This is an Agency Specific Requirements document (Exhibit C) for a General Services Administration (GSA) lease facility for the Department of Homeland Security, United States Secret Service (DHS-USSS), identified as solicitation 9CA3164.

The document establishes tenant improvement (TI) standards exceeding GSA shell condition standards and specifies detailed construction requirements for a leased office space. Key location requirements include proximity to public transportation, prohibition from first, second, or top floors, contiguous space accessible via the same elevator bank with secure elevator access, efficient column spacing with no more than 2:1 length-to-width ratio, and standard ceiling heights. The space must include secured enclosed parking for armored vehicles per separate DAV Requirements documentation. Room specifications detail construction standards for multiple space types: open office areas, enclosed rooms, break rooms with kitchenettes (requiring VCT flooring, independent HVAC zones with odor filtration, and approximately 10-12 linear feet of countertop with stainless steel double-basin sink), reception areas (with Aiphone, video monitor, buzzer release button, card reader, and transaction counter), storage rooms, meeting rooms with floor-mounted data and power, conference/training rooms with minimum Sound Transmission Coefficient of 45 or better and ceiling-mounted projection screens, copier rooms, and computer/LAN rooms requiring CAT-6 cabling and 24/7 HVAC with temperature, BTU, and humidity specifications to be determined. Security requirements include shatter-resistant window film, CCTV, duress systems, intrusion detection systems monitored through the FPS Mega Center, FSL Security Level 3, and multiple access control options (keyed, cipher lock, proxy-card, HSPD-12 compatible card readers). All construction details are referenced to a separate "Basic Agency Room Construction Criteria" document for comprehensive specifications.

View the file

Other files

File Type Posted
EXHIBIT C3_DAV Storage.pdf PDF
EXHIBIT C6_Adjacency Diagram.pdf PDF
EXHIBIT D_Security Requirements (FSL Level III).pdf PDF
EXHIBIT 3_GSA Form 1217 Lessor Annual Cost Statement.pdf PDF
EXHIBIT 4_GSA Form 12000_FPLS Prelease Evaluation.pdf PDF
EXHIBIT 5_Seismic Forms A - F.pdf PDF
EXHIBIT 8_Sensitive Information Request.pdf PDF
Exhibit A1 Global Lease Template L100.pdf PDF
EXHIBIT C1_BARCC.pdf PDF
EXHIBIT 2_GSA Form_1364.pdf PDF
EXHIBIT 6_FAR 52.204-24 Representation.pdf PDF
EXHIBIT C2_General DAV Requirements.pdf PDF
EXHIBIT C4_Technical Specifications for SCIF.pdf PDF
Exhibit F_3517B General Clauses .pdf PDF
Exhibit G_GSAR 552.270-33.pdf PDF
9CA3164 (RLP).pdf PDF
EXHIBIT 1_3516 Solicitation Provisions.pdf PDF
EXHIBIT C5_Office and Special Use Counts.pdf PDF
EXHIBIT E_CA Tax.pdf PDF
9CA3164_RLP Amendment No 5.pdf PDF
9CA3164_RLP Amendment No 3.pdf PDF
9CA3164_RLP Amendment No 2.pdf PDF
EXHIBIT 3_GSA Form 1217 Lessor_s Annual Cost Statement.pdf PDF
EXHIBIT 8_Sensitive Information Request.docx DOCX document
EXHIBIT C1_BARCC.docx DOCX document
EXHIBIT C3_DAV Storage.pdf PDF
EXHIBIT F_3517B General Clauses.pdf PDF
EXHIBIT C_Agency Specific Requirements.docx DOCX document
EXHIBIT C4_Technical Specifications for SCIF.pdf PDF
EXHIBIT 4_GSA Form 12000_FPLS Prelease Evaluation.docx DOCX document
EXHIBIT 6_FAR 52.204-24 Representation.pdf PDF
EXHIBIT C6_Adjacency Diagram.xlsx XLSX spreadsheet
2024.2.17__9CA3164_Global RLP.pdf PDF
2024.2.17_EXHIBIT A_Lease L100.pdf PDF
EXHIBIT 2_GSA Form_1364.pdf PDF
EXHIBIT 5_Seismic Forms A - F.pdf PDF
EXHIBIT C2_General DAV Requirements.docx DOCX document
EXHIBIT C5_Office and Special Use Counts.xlsx XLSX spreadsheet
EXHIBIT D_Security Requirements (FSL Level III).pdf PDF
EXHIBIT E_Security Unit Price List FSL III.xlsx XLSX spreadsheet
EXHIBIT G_Foreign Ownership and Financing Representation Form.pdf PDF
EXHIBIT 1_3516 Solicitation Provisions.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

LESSOR:______GOVERNMENT:______

9CA3164

Agency Specific Requirements

DHS-USSS

LESSOR:______GOVERNMENT:______

TABLE OF CONTENTS

SECTION 1 AGENCY UNIQUE REQUIREMENTS

SECTION 2 ROOM SCHEDULE AND DETAILS

2.01 ROOM SCHEDULE

2.02 SPACE DETAILS

A. Open Office Area

B. Enclosed Rooms

C. Break Room and Kitchenette Areas

D. Reception Area

E. Storage Rooms

F. Meeting Rooms

G. Conference/Training Rooms

H. Copier Room/Area

I. Computer/LAN Room

J. Rooms/spaces with Special Flooring Requirements

SECTION 3 ADDITIONAL SPECIAL REQUIREMENTS AND DETAILS

3.01 ROOM LAYOUT

3.02 ADDITIONAL CONSTRUCTION DETAILS

SECTION 4 GENERAL REQUIREMENTS

4.01 SECURITY

4.02 INFORMATION TECHNOLOGY

4.03 OTHER

LESSOR:______GOVERNMENT:______

SECTION 1 AGENCY UNIQUE REQUIREMENTS

● All of the below relate to TI standards found in Section 5 of the lease, which are in excess of GSA standards for shell condition found in Section 3 of the lease, unless a higher standard is specified by the agency.

● Proximity to public transportation

● Building Criteria:

○ Cannot be located on the first, second, or top floor of any building.

○ Space must be contiguous as defined by floors that are vertically stacked, accessible by the same elevator bank, and vertically connected with stairwells.

○ Secure elevator

○ Efficient use of space: column spacing, length to width ratio (ex. No more than

2:1)

○ Ceiling height beyond standard lease-No

● Parking requirements (Secured enclosed area for storage of armored vehicles) See documents labeled DAV Requirements.

SECTION 2 ROOM SCHEDULE AND DETAILS

2.01 ROOM SCHEDULE

See attached Space Detail / Room Schedule.

2.02 SPACE DETAILS

Refer to the GSA Lease for the construction standards applicable to the interior tenant area build-out unless a higher standard is specified below. These standards provide a general outline of the interior build-out requirements. For a complete list of requirements refer to the GSA

Lease and/or attached agency requirements.

A. Open Office Area

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice

● Window Coverings – Window blinds

LESSOR:______GOVERNMENT:______

B. Enclosed Rooms

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice

● Window Coverings – Window blinds

C. Break Room and Kitchenette Areas

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Commercial grade vinyl composite tile (VCT) flooring

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice - Provide three duplex electrical receptacles and one wall combination data/voice jack. Provide two wall mounted dedicated duplex electrical receptacles for refrigerators and/or other appliances. Provide two dedicated electrical receptacles for a microwave oven and/or other appliances above the counter. Provide two additional duplex electrical receptacles above the counter (GFI as required by code).

● HVAC (Only if enclosed room) - Independent HVAC zone on thermostat in this room and provide means to ensure negative pressure for this room to avoid odors from escaping this room. Provide filters to remove odors from any air being mixed back into the supply air for the remainder of the building or exhaust directly to the outside.

● Window Coverings – Window blinds

● Countertop and cabinet - Provide approximately 10-12 linear feet counter with integral backsplash with double basin stainless steel sink and all associated plumbing. Provide approximately 10-12 linear feet of base and wall cabinets with concealed hinges. The layout and finishes will be determined during the design phase.

D. Reception Area

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile

● Walls

LESSOR:______GOVERNMENT:______

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice

● Window Coverings – Window blinds

● ADDITIONAL REQUIREMENTS:

○ Aiphone

○ Video Monitor and buzzer release button to control the electric strike

○ Card reader

○ Transaction counter with clear glass window

E. Storage Rooms

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile OR Commercial grade vinyl composite tile (VCT) flooring.

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice

● Floor load

F. Meeting Rooms

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice – floor mounted data and power.

● Window Coverings – Window blinds

G. Conference/Training Rooms

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile

● Walls

○ Walls surrounding and leading into Conf/Training Rooms to have minimum Sound Transmission Coefficient (STC) of 45 or better

LESSOR:______GOVERNMENT:______

○ Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Window Coverings – Window blinds

● Electrical, Data, Voice – floor mounted data and power.

● ADDITIONAL REQUIREMENTS:

○ Flush ceiling mounted powered project screen with data and wiring and ceiling mounted projector stand with power supply.

○ Wall to be capable to support a mounted flat screen monitor.

H. Copier Room/Area

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Carpet tile and/or vinyl composite tile (VCT) flooring.

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice

I. Computer/LAN Room

See document labeled Basic Agency Room Construction Criteria for below:

● Flooring – Vinyl composite tile (VCT) flooring.

● Walls

● Door

○ Door Hardware

○ Door Identification

● Ceiling

● Lighting

● Electrical, Data, Voice-floor mounted data and power.

● CAT-6 cabling

● 24/7 HVAC needed for Server Room

○ Temperature range-TBD

○ BTU-TBD

○ Humidity range-TBD

J. Rooms/spaces with Special Flooring Requirements

● Lab space: anti- static carpet

LESSOR:______GOVERNMENT:______

SECTION 3 ADDITIONAL SPECIAL REQUIREMENTS AND

DETAILS

3.01 ROOM LAYOUT

● Standard office

3.02 ADDITIONAL CONSTRUCTION DETAILS

These construction details indicate required construction standards for the items listed. These standards may be more stringent than those listed in the Lease document. Where specified, these standards shall take precedence.

SECTION 4 GENERAL REQUIREMENTS

4.01 SECURITY

The following security standards are listed in addition to those listed in the Lease document and the building specific security attachment.

● Shatter resistant window film

● CCTV

● Duress

● IDS

● Agency’s security goes through the FPS Mega Center

● FSL Security Level (I, II, III, IV)

○ Current building FSL: 3

● Access to space: Keyed; Cipher Lock; Proxy-Card; HSPD-12 Compatible Card Reader

○ List of interior spaces requiring secured access. See document labeled Basic

Agency Room Construction Criteria

● Intrusion Detection System (IDS)

○ FPS Mega Center monitored

4.02 INFORMATION TECHNOLOGY

The following IT standards are listed in addition to those listed in the Lease document OR see attached specifications from the agency.

4.03 OTHER

All other space types not listed above, see document labeled Basic Agency Room Construction

Criteria.