This document is Exhibit C1, the Basic Agency Room Construction Criteria (BARCC) for US Secret Service Enterprise Readiness Operations Division facilities. It serves as general construction guidance for draft scopes and cost estimates, with site-specific refinements to follow once final site designs are formulated.
The BARCC specifies construction standards across multiple space categories. General standards include walls with ballistic reinforcement (public-facing walls at Level 3 ballistic rating), sound attenuation (STC 45 minimum, STC 54 for high attenuation), and fortified construction with steel mesh and ballistic materials where required. Ceilings must be drop-in tile with minimum NRC .90 unless otherwise noted. IT/Telecom provisions require CAT6 minimum data speeds with dual network locations per enclosed office and three connections per desk position. Electrical systems must be independently supplied with standard 110V 20A duplex outlets spaced every six feet, maximum twelve feet apart. All doors require locking systems with large-format 6-pin interchangeable cores; specific doors accommodate electronic combination locks and electrified locksets. HVAC systems operate independently with 24-hour availability upon request and 24/7 cooling in designated sections.
Space-specific requirements address numerous functional areas including executive offices (SES SAIC, SAIC, RAIC/DSAIC), standard offices (Special Agents, supervisory and administrative positions), support spaces (conference areas, break rooms, file rooms), security-related facilities (polygraph rooms, prisoner processing, interview rooms), specialized labs (ECTF, ECSAP with electrostatic dissipating furniture and 24/7 cooling at 2-10 tons), equipment rooms (Combined Equipment Room with 24/7 cooling and twelve dedicated circuits), and operational spaces (duty rooms, counterfeit control, weapons/ammunition storage). All spaces require ADA-compliant doorways, fire system compliance with federal/state/local regulations, and specialized finishes such as fortified walls, drywall ceilings, metal grab bars, and tamper-resistant equipment in prisoner processing and interview areas.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit C1
US Secret Service Enterprise Readiness Operations Division
LESSOR:______GOVERNMENT:______
Basic Agency Room Construction Criteria
(BARCC)
This Document outlines the layout and basic construction of various office and lab spaces included in the space calculations for Secret Service locations.
This is general construction information to drive a draft scope and construction estimate. A refined and site specific construction scope will be generated once a site design has been formulated. Individual site scopes will be updated with the most relevant construction and security information at this later phase of construction planning.
General specifications of Secret Service spaces will include:
Walls:
- Public Facing walls will be constructed of mesh and ballistic reinforced drywall on 16 gauge steel studs with 4” x 4” x 3/16 in steel tube pillars slab to slab or equivalent at each door location to support ballistic level 3 doors.
- Sound Attenuating walls will contain construction to achieve a STC of 45 unless otherwise noted
- High Sound Attenuation walls will contain construction to achieve an STC of 54 or better
- Office rated 5/8 in gypsum wallboard on all walls unless otherwise required or noted.
- Fortified walls will consist of ballistic material floor to finished ceiling on the public facing side as necessary and steel mesh with a minimum thickness of 9 gauge or equivalent from slab to slab and no unprotected openings larger than 100 Square inches. Openings will be fortified with 5/8 steel bars 6” OC or additional mesh as applicable
- Office Modular Partition walls will be as noted.
- IT/Telecomm provisions:
o Each enclosed office should be afforded two locations of three connections each o Desk positions should be afforded three connections unless noted for additional needs
- Electrical: Standard spacing of one duplex outlet every six feet of wall and no more than 12 feet apart.
Ceilings:
- Ceilings will be drop in tile unless otherwise noted. Min NRC .90
- Communications, network and radio equipment rooms do not require ceilings
- Solid Gypsum board ceilings will be noted as required.
HVAC:
- Overall Secret Service space will be independently controlled from the rest of the building with
24 hour operation will be available upon request
- Sections of the facility will have independent 24/7 cooling.
Electrical
- All Systems within the Secret Service space will be independently supplied and controlled
- Generator back up may be requested
- Audio announcement and public address systems will be segregated at the perimeter of the
Secret Service Space. With the exception of the Fire annunciator, no secret service audio systems will be tied to general building systems.
- Lighting systems will be independently controlled in the Secret Service Space.
- Conferencing areas may require need dimmable lighting systems.
- Outlets are 110 V 20 A duplex unless otherwise noted
Locking systems
- All doors will be furnished with locking systems unless otherwise noted
- Locking systems must allow use of large format 6 Pin interchangeable cores.
- Specific doors will be identified to accept additional lock support for electronic combination lock systems and or electrified locksets
Communications Network
- All office system cabling systems will be wired for data speed minimums of CAT6
- Specific areas will require additional networking and cabling provisions
General specifications of office, support and lab spaces will include the following:
- Fire System – System must meet all Federal, States and Local Law/Regulations.
- Doorways – All doorways in the suite must be ADA compliant.
- In reference to cancellable Occupancy Agreements, these modifications do not drive cancellable level changes to the structure.
General Office Areas:
SES SAIC will be allotted a 120 sf office space with an upgraded desk plus space to be fitted with a four person couch as well as two arm chairs. The office space will also include a six person conference table side table and credenza total space not to exceed 300 SF
Walls: The office should be constructed with sound attenuating walls
IT/Telecom: The office should be afforded three connections in two locations plus two data connections for additional equipment.
Electrical: Standard plus two outlets for special equipment
SAIC will be allotted a 120 sf office space will be fitted with an upgraded desk, a two person couch as well as two visitor chairs. The office space will include a four person conference table, side table and credenza total space not to exceed 280 SF
Walls: The office should be constructed with sound attenuating walls
IT/Telecom: The office should be afforded three connections in two locations plus two data connections
RAIC/DSAIC will be allotted a 120 sf office space will be fitted with an upgraded desk, two arm chairs.
The office space will include a four person conference table total space not to exceed 220 SF
Walls: The office should be constructed with sound attenuating walls
IT/Telecom: The office should be afforded three connections in two locations plus two data connections
Electrical: Standard plus two outlets
ASAIC/ ATSAIC will be allotted a 96 sf office space will be fitted with a standard desk and two visitor chairs total space not to exceed 120 SF
Walls: The office should be constructed with sound attenuating walls
IT/Telecom: The office should be afforded three connections
Senior/Supervisory Special Agent will be allotted a 64 sf High wall modular office space or enclosed office based on mission of position. Space will be fitted with a standard desk and two visitor chairs not to exceed 96 SF total
Walls: The office should be constructed with sound attenuating walls
Electrical: Standard
Special Agent will be allotted a 48 sf standard wall modular office space will be fitted with a standard desk and one visitor chair
Walls: standard wall modular office
Sup. Admin Officer/ Supervisory APT / PSA will be allotted a 64 sf high wall partition or standard wall office space will be fitted with a standard desk and two visitor chairs
Walls: The office should be constructed with sound standard walls
Electrical: Standard plus one outlet
APT Non-Supervisory position will be allotted a 48 sf standard modular office space will be fitted with a standard desk and one visitor chair
Walls: The office should be constructed with partition walls
Hoteling space
Walls: The 42 SF office will be constructed as a standard wall modular office space and will be fitted with a standard desk as part of an open office configuration
Equipment Support node
Walls: The space will be open areas identified for community office equipment
IT/Telecom: The space should be afforded one network connection per item plus one spare
Electrical: One dedicated circuit outlet will be required per item at location of equipment
Small Conference Area
Walls: The space should be constructed with sound attenuating standard walls
IT/Telecom: The office should be afforded three connections
Electrical: Standard plus two outlets for special equipment. Under carpet cabling system requested similar to Connextrack to supply three IT, one telephone and electrical connection to conference table
Special conference area
Walls: The space should be constructed with sound attenuating partition standard walls
IT/Telecom: The space should be afforded five connections similar to Connextrack to supply three IT, one telephone and electrical connection to conference table
Conference areas
IT/Telecom: The office should be afforded three connection locations based on layout similar to Connextrack to supply three IT, one telephone and electrical connection to conference table
Copier mail room
Walls: The space should be constructed with standard walls
IT/Telecom: The space should be afforded one network connection per item plus one spare and one telephone connection
Electrical: One dedicated circuit outlet will be required per item at location of equipment
File Room
IT/Telecom: The office should be afforded one telephone connection
Electrical: TBD based on configuration
Coffee Bar
Walls: The location of the coffee bar will be open and accessible to occupants
IT/Telecom: None Required
Electrical: one outlet every three feet
Break room
IT/Telecom: The space should be afforded one telephone connection
Electrical: Standard plus one outlet every three feet of counter space
Waiting Room
Walls: The office should be constructed with fortified sound attenuating walls.
IT/Telecom: The space should be afforded one telephone connection
Level 3 transaction window with deal tray will be installed at the waiting room area
Mail processing room
Walls: The office should be constructed with fortified sound attenuating walls if the walls face occupied space. The mail processing room should be collocated with the entrance/waiting room.
IT/Telecom: The space should be afforded one telephone connection
Electrical: Standard plus one dedicated outlet
HVAC: System will be set to provide negative pressure at this location with direct exhaust.
Security Equipment Room (SER)
Walls: The office should be constructed with sound attenuating partition standard walls
IT/Telecom: The office should be afforded one telephone connection
Electrical: Normally two dedicated circuits
Equipment Mounting: One or more walls will be fit with ¾ inch plywood to facilitate installation of security control equipment
Combined Equipment Room (CER)
Walls: The space should be constructed with standard walls. Three of four walls will be equipped with
¾” plywood from 18” ABF to 84” ABF to allow mounting of security or telecomm equipment on any of the walls.
IT/Telecom: The space needs connection to the Building Main Distribution Frame (MDF) DMARC and routes to the roof if radio support is needed from the office.
Cooling: 24/7 cooling at 3-10 tons based on size of the office.
Generator Support: TBD
Ceiling: None required
Electrical: Normally twelve dedicated 110V 20A circuits plus three convenience outlets. The final number based on size of office/size of Communications Equipment room. Dedicated Circuits will be available to racks (two per rack) and wall mounted equipment.
Equipment Mounting: All Equipment will be mounted either in equipment racks or attached to the walls.
Evidence Storage room
Walls: The space should be constructed with fortified walls
IT/Telecom: The space should be afforded three connections and one telephone connection
Electrical: Standard plus one outlet
Furniture: Office furniture may be required if the office does not have an evidence custodian position assigned.
Evidence Custodian
Walls: The office should be constructed with standard walls
Electrical: Standard plus
General Storage
IT/Telecom: The space should be afforded one telephone connection
Duty Room
Walls: The office should be constructed with sound attenuating standard walls
IT/Telecom: The office should be afforded three connections plus connections for each identified duty position
Electrical: Standard plus outlets to support installed equipment TBD
HVAC: 24-7 HVAC will be available to this room
Counterfeit Control Office/work room
IT/Telecom: The office should be afforded three connections for support equipment
Counterfeit storage
IT/Telecom: The office should be afforded one telephone connection
Electrical: Standard
Furniture: Office furniture may be required if the office does not have a counterfeit control officer assigned.
Polygraph, Prisoner Processing and Interview spaces:
Polygrapher will be allotted a 64 sf office space will be fitted with a standard desk and two visitor chairs not to exceed 96 SF total
Walls: The office should be constructed with sound attenuating walls
Electrical: Standard plus two outlets
Polygraph Room
Walls: The office should be constructed with sound attenuating fortified walls
IT/Telecom: The office should be afforded three connections
Prisoner processing with toilet
Ceiling: Drywall
Fitment: All installed equipment will be tamper-disassembly resistant. Restraint Points will be installed in the room. Install blocking in wall to properly attach 2” Metal grab bars
Bolt Metal Tables to floor in Interview Rooms and Prisoners Processing Room.
Furnishings: Prison Grade toilet and sink combo to be installed
IT/Telecom: The office should be afforded one telephone connection
Prisoner processing
Walls: The space should be constructed with sound attenuating fortified walls
Ceiling: Drywall
Fitment: All installed equipment will be tamper-disassembly resistant. Restraint Points will be installed in the room.
IT/Telecom: The space should be afforded three connections.
Interview Room
Walls: The space should be constructed with sound attenuating fortified walls
Fitment: All installed equipment will be tamper-disassembly resistant
Ceiling: Drywall
Telephone monitoring room
Walls: The office should be constructed with sound attenuating walls
IT/Telecom: The office should be afforded one telephone connection additional requirements TBD
HSDN
Walls: The office should be constructed with standard walls
IT/Telecom: The office should be afforded three connections, plus one interduct to the CER.
Special Use Spaces:
Secure Conference area
Walls: The office should be constructed with high level sound attenuating fortified walls
IT/Telecom: The office should be afforded one telephone connection additional requirements TBD
Electrical: TBD
Defense Tactics / Firearm room
IT/Telecom: The office should be afforded one telephone connection
Electrical: Standard plus one dedicated outlet
HVAC: System will be set to provide negative pressure at this location with direct exhaust.
Weapons and Ammo Storage cages will provide security for materials
Cleaning table will be installed or purchased separately.
Secured Storage
Walls: The office should be constructed with fortified standard walls
CIO Office
Walls: The 48 SF office will be contiguous with the CIO Workspace of standard walls
IT/Telecom: The office should be afforded two sets of three connections
CIO Work Room
IT/Telecom: The office should be afforded two connections per assigned person
Electrical: High Demand, additional outlets required to maintain equipment on standby.
TSD Office
Walls: The 48 SF office will be contiguous with the TSD Workspace and constructed of standard walls
IT/Telecom: The office should be afforded three connections with a separate interduct to the CER
TSD Work Space
IT/Telecom: The office should be afforded three connections
Electrical: High Demand, additional outlets required to maintain equipment on standby. USB charging stations may be requested.
OST Office
Walls: The 48 SF office will be contiguous with the OST Workspace and constructed of standard walls
OST Work space
INV Office
Walls: The 48 SF office will be contiguous with the INV Workspace and constructed of standard walls
INV Work Space
Task Force Space:
Task Force 42 SF office will be constructed as a modular office space and will be fitted with a standard desk as part of an open office configuration
Walls: The space should be constructed with partition walls
IT/Telecom: The office should be afforded three connections, plus two ECTF network connections.
Task force Case management
Walls: The area should be located contiguous with the Task force office area
IT/Telecom: The space should be afforded three connections for support equipment plus one telephone outlet.
ECTF lab
Furnishings: The Main ECTF will be fitted with Electrical Static Dissipating furniture such as Wright line or
Vidmar Technical Furnishings
Fitment: The space will be fit out with a space dedicated to a server rack.
Cooling: The area will require 24-7 Cooling 3 to 10 Tons required based on Tier of ECTF
IT/Telecom: The space workstations should be afforded a total of five connections, per seat. Three connections to the office main network, and two connections to the internal ECTF network. The space will be fitted with an internal network, server and security.
Electrical: Three Dedicated Circuits plus two circuits per ECTF tech position. Generator Back Up TBD
ECSAP lab
Furnishings: The ECSAP Lab will be fit with Electrical Static Dissipating furniture such as Wright line or
Vidmar Technical Furnishings
Cooling: The area will require 24-7 cooling 2-3 Tons required based on local conditions and space configuration.
IT/Telecom: The office should be afforded Two Sets of three standard connections, and two sets of ECTF network connections.
ECTF/ECSAP Vault
Walls: The office should be constructed with fortified walls and should be contiguous with the associated ECTF or ECSAP lab to facilitate sharing of Cooling resources.
Furnishings: The ECSAP Vault will be fit with Electrical Static Dissipating furniture such as Wright line or
Vidmar Technical Furnishings
Cooling: The area will require 24-7 cooling based on local conditions and space configuration.
IT/Telecom: The office should be afforded one telephone connection if constructed as a walled room with a door
HVAC; 24-7 Cooling required