic documentation of the object under consideration, in accordance with the PD1 Content Specialties Reference Package, for review and approval.

c. Submit a report that details the conservation and mounting needs for the object, for review and approval.

d. Provide the final historic object for installation in…