This is an Erosion, Sedimentation, and Pollution Control Plan (ESPCP) template for construction projects at Robins Air Force Base in Houston County, Georgia, designed to comply with General Permit No. GAR10000 under the National Pollutant Discharge Elimination System (NPDES) for stormwater discharges associated with construction activity. The template provides a comprehensive framework for contractors to develop site-specific ESPCPs that address erosion control, sediment management, stormwater pollution prevention, and compliance monitoring throughout all phases of construction. Key requirements include implementation of best management practices (BMPs) with a minimum of 67 cubic yards of sediment storage per acre of drainage area, construction entrance/exit controls, temporary and final stabilization measures, and structural controls such as silt fencing, check dams, sediment basins, and inlet protection devices. The plan mandates certified personnel (Level 1A, 1B, or 2 certification) to conduct daily, weekly, monthly, and rainfall event inspections, with detailed documentation of BMP installation, maintenance, and effectiveness. Contractors must submit a Notice of Intent (NOI) to the Georgia Environmental Protection Division (GA EPD) and Houston County, obtaining authorization within 14 days of submittal before groundbreaking. Sampling requirements include nephelometric turbidity unit (NTU) analysis of stormwater outfalls or receiving waters for qualifying rainfall events (≥0.5 inches), with results submitted to GA EPD by the 15th of the following month and to Robins AFB by the 25th. The template includes detailed appendices for general permits, inspection checklists, certification cards, sample analysis reports, calibration logs, site logs, and technical drawings depicting drainage areas, soil conditions, wetland buffers, BMP locations, stormwater management systems, and velocity dissipation devices. All records must be retained for three years following project completion and Notice of Termination submittal, with amendments required whenever design changes affect BMPs with hydraulic components or when the ESPCP proves ineffective.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN (ESPCP)
SITE NAME
SITE NUMBER
Estimated Completion Date: Day Month Year
WARNER ROBINS AIR LOGISTICS COMPLEX
ROBINS AIR FORCE BASE
HOUSTON COUNTY, GEORGIA
FOR COMPLIANCE WITH
GENERAL PERMIT NO. GAR10000[1, 2, or 3]
AUTHORIZATION TO DISCHARGE UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
[FOR STAND ALONE CONSTRUCTION PROJECTS]
DAY MONTH YEAR
THIS PAGE INTENTIONALLY LEFT BLANK
[Italicized and highlighted text refers to information that must be added/updated by the Contractor. This text should be reviewed and revised as appropriate, and the additional notes and instructions shall be deleted upon completion.]
[The ESPCP should be completed to the extent possible prior to submittal to Robins Air Force Base (AFB) for review. The following items can be left blank during an intermediate design submittal, but must be completed prior to the final design/pre-construction submittal (prior to submitting the NOI):
· Permittee Certification
· Duly Authorized Representative Letter(s)
· Part I. Operator Information
· Part III.I Construction Cost
· Appendix D GSWCC Certification Cards]
TABLE OF CONTENTS
ESPCP CHECKLIST
CERTIFICATIONS AND DECLARATION
1. DESIGN PROFESSIONAL’S CERTIFICATIONS
a. PLAN CERTIFICATION
b. SITE VISIT CERTIFICATION
c. INITIAL BMP INSPECTION REQUIREMENT
2. DULY AUTHORIZED REPRESENTATIVE LETTER(S) [INSERT AS APPROPRIATE]
3. PERMITTEE CERTIFICATION
4. STORM WATER CONTROL DECLARATION IN ACCORDANCE WITH ETL 14-1
ESPCP NARRATIVE
| I. | SITE INFORMATION |
| II. | PERMIT AUTHORIZATION |
| III. | SITE DESCRIPTION |
| IV. | CONTROLS |
| V. | INSPECTIONS |
| VI. | MAINTENANCE |
| VII. | SAMPLING REQUIREMENTS |
| VIII. | REPORTING |
APPENDICES
| A. | GENERAL PERMIT NO. GAR10000[1, 2, or 3] [INSERT APPROPRIATE GENERAL PERMIT] |
| B. | NOTICE OF INTENT AND HOUSTON COUNTY FEE & SOIL EROSION & SEDIMENTATION CONTROL PERMIT APPROVAL |
| C. | INSPECTION CHECKLISTS |
| D. | GSWCC CERTIFICATION CARDS |
| E. | SAMPLE ANALYSIS REPORT AND CALIBRATION LOG |
| F. | SITE LOG |
ATTACHMENTS
1. ATTACHMENT X – NAME
2. ATTACHMENT X – NAME
Attachment X refers to locations where additional information is required to be provided, generally in map or plan form. The Contractor can either:
1. prepare a new figure that meets the suggestions stated in this ESPCP narrative, and include the figure in the Attachments; or
1. use an already prepared drawing set for this site, add the drawing set to the attachments, and indicate within the text which drawing number contains which required information (i.e., “provided on Drawing X in Attachment X”).
Add a sequential number and a title to the added attachments; edit the Table of Contents and the main text that refers to attachments, accordingly.
ESPCP CHECKLIST
[INSERT AS APPROPRIATE BEHIND THIS SECTION,
DELETE INSTRUCTIONS AFTER COMPLETION OF SECTION]
[OBTAIN, COMPLETE, AND INSERT CHECKLIST FOR:
1. THE APPROPRIATE PERMIT TYPE [GENERAL PERMIT NOS. GAR100001 (STAND ALONE CONSTRUCTION PROJECTS), GAR100002 (INFRASTRUCTURE PROJECTS) OR GAR100003 (COMMON DEVELOPMENT)] AND
2. DATED EFFECTIVE AS OF JANUARY 1 OF THE YEAR IN WHICH THE SITE WILL BE PERMITTED, INCLUDING APPROVED AMENDMENTS UP UNTIL THE DATE OF THE NOTICE OF INTENT SUBMITTAL.
3. CHECKLIST SHOULD BE OBTAINED FROM THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION WEBSITE https://gaswcc.georgia.gov/technical-guidance-0.
(Note that checklist includes an Appendix 1, not presented herein, for sites that discharge to an impaired stream segment and for sites in which Georgia Environmental Protection Division (GA EPD) has approved in writing a request to disturb 50 acres or more at any one time.)]
CERTIFICATIONS AND DECLARATION
DESIGN PROFESSIONAL CERTIFICATIONS
Plan Certification:
“I certify that the permittee’s Erosion, Sedimentation and Pollution Control Plan provides for an appropriate and comprehensive system of best management practices required by the Georgia Water Quality Control Act and the document “Manual for Erosion and Sediment Control in Georgia” (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, provides for the sampling of the receiving water(s) or the sampling of the stormwater outfalls and that the designed system of best management practices and sampling methods is expected to meet the requirements contained in the General NPDES Permit No. GAR10000[1, 2 OR 3].”
Name: ______________________________________
SEAL
Title: _______________________________________
Level II Certification Number: ________________________ Signature:___________________________________ Date: ________________________
Site Visit Certification:
“I certify under penalty of law that this Plan was prepared after a site visit to the locations described herein by myself or my authorized agent, under my supervision.”
Name: ______________________________________
SEAL
Title: _______________________________________
Level II Certification Number: ________________________ Signature:___________________________________ Date: ________________________
Initial BMP Inspection Requirement:
The design professional who prepared the ESPCP is to inspect the installation of the initial sediment storage requirements and perimeter control BMPs within seven (7) days after installation. This inspection shall determine if the identified BMPs have been installed and are being maintained as designed. The results of the inspection shall be submitted to the Primary Permittee (Owner and/or Operator/Contractor) within seven (7) days after the inspection. The Primary Permittee shall correct all deficiencies within two (2) business days of receipt of the inspection report; unless weather related site conditions are such that additional time is required.
I, (Name of Design Professional):
__ agree to conduct the required inspection.
__ agree and delegate the following alternative design professional to conduct the require inspection. [Note: A request for an alternate design professional must be submitted in writing and approved by the GA EPD. Submit a copy of the request to Robins AFB at the time of submittal to GA EPD.]
Name: ___________________________ Title: ___________________
SIGNATURE REQUIREMENTS
[This page is information only and can be deleted after review and evaluation as to who will be signing documents on behalf of the permittee.] ALL SUBSEQUENT REPORTS AFTER NOTICE OF INTENT SUBMITTAL SHALL BE SIGNED, AND SUBMITTED IF NECESSARY BY AN INDIVIDUAL THAT HAS SIGNATORY AUTHORITY FOR THE PERMITTEE’S BUSINESS ENTITY, UNLESS THAT INDIVIDUAL DELEGATES ONE OR MORE DULY AUTHORIZED REPRESENTATIVES.
Signatory authority is defined as (Part V.G.1 of General Permit No. GAR10000[1, 2, and 3]):
a. For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (1) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision- making functions for the corporation; or (2) the manager of one or more manufacturing, production or operating facilities provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, State, Federal, or other public facility: by either a principal executive officer or ranking elected official.
A duly authorized representative of a signatory authority, is valid only if (Part V.G.2 of General Permit No. GAR10000[1, 2, and 3]):
a. The authorization is made in writing by a person(s) described above and submitted to the GA EPD;
b. The authorization specifies either an individual or a position having responsibility for specified operation(s) of the regulated facility or activity, such as the position of manager, operator, superintendent, or position of equivalent responsibility or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may be either a named individual or any individual occupying a named position).
**If a duly authorized representative is to be used, attach a copy of the authorization letter submitted in writing to the GA EPD behind this page.
DULY AUTHORIZED REPRESENTATIVE LETTER(S)
[INSERT AS APPROPRIATE BEHIND THIS SECTION, OR DELETE SECTION; DELETE INSTRUCTIONS AFTER COMPLETION OF SECTION]
All inspection reports, sampling reports, and other reports requested by the GA EPD shall be signed by a person meeting signatory requirements as described in Section V.G of the General Permit No. GAR10000[1, 2, or 3] (and described in the Permittee Certification section of this ESPCP), or a duly authorized representative of that person. The authorization must be made in writing by the person meeting the signatory requirements, submitted to the GA EPD, and specify either an individual or a position having responsibility for the specified operation(s) of the regulated facility or activity, or an individual or position having overall responsibility for environmental matters for the company. Insert letter here if permittee intends to use a duly authorized representative to sign reports.
PERMITTEE CERTIFICATION
[The following certification shall be signed in accordance with Part V.G of the General Permit No. GAR10000[1, 2, or 3], by a permittee representative with signatory authority, or a duly authorized representative, as described above. Complete the signatory information below and delete these instructions upon completion.] “I certify under penalty of law that this report and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that certified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
Signature: ______________________________________ Name: _____________________________________________ Title: _____________________________________________ Company: _____________________________________________
__ Permittee who meets signatory requirements [See definition above.] __ Duly authorized representative of permittee who meets signatory requirements. [Note: An authorization for duly authorized representative must be submitted in writing to the GA EPD. Attach a copy of the authorization letter in front of this page.]
STORM WATER CONTROL DECLARATION IN ACCORDANCE WITH ENGINEERING TECHNICAL LETTER (ETL) 14-1: STORM WATER CONSTRUCTION STANDARDS [All Air Force construction projects must affirm by declaration that the project does or does not require an NPDES construction stormwater permit and must provide a thorough explanation of the circumstances. This determination needs to be made early in the project development, preferably during the project definition phase and should also be covered during the Environmental Impact Analysis Process (EIAP). The following is suggested language to include on applicable contract or project documents and can be written to show intent during the early project development but must indicate completion before project groundbreaking. The declaration should include the following or equivalent content:]
1. The Air Force has determined that this project involves the disturbance, breakage, and/or movement of earth on land at a construction site encompassing a total aggregate site area of [X] acre(s).
2. [Select one of the follow statements as applicable; delete the not applicable statements] This construction site area is less than one acre and does not require a NPDES storm water construction permit. The activities taking place at this site (will be/have been) evaluated for their potential to generate or contaminate storm water. Best management practices and pollution prevention practices appropriate for this size and type project will be implemented during project construction.
OR
This construction site area involves the repair and maintenance of a facility that does not change the original line and grade, hydraulic capacity, or purpose of the facility site; and therefore, does not require an NPDES storm water construction permit.
OR
This construction site area is greater than one acre or is less than one acre but is judged to be part of a larger common plan of development exceeding one acre and requires coverage under an NPDES storm water construction permit.
This project comes under the jurisdiction of construction General Permit No. [X]. A Notice of Intent (NOI) to comply with the provisions of this general construction permit [will be/was] submitted on [date], [X] days before groundbreaking of this project commences.
3. Activity at this construction site [will be/was] completed [by] on [date], and a Notice of Termination [will be/was] issued [date].
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN NARRATIVE
[Italicized and highlighted text refers to information that must be added/updated by the Contractor. This text should be reviewed and revised as appropriate, and the additional notes and instructions shall be deleted upon completion.]
I. SITE INFORMATION
This ESPCP covers the [insert the name of the specific construction site here] site at Robins Air Force Base (Robins AFB) located in Houston County, Georgia. For the purpose of this ESPCP and the General Permit No. GAR100001 (a copy of which is provided in Appendix A), the Owner and Operator information is as follows:
Owner:
Robins Air Force Base
| Address |
| 78 CEG/CEIEC |
775 Macon Street, Building 1555 Robins AFB, Georgia 31098
| Contact Person (POC) |
| Marissa Willis |
| Position/Title |
| Water Quality Program Manager |
| Phone |
| 478-222-2526 office |
| marissa.willis.2@us.af.mil |
Operator:
The Primary Permittee shall be the operator (construction contractor) of record for this site.
| Company Name |
| Company Name |
| Address |
| Street Address 1 |
Street Address 2 City, State Zip Code
| Phone |
| Office Phone Number |
| 24-Hour Local Contact Responsible for Erosion, Sedimentation, and Pollution Controls |
| Name |
| Position/Title |
| Position/Title |
| Phone |
| Phone Number |
| Email Address |
II. PERMIT AUTHORIZATION
A. The Notice of Intent (NOI) for authorization for coverage under General Permit No. GAR100001, Authorization to Discharge under the National Pollutant Discharge Elimination System Storm Water Discharges Associated with Construction Activity For Stand Alone Construction Projects is included in Appendix B of this document, with the proof of submittal from the electronic submittal service provided by the GA EPD, the GA EPD Online System (GEOS). The site is authorized to discharge stormwater from construction activities under the terms and conditions of the General Permit fourteen (14) days after the date that the NOI is submitted and confirmation of submittal is received, unless indicated otherwise by GA EPD. A copy of the check/money order submitted or Automated Clearing House (ACH) receipt is also included in Appendix B of this document. [COMPLETE THE NOI THROUGH THE GEOS WEBSITE: https://geos.epd.georgia.gov/GA/GEOS/Public/GovEnt/Shared/Pages/Main/Login.aspx. If payment is mailed, note to include the NOI proof of submittal with the payment.]
B. A copy of the check for fees to be submitted to Houston County is included in Appendix B of this document. The Robins AFB POC will coordinate with Houston County for the issuance of the Soil Erosion and Sedimentation Control Permit. A copy of this permit shall be placed in Appendix B upon receipt.
C. [If the site will disturb 50 acres or greater at any one time, include this item. Otherwise, delete this item]. Written authorization from the GA EPD District Office has been obtained to disturb greater than 50 acres at one time. A copy of this authorization shall be placed in Appendix B upon receipt.
III. SITE DESCRIPTION
A. Nature of Construction Activity: The site will consist of [provide a description of the proposed site construction activities, including each activity that disturbs soil and groundcover on the site (i.e., grubbing, excavating, grading, embankment)].
B. Site Location: The construction site for which this ESPCP is intended is located at approximately latitude [X] north and longitude [X] west. The general location (or vicinity map) of the construction site is presented in Attachment X.
C. Site Scheduling: The construction site is expected to be completed in [XX weeks/months/years]. The following is a general description of the intended sequence of major activities that will disturb soils for major portions of the site. The site schedule, with BMP implementation, is provided in Attachment X [Note that a chart or timeline is required to be included. A sample schedule timeline is provided in the Attachments Guidance].
1. Install initial erosion and sediment controls . . .
2. [XXX].
3. [Add as many items as necessary to cover initial sediment storage requirements and perimeter control BMPs, clearing and grubbing activities, excavation activities, grading activities, infrastructure activities, and temporary and final stabilization. The section should conclude with the item below.]
4. Permanently stabilize site through [describe methods]. Robins AFB requires that all construction sites be stabilized using permanent stabilization measures at the earliest time possible. Construction sites shall be managed to ensure appropriate timing of seed/sod application to ensure successful germination and growth of permanent grass. Seeding between March and August shall consist of hulled Bermuda or Centipede; seeding between September and February shall consist of a mixture of Winter Rye and un-hulled Bermuda. Sod shall consist of Bermuda and shall not be installed between September and February. Brown Top Millet is not authorized for use at Robins AFB.
5. Remove erosion and sediment control measures.
D. Area Estimates:
1. Estimated Total Site Area: [x.x] acres
2. Estimated Total Disturbed Area: [x.x] acres
3. Non-impervious/Impervious Site Areas
| AREAS (ACRES) |
| PRIOR TO CONSTRUCTION ACTIVITIES |
| AFTER CONSTRUCTION ACTIVITIES |
| Paved Road Area |
| Value |
| Value |
| Unpaved Road Area |
| Value |
| Value |
| Paved Parking Area |
| Value |
| Value |
| Unpaved Parking Area |
| Value |
| Value |
| Aquatic Area |
| Value |
| Value |
E. Drainage Areas and Flow Rates:
1. Drainage Areas — Pre-development drainage areas were delineated for the project site and are depicted on Attachment X [Areas on figure should include acreage]. Post-development drainage areas were delineated for the project site and are depicted on Attachment X [Areas on figure should include acreage].
2. Peak Discharge Flows — Peak discharge flows were evaluated using the [X Method; Rational Method or NRCS TR-55 Methods recommended; Rational Method is NOT allowed for storage design] for the [X-year] return period event. The [runoff coefficients or curve numbers] for the pre- and post-development conditions were evaluated as follows: [List all values and descriptions that apply to land use types on-site; calculate composite runoff coefficient or curve number and provide calculations as appropriate. Recommended runoff coefficient or curve number values can be found in Tables 3.1.4-2 or 3.1.5-1 of the Georgia Stormwater Management Manual, Volume 2 (2016 Edition).] The time of concentration for the project site was [calculated/assumed as XXX minutes based on XXX calculations/assumptions]. The rainfall intensity for the project site is [XXX inches/hour] for the [XX-year, XX-hour design storm OR XX time of concentration], as obtained from the Precipitation Frequency Data Server database (http://hdsc.nws.noaa.gov/hdsc/pfds). Therefore, the peak discharge flow rates for the project site area are calculated as [modify layout if multiple outfall/discharge locations are evaluated]:
a. Pre-development: [XXX] cfs
b. Post-development: [XXX] cfs [Post-development peak flow rates must be less than or equal to pre-development peak flow rates. If post-development peak flow rates are greater than pre-development peak flow rates, because the calculation methodology does not account for post-construction BMPs, provide narrative explanation as to how the design will ultimately result in the post-development flow rate to be less than the pre-development flow rate.] The Stormwater Management Site Plan (also referred to as the Hydrologic and Hydraulic Report) is provided under separate cover, and includes the detailed calculations supporting the Peak Discharge Flows listed herein.
F. Soil Description and Native Vegetation: Based on the Natural Resources Conservation Service (NRCS) web soil survey for Houston County, Georgia, dated [Month, Year], the soils in the site area are comprised of [types, Hydrologic Soil Groups]. The soil series delineations are shown on Attachment X [Soils map provided must include the table that depicts what the soil symbols represent – type or Hydrologic Soil Group]. The native vegetation type is [vegetation type].
G. Surface Water Identification:
1. Receiving Waters – The receiving waters for the site are [name the initial receiving waters, through to the first named receiving water].
2. Wetland and Surface Waters – [There are no wetlands or surface waters on-site. The site is not adjacent to wetlands or surface waters. OR Describe areas, including adjacent areas of streams, lakes, residential areas, wetlands, etc. that may be affected. If wetlands or state waters are located within 200-feet of the project site, include following statement: Wetlands and state waters are located within 200-feet of the project site and are depicted on Attachment X. Stream buffers are shown on these figures/maps. If wetlands are located on-site, include areal extent of wetland acreage.] Non-exempt activities shall not be conducted within the 25 or 50-foot undisturbed stream buffers as measured from the point of wrested vegetation or within 25-feet of the coastal marshland buffer as measured from the Jurisdictional Determination Line without first acquiring the necessary variances and permits. If activities are to be conducted within the stream buffer or within the wetlands, include the following statement and information: The following activities are proposed within the stream buffer and/or wetlands (as applicable): provide description of encroachment activity. Applicable variances and permits for activities to be conducted within the undisturbed stream buffers or wetlands (as applicable) are provided in Attachment X.
3. Impaired Waters – The project site does not discharge stormwater into, or within 1 linear mile upstream of and within the same watershed as, any portion of a biota impaired stream segment. [Note that based on the Georgia Final 2016 305(b)/303(d) List Documents (Approved), no stormwater from Robins AFB discharges into Biota Impaired Stream Segments as described in the General Permit. However, several receiving waters are listed for other impairments (i.e., Ocmulgee River, from Sandy Run Creek to Big Indian Creek and Sandy Run Creek, from Bay Gall Creek to Ocmulgee River). The most current “305(b)/303(d) List Documents (Approved)” at the time of NOI submittal should be checked to evaluate if any changes have occurred that impact the receiving waters of the Base (i.e., Ocmulgee River, Sandy Run Creek, Echeconnee Creek, and Horse Creek).]
H. Critical Areas: [Describe critical areas and protection measures for those areas, on-site and adjacent to the site. Critical areas may include crossing state waters, disturbance inside the stream buffer, wetlands, residential areas, neighboring property to which the project site drains, etc. or No critical areas exist related to the site.]
I. Construction Cost: The total construction cost of this project is [X]. The estimated cost to implement the ESPCP is [X].
IV. CONTROLS
A. Erosion and Sediment Controls:
1. The nature of construction activity at this site generally consists of [give description of general construction activities and how they relate to erosion and sediment control phasing].
2. Initial sediment storage requirements and perimeter control BMPs will consist of [fill in]. Initial phase must include the required 67 cubic yards per acre of sediment storage, construction exit, tree-save fence if applicable, and BMPs necessary to prevent sediment from leaving the site (e.g., silt fence, inlet protection on existing storm drain structures, diversions, check dams, temporary ground cover, etc.). Limits of disturbance are to be only the areas needed to install the BMPs. Sediment storage options consist of Sd3 (Temporary Sediment Basin), Sd4 (Temporary Sediment Trap), Rt (Retrofitting), excavated Sd2 (Inlet Sediment Trap), or SpB (Seep Berm).
3. Intermediate grading and drainage BMPs will consist of [fill in]. BMPs should include inlet protection, additional silt fence as needed, revised sediment storage needed as drainage areas are altered, outlet protection, temporary and/or permanent vegetation, etc.
4. Final BMPs will consist of [fill in]. For construction sites where there will be no mass grading and the initial sediment storage requirements and perimeter control BMPs, intermediate grading and drainage BMPs, and final BMPs are the same, a single phase ESPCP may be prepared. If so, merge notes 2 through 4 into one note: No mass grading will occur at this site. The initial sediment storage requirements and perimeter control BMPs, intermediate grading and drainage BMPs, and final BMPs are the same. Therefore, this ESPCP combines all of the BMPs into a single phase. BMPs will consist of [fill in].
5. Controls are depicted in Attachment(s) X. Detailed drawings for all structural practices are provided in Attachment(s) X.
a. The following Equivalent BMP products are specified for use on this site: [List products, including Symbol and source/product name to be used as an equivalent BMP to those listed in the “Manual for Erosion and Sediment Control in Georgia.” Equivalent BMPs can be found on “The Georgia Soil and Water Conservation Commission’s Equivalent Best Management Practice List (EBMPL)” at http://gaswcc.georgia.gov/documents-list#field_related_links-95-E.
OR delete this section if no Equivalent BMPs are to be used.]
b. The following Alternative BMP products are specified for use on this site: [List products, including Symbol and source/product name to be used as an alternative BMP OR delete this section if no Alternative BMPs are to be used.] Attachment X includes the following information, signed and certified by the Design Professional: (i) one page summary detailing why the alternative BMP is equivalent or superior to the conventional BMPs in the “Manual for Erosion and Sediment Control in Georgia”; (ii) documented side by side testing (alternative vs. conventional) using appropriate design requirements and specifications contained in the Manual; (iii) proof that the alternative BMP was previously installed and worked under conditions comparable to the environmental conditions of the proposed site; and (iv) all specifications including the design requirement and procedures for proper installation and maintenance.
6. The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities.
7. Structural controls to be used include: [list structural controls designed for the site (e.g., silt fence, diversion berms, check dams, inlet protection devices, sediment basins, etc.)] For each common drainage location, a sediment basin providing at least 67 cubic yards of storage per acre drained shall be provided until final stabilization of the site. Sediment storage options consist of Sd3 (Temporary Sediment Basin), Sd4 (Temporary Sediment Trap), Rt (Retrofitting), excavated Sd2 (Inlet Sediment Trap), or SpB (Seep Berm). The sediment basin must utilize an outlet structure that withdraws water from the surface, unless infeasible. Include as appropriate: (i) calculations (e.g., design worksheets provided in the “Manual for Erosion and Sediment Control in Georgia”) for the design of sediment basins and include in and reference Attachment X; (ii) a written rationale explaining the decision to use equivalent controls when a sediment basin is not provided for each common drainage location; and/or (iii) a written justification explaining the decision that outlet structures that withdraw water from the surface of the sediment basin are infeasible when not provided].
8. Temporary stabilization measures shall consist of [describe temporary stabilization measures]. Temporary stabilization measures shall be initiated as soon as practicable, but in no case more than 14 days after, in portions of the site where construction activities have temporarily or permanently ceased. Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding.
9. Final stabilization measures shall consist of [describe final stabilization measures].
10. Staging and access for construction equipment shall be provided [describe construction equipment staging areas, construction entrance locations, etc.].
11. Best management practices shall be implemented in accordance with the design specifications contained in the “Manual for Erosion and Sediment Control in Georgia”.
B. Stormwater Management: The post-construction stormwater management system will consist of the following measures to be installed during construction: [fill in measures (e.g., stormwater detention and retention structures, flow attenuation from open vegetation, infiltration of runoff on-site, vegetated swales, storm drain inlets that protect stormwater runoff from entering the conveyance system, velocity dissipation devices, etc.) If post-construction stormwater management system is not being modified, include the following statements: The post-construction stormwater management system is not being modified during the construction activities. Therefore, no new or additional stormwater management measures will be installed during the project.
1. Storm drain pipes and weirs are depicted in Attachment X. Calculations demonstrating that appropriate velocity dissipation devices at discharge locations and as channel linings have been designed to accommodate discharges without erosion are provided in Attachment X. [A sample table for velocity dissipation/channel lining design is provided in the Attachments Guidance.]
2. The basis for selection of these practices to control pollution is [add discussion].
C. Other Controls: The following general BMPs will be implemented during each phase of construction at this site.
1. Worksite Housekeeping – Maintain good housekeeping practices at the project site and equipment/material storage locations.
2. Waste Disposal – Waste materials will be properly disposed of in accordance with Base protocols. Waste materials shall not be discharged to the waters of the State, except as authorized by a Section 404 permit. Locate waste disposal areas near construction site entrance(s) to the extent practicable and away from streets, gutters, watercourses, and storm drains. Provide secondary containment for liquid waste collection areas. Clear the construction site daily of trash, including organic debris, packaging materials, scrap, surplus building material, and domestic waste. Provide cover (e.g., plastic sheeting or temporary roofs) for construction wastes and trash to minimize exposure to precipitation and stormwater. Inspect waste disposal areas at least weekly and after each rain event.
3. Off-Site Vehicle Tracking – Off-site vehicle tracking of dirt, soils, and sediments and the generation of dust shall be minimized or eliminated to the maximum extent practical. Stone construction entrance/exits are the BMPs for minimizing off-site tracking of soils. Construction entrance/exits are located [describe locations] and are shown on Attachment X. Under conditions where soils have high moisture content, it may be necessary to build a wash area to remove solids from vehicles leaving the project site. Muddy equipment should be cleaned before it tracks mud onto base streets or public highways and any resulting on-site wash water should be properly contained and discharged. Inspect entrances/exits at least daily and after each rain event.
4. Sanitary Waste – All applicable State and local waste disposal, sanitary sewer, or septic system regulations will be met. All portable toilets will be equipped with internal dual containment or will be placed in a bermed area. Inspect sanitary waste areas at least weekly and after each rain event.
5. Spills –
a. The use of any petroleum products on-site will comply with all State and local regulations for storage and handling. Portable or permanent petroleum dispensing units will have dual containment or be placed in an impervious bermed area that is able to hold 130% of the total volume of the largest tank.
b. A full-service spill kit will be located on-site for minor leaks and drips. Spill kits should include absorbent pads, spill booms, personnel protection equipment, and disposal bags.
c. Minor spills and leaks from construction equipment are a source of potential discharge. Any spills will be cleaned immediately with absorbent material and disposed of in accordance with applicable regulations. Do not use water to wash down petroleum, oils, and lubricants (POL) spills from pavements.
d. All leaks and spills regardless of the quantity must be reported by the Contractor to the Robins AFB POC. For spills over five gallons, the Contractor will immediately call 911. The fire department will in-turn notify 78 CEG/CEIEC’s spill representative, who will make the required GA EPD and National Response Center notifications.
6. Material Delivery and Storage – Designate a material storage area that is provided with secondary containment. Store material on pallets. Provide a covering or shelter for building materials, building products, landscape materials, fertilizers, pesticides, herbicides, detergents, and other materials that could result in a discharge of pollutants to minimize contact with precipitation and stormwater. Store containers, drums, and bags away from direct traffic routes, in accordance with manufacturer’s recommendations, and in a manner to protect against contamination of stormwater. As construction proceeds, relocate the storage area into the building shell when feasible. Inspect storage facilities at least weekly and after each rain event.
7. Concrete Washdown/Waste – Create a designated concrete washdown area at least 50 feet from storm drains, open ditches, or waterbodies. Do not allow runoff from this area, by constructing a temporary pit or bermed area large enough for liquid and solid waste, with plastic lining material. Only concrete from mixer truck chutes, tools, and hoppers is permitted – drum washdown at the site is prohibited. Once the concrete waste is allowed to harden, concrete should be broken up, removed, and disposed of in accordance with applicable state and federal procedures. Inspect the washout area daily for runoff control adequacy and weekly for removal of hardened concrete.
8. Paint and Painting Supplies – Construction activity involving paint and painting supplies must be conducted to keep pollutants out of stormwater discharge by ensuring appropriate material storage, use, and cleanup. Inspect the site weekly for evidence of improper disposal and cleanup of painting activities. Prohibit construction workers from disposing of paint waste, painting equipment cleanup solvents, or wastewater, in any manner that results in discharge to the stormwater management system (e.g., storm drains and channels). Inspect paint storage and washout areas daily for runoff control adequacy.
9. Vehicle Fueling, Maintenance, and Cleaning – Ensure equipment is working properly; however, do not use the Base for routine maintenance of site equipment. Only emergency maintenance is allowed on site equipment and vehicles. Vehicle washing is prohibited on-Base. The exception to this is rinsing mud off tires at the construction exit (no soaps or solvents may be used). Designate a fueling point with a secondary containment area. Minimize the mobile fueling of equipment (i.e., equipment should be taken to a designated fueling area when feasible). Use drip pans and absorbent pads when fueling, lubricating, and providing emergency maintenance on equipment. Absorbents are to be handled in accordance with Resource Conservation and Recovery Act (RCRA) regulations. Inspect the fueling area daily and after all rain events.
10. Hazardous Waste Management – Prohibit the disposal of hazardous wastes and materials (e.g., paints and solvents, petroleum products, fertilizers, herbicides and pesticides, soil stabilization products, asphalt products, concrete) into the Base stormwater collection system. Ensure that construction workers understand proper material use and disposal as required by the Base hazardous waste management plan. Store hazardous materials (including POL) on-site in covered areas with secondary containment. Inspect hazardous waste storage areas at least weekly and after each rain event.
11. Vehicle Operation – Do not operate leaking equipment. Provide emergency repair to prevent further leaks. Use drip pans under heavy equipment left idle for two or more calendar days.
12. Dewatering – Minimize the discharge of pollutants from dewatering trenches and excavations. Dewatering discharges are prohibited unless managed by appropriate controls, such as a sediment trapping device.
D. Additional Controls:
1. Additional Controls are required for sites that:
a. Discharge into Impaired Stream Segments or within 1 linear mile upstream of and within the same watershed as, any portion of a Impaired Stream Segment (as shown on Georgia’s most current “305(b)/303(d) List Documents (Approved)” at the time of NOI submittal), with ALL of the following characteristics:
i. Listed for criteria violated/cause of “Bio F” (Impaired Fish Community) and/or “Bio M” (Impaired Macroinvertebrate Community);
ii. Within Category 4a, 4b, or 5; and
iii. Potential Cause of “NP” (nonpoint source) or “UR” (urban runoff); or
b. Are approved by GA EPD to disturb 50 acres or more at any one time. [If the proposed site is anticipated to disturb more than 50 acres at any one time, a request must be sent to the GA EPD District Office, with their approval attached to this ESPCP.] This site [choose the applicable statement(s): discharges into Impaired Stream Segment(s) as described above // is approved to disturb 50 acres or more at any one time // does not apply to the above.]
2. [If “more than 50 acres” is chosen, include this item. If “does not apply” is chosen, delete this item]. The GA EPD request and approval related to a site with anticipated disturbance greater than 50 acres at any one time is included in Attachment X.
3. [If either or both ‘Impaired Stream Segment’ or ‘more than 50 acres’ are chosen, include this item. If “does not apply” is chosen, delete this item.] Additional Controls selected are:
a. [List Additional BMP 1 from Part III.C.2 of the General Permit.]
b. [List Additional BMP 2 from Part III.C.2 of the General Permit.]
c. [List Additional BMP 3 from Part III.C.2 of the General Permit.]
d. [List Additional BMP 4 from Part III.C.2 of the General Permit.] [Include completed Appendix 1 of the ESPCP Checklist.] E. Non-Stormwater Discharges: The following non-stormwater discharges are authorized by the General Permit and may occur at the project site during construction activities: discharges from fire fighting activities; fire hydrant flushing; potable water sources including water line flushing; irrigation drainage; air conditioning condensate; springs; uncontaminated ground water; and foundation or footing drains where flows are not contaminated with process materials or pollutants. Appropriate pollution prevention measures for the applicable, authorized, non-stormwater components of discharges shall be implemented. These control measures will include [describe non-stormwater discharge control measures as appropriate].
V. INSPECTIONS
INSPECTION CHECKLISTS ARE PROVIDED IN APPENDIX C. COMPLETED INSPECTIONS CHECKLISTS SHALL BE RETAINED IN APPENDIX C OF THIS ESPCP.
0. Initial Inspection — The design professional who prepared this ESPCP, or an alternative design professional requested by the primary permittee through written request and approval of GA EPD, shall inspect the installation of the initial sediment storage requirements and perimeter control BMPs that the design professional designed within seven (7) days after installation. The design professional shall determine if these BMPs have been installed and are being maintained as designed. The design professional shall report the results of the inspection to the primary permittee within seven (7) days, and the permittee must correct all deficiencies within two (2) business days of receipt of the inspection report from the design professional unless weather related site conditions are such that additional time is required.
0. Inspections shall be conducted by “certified personnel” provided by the Contractor on a daily, weekly, monthly, and storm event basis. The term “certified personnel” means persons who have successfully completed a Level 1A, 1B, or 2 erosion and sediment control certification course approved by the Georgia Soil and Water Conservation Commission (GSWCC).
1. Additionally, in accordance with Georgia Code, Title 12, Chapter 7 (O.C.G.A. Section 12-7-1), Control of Soil Erosion and Sedimentation, 12-7-19 (a) (2), a minimum of one person who is in responsible charge of erosion and sedimentation control activities on behalf of the primary permittee and meets the applicable education or training certification requirements developed by the GSWCC will be present on site whenever land-disturbing activities are conducted on that site.
1. Subcontractors retained by the permittee to conduct any type of construction activity that involves the disturbance of soils, such as clearing, grading, excavating, filling of land, or other similar activities, which may result in soil erosion, must complete the appropriate certification course approved by the GSWCC in accordance with O.C.G.A Section 12-7-19.
1. Copies of certification cards issued by the GSWCC for personnel conducting inspections, sampling, and/or sampling analysis, personnel considered in responsible charge of erosion and sedimentation control activities, and representatives of subcontractors conducting activities described above, are included in Appendix D. [Insert copies of cards for all applicable personnel throughout the project.]
0. Daily Inspections — Each day when any type of construction activity has taken place, certified personnel shall inspect: (a) all areas where petroleum products are stored, used, or handled for spills and leaks from vehicles and equipment; (b) all locations where vehicles enter or exit the site for evidence of off-site sediment tracking; and (c) measure and record rainfall within disturbed areas of the site that have not met final stabilization once every twenty-four hour period at the site (except any non-working Saturday, non-working Sunday and non-working Federal holiday). These inspections must be conducted until a Notice of Termination is submitted. Measurement of rainfall may be suspended if all areas of the site have undergone final stabilization or established a crop of annual vegetation and a seeding of target perennials appropriate for the region.
0. Weekly and Rainfall Inspections — Certified personnel shall inspect the following at least once every seven (7) calendar days and within 24 hours of the end of a storm that is 0.5 inches or greater (unless such storm ends after 5:00 pm on any Friday or on any non-working Saturday, non-working Sunday or any non-working Federal holiday in which case the inspection shall be completed by the end of the next business day and/or working day, whichever occurs first): (a) disturbed areas of the construction site; (b) areas used for storage of materials that are exposed to precipitation; and (c) structural control measures. Erosion and sediment control measures identified in the ESPCP shall be observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving water(s). These inspections must be conducted until a Notice of Termination is submitted. For areas of a site that have undergone final stabilization or established a crop of annual vegetation and a seeding of target perennials appropriate for the region, the permittee must conduct monthly inspections described below.
0. Monthly Inspections — Certified personnel shall inspect at least once per month areas of the site that have undergone final stabilization or established a crop of annual vegetation and a seeding of target perennials appropriate for the region. These areas shall be inspected for evidence of, or the potential for, pollutants entering the drainage system and the receiving water(s). Erosion and sediment control measures identified in the ESPCP shall be observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving water(s). These inspections must be conducted until a Notice of Termination is submitted to the GA EPD.
0. A report of each inspection that includes the name(s) of certified personnel making each inspection, the date(s) of each inspection, construction phase (i.e., initial, intermediate, or final), major observations relating to implementation of the ESPCP, and actions taken shall be made and retained at the site or be readily available at the designated alternate location until the site or that portion of a construction project that has been phased has undergone final stabilization and a Notice of Termination is submitted to GA EPD. Such reports shall be readily available by the end of the second business day and/or working day and shall identify all incidents of BMPs that have not been properly installed and/or maintained as described in the ESPCP. Where the report does not identify any incidents, the inspection report shall contain a certification that the BMPs are in compliance with the ESPCP and the General Permit. The inspection checklists provided in Appendix C meet the requirements of the report.
0. Based on the results of each inspection, the site description and BMPs identified in the ESPCP shall be revised as appropriate no later than seven (7) calendar days following each inspection. Implementation of such modifications shall be made as soon as practical but in no case later than seven (7) calendar days following each inspection. The Contractor will provide documentation of all design changes to the Robins AFB POC within the same seven (7) calendar day period.
0. If during the course of routine inspection, BMP failures beyond routine maintenance are observed which have resulted in sediment deposition into Waters of the State, the Contractor shall immediately take all reasonable steps to address the condition, including cleaning up any contaminated surfaces so that material will not discharge in subsequent storm events. The Contractor shall immediately submit a summary of the violation to the Robins AFB POC to be reviewed and submitted to the GA EPD. It is noted that BMP maintenance as a result of routine inspections shall not be considered a violation.
7. When the repair does not require a new or replacement BMP or significant repair, the BMP failure or deficiency must be repaired within two (2) business days from the time of discovery;
7. When the repair requires a new or replacement BMP or significant repair, the installation of the new or modified BMP must be completed and the BMP must be operational by no later than seven (7) days from the time of discovery. If it is infeasible to complete the installation or repair within seven (7) days, the Contractor must document why it is infeasible to complete the installation or repair within the seven (7) day timeframe and document the schedule for installing or repairing the BMPs and making the BMPs operational as soon as feasible after the seven (7) day timeframe.
VI. MAINTENANCE
A. Maintenance of vegetation, erosion and sediment control measures, and other protective measures identified in the ESPCP shall be performed in accordance with the schedules and procedures set forth in the “Manual for Erosion and Sediment Control in Georgia”.
B. In the event that erosion control devices fail, they shall be replaced or repaired during the same work day. Silt build-up behind all silt fencing, check dams, rock filter dams, and inlet sediment traps shall be removed when it reaches one half the height of the erosion control device. Silt build-up in temporary sedimentation basins shall be removed when the silt level reaches one-third of the capacity of the basin.
C. Erosion control measures will be maintained at all times.
This is the start of the file's text. The full file is on GovTribe.