This is a construction price breakout template spreadsheet for contractors to itemize costs across 24 different construction divisions (0-34) for a VA Medical Center roofing project. The template includes separate worksheets for each division (Special Sections, General Requirements, Existing Conditions, Concrete, Masonry, etc.) with columns to input labor and materials costs including quantity, unit prices, and totals. The summary sheet calculates subtotals for each division plus overhead (5%), profit (5%), and bonds (3%). The only pre-populated quantities appear in Division 31 Earthwork, showing 13,441 SF for base removal/new base material and 100 CY for sub-base treatment. This template appears to be revision 02 effective June 14, 2022 and is marked "For Official Use Only."

The template is associated with VA solicitation 36C25725B0017 for replacing and correcting the roof of Building 44 at the Amarillo VA Medical Center (project #504-25-115), but contains no actual cost figures or detailed scope requirements.

View the file

Other files

File Type Posted
36C25725B0017 0008.docx DOCX document
36C25725B0017 0007.docx DOCX document
36C25725B0017 0006.docx DOCX document
36C25725B0017 0005.docx DOCX document
36C25725B0017 0004.pdf PDF
S05 - Facility Lightning Protection - 264100.pdf PDF
36C25725B0017 0003.docx DOCX document
S04 - Sign In Visit Sheet 03-04-2025.pdf PDF
36C25725B0017 0002.docx DOCX document
Sign In Sheet 02-24-2024.pdf PDF
36C25725B0017 0001.docx DOCX document
504-25-115 Replace and Correct Roof Building 44 Specifications.pdf PDF
504-25-115 Replace and Correct Roofs Building 44 Drawings.pdf PDF
36C25725B0017.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

DATE
CONSTRUCTION OFFEROR - PRICE BREAKOUTSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
DIVISION 0-SPECIAL SECTIONS$0.00
DIVISION 1-GENERAL REQUIREMENTS$0.00
DIVISION 2-EXISTING CONDITIONS$0.00
DIVISION 3-CONCRETE$0.00
DIVISION 4-MASONRY$0.00
DIVISION 5-METALS$0.00
DIVISION 6-WOOD AND PLASTIC$0.00
DIVISION 7-THERMAL AND MOISTURE PROTECTION$0.00
DIVISION 8-DOORS AND WINDOWS$0.00
DIVISION 9-FINISHES$0.00
DIVISION 10-SPECIALTIES$0.00
DIVISION 11-EQUIPMENT$0.00
DIVISION 12-FURNISHINGS$0.00
DIVISION 13-SPECIAL CONSTRUCTION$0.00
DIVISION 14-CONVEYING EQUIPMENT$0.00
DIVISION 21-FIRE SUPPRESSION$0.00
DIVISION 22-PLUMBING$0.00
DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING$0.00
DIVISION 26-ELECTRICAL$0.00
DIVISION 27-COMMUNICATIONS$0.00
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$0.00
DIVISION 31-EARTHWORK$0.00
DIVISION 32-EXTERIOR IMPROVEMENTS$0.00
DIVISION 33-UTILITIES$0.00
DIVISION 34-TRANSPORTATION$0.00
SUB-TOTAL$0.00
OVERHEAD (5%)$0.00
PROFIT (5%)$0.00
BONDS (3%)$0.00
TOTAL:$0.00

&A For Official Use Only

Revision: 02 Effective Date: 06/14/2022

Div 0 Special Sections

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 0 Special Sections
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0.00$0.00$0

For Official Use Only

Effective Date: 06/14/2022

Div 1 General Requirements

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Divison 1 General Requirements
SuperintendentHR$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 2 Existing Conditions

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 2 Existing Conditions
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 3 Concrete

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 3 Concrete
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 4 Masonry

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 4 Masonry
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 5 Metals

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 5 Metals
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 6 Wood & Plastic

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 6 Wood & Plastic
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 7 Thermal & Moisture Protec

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 7 Therm & Moisture Protection
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 8 Doors & Windows

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 8 Doors & Windows
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 9 Finishes

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 9 Finishes
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 10 Specialties

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 10 Specialties
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 11 Equipment

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 11 Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 12 Furnishings

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 12 Furnishings
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 13 Special Construction

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 13 Special Construction
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Division 14 Conveying Equipment

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 14 Conveying Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 21 Fire Suppression

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 21 Fire Suppression
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 22 Plumbing

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 22 Plumbing
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 23 HVAC

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 23 Heat, Vent & Air Cond.
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 26 Electrical

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 26 Electrical
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 27 Communications

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 27 Communications
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 28 Electronic Safety & Secu

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 28 Electronic Safety & Security
$0.00$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00Ea$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 31 Earthwork

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 31 Earthwork
Remove Base13441SF$0.00$0.00$0
Rework Sub-base13441SF$0.00$0.00$0
Sub-base treatment100CY$0.00100CY$0.00$0
New Base Material13441SF$0.0013441SF$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 32 Exterior Improvements

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 32 Exterior Improvements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 33 Utilities

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 33 Utilities
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

Div 34 Transportation

DATE
CONSTRUCTION PROGRAM - ESTIMATE WORKSHEETSHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

PO #V.A. MEDICAL CENTERNO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
PrintFINALOTHER
SignDESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 34 Transportation
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
SECTION TOTAL:$0

For Official Use Only

Effective Date: 06/14/2022

File details come from the government source that posted it. Updated .