6-West Transportation Utility Plans.pdf

PDF 7 MB Posted

Attached to
Lake Mountain School District Design-Build Services: Bus Maintenance & Transportation Facility
Solicitation number
LMSD12102026CS
Issued by
Utah County, Utah

About this file

This file is a Transportation Utility Plans document related to Lake Mountain School District's Design-Build Services RFP for a Bus Maintenance & Transportation Facility located in Utah County. The project involves the design, engineering, permitting, procurement, and construction of an approximately 21,600 gross square foot purpose-built facility on existing district-owned property at the Alpine School District Transportation West facility in Saratoga Springs, Utah. The facility will serve as a dedicated CTE satellite program for Westlake High School students. The RFP requires qualified, licensed Design-Build Teams consisting of general contracting firms partnered with licensed Architectural and Engineering sub-consultants to provide turnkey services. The proposal closing date and time is Friday, December 10th, 2026, at 2:00 PM Mountain Time, with construction anticipated to commence on December 29, 2026, and substantial completion targeted for February 17, 2028. The resulting contract will be for the duration of the project, with the selected DB team holding single-point responsibility for all integrated services.

The file does not contain detailed information regarding pricing terms, set-asides, incumbent contractors, funding sources, or budget amounts. Contract award will be made to the responsive and responsible offeror with the highest score as justified by the procurement code. Additional salient details regarding cost, financing, and specific set-asides are not presented in this transportation utility plans document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

District Plumbing Note: The waterline from the north water meter ensa at the frost-free hydrant by the electrical gear.

There is a locate wire with it. Hydrant moved to the present location by Dave Davis.and Grey Davenport.

5746 South 1475 East - Su i te 200 Ogden, Utah 84403 Main (801)394-4515

S.L.C (801)521-0222 FAX 801-392-7544

W W W . G R E A T B A S I N E N G I N E E R I N G . C O M

845 South 220 East Orem, UT 84058

Phone: 801.229.0088 Fax: 801.229.0089 www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE REVISION/ISSUE

SA - 1521

SEPTEMBER 22, 2015

HMA

MEB

TR

A

N S

P O

R

TA

TI

O

N W

E S

T A

D M

IN

. B

LD

G

P

H A

S E

II

A

LP

IN

E S

C H

O O

L D

IS

TR

IC

T

N O

R

TH

W E

S T

S A

R A

TO

G

A S

P R

IN

G

S , U

TA

H

UTILITY PLAN

OCTOBER

26, 2015

ADDENDUM 1

W:\13N213 - Saratoga Springs Bus Facility\13N213 Phase II-S2.dwg, 10/26/2015 3:09:56 PM, HeatherA, 1:1

File details come from the government source that posted it. Updated .