This is a blank Bidding Schedule for three federal contract opportunities related to airport facility maintenance and repair work. The schedule covers contract numbers UHHZ210404, UHHZ150412, and UHHZ160138 and requires contractors to provide all plant, labor, materials, equipment, and supplies for the specified work.

The solicitation includes one base line item and four optional line items. Item 0001 is the mandatory base item for contract UHHZ210404, requiring removal and replacement of slabs and shoulders and maintenance/painting of Runway 3901. Item 0002 provides an option to replace the south overrun area under the same contract, with Item 0002A providing contingency pricing for the same work. Item 0003 is an optional item under contract UHHZ150412 for repair work on Taxiway C (Facility 3931). Item 0004 is an optional item under contract UHHZ160138 for repair and correction of drainage and storm drain disposal (Facility 8700). All pricing is to be provided in blank spaces for each line item, with a total amount required. The document includes standard contractor identification fields (company name, person, title, and date) and includes a critical note strongly recommending site visits to determine work complexity and material requirements, as conditions visible during site inspection will not be considered under the Differing Site Conditions contract provision.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule (Blank) - 4-Nov-99

UHHZ210404,UHHZ150412,UHHZ160138

BIDDING SCHEDULE

ITEM DESCRIPTION AMOUNT

0001 Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for UHHZ210404 to REMOVE/REPLACE SLABS AND

SHOULDERS AND MTN/PAINT RUNWAY, RUNWAY, 3901 $__________

0002 Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for UHHZ210404 to Replace south Overrun for REMOVE/REPLACE

SLABS AND SHOULDERS AND MTN/PAINT RUNWAY,

RUNWAY, 3901 $___________

0002A Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for UHHZ210404 to Replace south Overrun for REMOVE/REPLACE

SLABS AND SHOULDERS AND MTN/PAINT RUNWAY,

RUNWAY, 3901 (Contingency Pricing) $___________

0003 Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for UHHZ150412 to REPAIR TWY C, TAXIWAY, FCLTY/ 3931 $___________

0004 Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with the Drawings and Specifications for UHHZ160138 to RPR/CORRECT DRAINAGE, STRM DRN

DSPL, FCLTY 8700 $__________

TOTAL ==> $___________

BIDDING COMPANY: ____________________________

PERSON: _______________________________________

TITLE: __________________________________________

DATE: __________________________________________

NOTE: We strongly recommended the contractor visit the site to determine the complexity of the work and the amount of material required for this project. Field measurements may have been necessary to determine the size and quantity of materials. Conditions that the Contracting Officer decides would have been obvious or visible to the contractor on inspection at the site visit will not be considered under the Differing Site Conditions provision of the contract.