PROJECT OVERVIEW AND SCOPE
This is a comprehensive set of construction drawing documents for the Renovation of CT Scan Suite and CT Simulator Suite at Smith Clinic for Harris Health System, located at 2525 Holly Hall Street, Houston, Texas 77054. The project involves interior renovation work, cosmetic upgrades, and preaction sprinkler coverage to support computed tomography equipment replacement in three CT rooms and one CT simulation room at the ground floor of Smith Clinic. The project is designed in accordance with the 2021 International Building Code (with Houston amendments), 2021 International Energy Conservation Code, 2023 National Electrical Code, 2021 UPC, 2021 UMC, 2021 IFC, and 2012 NFPA 101 and NFPA 99 standards. The construction documents include 41 drawing sheets covering architectural, structural, mechanical, electrical, fire protection, plumbing, and medical equipment planning, prepared by Page Southerland Page, Inc. (architecture/engineering/interiors/planning/consulting) with supporting engineering firms including Dally Associates (structural), MEPCE, Inc. (MEP/low voltage/security), and SSR Inc. (medical equipment planning). The project was issued for construction on October 29, 2025, with the drawings marked as the original issue date.
TECHNICAL AND CONSTRUCTION REQUIREMENTS
The scope encompasses detailed demolition and construction sequencing across multiple disciplines, including removal of existing ceiling and grid systems, demolition of existing HVAC equipment and controls, replacement of VAV boxes with new hydronic reheat units, installation of new sprinkler systems with preaction valve assemblies, relocation and installation of electrical systems including new disconnect panels for CT equipment, replacement of plumbing fixtures with new sinks, lavatories, and water closets, and comprehensive interior finishes including wall tile, flooring, and casework. All work requires coordination with the ongoing hospital operations, with the contractor responsible for maintaining negative air pressure in construction zones, protecting existing fire-proofing and rated assemblies, scheduling system shutdowns with facility management, and providing temporary signage and protection. The existing building is Type II-A construction with business occupancy classification. Contractor must field-verify all existing conditions prior to construction, submit shop drawings for approval, coordinate with equipment vendors (particularly GE for CT equipment), perform testing and balancing of HVAC systems, and complete all work in compliance with local, state, and federal codes including ADA/TAS accessibility standards. The estimated project budget is $1,700,000.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Southerland Page, Inc.
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Albany / Albuquerque / Atlanta / Austin / Boston / Charleston / Dallas / Denver /
Dubai / Houston / Los Angeles / Mexico City / New York City / Orlando / Phoenix /
Raleigh / Richmond / San Antonio / San Francisco / Tampa / Washington DC
F
IL
E N
A M
E
U S
E R
N A
M E
D A
T E
S T
A M
P
Structural Engineer
Dally Associates 9800 Richmond Avenue Suite 460
713-337-8881 Houston, TX 77042
P ag e P ro je ct N um be r
1111 Louisiana Street, 26th Floor Houston, TX 77002 pagethink.com
TEL 713-871-8484
MEP Engineer / Low Voltage Design / Security
MEPCE, Inc.
4306 Yoakum Suite 470
972-870-9060 Houston, TX 77006
Medical Equipment Planning
SSR Inc.
900 Threadneedle St.
Ashford 7, Suite 600
713-784-8211 Houston, TX 77079
CLIENT
PROJECT
ORIGINAL ISSUE
CONSULTANT TEAM PROFESSIONAL SEALS
PROJECT NUMBER
A u to d e s k D o c s /4
.0
-H
H S
S
C P
A C
S S
C C
T S c a n s
-3
C T
/4
.0
-A
-S C
P A
C S
S C
C T
S c a n s
-3 .r v t
/2 /2
:2
:2
P M
SCP ACS SC CT Scans (1-3) and CT Simulator Replacement
ISSUE FOR CONSTRUCTION
4800 Fournace Place, 5th Floor East Bellaire, TX 77401
Harris Health System
422089.06
29 OCT 2025
2525 Holly Hall
.0
S
C P
A C
S S
C C
T S ca ns
1-
3) a nd C
T S im ul at or
R ep la ce m en t
O C
T
G -0
PROJECT DESCRIPTION:
INTERIOR RENOVATION WORK, COSMETIC UPGRADES, AND PREACTION SPRINKLER
COVERAGE TO SUPPORT COMPUTED TOMOGRAPHY EQUIPMENT REPLACEMENT IN 3
CT ROOMS AND ONE CT SIMULATION ROOM AT THE GROUND FLOOR OF SMITH CLINIC
10/29/2025
GENERAL NOTESBUILDING CODE NOTES
1. COMPLY WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF PUBLIC AUTHORITIES
GOVERNING THE WORK.
2. OBTAIN AND PAY FOR PERMITS AND INSPECTIONS REQUIRED BY PUBLIC AUTHORITIES
GOVERNING THE WORK.
3. THESE DRAWINGS HAVE BEEN DEVELOPED IN COORDINATION WITH PROJECT SPECIFICATIONS.
THE DRAWINGS AND SPECIFICATIONS SHALL BE USED TO COMPLEMENT EACH OTHER.
4. REVIEW CONTRACT DOCUMENTS AND FIELD DIMENSIONS AND CONDITIONS. CONFIRM THAT
WORK IS BUILDABLE AS SHOWN. PROMPTLY REPORT ANY ERRORS, CONFLICTS, OR OMISSIONS
TO THE ARCHITECT FOR CLARIFICATION PRIOR TO PERFORMING ANY WORK IN QUESTION. IF THE
CONTRACTOR FAILS TO NOTIFY ARCHITECT OF A KNOWN NONCONFORMITY, THEN THE
CONTRACTOR IS TO PAY SUCH COSTS AND DAMAGES TO THE OWNER AS WOULD HAVE BEEN
AVOIDED IF NOTIFICATION HAD BEEN PERFORMED.
5. COORDINATE WORK WITH THE OWNER/TENANT, INCLUDING SCHEDULING TIME AND LOCATIONS FOR DELIVERIES, BUILDING ACCESS, USE OF BUILDING SERVICES AND FACILITIES, AND USE OF
ELEVATORS. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS.
6. CONTRACTOR SHALL ENSURE THAT CONTRACTOR EMPLOYEES AND SUBCONTRACTORS SHALL
COMPLY WITH ALL BUILDING RULES AND REGULATIONS.
7. OWNER WILL PROVIDE WORK NOTED "BY OTHERS" OR "NIC" UNDER SEPARATE CONTRACT.
INCLUDE SCHEDULE REQUIREMENTS IN CONSTRUCTION PROGRESS SCHEDULE AND
COORDINATE TO ASSURE ORDERLY SEQUENCE OF INSTALLATION.
8. COORDINATE TELECOMMUNICATIONS, DATA, AND SECURITY SYSTEM INSTALLATION.
9. MAINTAIN EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES, AND ALARMS IN CONFORMANCE
WITH CODES AND ORDINANCES.
10. WORK AREAS TO BE SECURE AND LOCKABLE DURING CONSTRUCTION. COORDINATE WITH
TENANT AND LANDLORD TO ENSURE SECURITY.
11. PROTECT AREA OF WORK AND ADJACENT AREAS FROM DAMAGE.
12. DURING CONSTRUCTION, EACH TRADE SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE
CAUSED BY THEIR WORK.
13. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. IN CASE OF CONFLICT, CONSULT
ARCHITECT.
14. U.N.O., PARTITIONS ARE DIMENSIONED FROM FINISH FACE TO FINISH FACE. MAINTAIN
DIMENSIONS MARKED "CLEAR". ALLOW FOR THICKNESS OF FINISHES.
15. CONTRACTOR TO FIELD VERIFY SIZES, LOCATIONS, AND CHARACTERISTICS OF EXISTING
EQUIPMENT BEFORE CONSTRUCTION AND TO COORDINATE WITH THE CONSTRUCTION
DOCUMENTS TO CORRECT FIELD CONDITIONS OR CONFLICTS AS REQUIRED.
16. WHERE EXISTING ACCESS PANELS CONFLICT WITH CONSTRUCTION, RELOCATE PANELS TO
ALIGN WITH AND FIT WITHIN NEW CONSTRUCTION.
17. UNDERCUT DOORS TO CLEAR TOP OF FLOOR FINISH BY 1/4 INCH MINIMUM, U.N.O.
18. U.N.O., ALL INTERIOR PARTITIONS MUST TERMINATE AT EXISTING WINDOW MULLIONS WITH
MULLION CAPS. FURNISH AND INSTALL ACOUSTICAL SEAL AT ALL WALL AND EXTERIOR GLASS
INTERSECTIONS. CLEAN AND/OR REPAIR ALL MULLIONS AFTER DEMOLITION WORK.
19. CASED OPENING SHALL BE GYPSUM BOARD WITH METAL REINFORCED CORNERS.
20. ALL DOORS ARE TO BE SET OFF OF INTERSECTION WALL BY 6" CLEAR, U.N.O.
21. SUBMIT REQUESTS FOR SUBSTITUTIONS, REVISIONS, OR CHANGES TO ARCHITECT FOR REVIEW
PRIOR TO PURCHASE, FABRICATION, OR INSTALLATION.
22. COORDINATE AND PROVIDE BLOCKING FOR MILLWORK AND ITEMS ATTACHED TO WALLS OR
CEILINGS.
REFLECTED CEILING NOTES
LOCATE DIFFUSER AND LIGHT FIXTURES WITHIN GRID LINES. CENTER SPRINKLER HEADS,
SPEAKERS, RECESSED FIXTURES, AND SIMILAR CEILING ELEMENTS IN ACOUSTICAL UNITS, U.N.O.
FINISH HVAC DIFFUSERS, DRAPERY POCKETS, AND SPEAKER GRILLES TO MATCH ADJACENT FINISH, U.N.O.
PROJECT INFORMATION
1. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-1 WITHIN 75 FOOT TRAVEL DISTANCE TO ALL PORTIONS OF THE TENANT SPACE ON
EACH FLOOR, AND ADDITIONAL EXTINGUISHERS AS REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR OR BUILDING DEPARTMENT INSPECTOR.
2. PROVIDE EXIT SIGN OVER REQUIRED EXITS, WHERE SHOWN ON DRAWINGS, AND ADDITIONAL SIGNS AS REQUIRED BY BUILDING DEPARTMENT INSPECTOR OR FIRE DEPARTMENT FIELD INSPECTOR. CONNECT EXIT SIGNS TO EMERGENCY POWER CIRCUITS OR PROVIDE BATTERY PACKS. COMPLY WITH BUILDING CODES.
3. PROVIDE EMERGENCY LIGHTING OF ONE FOOT-CANDLE AT FLOOR LEVEL.
4. MAINTAIN AISLES AT LEAST 44" WIDE AT BUILDING CORRIDORS.
5. EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. SPECIAL LOCKING DEVICES SHALL
BE OF AN APPROVED TYPE.
6. DOORS OPENING INTO REQUIRED 1-HOUR, FIRE-RESISTIVE CORRIDORS SHALL BE PROTECTED WITH A SMOKE OR DRAFT STOP ASSEMBLY HAVING A 20-MINUTE RATING
AND SHALL BE SELF-CLOSING.
7. 20, 45, 60 AND 90 -MINUTE DOOR JAMBS TO BE TIGHT-FITTING, SMOKE AND DRAFT CONTROLLED.
8. INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E 84 FLAME SPREAD AND SMOKE-DEVELOPED INDEXES.
A. CLASS A, FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
B. CLASS B, FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.
C. CLASS C, FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450.
9. REFERENCE IBC 2021 SECTION 803, WALL AND CEILING FINISHES, AND TABLE 803.9 FOR FINISH REQUIREMENTS BY OCCUPANCY.
10. DECORATIONS (CURTAINS, DRAPES, SHADES, HANGINGS, ETC.) SHALL BE NON-COMBUSTIBLE OR BE FLAME PROOFED IN AN APPROPRIATE MANNER.
11. REFER TO MECHANICAL DRAWINGS FOR DAMPER REQUIREMENTS WHERE AIR DUCTS PENETRATE FIRE-RATED WALLS OR CEILINGS.
12. STORAGE, DISPENSING, OR USE OF ANY FLAMMABLE OR COMBUSTIBLE LIQUIDS, FLAMMABLE GAS, AND HAZARDOUS SUBSTANCES SHALL COMPLY WITH LOCAL FIRE
CODE REGULATIONS.
13. WOOD BLOCKING SHALL BE FIRE TREATED IN ACCORDANCE WITH APPLICABLE CODE REQUIREMENTS.
14. EXTEND OR MODIFY EXISTING FIRE/LIFE SAFETY SYSTEM AS REQUIRED TO PROVIDE AN APPROVED FIRE/LIFE SAFETY SYSTEM. SUBMIT PLANS TO FIRE DEPARTMENT WITH COMPLETE DESCRIPTION OF SEQUENCE OF OPERATION, AND OBTAIN APPROVAL PRIOR TO INSTALLATION.
15. LOCATE THE CENTER OF FIRE ALARM INITIATING DEVICES 48" ABOVE THE LEVEL OF THE FLOOR, WORKING PLATFORM, GROUND SURFACE OR SIDEWALK.
16. EMERGENCY WARNING SYSTEMS SHALL ACTIVATE A MEANS OF WARNING THE HEARING IMPAIRED. FLASHING VISUAL WARNING SHALL HAVE A FREQUENCY OF NOT
MORE THAN 60 FLASHES PER MINUTE.
17. EXTEND OR MODIFY EXISTING AUTOMATIC FIRE PROTECTION SPRINKLER SYSTEM AS REQUIRED TO PROVIDE AN APPROVED SYSTEM PER NFPA 13. SUBMIT PLANS TO
FIRE DEPARTMENT AND OBTAIN APPROVAL PRIOR TO INSTALLATION.
1. SPRINKLER CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF CALCULATIONS AND SPRINKLER
HEAD LOCATIONS FOR ARCHITECT TO REVIEW PRIOR TO ANY INSTALLATION, AND PRIOR TO
SUBMITTING DRAWINGS TO THE CITY. NO EXCEPTIONS TAKEN, OR CONTRACTOR WILL
RELOCATE SPRINKLER HEADS AT THEIR OWN EXPENSE.
2. IN ALL GYP BD CEILINGS, PROVIDE CONCEALED SPRINKLER HEADS WITH CAPS TO BE FACTORY PAINTED TO MATCH THE CEILING, AND ALIGN WITH LIGHT FIXTURES. ALL SPRINKLER HEADS IN
LAY-IN CEILINGS SHALL BE LOCATED IN THE CENTER OF CEILING PANEL AND ALIGNED WITH
LIGHT FIXTURES.
3. IF IRREGULARITIES ARE OBSERVED, DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED AND REVIEWED WITH ARCHITECT.
DEMOLITION NOTES
COMPLY WITH APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS
PERTAINING TO SAFETY OF PERSONS, PROPERTY, AND ENVIRONMENTAL PROTECTION.
PROVIDE AND MAINTAIN BARRICADES, LIGHTING, GUARDRAILS AS REQUIRED BY APPLICABLE
CODES AND REGULATIONS TO PROTECT OCCUPANTS OF BUILDING AND WORKERS.
ERECT AND MAINTAIN DUSTPROOF PARTITIONS AS REQUIRED TO PREVENT THE SPREAD OF
DUST, FUMES, SMOKE, ETC. TO OTHER PARTS OF THE BUILDING. ON COMPLETION OF THE
PROJECT, REMOVE PARTITIONS AND REPAIR DAMAGED SURFACES TO MATCH ADJACENT
SURFACES.
IF DEMOLITION IS PERFORMED IN EXCESS OF THAT REQUIRED, RESTORE EFFECTED AREAS
AT NO COST TO OWNER.
FINISH NOTES
ENSURE SURFACES TO RECEIVE FINISHES ARE CLEAN, TRUE, AND FREE OF
IRREGULARITIES. DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS
HAVE BEEN CORRECTED.
REPAIR EXISTING SURFACES TO REMAIN AS REQUIRED FOR APPLICATION OF NEW FINISHES.
PROVIDE TWO COATS OF FINISH PAINT, NO TEXTURE, OVER ONE COAT OF PRIMER AT ALL
WALLS TO RECEIVE PAINT.
SUBMIT SAMPLES OF ALL FINISH MATERIALS PER THE REQUIREMENTS OF INDIVIDUAL
SPECIFICATION SECTIONS IN THE PROJECT MANUAL OR ON THE SPECIFICATION SHEET(S).
FURNISH FLOOR PREP AS NECESSARY TO LEVEL IRREGULARITIES IN SLAB IN ACCORDANCE
WITH INDUSTRY STANDARDS.
WALL COVERINGS TO BE INSTALLED WITH "STRIPPABLE" ADHESIVE ONLY.
SEE FINISH SCHEDULE AND PROJECT MANUAL FOR PRODUCT SPECIFICATIONS.
POWER & TELCOM NOTES
PRIOR TO CORING SLAB, REVIEW LOCATIONS WITH ARCHITECT AND COORDINATE LOCATIONS
WITH OWNER.
VERIFY CONTRACTOR PROVIDED AND/OR INSTALLED EQUIPMENT SPECIFICATIONS, POWER
AND INSTALLATION REQUIREMENTS WITH MANUFACTURERS TO ENSURE PROPER FIT AND
FUNCTION.
VERIFY MOUNTING REQUIREMENTS OF ELECTRICAL, TELEPHONE, AND OTHER CONTRACTOR
PROVIDED AND/OR INSTALLED EQUIPMENT.
GANG ADJACENT LIGHT SWITCHES AND COVER WITH A SINGLE PLATE.
INDICATED DIMENSIONS ARE TO THE CENTER LINE OF OUTLET OR SWITCH, OR CLUSTER OF
OUTLETS OR SWITCHES, U.N.O.
INSTALL OUTLETS ON OPPOSITE SIDES OF PARTITIONS IN SEPARATE STUD CAVITIES. DO NOT
INSTALL BACK-TO-BACK. USE SUPPLEMENTAL STUD (CRIPPLE) FRAMING IF NEEDED TO
ACHIEVE PROPER ALIGNMENT AND SPACING OF DEVICES.
PROVIDE MATCHING COVER PLATES, RECEPTACLES, AND RELATED ITEMS. PROVIDE ONE-
PIECE TYPE GANG COVER PLATES, U.N.O.
IDENTIFY ISOLATED GROUND ELECTRICAL OUTLETS WITH AN ORANGE DOT.
ALL OUTLETS AT COFFEE BARS/BREAK ROOMS SHALL BE DEDICATED AND LOCATED ABOVE
COUNTER HEIGHT, EXCEPT WHERE OUTLETS ARE SERVING UNDERCOUNTER EQUIPMENT,
U.N.O. ALL OUTLETS ADJACENT TO SINKS SHALL BE GFI IN ACCORDANCE WITH LOCAL CODES.
1.
2.
3.
4.
5.
6.
7.
1.
2.
3.
4.
5.
6.
7.
8.
9.
FIRE PROTECTION NOTES
HARRIS HEALTH
SCP ACS SC CT Scans (1-3) and CT Simulator Replacement
2525 HOLLY HALL ST.
HOUSTON, TEXAS 77054
HOUSTON, TEXAS
2021 INTERNATIONAL BUILDING CODE (WITH HOUSTON AMENDMENTS)
2021 INTERNATIONAL ENERGY CONSERVATION CODE (WITH HOUSTON
AMENDMENTS)
2023 NATIONAL ELECTRICAL CODE (STATE MANDATED)
2021 UPC, UNIFORM PLUMBING CODE (WITH HOUSTON AMENDMENTS)
2021 UMC, UNIFORM MECHANICAL CODE (WITH HOUSTON AMENDMENTS)
2021 IFC, INTERNATIONAL FIRE CODE (WITH HOUSTON AMENDMENTS)
2012 NFPA 101 LIFE SAFETY CODE AND NFPA 99
2012 TAS - STATE OF TEXAS ACCESSIBILITY STANDARD
INTERIOR RENOVATION WORK, COSMETIC UPGRADES, AND PREACTION
SPRINKLER COVERAGE TO SUPPORT COMPUTED TOMOGRAPHY EQUIPMENT
REPLACEMENT IN 3 CT ROOMS AND ONE CT SIMULATION ROOM AT THE
GROUND FLOOR OF SMITH CLINIC
TYPE II-A
BUSINESS (B)
TBD
PROJECT TITLE:
PROJECT ADDRESS:
JURISDICTION:
BUILDING CODES:
PROJECT DESCRIPTION:
EXISTING BUILDING
CONSTRUCTION TYPE:
EXISTING OCCUPANCY:
TDLR NUMBER:
2525 HOLLY HALL STREET
HOUSTON, TX 77054
PROJECT LOCATION
LOCATION MAP
NORTH
PROJECT LOCATION
HOUSTON
HWY
FM
HWY
BELT
BELT
& AND
L ANGLE (RIGHT)
L ANGLE (ACUTE)
@ AT
CL CENTERLINE
AB
ACT
AD
AFF
ALT
ALUM
ARCH
AU
AV
ANCHOR BOLT
ACOUSTICAL TILE
AREA DRAIN
ABOVE FINISH FLOOR
ALTERNATE
ALUMINUM
ARCHITECTURAL
ASH URN
AUDIO VISUAL
BD
BLD
BLK
BM
BNG
BOD
BOT
BR
BRG
BUR
BW
BOARD
BUILDING
BLOCKING
BEAM OR BENCHMARK
BEARING
BOTTOM OF DECK
BOTTOM
BACKER ROD
BRIDGING
BUILT-UP ROOFING
BOTH WAYS
C
CAB
CEM
CG
CFCI
CIP
CIR
CJ
CLG
cm
CMU
COL
CONC
CONS
CONT
CORR
CPT
CSK
CT
COURSE
CABINET
CEMENT OR CEMENTITIOUS
CORNER GUARD
CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CAST-IN-PLACE
CIRCLE
CONTROL JOINT
CEILING
CENTIMETER
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
CORRIDOR
CARPET
COUNTERSINK
CERAMIC TILE
D
DBL
DEG
DEM
DTL
DF
DIA
DIM
DN
DP
DR
DS
DTL
DW
DWG
DWR
DEPTH OR DEEP
DOUBLE
DEGREE
DEMOLITION
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DOWN
DAMPPROOFING
DOOR
DOWNSPOUT
DETAIL
DISHWASHER
DRAWING
DRAWER
E
EA
EHB
EHD
EIFS
EJ
EL
ELEC
EQ
EQUIP
ETS
EW
EWC
EXP
EXIST
EXT
EXTD
EAST
EACH
ELECTRIC HAIR BLOWER
ELECTRIC HAND DRYER
EXTERIOR INSULATING FINISH SYSTEM
EXPANSION JOINT
ELEVATION (GRADE)
ELECTRICAL
EQUAL
EQUIPMENT
EXPOSED TO STRUCTURE
EACH WAY
ELECTRIC WATER COOLER
EXPANSION OR EXPOSED
EXISTING
EXTERIOR
EXTRUDED
FD
FE
FEC
FEX
FFA
FFE
FF
FHC
FIN
FLR
FLUOR
FP
FR
FRP
FT
FTG
FURN
FV
FWC
FPHB
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER (NO CABINET)
FURNITURE, FIXTURES & ACCESSORIES
FURNITURE, FIXTURES & EQUIPMENT
FINISHED FLOOR
FIRE HOSE CABINET
FINISH
FLOOR
FLUORESCENT
FIREPROOFING
FIRE RETARDANT/ FIRE RESISTIVE
FIBERGLASS REINFORCED POLYMER
FOOT/ FEET
FOOTING
FURNITURE
FIELD VERIFY
FABRIC WALL COVERING
FREEZE-PROOF HOSE BIBB
A
B
C
D
E
F
GA
GALV
GB
GFRC
GFRG
GL
GND
GR
GYP
GYP BD
GAUGE
GALVANIZED
GRAB BAR
GLASS FIBER REINFORCED CONCRETE
GLASS FIBER REINFORCED GYPSUM
GLASS
GROUND
GRADE
GYPSUM
GYPSUM BOARD
G
H
HB
HC
HD
HBD
HCTL
HDR
HDW
HDWD
HM
HOR
HPL
HR
HT
HVAC
HIGH
HOSE BIBB
HOLLOW CORE
HOLD
HARDBOARD
HANDICAPPED ACCESSIBLE TOILET
HEADER
HARDWARE
HARDWOOD
HOLLOW METAL
HORIZONTAL
HIGH PRESSURE LAMINATE
HOUR
HEIGHT
HEATING, VENTILATION & AIR
CONDITIONING
ID
IN
INCAN
INSUL
INT
INSIDE
DIAMETER INCH
INCANDESCENT
INSULATION
INTERIOR
JB
JT
JUNCTION BOX
JOINT
KD
KO
KNOCK DOWN
KNOCKOUT
L
LAM
LAV
LB
LF
LLH
LLV
LT
LONG
LAMINATED
LAVATORY
LAG BOLT
LINEAR BOLT OR LINEAR FEET
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LIGHT OR LIGHTING
M
MAC
MAS
MAT'L
MAX
MBH
MBR
MC
MECH
MEM
MFR
MH
MIN
MIR-F
MIR-G
MLD
MM
MO
MS
MTD
MTG
MTL
METER
MACHINE
MASONRY
MATERIAL
MAXIMUM
MOP AND BROOM HOLDER
MODIFIED BITUMEN ROOFING
MEDICINE CABINET
MECHANICAL
MEMBRANE
MANUFACTURER
MANHOLE
MINIMUM
MIRROR-FRAMED EDGE
MIRROR-GLASS EDGE
MOULDING
MILLIMETER
MASONRY OPENING
MOP SINK
MOUNTED
MOUNTING
METAL
N
NCOM
NIC
NOM
NPS
NTS
NORTH
NONCOMBUSTIBLE
NOT IN CONTRACT
NOMINAL
NOMINAL PIPE
NOT TO SCALE
OC
OD
OFCI
OFD
OFOI
OH
OPG
OPP
OPT
ON CENTER
OUTSIDE DIAMETER
OWNER FURNISHED/ CONTRACTOR INSTALLED
OVERFLOW DRAIN
OWNER FURNISHED/ OWNER INSTALLED
OPPOSITE HAND OR OVERHEAD
OPENING
OPPOSITE
OPTION OR OPTIONAL
PC
PCEM
PA
PCF
PL P.LAM
PLTR
PLBG
PLF
PMR
PNL
PNT
POL
PR
PSF
PSI
PT
PTD
PTD/WR
PTM
PTN
PVC
PVMT
PWD
PRECAST
PORTLAND CEMENT
PUBLIC ADDRESS SYSTEM
POUNDS PER CUBIC FOOT
PLATE PLASTIC LAMINATE
PLASTER
PLUMBING
POUNDS PER LINEAR FOOT
PROTECTED MEMBRANE ROOFING
PANEL
PAINT OR PAINTED
POLISHED
PAIR
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POINT
PAPER TOWEL DISPENSER
PAPER TOWEL DISPENSER/ WASTE RECEPTACLE
PATCH TO MATCH
PARTITION
POLYVINYL CHLORIDE
PAVEMENT
PLYWOOD
QT
QTR
QTY
QUARRY TILE
QUARTER
QUANTITY
H
I
J
K
L
M
N
O
P
Q
R
RA
RCP
RD
REF
REFL
REG
REIN
REQ
RES
REV
RH
RM
RO
ROW
RSF
RADIUS OR RISER
RETURN AIR
REFLECTED CEILING PLAN
ROOF DRAIN
REFER OR REFERENCE
REFLECTED
REGISTER
REINFORCEMENT
REQUIRED
RESILIENT
REVERSE
ROBE HOOK
ROOM
ROUGH OPENING
RIGHT-OF-WAY
RESILIENT SHEET FLOORING
S
SA
SAN
SB
SC
SCHD
SD
SECT
SF
SFP
SH
SHT
SHTG
SIM
SKLT
SND
SNV
SP
SPEC
SPR
SQ
SR
SR/SC
SS
ST
STA
STC
STD
STL
STOR
STRU
SUSP
SYM
SYN
SYS
SOUTH
SUPPLY AIR
SANITARY
SPLASH BLOCK
SOLID CORE OR SHOWER CURTAIN
SCHEDULE OR SCHEDULED
SOAP DISPENSER
SECTION
SQUARE FOOT OR SQUARE FEET
SPRAYED FIREPROOFING
SPRINKLER HEAD
SHEET
SHEATHING
SIMILAR
SKYLIGHT
SANITARY NAPKIN DISPOSAL
SANITARY NAPKIN VENDOR
STANDPIPE
SPECIFIED OR SPECIFICATIONS
SINGLE PLY ROOFING
SQUARE
SHOWER ROD
SHOWER ROD/ SHOWER CURTAIN
STAINLESS STEEL
SOAP TRAY
STATION
SOUND TRANSMISSION CLASS
STANDARD
STEEL
STORAGE
STRUCTURE OR STRUCTURAL
SUSPENDED OR SUSPENSION
SYMBOL
SYNTHETIC
SYSTEM
T
TB
TBL
T&B
TC
TD
TEL
TERR
T&G
THK
THRU
TLT
TOC
TOD
TOF
TOI
TOJ
TOL
TOP
TOS
TOW
TPH
TR
TS
TTB
TV
TYP
TREAD OR TOP
TOWEL BAR
TOP OF BRICK LEDGE
TEST AND BALANCE
TOP OF CURB
TRENCH DRAIN
TELEPHONE
TERRAZZO
TONGUE & GROOVE
THICK OR THICKNESS
THROUGH
TOILET
TOP OF CONCRETE
TOP OF DECK
TOP OF FOOTING
TOP OF INSULATION
TOP OF JOIST
TOLERANCE
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER HOLDER
TELEPHONE RECEPTACLE
TOP OF SLAB
TELEPHONE TERMINAL BOARD
TELEVISION
TYPICAL
UCL
ULAY
UNO
UR
UNDER CABINET LIGHT
UNDERLAYMENT
UNLESS NOTED OTHERWISE
URINAL
VB
VCT
VERT
VP
VS
VT
VWC
VAPOR BARRIER
VINYL COMPOSITION TILE
VERTICAL
VENT PIPE
VENT SHAFT
VINYL TILE
VINYL WALLCOVERING
W W/
WB
WC
WCOT
WD
WDO
WH
WO
W/O
WP
WR
W/R
WS
WT
WWF
WEST OR WIDE OR WIDTH
WITH
WIND BRACE OR BRACING
WATER CLOSET
WAINSCOT
WOOD
WINDOW
WEEPHOLE
WINDOW OPENING
WITHOUT
WATERPROOFING
WASTE RECEPTACLE
WATER RESISTIVE OR RESISTANT
WEATHERSTRIPPING
WEIGHT
WELDED WIRE FABRIC
YD YARD
R
S
T
U
V
Y
W
= EQUAL
± PLUS OR MINUS
# POUND OR NUMBER
x TIMES
° DEGREES
' FOOT OR FEET
" INCH
- MINUS
+ PLUS
ABBREVIATIONS & NOTATIONS
ARCHITECTURAL - INDEX OF DRAWINGS
SHEET NO SHEET TITLE
ISSUE DATE
ORIGINAL
ISSUE
LAST
REVISION
GENERAL
G-000 COVER SHEET 29 OCT 2025
G-001 PROJECT INFORMATION 29 OCT 2025
G-002 ADA / TAS STANDARDS 29 OCT 2025
GL-101 GENERAL - LIFE SAFETY PLAN - LEVEL 01 29 OCT 2025
PH-101 ARCHITECTURAL - OVERALL FLOOR PLAN & PHASING PLAN - LEVEL 01 29 OCT 2025
STRUCTURAL
S101 STRUCTURAL GENERAL CRITERIA 29 OCT 2025
S201 EXISTING OVERALL FOUNDATION PLAN - LEVEL 1 29 OCT 2025
S202 EXISTING PARTIAL PLANS AND DETAILS 29 OCT 2025
S203 EXISTING PARTIAL PLANS AND DETAILS 29 OCT 2025
MEDICAL EQUIPMENT
MEQ-101 MEDICAL EQUIPMENT FLOOR PLAN - LEVEL 01 29 OCT 2025
ARCHITECTURAL
AD-421 ARCHITECTURAL - ENLARGED DEMOLITION FLOOR PLANS - LEVEL 01 29 OCT 2025
ADC-421 ARCHITECTURAL - ENLARGED DEMOLITION REFLECTED CEILING PLAN - LEVEL 01 29 OCT 2025
A-421 ARCHITECTURAL - ENLARGED FLOOR PLANS - LEVEL 01 29 OCT 2025
A-422 ARCHITECTURAL - ENLARGED REFLECTED CEILING PLANS - LEVEL 01 29 OCT 2025
A-423 ARCHITECTURAL - ENLARGED FINISH FLOOR PLAN - CT SCAN ROOMS - LEVEL 01 29 OCT 2025
A-424 ARCHITECTURAL - ENLARGED FINISH FLOOR PLANS - CT SIMULATOR - LEVEL 01 29 OCT 2025
A-425 ARCHITECTURAL - INTERIOR ELEVATIONS - LEVEL 01 29 OCT 2025
A-426 ARCHITECTURAL - INTERIOR ELEVATIONS - LEVEL 01 29 OCT 2025
A-701 ARCHITECTURAL - CASEWORK DETAILS 29 OCT 2025
A-702 ARCHITECTURAL - CASEWORK DETAILS 29 OCT 2025
MECHANICAL
M001 MECHANICAL GENERAL NOTES AND LEGENDS 29 OCT 2025
M101 MECHANICAL DEMOLITION PLAN - LEVEL 1 29 OCT 2025
M201 MECHANICAL PLAN - LEVEL 1 29 OCT 2025
M301 MECHANICAL DETAILS & SCHEDULES 29 OCT 2025
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES LEGEND 29 OCT 2025
E101 ELECTRICAL DEMOLITION PLAN - LEVEL 1 29 OCT 2025
EL401 ELECTRICAL LIGHTING PLAN - LEVEL 1 29 OCT 2025
EP401 ELECTRICAL POWER PLAN - LEVEL1 OVERALL 29 OCT 2025
EP402 ELECTRICAL POWER PLAN - LEVEL 1 29 OCT 2025
EZ501 ELECTRICAL DETAILS 29 OCT 2025
EZ601 ELECTRICAL SCHEDULES 29 OCT 2025
FIRE PROTECTION
FP001 FIRE PROTECTION GENERAL NOTES AND LEGEND 29 OCT 2025
FP101 FIRE PROTECTION DEMOLITION PLAN - LEVEL 1 29 OCT 2025
FP201 FIRE PROTECTION OVERALL PLAN - LEVEL 1 29 OCT 2025
FP301 FIRE PROTECTION PLAN - LEVEL 1 29 OCT 2025
PLUMBING
P001 PLUMBING GENERAL NOTES AND LEGEND 29 OCT 2025
P101 PLUMBING DEMOLITION PLAN - LEVEL 1 29 OCT 2025
P201 PLUMBING UNDERSLAB PLAN 29 OCT 2025
P301 PLUMBING WASTE & VENT PLAN - LEVEL 1 29 OCT 2025
P401 PLUMBING SUPPLY PLAN -LEVEL 1 29 OCT 2025
P501 PLUMBING DETAILS & SCHEDULES 29 OCT 2025
Grand total: 41
Page Southerland Page, Inc.
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Albany / Albuquerque / Atlanta / Austin / Boston / Charleston / Dallas / Denver /
Dubai / Houston / Los Angeles / Mexico City / New York City / Orlando / Phoenix /
Raleigh / Richmond / San Antonio / San Francisco / Tampa / Washington DC
DESCRIPTIONREVISION DATE
F
IL
E P
A T
H
U S
E R
N A
M E
D A
T E
S T
A M
P
1111 Louisiana Street, 26th Floor Houston, TX 77002 pagethink.com
TEL 713 665 5665
REVISION HISTORY
PROFESSIONAL SEALS
CLIENT
PROJECT
CHECKED BYDRAWN BY
PROJECT NUMBER ABBREVIATION
ORIGINAL ISSUE
SHEET NAME
SHEET NUMBER
A u to d e s k D o c s /4
.0
-H
H S
S
C P
A C
S S
C C
T S c a n s
-3
C T
/4
.0
-A
-S C
P A
C S
S C
C T
S c a n s
-3 .r v t
/2 /2
:2
:2
P M
Harris Health System
SCP ACS SC CT Scans (1-3) and CT Simulator Replacement 2525 Holly Hall
G-001
29 OCT 2025
ISSUE FOR CONSTRUCTION
BG
422089.06
CW, NM, SH
PROJECT INFORMATION
CT SCANS 1-3
m in m in m in
36 min m in X m in
48 min m in m in
60 min
12 min
36 min
12 min
WIDTH OF ACCESSIBLE
ROUTE FOR 90 ° TURN
WIDTH OF ACCESSIBLE ROUTE FOR
TURNS AROUND OBSTRUCTION
FIGURE 403.5.2
ACCESSIBLE ROUTE WIDTH FOR TURNS
FIGURE 304.3.2
WHEELCHAIR TURNING SPACE
NOTE: DASHED LINES INDICATE MIN. CLEAR SPACE REQUIRED ON
EACH ARM OF THE T-SHAPED SPACE TO COMPLETE THE TURN.
T-SHAPED SPACE FOR 180 ° TURN
10 max m in m a x m ax m ax
FIGURE 308.3.1
UNOBSTRUCTED SIDE REACH LIMIT
FIGURE 308.3.2
OBSTRUCTED SIDE
REACH LIMIT
24 max length de pt h
48 min m a x
60 min
FIGURE 305.7.2
CLEARANCE IN ALCOVE, PARALLEL APPROACH
FIGURE 305.5
CLEAR FLOOR SPACE, PARALLEL APPROACH
30 min de pt h
36 min width
FIGURE 305.7.1
CLEARANCE IN ALCOVE, FORWARD APPROACH
FIGURE 305.5
CLEAR FLOOR/GROUND SPACE,
FORWARD APPROACH
X < 20
X
CLEAR FLOOR / GROUND
SPACE SHALL EXTEND NO
MORE THAN 25 in (625 mm)
UNDER THE OBSTRUCTION
ITEM WITHIN SHADED
AREAS ARE WITHIN REACH
Y m ax
Y m ax
Z > X
FIGURE 308.2.2
FORWARD REACH OVER AN OBSTRUCTION
NOTE: X = REACH DEPTH
Y = REACH HEIGHT
Z = CLEAR KNEE SPACE.
Z IS THE CLEAR SPACE BELOW
THE OBSTRUCTIN, WHICH SHALL
BE AT LEAST AS DEEP AS THE
REACH DISTANCE X.
-1 eye level lap seat toe armrest handle a x m in
FIGURE 308.2.1
UNOBSTRUCTED FORWARD REACH LIMITS
DIMENSIONS - ADULT SIZE WHEELCHAIR
WHEELCHAIR APPROACHES
510-635
X=20-25
30 min m ax m ax si de a pp ro ac h fr on t a pp ro ac h
20 (508) max - front approach 10 (254) max - side approach m ax m ax si de a pp ro ac h fr on t a pp ro ac h adjustable range m in
STORAGE SHELVES AND CLOSETS
REF. 305 - CLEAR FLOOR/GROUND SPACE
REF. 308 - REACH RANGES
FIGURE 602.5
CANTILEVERED DRINKING FOUNTAINS AND WATER COOLERS (LOW)
REF. 305 - 309
NOTE: HIGH FOUNTAINS FOR STANDING PERSONS SHALL BE 38 (965) MIN. AND 43 (1090) MAX. AFF. HIGH FOUNTAINS SHALL PROVIDE CANE DETECTION ( OR BE LOCATED IN ALCOVE SO AS NOT TO PROTRUDE INTO WALKWAY)
SPOUT HGT. AND LEG CLEARANCE CLEAR FLOOR / GROUND SPACE
SPOUT LOCATION
m ax
17 min
8 min
11 min e xa ct ly m in
48 min m in
5 max
15 min
NOTE: EQUIPMENT PERMITTED WITHIN
SHADED AREA IF MOUNTED BELOW APRON.
30 min m in
Ø
FIGURE 305.3
CLEAR FLOOR SPACE FOR WHEELCHAIRS
REF. 304.3.1
WHEEL CHAIR TURNING SPACE
36 min m in
FIGURES 802.1.3 / 802.1.2 / 803.3.1
WIDTH, DEPTH, ALIGNMENT OF WHEELCHAIR SPACES AND
COMPANION SEATING IN ASSEMBLY AREAS
m in
FRONT OR REAR ENTRY SIDE ENTRY
33 min
33 min
TWO SPACES
NOTE: SHOULDERS OF PERSONS SETED SHALL ALIGN WITH
THOSE IN WHEELCHAIRS ( SHOULDERS OF PERSONS
IN WHEELCHAIRS ARE 36 (915) FROM FRONT OF CHAIR.
42 min 305 12 max
0-
-3
0-
-1
60 min
42 min
FIGURE 604.2 & 604.8.2
AMBULATORY ACCESSIBLE STALL
42 min
12 max
0-
-1
54 min
FIGURE 604.8.1.1
WHEELCHAIR ACCESSIBLE TOILET STALLS DOOR SWINGS OUT
m in m ax m in m ax
4 max 815
32 min ALTERNATE
DOOR
LOCATION
42 (1065) min LATCH
APPROACH ONLY,
OTHER APPROACHES
48 (1220) min
56 min
59 min wall mounted WC floor mounted WC m in
56 min
59 min wall mounted WC floor mounted WC m ax305
12 max
36 min
WHEELCHAIR ACCESSIBLE TOILET
STALLS DOOR SWING IN END OF ROW
12 max
42 min
0-
-3
180-230 7-9
0-
-4
54 min
T P d is pe ns er
FLUSH CONTROLS - REF: 604.6, 305, 309
* DISPENSER OUTLET MUST BE > 1.5
(38) BELOW GRAB BAR OR > 12"
ABOVE GRAB BAR. REF 604.7 & 609.3
FIGURE 604.4 - 604.7 & 609
WATER CLOSET SIDE VIEW
FIGURE 604.5.2
WATER CLOSET FRONT VIEW
12 min
405-455
16-18
24 min
* 36 min
0-
-3
NOTE: 24" GRAB BAR PERMITTED, CENTERED ON
WC, WHERE SPACE DOES NOT ALLOW DUE TO
LOCATION OF A RECESSED FIXTURE ADJ. TO WC.
* WHERE SPACE PERMITS, EXTEND
GRAB BAR ON TRANSER SIDE.
FIGURE 604.3.1
WC - CLEAR FLOOR SPACE
405-455
16-18
60 min in
CLEAR
FLOOR
SPACE
m ax m in
6 max m in m ax
8 min
11 min m in knee clearance toe clearance m irr or
FIGURE 606.3
LAVATORY CLEARANCE
REF: 606.2, 305,306
LAVATORIES AND SINKS CLEAR FLOOR SPACE
CLEAR
FLOOR
SPACE
m in
48 min
430-635
17-25 m in
-1
/2 m in m in
19 max
FIG. 607.2
CLEARANCE FOR BATHTUBS
m ax
12 max
24 min
24 max m in m in
CONTROL
END
HEAD
END
length of bathtub m in
CONTROL
END
HEAD
END
12 min
CLEAR
FLOOR
SPACE
seat
a) REMOVABLE SEAT
b) PERMANENT SEAT length of bathtub CLEAR
FLOOR
SPACE
380-405 15-16 min
15 min
12 min
FIG. 607.4.2
GRAB BARS & CONTROLS
BATHTUBS WITH REMOVABABLE SEAT
EQ EQ
CONTROL
AREA
0-
-3
6-
-1
0 305 12 max
24 min
24 max
0-
-1 se at h ei gh t
12 min
FIG. 607.4.1
GRAB BARS & CONTROLS
PERMANENT SEAT BATHTUBS
EQ EQ
CONTROL
AREA
0-
-3 6 se at h ei gh t
12 max
48 min 15"
5-
-1
0-
-1
FIG. 609.3
SIZE & SPACING OF GRAB BARS
1-
1/ m in m in
1-1/2
PROJECTING OBJECT
PROJECTING OBJECT
2.5 max
1.
m ax
560-585
22-23
5-
-1
380-405
15-16
FIG. 610.3
SHOWER SEAT DESIGN
m ax
F U
LL
D
E P
T H
O F
S T
A
LL
FIG. 608.5.2
GRAB BARS & CONTROLS IN ROLL-IN
TYPE SHOWER COMPARTMENTS
CONTROL
AREA
48 min
36 - exact to finish face e xa ct m in
FIG. 608.2.1 & 608.3.1
TRANSFER TYPE SHOWER COMPARTMENT
CONTROL
END
to fi ni sh fa ce
FIG. 608.2.2
ROLL-IN TYPE SHOWER COMPARTMENT
60 min m in seat m in
36 exact
15 max m in
0-
-3 6 12 m ax
FIG. 608.5.1
TRANSFER TYPE SHOWER
COMPARTMENT CONTROLS
to finish face
CONTROL
AREA
se at h ei gh t
CONTROL
AREA
a) WITHOUT SEAT b) WITH SEAT
27 max
0-
-1 9 96 m in m ax
NOTE: IN ROLL-IN TYPE SHOWERS WITHOUT SEAT, SHOWER
HEAD AND OPERABLE PARTS MAY BE LOCATED ON ANY WALL.
0-
-3
18 min
CONTROL
END
FIG. 404.2.4.1
MANUEVERING CLEARANCES AT MANUAL SWINGING DOORS & GATES
18 min m in
a) front approach, pull side m in
b) front approach, push side m in
b) front approach, push side - door provided with both closer & latch
12 min m in
d) hinge approach, pull side
36 min m in
e) hinge approach, pull side
42 min
f) hinge approach, push side
g) door provided with both closer & latch m in
22 min
24 min12 m in
h) latch approach, pull side
i) door provided with closer
j) latch approach, push side
k) door provided with closer m in
24 min
FIG. 404.2.4.2 & FIG.404.2.3
MANUEVERING CLEARANCES AT SLIDING DOORS, GATES, FOLDING DOORS AND OPENINGS WITHOUT DOORS m in
a) front approach b) side approach m in
c) pocket or hinge approach m in
22 min
d) stop or latch approach m in
24 min
32 min
32 min
32 min
32 min
FIG. 307.2
LIMITS OF PROTRUDING OBJECTS
4 max
5-
-3
EQ EQ
m ax x
12 min
FIG. 307.4
VERTICAL CLEARANCE
NOTE:
505.10.1 RAMP HANDRAILS EXTEND 12 min (305) BEYOND
RAMP RUN BOTH TOP & BOTTOM.
505.10.2 TOP EXT. - HOR. 12 MIN. DIRECTLY ABOVE 1ST RISER
NOSING.
505.10.3 BOTTOM EXT. - EXTENDS AT SLOPE OF THE STAIR
FLIGHT FOR A HOR. DISTANCE AT LEAST EQUAL TO
ONE TREAD DEPTH BEYOND THE LAST RISER
NOSING.
FIG. 404.2.6
DOORS & GATES IN SERIES
48 min
48 min 48"
FIG. 504.5
STAIR NOSINGS
a) radius of tread edge (typ) for all profiles b) angled riser c) curved nosing d) beveled nosing
R = 1/2 max
0-
-7
30° max
1-1/2 max
1-1/2 max
11 min
FIG. 505.5 & FIG. 505.6
HANDRAIL CLEARANCE GRIPPING
SURFACE & SUPPORTS
1-1/2 min *
1-
1/ m in
32 min m ax
36 min
FIG. 505.7.2
HANDRAIL CROSS SECTIONS
32-51
1 1/4 - 2 Ø
572 1 /4 m ax
2 1/4 max
4 - 6 1/4 perimeter 100-160
1' - 5 81/256"
NOTE: IT IS NOT REQUIRED THAT THE CLEAR
FLOOR SPACE IS CENTERED ON LAVATORY
2-
-1
NOTE: FLUSH CONTROL ON OPEN / TRANSER SIDE
* WHERE APPLICABLE, NFPA
REQUIRES 2-1/4" min.
NOTE: DIMENSIONS SHOWN APPLY WHEN X < 48".
ADA GENERAL NOTES
1. ENTITIES MUST COMPLY WITH THE REGULATIONS ISSUED BY FEDERAL AGENCIES, THE
U.S. DEPARTMENT OF JUSTICE AND THE U.S. DEPARTMENT OF TRANSPORTATION
UNDER THE AMERICANS WITH DISABILITIES ACT.
2. UNLESS OTHERWISE INDICATED ALL FIGURE NUMBERS REFER TO ILLUSTRATIONS IN
THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN. THE MAJORITY OF OTHER
FIGURES AND NOTES REFER TO THE 2012 TEXAS ACCESSIBILITY STANDARDS (TAS) OF
THE ARCHITECTURAL BARRIERS DIVISION OF THE TEXAS DEPARTMENT OF LICENSING
AND REGULATION (TDLR).
3. THE FIGURES CONTAINED ON THIS SHEET ARE PROVIDED ONLY TO ILLUSTRATE SOME
OF THE CRITERIA IN THE STANDARD. THEY ARE NOT PART OF THE STANDARD AND THEY
ARE NOT INTENDED TO INTRODUCE CRITERIA THAT ARE NOT CONTAINED IN THE
STANDARD.
4. THE MINIMUM REQUIRED ACCESSIBILITY COMPLIANCE INCLUDES, BUT IS NOT LIMITED
TO, THE INFORMATION SHOWN WITHIN.
5. NOT ALL CONDITIONS SHOWN ON THIS SHEET MAY BE REQUIRED BY THIS PROJECT.
COMPARE THE REQUIREMENTS OF THE ARCHITECTURAL DRAWINGS WITH THIS SHEET
FOR RELEVANCE OF INFORMATION.
6. DIMENSIONS INDICATED ARE THE MINIMUM CLEAR DIMENSIONS REQUIRED BY
ACCESSIBILITY GUIDELINES. THE CONTRACTOR IS RESPONSIBLE FOR LAYOUT OF
BUILDING ELEMENTS TO ASSURE THAT DIMENSIONS SHOWN ARE PROVIDED.
7. DIMENSIONS SHOWN AS FOLLOWS: INCHES ( CENTIMETERS )
8. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES BETWEEN THE
ARCHITECTURAL DRAWINGS AND THE INFORMATION GIVEN ON THIS SHEET.
9. DO NOT SCALE THESE DRAWINGS.
10. OUTDOOR SURFACES SHALL BE DESIGNED SO THAT WATER WILL NOT ACCUMULATE ON
WALKING SURFACES.
Page Southerland Page, Inc.
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Albany / Albuquerque / Atlanta / Austin / Boston / Charleston / Dallas / Denver /
Dubai / Houston / Los Angeles / Mexico City / New York City / Orlando / Phoenix /
Raleigh / Richmond / San Antonio / San Francisco / Tampa / Washington DC
DESCRIPTIONREVISION DATE
F
IL
E P
A T
E R
N A
M E
D A
T E
S T
A M
P
1111 Louisiana Street, 26th Floor Houston, TX 77002 pagethink.com
TEL 713 665 5665
REVISION HISTORY
PROFESSIONAL SEALS
CLIENT
PROJECT
CHECKED BYDRAWN BY
PROJECT NUMBER ABBREVIATION
ORIGINAL ISSUE
SHEET NAME
SHEET NUMBER
A u to d e s k D o c s /4
.0
-H
H S
S
C P
A C
S S
C C
T S c a n s
-3
C T
/4
.0
-A
-S C
P A
C S
S C
C T
S c a n s
-3 .r v t
/2 /2
:2
:3
P M
Harris Health System
SCP ACS SC CT Scans (1-3) and CT Simulator Replacement 2525 Holly Hall
G-002
29 OCT 2025
ISSUE FOR CONSTRUCTION
BG
422089.06
NM
ADA / TAS STANDARDS
CT SCANS 1-3
PROJECT LIMITS
PROJECT LIMITS
A-421
A-421
Page Southerland Page, Inc.
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Albany / Albuquerque / Atlanta / Austin / Boston / Charleston / Dallas / Denver /
Dubai / Houston / Los Angeles / Mexico City / New York City / Orlando / Phoenix /
Raleigh / Richmond / San Antonio / San Francisco / Tampa / Washington DC
DESCRIPTIONREVISION DATE
F
IL
E P
A T
E R
N A
M E
D A
T E
S T
A M
P
1111 Louisiana Street, 26th Floor Houston, TX 77002 pagethink.com
TEL 713 665 5665
REVISION HISTORY
PROFESSIONAL SEALS
CLIENT
PROJECT
CHECKED BYDRAWN BY
PROJECT NUMBER ABBREVIATION
ORIGINAL ISSUE
SHEET NAME
SHEET NUMBER
KEYPLAN
A u to d e s k D o c s /4
.0
-H
H S
S
C P
A C
S S
C C
T S c a n s
-3
C T
/4
.0
-A
-S C
P A
C S
S C
C T
S c a n s
-3 .r v t
/2 /2
:2
:1
P M
Harris Health System
SCP ACS SC CT Scans (1-3) and CT Simulator Replacement 2525 Holly Hall
GL-101
29 OCT 2025
ISSUE FOR CONSTRUCTION
BG
422089.06
SH
GENERAL - LIFE SAFETY PLAN - LEVEL
CT SCANS 1-3
SCALE: 1/16" = 1'-0"1 LIFE SAFETY PLAN - LEVEL 01
(TOTAL CAPACITY = 1,140)
(TOTAL USED = 607)
FRU EGRESS
F R
U E
G R
E
SS
FRU EGRESS
FRU EGRESS
F
RU
E G
R E
SS
F in is he d w al l
F inishe d w all s e is m ic b r a c k e t s e is m ic b r a c k e t
S1411
PATIENT
UPTAKE #1
S1409
PATIENT
UPTAKE #2
PATIENT
UPTAKE #3
S1405
STORAGE
S1403
PET/CT SCAN
S1400
VESTIBULE
S1413
PET
HOT LAB
S1406
DRESS
RM #2
S1410
PAT
TLT
S1408
PAT
TLT
S1404
DRESS
RM #1
S1401
PET CONTROL
S1501
MRI COMPUTER
ROOM
S1505
MRI SCAN 1.5T
S1500
MRI SUITE
VESTIBULE
S1504
MRI CONTROL
ROOM #2
S1227
GEN RAD
SCAN RM #1
S1227A
CONTROL
S1228
R/F SCAN
RM #2
S1228A
CONTROL
CONTROL
S1226
R/F SCAN
RM #1
S1226A
UP
UP
STAIR B
ELEVATOR
LOBBY
ELEVS
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
LOBBY
WHEELCHAIR
STORAGE
STAIR A
CORRIDOR
CORRIDOR
SUPPORT
BOILER ROOM
ELECTRICAL
PLUMBING
ROOM
HSKP
M TOILET
F TOILET
MECH
STOR
SERVICE
ELEV #4
PAT
TLT
PAT
TLT
PAT
TLT
PAT
TLT
PAT
TLT
STAFF
TLT
STAFF
TLT
PAT
TLT
PAT
TLT
HSKP
STAFF
TLT
EMPLOYEE BREAK
STAFF LOUNGE
CAFETERIA
MATERIAL
STAGING
OFFICE
BUILDING
SOILED HOLD
SOILED
HOLDING
CLEAN
SUPPLY
FIRE
COMMAND
PAT PREP
DI READING
ROOM
ELECTRICAL
MRI SCAN 1.5T
VESTIBULE
CORRIDOR
PAT
TLT
MEN
LOCKERS
DRESS A
DRESS
B
DRESS
C
DRESS
D
MEN GOWNED
WAITING
DRESS
B
DRESS
C
DRESS
D
WOMEN
LOCKERS
DRESS
A
WOMEN GOWNED
WAITING
GEN RAD
SCAN RM #2
CONTROL
GEN RAD
SCAN RM #3
STORAGE
IT ROOM
CORRIDOR
CONFERENCE
ROOM ULTRASOUND #1
ULTRASOUND #2
ADMIN SUPPORT
STAFF
PHYSICIAN DIR
OUTPAT IMAGING
WK AREA
ULTRASOUND #3
DIRECTOR
BODY IMAGING
ULTRASOUND
READING RM
SWING OFFICE/
IMAGING PHYS
DIR IMAGING
SERVICES
IT/PACS
ANALYST
ULTRASOUND #4
WK
AREA
CLEAN
SUPPLY ULTRASOUND #5
PVT
CIRC
CORRIDOR
ELECTRICAL
CONSULT CONSULT
STAFF
LOCKERS
RT-IMAGING
STAFF LOUNGE
SOILED
HOLDING PHYSICS
STORAGE
SWING OFFICE
RAD ONCOLOGY DR
WOMEN GOWNED
WAITING
DRESS
A
DRESS
B
MEN GOWNED
WAITING
DRESS
A
PHYSICIST
PHYSICIST
DARK RM/
FUTURE OFFICE
OFFICE
PROFESSIONAL
WORKROOM
CLERICAL
WORK
VITALS
STOR
NURSE
STATION
CLEAN
SUPPLY
EXAM HEAD
& NECK #8
EXAM
PROCEDURES #5
EXAM #4
EXAM #3
EXAM #2
EXAM #1
BRACHYTHERAPY
CONTROL
BRACHYTHERAPY
ROOM
LINAC #1
CONTROL
LINAC #2
CONTROL
LINAC #3
CONTROL
LINEAR
ACCELERATOR #1 LINEAR
ACCELERATOR #2
LINEAR
ACCELERATOR #3
CONTROL
DRESS
B
SUB-WAITING
MANAGER
OFFICE
PHYSICIAN
DIRECTOR
STORAGE
PATIENT
HOLDING AREA
PATIENT
EDUCATION
RECEPTION/
CASHIER
RADIOLOGY PATIENT
SUPPORT TECH STATION
1A REGISTRATION
DROP-OFF/PICK-UP
WAITING
IMAGING
WAITING
RADIATION
WAITING
IT ROOM
STORAGE
CORRIDOR
PRE-ACTION
SYSTEM
CORRIDOR
CORRIDOR
PVT
CIRC
CORRIDOR
CORRIDOR
STAFF
TLT
SOILED
HOLDING
CORRIDOR
PAT
TLT
MRI CONTROL
ROOM #1
DOSIMETRY
WORK ROOM
S1002
S1909
S1909A
S1800
S1916
S1801
S1817
S1000
S1007A
S1911
S1005
S1821
S1809
S1300
S1924
S1926
S1928
S1906
S1905
S1907
S1614
S1004
S1239
S1235A
S1208A
S1218AS1126
S1139
S1141
S1148 S1150 S1152
S1209
S1915
S1914
S1913
S1912
S1610
S1612
S1902
S1601
S1606
S1608
S1503
S1007
S1822
S1234A
S1234
S1232A
S1232BS1232S1232D
S1230
S1233BS1233CS1233D
S1235
S1233A
S1233
S1225
S1225A
S1223
S1238
S1224
S1820
S1201
S1206
S1208
S1205
S1207
S1208B
S1210
S1211
S1216 S1213
S1215
S1217
S1218
S1222
S1221
S1220
S1219 S1812
S1135
S1143 S1156
S1137A
S1137
S1132 S1134
S1133
S1128
S1128A
S1128B
S1130
S1130A
S1136
S1140
S1142
S1236
S1144S1118
S1146
S1154
S1116
S1120
S1117
S1119
S1121
S1123
S1125
S1127
S1301A
S1301
S1302A S1303A S1304A
S1302 S1303
S1304
S1123A
S1130B
S1115
S1113
S1111
S1109
S1105 S1107
S1103 S1203
S1910
S1200
S1200AS1100
S1158
S1917B
S1900
S1157
S1808
S1807
S1810
S1237
S1803
S1412S1159
S1818
S1226B
S1502
S1138
ELEVATOR #1
ELEVATOR #2
ELEVATOR #3
FLOOR PLAN GENERAL NOTES
1. ALL UNMARKED PARTITIONS ARE TYPE __. ALL COLUMN FURRING TO BE PARTITION
TYPE __ UNLESS NOTED OTHERWISE.
2. ALL WINDOW & DOOR PLAN OPENINGS ARE DIMENSIONED ON AREA PLANS.
3. FOR FIRE AND LIFE SAFETY PLANS, REFER TO G1 DRAWINGS.
4. ROOF PLAN SHOWN FOR REFERENCE ONLY. REFER TO ROOF PLAN FOR NOTES AND
DIMENSIONS.
5. REFER TO A2 SERIES DRAWINGS, EXTERIOR ELEVATIONS, A3 BUILDING AND WALL
SECTIONS.
6. REFER TO A6 SERIES FOR ALL PARTITIONS, DOORS, WINDOWS, AND ACCESSORIES.
7. INSTALL APPROPRIATE MANUFACTURED EXPANSION JOINT COVERS AT ALL VISIBLE
BUILDING EXPANSION JOINTS. TOP OF COVER OF FLOOR EXPANSION JOINT
COVERS TO BE FLUSH WITH TOP OF FINISHED FLOOR.
8. ALL PARTITION DIMENSIONS ARE TAKEN FROM THE CENTERLINE OF COLUMNS AND
TO THE DRYWALL FACE.
9. INSTALL BLOCKING AS REQUIRED TO SUPPORT WALL MOUNTED DEVICES.
10. AT ALL SPANDREL GLASS LOCATIONS, FACE OF INTERIOR WALL TO BE CONTINUOUS
WITH ADJACENT WALL.
11. REFER TO A-551 FOR INTERIOR EXPANSION JOINT DETAILS.
12. GENERAL DIMENSIONS PROVIDED ON FLOOR PLANS AND AREA PLANS DO NOT
REFLECT THE ROUGH OPENING DIMENSIONS REQUIRED FOR COORDINATION WITH
MASONRY JOINT COURSING. CONTRACTOR IS TO PROVIDE ROUGH OPENING
FRAMING DIMENSIONS CONSISTENT WITH ENLARGED ARCHITECTURAL
PLAN/SECTION DETAILS (A5 SERIES SHEETS), AND WINDOW SCHEDULE/DETAILS (A6
SERIES). CONTRACTOR TO SUBMIT RFI FOR ANY ROUGH OPENING DIMENSIONS NOT
GIVEN IN DETAILING FOR CLARIFICATION REQUIRED.
A
6 7 7.3 7.6 84
B
C
D
E
F
G
321 9 10
CT
SIMULATOR
1136A
MOLD /
BLOCK
WORKROOM
CT
SIMULATOR
CONTROL
A-421
A-421
2 1603
NURSE
STATION
CT SCAN #3
CT SCAN #2
CT SCAN #1
PATIENT
TOILET
STAFF WORK
AREA
A-424
A-423
DESCRIPTIONSYMBOL
FLOOR PLAN LEGEND
MATCH LINE
PARTITION TAG
REFER TO PARTITION SCHEDULE
BUILDING SECTION TAG
WALL SECTION TAG
EXTERIOR ELEVATION TAG
PLAN REFERENCE TAG
ROOM NAME
COLUMN GRID
DESIGNATIONS
KEYED NOTE
KEYED NOTES ONLY APPLY TO THIS SHEET
04 21 13.13.A01
SHEET REFERENCE
1 A-211 INTERIOR ELEVATION TAG
ROOM NUMBER
NEW DOOR
WITH DOOR TAG
REF DOOR SCHED
NEW WINDOW
WITH WINDOW MARK
REF GLAZING ELEVATIONS
A-431
MATCHLINE
REF /01 A101
A1 X
SMOKE PARTITION
1-HOUR FIRE WALL, FIRE BARRIER, OR FIRE PARTITION
1-HOUR FIRE-RATED SMOKE BARRIER
2-HOUR FIRE WALL, FIRE BARRIER, OR FIRE PARTITION
2-HOUR FIRE-RATED SMOKE BARRIER
A-201
A-301
1002 28
A
ROOM NAME
3-HOUR FIRE WALL, FIRE BARRIER, OR FIRE PARTITION
DESCRIPTIONSYMBOL
PHASING PLAN LEGEND
PHASE 1 DEMARCATION AREA
PHASE 2 DEMARCATION AREA
PHASE 3 DEMARCATION AREA
PHASE 4 DEMARCATION AREA
Page Southerland Page, Inc.
ARCHITECTURE / ENGINEERING / INTERIORS / PLANNING / CONSULTING
Albany / Albuquerque / Atlanta / Austin / Boston / Charleston / Dallas / Denver /
Dubai / Houston / Los Angeles / Mexico City / New York City / Orlando / Phoenix /
Raleigh / Richmond / San Antonio / San Francisco / Tampa / Washington DC
DESCRIPTIONREVISION DATE
F
IL
E P
A T
E R
N A
M E
D A
T E
S T
A M
P
1111 Louisiana Street, 26th Floor Houston, TX 77002 pagethink.com
TEL 713 665 5665
REVISION HISTORY
PROFESSIONAL SEALS
CLIENT
PROJECT
CHECKED BYDRAWN BY
PROJECT NUMBER ABBREVIATION
ORIGINAL ISSUE
SHEET NAME
SHEET NUMBER
KEYPLAN
A u to d e s k D o c s /4
.0
-H
H S
S
C P
A C
S S
C C
T S c a n s
-3
C T
/4
.0
-A
-S C
P A
C S
S C
C T
S c a n s
-3 .r v t
/2 /2
:2
:0
P M
Harris Health System
SCP ACS SC CT Scans (1-3) and CT Simulator Replacement 2525 Holly Hall
PH-101
29 OCT 2025
ISSUE FOR CONSTRUCTION
BG
422089.06
CW, NM, SH
ARCHITECTURAL - OVERALL FLOOR
PLAN & PHASING PLAN - LEVEL 01
CT SCANS 1-3
SCALE: 1/16" = 1'-0"1 ARCHITECTURAL - OVERALL FLOOR PLAN - LEVEL 01
A. THESE NOTES APPLY TO STRUCTURAL DOCUMENTS SEALED BY THE STRUCTURAL ENGINEER AND ARE INTENDED TO BE COMPLIMENTARY TO AND USED IN CONJUNCTION WITH THE PLANS AND SPECIFICATIONS, INCLUDING THOSE PREPARED BY OTHER DISCIPLINES. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT/ENGINEER IMMEDIATELY. ANY SUCH DISCREPANCIES SHALL BE RESOLVED TO THE MORE
STRINGENT REQUIREMENTS, UNLESS OTHERWISE AUTHORIZED BY ARCHITECT/ENGINEER.
B. IT IS THE INTENT OF THE STRUCTURAL DOCUMENTS TO DESCRIBE A FUNCTIONALLY COMPLETE STRUCTURAL PROJECT. ALL LABOR, DOCUMENTATION, SERVICES, MATERIALS, OR EQUIPMENT THAT MAY BE REASONABLY INFERRED FROM THESE DOCUMENTS OR FROM PREVAILING CUSTOM OR TRADE USAGE AS BEING REQUIRED TO PRODUCE THE INTENDED RESULT, WHETHER OR NOT SPECIFICALLY CALLED FOR, SHALL
BE PROVIDED AT NO ADDITIONAL COST TO OWNER.
C. ANY DISCREPANCIES ON THE STRUCTURAL DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT/STRUCTURAL ENGINEER PRIOR TO SUBMISSION OF BIDS OR PROPOSALS, OR IF NOT REASONABLY DISCERNABLE DURING PREPARATION OF BIDS AND PROPOSALS, BEFORE COMMENCING THE WORK IN QUESTION. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT
PRIOR APPROVAL OF THE ARCHITECT AND THE STRUCTURAL ENGINEER. NO CHANGE ORDER
CONSIDERATION WILL BE GIVEN TO CHANGES FOR WHICH THE ARCHITECT AND STRUCTURAL ENGINEER
WERE NOT CONTACTED PRIOR TO CONSTRUCTION OF THE AFFECTED ITEM.
D. ANY DEVIATION FROM, ADDITION TO, SUBSTITUTION FROM, OR MODIFICATION TO THE STRUCTURE OR ANY PART OF THE STRUCTURE DESCRIBED IN THESE DOCUMENTS SHALL BE SUBMITTED IN WRITING TO THE
ARCHITECT/ENGINEER FOR REVIEW.
E. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE MEANS AND METHODS OF CONSTRUCTION UNLESS SO STATED OR NOTED. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY PROGRAMS AND PRECAUTIONS IN CONNECTION WITH THE WORK, AND SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE WORK, OTHER PROPERTY, THE WORKMEN AND OTHER PERSONS DURING DEMOLITION AND
CONSTRUCTION.
F. SITE OBSERVATION VISITS, IF MADE BY ENGINEER, ARE MADE FOR THE PURPOSE OF DETERMINING, FOR THE BENEFIT OF THE OWNER, THAT THE WORK IS GENERALLY PROCEEDING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SITE OBSERVATIONS ARE NOT INTENDED TO BE EXHAUSTIVE OR DETAILED INSPECTIONS OF CONTRACTOR'S WORK. CONTRACTOR RETAINS SOLE RESPONSIBILITY TO CONSTRUCT THE
WORK IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS, AND APPLICABLE REGULATIONS.
G. CONSTRUCTION MATERIALS OR EQUIPMENT SHALL NOT BE STORED OR OPERATED ON FLOORS OR ROOFS IN EXCESS OF THE DESIGN LOADS INDICATED ON THE DRAWINGS. IMPACT SHALL BE AVOIDED WHEN PLACING
MATERIALS ON FLOOR OR ROOFS.
H. REFER TO WALL SECTIONS AND ELEVATIONS FOR ADDITIONAL REINFORCEMENT, INSERTS, ANCHORS, ETC.
REFER TO DRAWINGS AND SPECIFICATIONS FOR WATERPROOFING, FLASHING, METAL EXPANSION JOINTS, CAULKING, SEALANTS, ETC. CONTRACTOR SHALL COMPARE THE STRUCTURAL SECTIONS WITH THE ARCHITECTURAL SECTIONS AND REPORT ANY DISCREPANCIES TO THE ARCHITECT/ENGINEER PRIOR TO
COMPLETION OF THE SHOP DRAWINGS.
I. NOT ALL OPENINGS AND OTHER COMPONENTS THAT ARE REQUIRED HAVE BEEN SHOWN IN THE
STRUCTURAL DRAWINGS. COORDINATE WITH THE ARCHITECTURAL, MECHANICAL, PLUMBING AND
ELECTRICAL DRAWINGS AND VERIFY THE LOCATIONS AND SIZES OF ALL CHASES, INSERTS, OPENINGS, SLEEVES, FINISHES, DEPRESSIONS, PADS AND OTHER PROJECT REQUIREMENTS. FLOOR PLAN WILL BE
FURNISHED FOR THAT PURPOSE.
J. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE MECHANICAL, ELECTRICAL, PLUMBING AND ARCHITECTURAL DRAWINGS TO DETERMINE WHERE OPENINGS ARE REQUIRED IN REINFORCED CONCRETE
BEAMS, SLABS AND WALLS.
K. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, DETAILING ALL THE OPENINGS, INCLUDING ADDED REINFORCEMENT AS SHOWN ON THE TYPICAL WALL, SLAB AND BEAM OPENING DETAILS FOR REVIEW.
L. ADDITIONAL REINFORCEMENT ABOVE THAT SHOWN IN THE TYPICAL SLAB AND BEAM OPENING DETAILS MAY
BE REQUIRED AND WILL BE REVIEWED ON THE SHOP DRAWINGS.
M. USE THE MANUFACTURER'S CERTIFIED DRAWINGS AND SPECIFICATIONS FOR THE EQUIPMENT
ANCHORAGE AND DETAILS.
N. ALL CONSTRUCTION JOINTS SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE INCORPORATED INTO THE STRUCTURE. ADDITIONAL CONSTRUCTION JOINTS TO FACILITATE CONSTRUCTION SHALL BE LOCATED AND
DETAILED ON THE SHOP DRAWINGS FOR REVIEW.
O. HORIZONTAL CONSTRUCTION JOINTS SHALL NOT BE PERMITTED IN BEAMS UNLESS SHOWN ON THE
STRUCTURAL DRAWINGS.
P. ALL CONSTRUCTION AND CONTROL JOINTS FOR BEAMS WHICH ARE EXPOSED TO VIEW ARE TO BE LOCATED TO COINCIDE WITH THE ARCHITECTURAL RUSTICATION JOINTS AS SHOWN ON THE BUILDING ELEVATION
SHEETS OR AS REVIEWED IN WRITING.
Q. SHOP DRAWINGS:
1. THE TERM "SHOP DRAWINGS" INCLUDES FABRICATION, MANUFACTURING, ERECTION AND
SETTING DRAWINGS, BROCHURES, CERTIFICATES, AND PRODUCT DATA DESCRIBING
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL INCLUDE ALL PERTINENT
INFORMATION REQUIRED FOR THE ENGINEER TO FULLY EVALUATE THE MATERIALS BEING
REPRESENTED BY THE SUBMITTAL INCLUDING THE PHYSICAL PROPERTIES, DIMENSIONS,
LOCATIONS AND METHOD OF INSTALLATION.
2. SHOP DRAWINGS WILL BEAR THE REVIEW STAMP OF THE CONTRACTOR INDICATING THAT HE
HAS REVIEWED THE DRAWINGS FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS;
COORDINATED ITEMS INCLUDED IN THE SUBMITTAL WITH RELATED ITEMS; AND VERIFIED AND
COORDINATED DIMENSIONS.
3. REPRODUCTIONS OF THE ENGINEERING DRAWINGS WILL NOT BE ACCEPTABLE AS SHOP
DRAWINGS.
4. ANY SHOP DRAWING NOT CONFORMING TO THESE REQUIREMENTS WILL BE CAUSE FOR
REJECTION AND WILL BE RETURNED WITHOUT ANY FURTHER ACTION.
GENERAL NOTES FOR CONSTRUCTION EXCAVATION, BACKFILLING & FOUNDATIONS
A. A GEOTECHNICAL EXPLORATION OF SUBSURFACE CONDITIONS, CONTAINING TEST BORINGS, LABORATORY TEST, ENGINEERING ANALYSIS AND FOUNDATION RECOMMENDATIONS IS NOT AVAILABLE FOR REVIEW. PAD
HAS BEEN DESIGNED FOR AN ALLOWABLE BEARING PRESSURE OF 1000 PSF.
B. MAINTAIN PROPER SITE DRAINAGE DURING CONSTRUCTION SO THAT PONDING OF WATER DOES NOT
OCCUR IN THE BUILDING AREA.
NORMAL WEIGHT
BUILDING COMPONENT
3000 4000
28 DAY CYLINDER COMPRESSIVE STRENGTH
POUNDS PER SQUARE INCH(PSI)
SLUMP
(IN)
MAX
AGGREGATE
SIZE (IN)
W/C
RATIO
CONCRETE
A. CONCRETE SCHEDULE
B. PROVIDE DEFORMED NEW BILLET STEEL BARS CONFORMING TO ASTM A615, GRADE 60. ALL
REINFORCING STEEL SHALL BE SECURELY HELD IN PLACE; PROVIDE ADDITIONAL BARS OR STIRRUPS FOR
SUPPORT AS REQUIRED.
C. WELDED WIRE FABRIC SHALL CONSIST OF FLAT SHEETS AND SHALL CONFORM TO ASTM A185, WITH A
MINIMUM YIELD STRENGTH OF 65.0 KSI
D. PROVIDE FULL EMBEDMENT WITH STANDARD 90 DEGREE HOOKS FOR ALL DOWELS. IF NOT OTHERWISE
SPECIFIED, THE DOWEL SIZE AND SPACING SHALL BE THE SAME AS THE MAIN REINFORCING.
E. WHEN REINFORCING STEEL IN GRADE BEAMS, WALLS, SLABS AND BEAMS, IS NOTED AS CONTINUOUS, SPLICE REINFORCING STEEL ONLY WHEN UNAVOIDABLE DUE TO STOCK LENGTHS. STAGGER ALL SPLICES
A MINIMUM OF 4'-0". ADJACENT BAR SPLICES ARE NOT ACCEPTABLE.
LOCATE THE TOP BAR SPLICES WITHIN THE MIDDLE HALF OF THE SPAN AND LOCATE THE BOTTOM BAR SPLICES AT SUPPORTS OR BETWEEN SUPPORTS AND 1/3 SPAN POINT, UNLESS NOTED OTHERWISE ON
PLANS, DETAILS OR SCHEDULES.
F. PROVIDE INTERIOR AND EXTERIOR HORIZONTAL LAPPED CORNER BARS AT ALL CORNERS TO MATCH
THE SIZE, TYPE AND SPACING OF THE WALL AND GRADE BEAM HORIZONTAL REINFORCING.
G. UNLESS SPECIFICALLY NOTED, SCHEDULED OR DETAILED OTHERWISE, PROVIDE DEVELOPMENT LENGTH FOR REINFORCING IN CONCRETE COMPONENTS IN ACCORDANCE WITH THE SCHEDULE IN NOTE H. BELOW. THIS SCHEDULE SHALL APPLY TO ALL DEVELOPMENT LENGTHS NOT OTHERWISE NOTED, DETAILED OR SCHEDULED IN THE DRAWINGS OR SPECIFICATIONS.
H. REINFORCING BAR DEVELOPMENT LENGTHS (Ld) IN INCHES FOR VARIOUS CONCRETE STRENGTHS IN POUNDS PER SQUARE INCH (PSI). TOP BARS ARE DEFINED AS HORIZONTAL REINFORCING SO PLACED IN A MEMBER THAT MORE THAN 12 INCHES OF CONCRETE IS CAST BELOW THE BAR. ALL OTHER CONDITIONS
ARE CONSIDERED BOTTOM BARS FOR DEVELOPMENT AND SPLICE LENGTH PURPOSES.
J. PROVIDE LAP SPLICE LENGTHS FOR REINFORCING BARS 1.3 TIMES THE Ld NOTED IN NOTE H ABOVE.
1. WHEN TWO BARS OF DIFFERENT SIZES ARE LAPPED, THE SMALLER SIZE SHALL GOVERN
THE LAP LENGTH UNLESS SPECIFICALLY NOTED.
2. WELDED OR MECHANICAL SPLICES CAPABLE OF DEVELOPING 125% OF THE BAR YIELD
STRENGTH MAY BE USED IN LIEU OF THE LAPS. SUCH SPLICES MAY BE EITHER FULL BUTT
WELDS OR SERIES "C CADWELDS OR EQUAL."
K. THE GENERAL NOTES, LAP LENGTHS OR DETAILS PERTAINING TO REINFORCING STEEL AS SHOWN ON THE DETAIL SHEETS OR OTHER SCHEDULES SHALL SUPERSEDE THE NOTES SHOWN ON THIS SHEET.
L. PROVIDE THE FOLLOWING COVER FOR CAST-IN-PLACE CONCRETE REINFORCING.
1. UNFORMED SURFACES IN CONTACT WITH EARTH: 3 INCHES
2. UNFORMED SURFACES OVER MOISTURE BARRIER: 2 INCHES
3. FORMED SURFACES EXPOSED TO EARTH OR WEATHER
a. #6 AND LARGER: 2 INCHES
b. #5 AND SMALLER: 1 1/2" INCHES
4. FORMED SURFACES NOT EXPOSED TO EARTH OR WEATHER
a. SLABS AND WALLS: 3/4 INCHES
b. BEAMS AND COLUMNS 1 1/2 INCHES
BAR SIZE
GRADE 60
#8 #9
#10 #11
#7
#4 #5
#3
#6
3000 50004000 40003000 5000 6000
Ld FOR TOP BARS
28 DAY CYLINDER
CONCRETE STRENGTH (PSI)
Ld FOR BOTTOM BARS
28 DAY CYLINDER
CONCRETE STRENGTH (PSI)
A. A GEOTECHNICAL EXPLORATION OF SUBSURFACE CONDITIONS, CONTAINING TEST BORINGS,
LABORATORY TEST, ENGINEERING ANALYSIS AND FOUNDATION RECOMMENDATIONS, IS AVAILABLE
FOR REVIEW.
B. EMPLOYMENT OF A TESTING LABORATORY IN NO WAY RELIEVES THE CONTRACTOR OF ANY
OBLIGATION TO PERFORM WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
C. CONTRACTOR RESPONSIBILITIES:
1. DELIVER TO LABORATORY AT DESIGNATED LOCATION ADEQUATE SAMPLES OF
MATERIALS PROPOSED TO BE USED WHICH REQUIRE TESTING, TOGETHER WITH
PROPOSED MIX DESIGNS.
2. COOPERATE WITH LABORATORY PERSONNEL AND PROVIDE ACCESS TO WORK AND
TO MANUFACTURER'S FACILITIES.
3. PROVIDE INCIDENTAL LABOR AND FACILITIES TO PROVIDE ACCESS TO WORK TO BE
TESTED, TO OBTAIN AND HANDLE SAMPLES AT THE SITE OR AT SOURCE OF
PRODUCTS TO BE TESTED, TO FACILITATE TEST AND INSPECTIONS AND FOR STORAGE
AND CURING OF TEST SAMPLES.
4. NOTIFY LABORATORY OF MATERIAL SOURCES AND FURNISH NECESSARY
QUANTITIES OF REPRESENTATIVE SAMPLES OF MATERIALS PROPOSED FOR USE
WHICH ARE REQUIRED TO BE TESTED.
5. NOTIFY ARCHITECT AND LABORATORY 24 HOURS PRIOR TO EXPECTED TIME FOR
OPERATIONS REQUIRING INSPECTION AND TESTING SERVICES.
6. ADVISE LABORATORY IN A TIMELY FASHION TO COMPLETE REQUIRED INSPECTION
AND TESTING PRIOR TO SUBSEQUENT WORK BEING PERFORMED.
7. PAY FOR ALL SUBSEQUENT RE-TESTING OF PRODUCTS OR SYSTEMS FOUND TO BE
DEFECTIVE OR OTHERWISE NOT IN ACCORDANCE WITH SPECIFICATION
REQUIREMENTS. REMOVE REJECTED PRODUCTS AND REPLACE WITH PRODUCTS OF
SPECIFIED QUALITY.
D. SPECIAL INSTRUCTIONS:
1. THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTOR(S) TO PROVIDE
INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF CONSTRUCTION
LISTED IN THIS SECTIONS. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON
WHO SHALL DEMONSTRATE COMPETENCE TO THE INSPECTIONS BEING PERFORMED
TO THE SATISFACTION OF THE ENGINEER OF RECORD AND THE BUILDING OFFICIAL.
THE SPECIAL INSPECTOR SHALL HAVE EXPERIENCE WITH AT LEAST FIVE OTHER
PROJECTS SIMILAR IN NATURE.
2. THE PURPOSE OF THE INSPECTIONS SHALL BE TO ENFORCE COMPLIANCE WITH THE
CONSTRUCTION DRAWINGS, SPECIFICATIONS, GEOTECHNICAL REPORT AND THE 2021
INTERNATIONAL BUILDING CODE (IBC), SECTION 1704.
3. THE FOLLOWING ITEMS REQUIRE INDIVIDUAL TESTS & INSPECTIONS BY THE SPECIAL
INSPECTOR AS OUTLINED IN CHAPTER 17 OF THE IBC.
CONCRETE COMPRESSIVE STRENGTH TESTS
CONCRETE SLUMP TESTS
CONCRETE AIR CONTENT TESTS
NOTES:
1. PROVIDE A SET OF 4 TEST SAMPLES FOR EVERY 75 CY OF BUT NOT LESS THAN 1
TEST SAMPLE FOR EVERY 5,000 SF OF SLAB OR WALL SURFACE AREA. MONITOR
SLUMP AND AIR CONTENT OF CONC. AND NOTIFY DELIVERY DRIVER IF SLUMP
DEVIATES MORE THAN 1" FROM SPEC'D VALUE.
2. ALL DRILLED AND EPOXIED ANCHORS (REBAR, BOLTS, THREADED RODS ETC.)
SHALL BE PULL TESTED TO 110% FOR NO LESS THAN 3 MIN.
3. ADDITIONAL TESTS AT THE CONTRACTOR'S EXPENSE WILL BE PERFORMED TO
DETERMINE COMPLIANCE OF REPLACED OR ADDITIONAL WORK WITH SPECIFIED
REQUIREMENTS.
4. CORRECT DEFICIENCIES IN WORK THAT TEST REPORTS AND INSPECTIONS
INDICATE DO NOT COMPLY WITH THE CONTRACT DOCUMENTS.
5. PROVIDE THE ENGINEER OF RECORD (EOR) COPIES OF ALL SPECIAL INSPECTIONS
SO A SPECIAL INSPECTIONS REPORT CAN BE PREPARED FOR OBTAINING A
CERTIFICATE OF OCCUPANCY.
INDEPENDENT TESTING LABORATORY & SPECIAL INSPECTIONS
A. CONDUCT DEMOLITION OPERATIONS IN EXTREMELY CAREFUL MANNER IN ORDER TO PREVENT ANY
DAMAGES TO ALL EXISTING CONSTRUCTION AND TO MINIMIZE INTERFERENCE WITH ADJACENT
**STRUCTURES**
B. PREVENT THE MOVEMENT, SETTLEMENT, DAMAGE OR INJURY TO ADJACENT STRUCTURES, PROVIDE & PLACE BRACING OR SHORING & BE RESPONSIBLE FOR THE SAFETY AND SUPPORT OF THE ADJACENT STRUCTURES, ASSUME FULL LIABILITY FOR SUCH MOVEMENT, SETTLEMENT, DAMAGE, OR INJURY.
C. CEASE OPERATIONS & NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IF SAFETY ADJACENT STRUCTURES APPEARS TO BE ENDANGERED. TAKE PRECAUTIONS TO SUPPORT EXISTING STRUCTURES
PROPERLY. DO NOT RESUME OPERATIONS UNTIL THE FULL SAFETY IS RESTORED.
D. PREVENT MOVEMENT, SETTLEMENT OR COLLAPSE OF ADJACENT SERVICES, SIDEWALKS, DRIVEWAYS & TREES. ASSUME FULL LIABILITY FOR SUCH MOVEMENT, SETTLEMENT OR COLLAPSE. REPAIR DAMAGE
PROMPTLY AT NO COST TO THE OWNER.
E. DEMOLISH INDICATED STRUCTURES & APPURTENANCE IN AN ORDERLY AND CAREFUL MANNER.
F. PERFORM DEMOLITION IN ACCORDANCE WITH THE APPLICABLE AUTHORITIES HAVING JURISDICTION.
G. REMOVE FOUNDATION WALLS & FOOTINGS AS INDICATED ON DEMOLITION DRAWINGS TO A MINIMUM 3'
FEET BELOW FINISH GRADE.
H. REPAIR ANY DEMOLITION PERFORMED IN EXCESS OF THAT…