A_N4008423R8702_ELINs.xlsx
XLSX spreadsheet 178 KB Posted
- Solicitation number
- N4008423R8702
About this file
This document contains line item pricing tables for recurring and non-recurring facility maintenance services required under a federal solicitation for HVAC, hangar, storage tank, and utility systems maintenance on a Naval base in Japan. Key details include line items for emergency, urgent and routine service orders; preventative maintenance programs; inspections and certifications; seasonal start-ups and shutdowns; and operations. Non-recurring line items cover replacement of various fan coil units up to 5kW in capacity, filter replacements, and deep cleaning services. Pricing is provided for labor, materials, and temporary equipment leases along with estimated quantities over multiple option periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A_N4008423R8702_ELINs_Revised.xlsx | XLSX spreadsheet | |
| 6_N4008423R8702_PWS_Amd.pdf | ||
| SF30_N4008423R8702_0002.pdf | ||
| 23R8702_Pre-ProposalConferenceMinutes.pdf | ||
| SF30_N4008423R8702_0001.pdf | ||
| SF33_N4008423R8702.pdf | ||
| D_SiteVisit_Request.xlsx | XLSX spreadsheet | |
| E_PreProposal_InquiryForm.xlsx | XLSX spreadsheet | |
| C_ExhibitB_PPQ.doc | DOC document | |
| B_ExhibitA_ExperienceProject DataSheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Rec
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 22018438 / e-Project Number 1755043 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Work - Base Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC | |||||
| ITEM 3 | |||||
| ELINs A001 through A006. | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price (¥) | Total (¥) |
| A001 | HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| A001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| A001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| A001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| A001AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | 12 | MO |
| A001AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO |
| A001AF | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
| A001AG | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | 12 | MO |
| A001AH | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 | 12 | MO |
| A001AJ | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO |
| A001AK | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO |
| A001AL | Other Recurring Services Program,Cooling Tower and Chiller Chemical Cleaning Services, Spec Item 3.4.5 | 1 | LS |
A001 Housing Fund, Sub Total
| A002 | ST FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| A002AA | Emergency Service Orders, Spec Item 3.1.1 | ||
| A002AA01 | HVAC System Exclude Bldg.3043 | 12 | MO |
| A002AA02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| A002AA03 | Hangar Doors,ASTUST | 12 | MO |
| A002AB | Urgent Service Orders, Spec Item 3.1.2 | ||
| A002AB01 | HVAC System Exclude Bldg.3043 | 12 | MO |
| A002AB02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| A002AB03 | Hangar Doors,ASTUST | 12 | MO |
| A002AC | Routine Service Orders, Spec Item 3.1.3 | ||
| A002AC01 | HVAC System Exclude Bldg.3043 | 12 | MO |
| A002AC02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| A002AC03 | Hangar Doors,ASTUST | 12 | MO |
| A002AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | ||
| A002AD01 | HVAC System Excludde Bldg.3043 | 12 | MO |
| A002AD02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| A002AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO |
| A002AF | Preventive Maintenance (PM) Program, Fan Convectors and Unit Heaters, Spec Item 3.2.3 | 12 | MO |
| A002AG | Preventive Maintenance (PM) Program, Low Pressure Compressed Air System (for Breathing Air) (for Spray Painting), Spec Item 3.2.4 | 12 | MO |
| A002AH | Preventive Maintenance (PM) Program, Paint Spray Booth Systems Including Outside Air Units, Spec Item 3.2.5 | 12 | MO |
| A002AJ | Preventive Maintenance (PM) Program, Air Intake Hangar Doors (for Corrosion Control Hangar Bldg. 1502), Spec Item 3.2.6 | 12 | MO |
| A002AK | Preventive Maintenance (PM) Program, Hangar Doors, Spec Item 3.2.7 | 12 | MO |
| A002AL | Inspection, Testing, and Certification Program, Underground Storage Tank, Spec Item 3.3.1 | 12 | MO |
| A002AM | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
| A002AN | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | ||
| A002AN01 | HVAC System Excludde Bldg.3043,Hangar Doors,ASTUST | 12 | MO |
| A002AN02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| A002AP | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| A002AQ | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO |
| A002AR | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO |
| A002AS | Other Recurring Services Program,Cooling Tower and Chiller Chemical Cleaning Services, Spec Item 3.4.5 | 1 | LS |
| A002AT | Other Recurring Services Program, Steam Equipment Seasonal Start-Up and Shutdown (for Corrosion Control Hangar), Spec Item 3.4.6 | 12 | MO |
| A002AU | Other Recurring Services Program, Cooling Water's Water Testing and Treatmnet Services (for Corrosion Control Hangar), Spec Item 3.4.7 | 12 | MO |
A002 ST Fund, Sub Total
| A003 | NGIS FUND,Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| A003AA | Emergency Service Orders, Spec Item 3.1.1 | ||||
| A003AA01 | Bldg.482 & 484 HVAC System Excludde Bldg.3043 | 12 | MO | ||
| A003AA02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| A003AB | Urgent Service Orders, Spec Item 3.1.2 | ||||
| A003AB01 | Bldg.482 & 484 HVAC System Excludde Bldg.3043 | 12 | MO | ||
| A003AB02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| A003AC | Routine Service Orders, Spec Item 3.1.3 | ||||
| A003AC01 | Bldg.482 & 484 HVAC System Excludde Bldg.3043 | 12 | MO | ||
| A003AC02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| A003AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| A003AE | Preventive Maintenance (PM) Program, | ||||
| Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | |||
| A003AF | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| A003AG | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| A003AH | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ||
| A003AJ | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ||
| A003AK | Other Recurring Services Program,Cooling Tower and Chiller Chemical Cleaning Services, Spec Item 3.4.5 | 1 | LS |
A003 NGIS Fund, Sub Total
| A004 | FRCWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| A004AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| A004AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| A004AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| A004AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
A004 FRCWP Fund, Sub Total
| A005 | DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| A005AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| A005AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| A005AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| A005AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
A005 DeCA Fund, Sub Total
| A006 | DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| A006AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| A006AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| A006AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| A006AD | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO |
| A006AE | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO |
| A006AF | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO |
| A006AG | Other Recurring Services Program,Cooling Tower and Chiller Chemical Cleaning Services, Spec Item 3.4.5 | 1 | LS |
A006 DoDEA Fund, Sub Total
TOTAL RECURRING WORK PRICE - BASE PERIOD TOTAL ¥
| NOTES: | |
| (1) Abbreviation : MO = Month LS = Lump Sum | |
| (2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per command | |
| (facility.) | |
| * Some locations are funded by multiple fund sources. Enter the price of each ELINs by the indicated percentage. | |
| Example: | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* |
| If total unit price of Bldg.3043 HVAC System is ¥100,000, enter the unit price for ELIN A002AA02 | |
| as ¥10,000 and ELIN A003AA02 as ¥90,000 |
&"Times New Roman,Regular"CUI//FEDCON[When filled in] Source Selection Information--See FAR 2.101 and 3.104[When filled in]
&"Times New Roman,Regular"CUI//FEDCON[When filled in] Source Selection Information--See FAR 2.101 and 3.104[When filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Base Non
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 22018438 / e-Project Number 1755043 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Work - Base Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs A700 through A719 | ||||||
| Name of Offeror/Contractor: | ||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Unit Price (¥) | Extended (Total) Price (¥) |
| A700 | Unit Priced Labor Work - During Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 300 | HR | |||||
| A701 | Unit Priced Labor Work - Outside Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | HR | |||||
| A702 | Material Costs- (Negotiated) | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 89,000,000 | Yen | ||
| A703 | Lease of Temporary Air Conditioner (Cooling capacity; approx. 30kW) | Provide a lease service of a temporary air conditioner (cooling capacity; approx. 30kW or more) for the Government facility use. Exact location and duration will be specified when this item is used. The unit shall be; fuel operated (or Provide with sound-proof generator for the unit), outdoor type. Fuel shall be provided to its full by the Contractor upon initial delivery. Unit price shall include insurance. After both the Government and the Contractor confirm the unit is applicable to the subject facility, this item will be issued. Unit Priced Task Work (UPT Work) |
| 10 | Week | ||||
| A704 | Delivery of Temporary Air Conditioner | This item is for transporation (one round trip), installing (hook up) work and removal work of Lease of air conditioner (above A703). Up to ¥25,000 for materials and up to 12 hours labor respectively to hook up and remove the duct to subject facility's system (only when the modification to facility system is required) is also included. One round trip is counted as “1 EA.” (UPT Work) | 3 | EA | |
| A705 | Trouble Shooting (on NAF Atsugi) | Respond to and perform trouble shooting, to investigate the trouble. The Government, using this line item, may ask for the Contractor’s trouble shooting work for HVAC or hangar systems/equipment or AST/UST not listed in Attachment J but located on NAF Atsugi. | |||
| Provide four-hour on-site labor per trouble shooting to perform the trouble shooting requested within two working days after the issurance of this item. The labor hour shall not include any hours for travel and administrative work. The Contractor may be requested to submit proposal and estimate for the repair/replacement, as specified in Annex 2 (Section C, Sub Annex 0200000.) Submit the trouble shooting report. (UPT Work) | 15 | EA | |||
| A706 | Replacement of Fan Coil Unit (FCU), Cooling; 1.1 kW ~ 2.03 kW, Heating; 2.03 kW ~ 2.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.99 kW, and approximate heating capacity is around between 2.03 kW ~ 2.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (1) HVAC System From Bldg. 3125 (g) (i), (2) HVAC System From Bldg. 3145 (d) (i), (3) HVAC System From Bldg. 3142 (f) (i), (4) HVAC System From Bldg. 3136 (e) (iv), (8) HVAC System From Bldg. 3102 (g) (i), (6) HVAC System From Bldg. 3050 (g) (i) and (ii), (7) HVAC System From Bldg. 3069 (g) (i). (UPT Work) | 125 | EA | |
| A707 | Replacement of FCU, Cooling; 2.0 kW ~ 2.99 kW, Heating; 3.5 kW ~ 4.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 2.0 kW and 2.99 kW, and approximate heating capacity is around between 3.5 kW ~ 4.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1(1) HVAC System from Bldg. 3125 (g) (ii) and (iii), (2) HVAC System Bldg. 3145 (d) (ii), (3) HVAC System from Bldg. 3142 (f) (ii) and (iii), (4) HVAC System from Bldg. 3136 (e) (iii), (6) HVAC System from Bldg. 3050 (g) (iii), (7) HVAC System from Bldg. 3069 (g) (ii), (8) HVAC System from Bldg. 3102 (g) (ii) and (iii). (UPT Work) | 40 | EA | |
| A708 | Replacement of FCU, Cooling; 3.5 kW ~ 4.1 kW, Heating; 5.5 kW ~ 6.5 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 3.5 kW and 3.99 kW, and approximate heating capacity is around between 5.5 kW ~ 6.5 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (4) HVAC System from Bldg. 3136 (e) (ii), (6) HVAC System from Bldg. 3050 (g) (iv), (7) HVAC System from Bldg. 3069 (g) (iii), (8) HVAC System from Bldg. 3102 (g) (iv). (UPT Work) | 10 | EA | |
| A709 | Replacement of FCU, Cooling; 4.4 kW ~ 4.99 kW, Heating; 7.0 kW ~ 7.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 4.4 kW and 4.99 kW, and approximate heating capacity is around between 7.0 kW ~ 7.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (3) HVAC System from Bldg. 3142 (f) (iv), (4) HVAC System from Bldg. 3136 (e) (i), (7) Bldg. 3069 (g) (iv). (UPT Work)
| 5 | EA | |
| A710 | Replacement of FCU, Cooling; 5.0 kW ~ 5.99 kW, Heating; 9.0 kW ~ 12.0 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 5.0 kW and 5.99 kW, and approximate heating capacity is around between 9.0 kW ~ 9.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (3) HVAC System from Bldg. 3142 (f) (v), (5) HVAC System from Bldg. 3042 (d) (v) , J-1502000-03 Part 3 (1) Bldg. 3043 (d) (iii) and (iv). (UPT Work) | 2 | EA | |
| A711 | Replacement of FCU, Cooling; 1.8 kW ~ 2.0 kW, Heating; 3.09 kW ~ 4.1 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 1.8 kW and 2.0 kW, and approximate heating capacity is around between 3.09 kW ~ 4.1 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (5) Bldg. 3042 (d) (i). (UPT Work) | 2 | EA | |
| A712 | Replacement of FCU, Cooling; 1.7 kW ~ 2.0 kW, Heating; 3.1 kW ~ 3.5 kW, Ceiling Suspended (Exposed) | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 1.7 kW and 2.0 kW, and approximate heating capacity is around between 3.1 kW ~ 3.5 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (5) Bldg. 3042 (d) (ii). (UPT Work) | 2 | EA | |
| A713 | Replacement of FCU, Cooling; 2.6 kW ~ 2.99 kW, Heating; 4.5 kW ~ 4.99 kW, Ceiling Suspended (Exposed) | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 2.6 kW and 2.99 kW, and approximate heating capacity is around between 4.5 kW ~ 4.99 kW. Type; Ceiling suspended (exposed), 2 piping. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (5) Bldg. 3042 (d) (ii). (UPT Work) | 2 | EA | |
| A714 | Replacement of FCU, Cooling; 3.7 kW ~ 5.1 kW, Heating; 6.7 kW ~ 8.9 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 3.7 kW and 5.1 kW, and approximate heating capacity is around between 6.7 kW and 8.9 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (5) Bldg. 3042 (d) (iii). (UPT Work) | 5 | EA | |
| A715 | Replacement of FCU, Cooling; 1.1 kW ~ 1.8 kW, Heating; 2.4 ~ 3.9 kW, Ceiling Mounted, Cassette, 4 Way | Replace existing FCU with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.8 kW, and approximate heating capacity is around between 2.4 kW and 3.9 kW. Type; Ceiling mounted, cassette, 4 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (5) Bldg. 3042 (d) (iv), J-1502000-03 Part 3 (1) Bldg. 3043 (d) (i) and (ii). (UPT Work) | 2 | EA | |||
| A716 | Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 1, Bldg. 1502 | Remove and dispose of existing all after-filters located in hangar bay 1, Bldg. 1502, and Provide new after-filters. (32 ea. x 3 = 96 ea.) Refer to J-1502000-08 Part 1 for material information. (UPT Work) | 2 | EA | |
| A717 | Replacement of All After-Filters for Paint Spray Booth, Hagar Bay 2, Bldg. 1502 | Remove and dispose of existing all after-filters located in hangar bay 2, Bldg. 1502, and Provide new after-filters. (32 ea. x 4 = 128 ea.) Refer to J-1502000-08 Part 1 for material information. (UPT Work) | 2 | EA | |
| A718 | Replacement of All Supply Air-Filters for Paint Spray Booth, Hagar Bay 1 and 2, Bldg. 1502 | Remove and dispose of existing all supply air-filters located in hangar bay 1 and 2, Bldg. 1502, and Provide new Supply Air-filters TYPE-1. ( 537 ea.) and TYPE-2. ( 15 ea.). Refer to J-1502000-08 Part 1 for material information. (UPT Work) | 2 | EA | |
| A719 | Fan Coil Unit Deep Cleaning | The Contractor shall perform fan coil unit deep cleaning by; removing the fan coil unit, cleaning its interior parts including but not limited to fan, fin, coil, impeller, drain pan, filter, casing, by high pressure water or other appropriate instrument with detergent, then assembling and reinstalling the fan coil unit. Also, if there are water leak, applying putty to prevent leaks disassembling. The Contractor shall also clean as much drain pipinig as possible by wet vacuum or other method. Fan Coil is removed odor, dirt, and mold to provide clean air. | 300 | EA |
TOTAL NON-RECURRING WORK NOT-TO-EXCEED PRICE BASE PERIOD (MAX AMOUNT)
| Notes: |
| Note 1: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price. |
Note 2: Abbreviation - LS = Lump Sum EA = Each HR = Hour
Note 3: For replacement of FCU, the Governement may consult with the Contractor to identify exact line item that matches the requested site.
&"Times New Roman,Regular"CUI//FEDCON[When filled in] Source Selection Information--See FAR 2.101 and 3.104[When filled in]
Source Selection Information--See FAR 2.101 and 3.104[When filled in]
1st Rec
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 22018438 / e-Project Number 1755043 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring Work - First Option Period | |||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC | |||||
| ITEM 3 | |||||
| ELINs B001 through B006. | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price (¥) | Total (¥) |
| B001 | HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| B001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| B001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| B001AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | 12 | MO |
| B001AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO |
| B001AF | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
| B001AG | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | 12 | MO |
| B001AH | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 | 12 | MO |
| B001AJ | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO |
| B001AK | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO |
| B001AL | BREAK |
B001 Housing Fund, Sub Total
| B002 | ST FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| B002AA | Emergency Service Orders, Spec Item 3.1.1 | ||
| B002AA01 | HVAC System Exclude Bldg.3043 | 12 | MO |
| B002AA02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| B002AA03 | Hangar Doors,ASTUST | 12 | MO |
| B002AB | Urgent Service Orders, Spec Item 3.1.2 | ||
| B002AB01 | HVAC System Exclude Bldg.3043 | 12 | MO |
| B002AB02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| B002AB03 | Hangar Doors,ASTUST | 12 | MO |
| B002AC | Routine Service Orders, Spec Item 3.1.3 | ||
| B002AC01 | HVAC System Exclude Bldg.3043 | 12 | MO |
| B002AC02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| B002AC03 | Hangar Doors,ASTUST | 12 | MO |
| B002AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 | ||
| B002AD01 | HVAC System Excludde Bldg.3043 | 12 | MO |
| B002AD02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| B002AE | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO |
| B002AF | Preventive Maintenance (PM) Program, Fan Convectors and Unit Heaters, Spec Item 3.2.3 | 12 | MO |
| B002AG | Preventive Maintenance (PM) Program, Low Pressure Compressed Air System (for Breathing Air) (for Spray Painting), Spec Item 3.2.4 | 12 | MO |
| B002AH | Preventive Maintenance (PM) Program, Paint Spray Booth Systems Including Outside Air Units, Spec Item 3.2.5 | 12 | MO |
| B002AJ | Preventive Maintenance (PM) Program, Air Intake Hangar Doors (for Corrosion Control Hangar Bldg. 1502), Spec Item 3.2.6 | 12 | MO |
| B002AK | Preventive Maintenance (PM) Program, Hangar Doors, Spec Item 3.2.7 | 12 | MO |
| B002AL | Inspection, Testing, and Certification Program, Underground Storage Tank, Spec Item 3.3.1 | 12 | MO |
| B002AM | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
| B002AN | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 | ||
| B002AN01 | HVAC System Excludde Bldg.3043,Hangar Doors,ASTUST | 12 | MO |
| B002AN02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| B002AP | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO |
| B002AQ | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO |
| B002AR | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO |
| B002AS | BREAK | ||
| B002AT | Other Recurring Services Program, Steam Equipment Seasonal Start-Up and Shutdown (for Corrosion Control Hangar), Spec Item 3.4.6 | 12 | MO |
| B002AU | Other Recurring Services Program, Cooling Water's Water Testing and Treatmnet Services (for Corrosion Control Hangar), Spec Item 3.4.7 | 12 | MO |
B002 ST Fund, Sub Total
| B003 | NGIS FUND,Spec Item 3, Sub Annex 1502000 Facility Investment | ||||
| B003AA | Emergency Service Orders, Spec Item 3.1.1 | ||||
| B003AA01 | Bldg.482 & 484 HVAC System Excludde Bldg.3043 | 12 | MO | ||
| B003AA02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| B003AB | Urgent Service Orders, Spec Item 3.1.2 | ||||
| B003AB01 | Bldg.482 & 484 HVAC System Excludde Bldg.3043 | 12 | MO | ||
| B003AB02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| B003AC | Routine Service Orders, Spec Item 3.1.3 | ||||
| B003AC01 | Bldg.482 & 484 HVAC System Excludde Bldg.3043 | 12 | MO | ||
| B003AC02 | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| B003AD | Preventive Maintenance (PM) Program, HVAC Systems, Spec Item 3.2.1 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| B003AE | Preventive Maintenance (PM) Program, | ||||
| Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO | |||
| B003AF | Other Recurring Services Program, HVAC Seasonal Start-Up and Shutdown, Spect Item 3.4.1 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| B003AG | Other Recurring Services Program, HVAC Systems Opepration, Spec Item 3.4.2 Bldg.3043 HVAC System (ST 10% : NGIS 90%)* | 12 | MO | ||
| B003AH | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO | ||
| B003AJ | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO | ||
| B003AK | BREAK |
B003 NGIS Fund, Sub Total
| B004 | FRCWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| B004AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| B004AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| B004AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| B004AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
B004 FRCWP Fund, Sub Total
| B005 | DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| B005AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| B005AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| B005AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| B005AD | Inspection, Testing, and Certification Program, Aboveground Storage Tank, Spec Item 3.3.2 | 12 | MO |
B005 DeCA Fund, Sub Total
| B006 | DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment | ||
| B006AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO |
| B006AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO |
| B006AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO |
| B006AD | Preventive Maintenance (PM) Program, Biocidal Treatment Devices, Spec Item 3.2.2 | 12 | MO |
| B006AE | Other Recurring Services Program, Biocidal Treatment Devices Seasonal Start-Up and Shutdown, Spec Item 3.4.3 | 12 | MO |
| B006AF | Other Recurring Services Program, Biocidal Treatment Devices Operation (including Sampling and Analysis for Water Quality and Legionella Bacteria), Spec Item 3.4.4 | 12 | MO |
| B006AG | BREAK |
B006 DoDEA Fund, Sub Total
TOTAL RECURRING WORK PRICE - FIRST OPTION PERIOD TOTAL ¥
| NOTES: | |
| (1) Abbreviation : MO = Month LS = Lump Sum | |
| (2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per command | |
| (facility.) | |
| * Some locations are funded by multiple fund sources. Enter the price of each ELINs by the indicated percentage. | |
| Example: | Bldg.3043 HVAC System (ST 10% : NGIS 90%)* |
| If total unit price of Bldg.3043 HVAC System is ¥100,000, enter the unit price for ELIN A002AA02 | |
| as ¥10,000 and ELIN A003AA02 as ¥90,000 |
&"Times New Roman,Regular"CUI//FEDCON[When filled in] Source Selection Information--See FAR 2.101 and 3.104[When filled in]
&"Times New Roman,Regular"CUI//FEDCON[When filled in] Source Selection Information--See FAR 2.101 and 3.104[When filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
1st Non
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SRN 22018438 / e-Project Number 1755043 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Work - First Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs B700 through B719 | ||||||
| Name of Offeror/Contractor: | ||||||
| ELIN | Product Name | Description Extended | Estimated Quantity (Maximum) | Unit of Issue | Unit Price (¥) | Extended (Total) Price (¥) |
| B700 | Unit Priced Labor Work - During Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 300 | HR | |||||
| B701 | Unit Priced Labor Work - Outside Regular Working Hours (Negotiated) | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | ||||
| 100 | HR | |||||
| B702 | Material Costs- (Negotiated) | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 89,000,000 | Yen | ||
| B703 | Lease of Temporary Air Conditioner (Cooling capacity; approx. 30kW) | Provide a lease service of a temporary air conditioner (cooling capacity; approx. 30kW or more) for the Government facility use. Exact location and duration will be specified when this item is used. The unit shall be; fuel operated (or Provide with sound-proof generator for the unit), outdoor type. Fuel shall be provided to its full by the Contractor upon initial delivery. Unit price shall include insurance. After both the Government and the Contractor confirm the unit is applicable to the subject facility, this item will be issued. (UPT Work) |
| 10 | Week | ||||
| B704 | Delivery of Temporary Air Conditioner | This item is for transporation (one round trip), installing (hook up) work and removal work of Lease of air conditioner (above B703). Up to ¥25,000 for materials and up to 12 hours labor respectively to hook up and remove the duct to subject facility's system (only when the modification to facility system is required) is also included. One round trip is counted as “1 EA.” (UPT Work) | 3 | EA | |
| B705 | Trouble Shooting (on NAF Atsugi) | Respond to and perform trouble shooting, to investigate the trouble. The Government, using this line item, may ask for the Contractor’s trouble shooting work for HVAC or hangar systems/equipment or AST/UST not listed in Attachment J but located on NAF Atsugi. | |||
| Provide 4-hour on-site labor per trouble shooting to perform the trouble shooting requested within two working days after the issurance of this item. The labor hour shall not include any hours for travel and administrative work. The Contractor may be requested to submit proposal and estimate for the repair/replacement, as specified in Annex 2 (Section C, Sub Annex 0200000.) Submit the trouble shooting report. (UPT Work) | 15 | EA | |||
| B706 | Replacement of FCU, Cooling; 1.1 kW ~ 1.99 kW, Heating; 2.03 kW ~ 2.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 1.1 kW and 1.99 kW, and approximate heating capacity is around between 2.03 kW ~ 2.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (1) HVAC System From Bldg. 3115 (g) (i), (2) HVAC System From Bldg. 3125 (g) (i), (4) HVAC System From Bldg. 3142 (f) (i), (9) Bldg. 3102 (g) (i), (3) HVAC System From Bldg. 3145 (e) (i), (5) HVAC System From Bldg. 3136 (e) (iv), (7) Bldg. 3050 (g) (i) and (ii), (8) Bldg. 3069 (g) (i). (UPT Work) | 125 | EA | |
| B707 | Replacement of FCU, Cooling; 2.0 kW ~ 2.99 kW, Heating; 3.5 kW ~ 4.99 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 2.0 kW and 2.99 kW, and approximate heating capacity is around between 3.5 kW ~ 4.99 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (1) HVAC System from Bldg. 3115 (g) (ii) and (iii), (2) HVAC System from Bldg. 3125 (g) (ii) and (iii), (3) HVAC System Bldg. 3145 (e) (ii), (4) HVAC System from Bldg. 3142 (f) (ii) and (iii), (8) Bldg. 3069 (g) (ii), (9) Bldg. 3102 (g) (ii) and (iii), (5) HVAC System from Bldg. 3136 (e) (iii), (7) Bldg. 3050 (g) (iii). (UPT Work) | 40 | EA | |
| B708 | Replacement of FCU, Cooling; 3.5 kW ~ 3.99 kW, Heating; 5.5 kW ~ 6.5 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 3.5 kW and 3.99 kW, and approximate heating capacity is around between 5.5 kW ~ 6.5 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (5) HVAC System from Bldg. 3136 (e) (ii) and (iv), (8) Bldg. 3069 (g) (iii). (UPT Work) | 10 | EA | |
| B709 | Replacement of FCU, Cooling; 4.4 kW ~ 4.99 kW, Heating; 7.0 kW ~ 7.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 4.4 kW and 4.99 kW, and approximate heating capacity is around between 7.0 kW ~ 7.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (4) HVAC System from Bldg. 3142 (f) (iv), (5) HVAC System from Bldg. 3136 (e) (i), (8) Bldg. 3069 (g) (iv). (UPT Work)
| 5 | EA | |
| B710 | Replacement of FCU, Cooling; 5.0 kW ~ 5.99 kW, Heating; 9.0 kW ~ 9.9 kW, Ceiling Mounted, Cassette, 2 Way | Replace existing fan coil unit with new, similar capacity. Approximate cooling capacity is around between 5.0 kW and 5.99 kW, and approximate heating capacity is around between 9.0 kW ~ 9.9 kW. Type; Ceiling mounted, cassette, 2 way. Switch, associated valves such as ball valve and solenoid valve are included. Install FCU so there is no gap between the unit and ceiling. |
Note: Before accepting the order and ordering material, the Contractor must confirm exact type on site.
| Ref: This item will be for the replacement of FCU listed in J-1502000-03 Part 1 (4) HVAC System from Bldg. 3142 (f) (v). (UPT Work) | 2 | EA |