About this file
This is a Technical Proposal Schedule B for a Design-Build Services solicitation issued by Lake Mountain School District for a Bus Maintenance & Transportation Facility. The District seeks qualified Design-Build teams consisting of general contracting firms partnered with licensed architectural and engineering sub-consultants to provide turnkey design, engineering, permitting, procurement, and construction services for a new approximately 21,600 gross square foot facility to be constructed on district-owned property in Saratoga Springs, Utah, adjacent to Westlake High School. The facility will serve as a dedicated Career and Technical Education (CTE) satellite program for Westlake High School students. The solicitation closing date and time is Friday, December 10, 2026, at 2:00 PM Mountain Time, with construction anticipated to commence on December 29, 2026, and substantial completion targeted for February 17, 2028. The contract resulting from this RFP will be awarded to a single responsive and responsible offeror with the highest justified score per procurement code.
Scoring of the technical proposal is based on 85 points distributed across five criteria: Key Personnel (25 points), Similar Project Experience (20 points), Design Phase Approach and Cost Control (20 points), Schedule and Fast Delivery (10 points), and Past Performance and Risk Management (5 points each). The technical proposal must be submitted as one PDF document organized by specified tabs on 8.5x11 pages in 10-point type or larger within a 13-page limit, plus two 11x17 pages for organizational charts and schedules. An additional 15 points are reserved for Fees scored from a separate sealed Schedule C submission. Optional interviews may add up to 20 points to the total 100-point evaluation. The technical proposal evaluation emphasizes experience with progressive design-build projects, vehicle maintenance or transportation facilities of 15,000 square feet or more, cost control mechanisms, credible critical-path scheduling with 6-9 month construction timelines, and demonstrated past performance with DFCM references.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Mountain School District – Bus Maintenance & Transportation Facility – Schedule B: Technical Proposal
Lake Mountain School District – Bus Maintenance & Transportation Facility – Schedule B: Technical Proposal | Page 1
SCHEDULE “B” — TECHNICAL PROPOSAL
Bus Maintenance & Transportation Facility – Progressive Design-Build Services
Solicitation No.: LMSD12102026CS
The Evaluation Committee scores the technical proposal on the criteria below (Section 16 of the RFP). Submit one PDF organized by the tabs shown, on 8.5×11 pages in 10-point type or larger, within the 13-page limit plus two 11×17 pages (organizational chart and schedule).
Key personnel (25 pts, Tab 2; 5 pages + 11×17 org chart): Org chart (11×17); one-page resumes for the DB Project Manager, Project Architect, Superintendent, MEP Engineer, and Preconstruction Estimator;
Utah license numbers; percent of time committed. Full points for years in role, comparable projects, and time committed (DB Project Manager 10, Project Architect 6, Superintendent 5, MEP Engineer 2, Preconstruction Estimator 2).
Similar project experience (20 pts, Tab 3; 3 pages): Up to 4 projects completed in the last 10 years: at least 2 design-build (progressive preferred) and at least 2 vehicle maintenance, transportation, or industrial service facilities of 15,000 sf or more. For each: owner, size, delivery method, original vs. final cost and schedule, and which proposed staff worked on it. Full points for vehicle maintenance or industrial service facilities, delivered design-build by this team, on cost and schedule.
Design Phase approach and cost control (20 pts, Tab 4; 2 pages): How design and cost develop together;
cost model reporting; how layout, storage, program fit, and future CTE questions get resolved with the District; how the GMP is built and subcontracts are bid; early work packages. Full points for a clear, collaborative process with cost visible at every milestone and a credible path to a cost-effective GMP.
Schedule and fast delivery (10 pts, Tab 5; 1 page + 11×17 schedule): Critical-path schedule (11×17) from contract to final completion, showing Design Phase milestones, City and DFCM reviews, GMP, long-lead items, and SSB coordination; one-page narrative on the fastest credible path to opening. Full points for a credible critical path and 6–9 month construction; shorter credible durations score higher.
Past performance (5 pts, Tab 7; form): DFCM Performance References Form for 3 projects. Scored on DFCM ratings and reference scores, averaged.
Risk and campus operations (5 pts, Tab 6; 1 page): Ranked risks with mitigation; plan for year-round bus operations, fire access, and SSB coordination. Full points for site-specific, ranked risks and a workable plan for bus operations and SSB coordination.
Technical criteria total: 85 points. The remaining 15 points are Fees, scored from Schedule C. Schedule C is issued as a separate document and uploaded separately as the sealed fee submission (Tab 8); it is not part of this technical proposal. Written total: 100 points.
Tab 1 (Letter of introduction, 1 page) and Tab 9 (Certifications) are required but carry no points. Interviews are optional and, if held, add up to 20 points (RFP Section 16.4).