Schedule "C" - Turnkey Cost & Value Pricing Summary

This document is a cost proposal form for the Lake Mountain School District Design-Build Services project for a Bus Maintenance & Transportation Facility located in Saratoga Springs, Utah. The form presents a detailed cost breakdown across six major project phases and components, requiring offerors to provide fixed pricing for each line item. The scope includes pre-construction services encompassing schematic design, geotechnical and structural engineering, MEP engineering, permitting, and stamped plans; Phase I civil site work involving selective demolition, re-grading, utility extensions, and three-phase electrical service installation; Phase II site improvements including bus aprons, ADA pathways, lighting, and perimeter fencing; Phase III structural steel frame and concrete foundations; Phase IV exterior enclosure and code compliance with masonry and cladding; and Phase V interior build-out featuring eight service bays, a bus wash bay, CTE classroom, offices, and specialized storage areas. Construction is anticipated to commence on December 29, 2026, with substantial completion targeted for February 17, 2028. The RFP closing date is Friday, December 10, 2026, at 2:00 PM Mountain Time.

The Schedule "C" form requires Design-Build Teams to provide turnkey fixed pricing for all project components, with an additional line item for construction overhead, general conditions, performance and payment bonds, and contingency. The form includes space for the total project cost and authorized signatures with date fields, with final approval designated for the purchasing department only. This pricing structure establishes single-point responsibility for the selected Design-Build Team to deliver the approximately 21,600 gross square foot facility as a fully integrated turnkey solution. The contract award will be made to the responsive and responsible offeror with the highest evaluation score as justified by the procurement code.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE “C” — TURNKEY COST & VALUE PRICING

Project Component / Phase Fixed Design &

Construction Cost

Pre-Construction (Schematic Design, Geotechnical, Structural, MEP Engineering, Permits & Stamped Plans)

Phase I: Civil Site Work (Selective Demolition, Re-Grading, Sub-Grade Prep, Utility Trenching & Extensions, Rocky Mountain Power 3-Phase Service)

Phase II: Site Improvements (Bus Maneuvering Aprons, ADA Pathways & Sidewalks, Pavement Repairs & Markings, Exterior LED Lighting, Perimeter Fencing)

Phase III: Structural Steel Frame & Foundations (Pre-Engineered Columns, Foundations & Reinforced Concrete 6″ Slab)

Phase IV: Exterior Enclosure & Code Compliance, Chapter 19.16 Masonry Wainscot, IMP Cladding, Mechanical Screening)

Phase V: Interior Build-Out (8 Service Bays, Bus Wash Bay, CTE Classroom, Offices, Restrooms, Break Room, Tire Storage, Bulk Fluid/Chemical Storage, Parts Room)

Construction Overhead, General Conditions, Performance/Payment Bonds, and Contingency

Authorized Signature: Date:

Total: (For purchasing department only)