6-GE Final – CT 2 GE HealthCare Pre-Installation Manual Drawings.pdf

PDF 2 MB Posted

Attached to
CSP- Renovation of CT Scan Suite and CT Simulator Suite at Smith Clinic for Harris Health (Estimated Budget $1, 700, 000)
Solicitation number
25/0286
Issued by
Harris County, Texas

About this file

This is a GE HealthCare pre-installation manual and technical drawings document for Harris Health's Smith Clinic in Houston, Texas, supporting a CT scan suite and CT simulator suite renovation project with an estimated budget of $1,700,000. The document provides comprehensive specifications for the installation of a Revolution APEX Elite Power Core CT system, including detailed equipment layouts, structural requirements, electrical specifications, HVAC considerations, and radiation protection protocols. The installation encompasses multiple components including the gantry system, patient table (NG-1700SV model), power distribution unit, uninterruptible power supply, system cabinet, operator console, and positioning camera, with specific dimensional requirements, weight specifications, and delivery considerations documented throughout the 18-sheet drawing set dated May 19, 2025.

The document establishes critical site preparation requirements and customer responsibilities for successful equipment installation and operation. The customer must ensure proper floor preparation with levelness tolerances of 6mm over 3000mm distances, provide structural support for ceiling-mounted equipment, and implement specialized vibration mitigation measures specific to CT systems. Electrical requirements include three-phase power input of 380-480V at 50/60Hz with a maximum power demand of 150kVA and average continuous demand of 11kVA, requiring dedicated distribution infrastructure and grounding systems. Environmental specifications mandate temperature ranges of 18-26°C and relative humidity of 30-70% in both exam and control rooms, with comprehensive HVAC heat dissipation requirements detailed for all major system components. The document emphasizes that GE HealthCare assumes no responsibility for damages resulting from non-compliance with specifications or modifications made by other parties, making adherence to the pre-installation manual mandatory for site design and preparation.

View the file

Other files

File Type Posted
14-Harris Health Finish Hardware Specifications.pdf PDF
11-Equipment Solution Planning - Equipment Room-by-Room Report.pdf PDF
18-Replacement Room Signage Message Schedule.pdf PDF
26-250286 Radiographic X-Ray Room Renovation at Multiple Clinics for Harris Health.pdf PDF
3-Bid Bond and Bid Check Authorization Form.pdf PDF
15-Project Manual.pdf PDF
5-GE Final – CT 1 GE HealthCare Pre-Installation Manual Drawings.pdf PDF
17-Signage Removal Location Plans.pdf PDF
12-General and Supplemental Conditions.pdf PDF
13-Harris Health Facilities Engineering Policies and Procedures.pdf PDF
24-Bid Guaranty and Performance.pdf PDF
1-Tax Residence Certification.pdf PDF
20-Q4 - 2025 - Building Construction Prevailing Wage Rates.pdf PDF
22-Harris Health Rolling Owner Insurance Program Manual.pdf PDF
16-MEQ Item Specs Report.pdf PDF
19-Harris Health CSP Proposal Acknowledgement.pdf PDF
25-Harris Health Safety Performance Program (SPP).pdf PDF
23-Harris Health Insurance and Bonding Requirements.pdf PDF
21-MWBE Utilization Plan.pdf PDF
8-GE Final – CT Sim GE HealthCare Pre-Installation Manual Drawings.pdf PDF
10-Division 27 Communications Specification.pdf PDF
2-Workers Compensation Insurance Requirements.pdf PDF
7-GE Final – CT 3 GE HealthCare Pre-Installation Manual Drawings.pdf PDF
4-Policy Bond Construction Requirements Exhibit A.pdf PDF
9-Drawings.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Houston, TX

Alvin Sumler

REVOLUTION APEX ELITE POWER CORE

IM

GE HealthCare does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawings. GE HealthCare cannot accept responsibility for any damage due to the partial use of GE HealthCare final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE HealthCare accepts no responsibility or liability for defective work due to scaling from these drawings. /18CT-M447725-FIN-00-A.DWG

(262) 202-7553

Alvin.sumler@gehealthcare.com

IM 5418654-1EN

USA

1/4"=1'-0"

2011307551.7

19/MAY/2025

Harris Health Smith Clinic

REV DATE MODIFICATIONS

A 19/MAY/2025 FINAL DC-477567

A mandatory component of this drawing set is the GE HealthCare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE HealthCare products can be accessed on the web at: https://www.gehealthcare.com/support/manuals -

Drawn by Verified by PIM Manual

SheetFormat

Concession

Scale DateFile Name

RevGON/Quote

A3

FINAL STUDY

01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness Checklist 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Radiation Protection 06 - A4 - Equipment Dimensions (1) 07 - A5 - Equipment Dimensions (2) 08 - A6 - Delivery 09 - S1 - Structural Notes

10 - S2 - Structural Layout 11 - S3 - Structural Details (1) 12 - S4 - Structural Details (2)

13 - M1 - HVAC

14 - E1 - Electrical Notes 15 - E2 - Electrical Layout 16 - E3 - Electrical Elevations 17 - E4 - Power Requirements 18 - E5 - Electrical Details - Interconnect

GENERAL SPECIFICATIONS

· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.

· The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.

· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.

· The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.

· Dimensions apply to finished surfaces of the room.

· Actual configuration may differ from options presented in some typical views or tables.

· If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.

· The equipment layout indicates the placement and interconnection of the indicated equipment components.

There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.

· All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.

· These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.

CUSTOMER RESPONSIBILITIES

· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.

· Prior to installation, a structural engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.

RADIO-PROTECTION

· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.

DISCLAIMER

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

· A mandatory component of this drawing set is the GE HealthCare Pre-installation manual. Failure to reference the Pre-installation manual will result in incomplete documentation required for site design and preparation.

· The items on the GE HealthCare Site Readiness Checklists listed below are REQUIRED to facilitate equipment delivery to the site. Equipment will not be delivered if these requirements are not satisfied.

CUSTOMER SITE READINESS REQUIREMENTS

REQUIRED MANUALS FOR SYSTEM PRE-INSTALLATION

Description Document Number*

Product specific Pre-installation Manual Refer to cover page

*documents can be accessed in multiple languages at https://www.gehealthcare.com/support/manuals

· Any deviation from these drawings must be communicated in writing to and reviewed by your local GE HealthCare installation project manager prior to making changes.

· Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE HealthCare installation project manager can supply a reference list of rigging contractors.

· New construction requires the following;

1. Secure area for equipment,

2. Power for drills and other test equipment,

3. Restrooms.

· Provide for refuse removal and disposal (e.g. crates, cartons, packing)

· For CT systems it is required to minimize vibrations within the scan room. It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system Pre-installation manual for vibration specifications.

REQUIRED SITE-READINESS CHECKLISTS FOR SYSTEM PRE-INSTALLATION

Modality Document Number*

Computerized Tomography DOC2949059

Radiology, Radiology and Fluouroscopy, Mammography, Bone Mass Densitometry DOC2949063

All modality Customer/Contractor Worksheet DOC2949068 *documents can be accessed in multiple languages at https://www.gehealthcare.com/support/manuals

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic Disclaimer - Site Readiness Checklist 02

ENVIRONMENT

ALTITUDE

The system shall meet all functional and performance specifications when placed in a room that is at an elevation of -150 m to 3,000 m [-492 ft to 9,843 ft] above sea level.

MAGNETIC FIELD SPECIFICATIONS

· Limit the magnetic interference to guarantee specified imaging performance.

GANTRY:

· Ambient static magnetic fields less than 1 Gauss.

· Ambient AC magnetic fields less than 0.01 Gauss.

OPERATOR CONSOLE:

· Ambient static magnetic fields less than 10 Gauss.

SYSTEM CABINET:

· Ambient static magnetic fields less than 10 Gauss.

SYSTEM NOISE LEVEL

· The maximum noise level produced by the system in the scan room is less than 70 dBA at one meter [3.3 ft] from any surface of the system.

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic General Notes 03

BY ITEM DESCRIPTION

MAX

HEAT

OUTPUT

(BTU/h)

WEIGHT

(lbs)

MAX

HEAT

OUTPUT

(W)

WEIGHT

(kg)

A 1 GANTRY 27125 5901 7950 2676.2

A 2 NG-1700SV TABLE - 1455 - 660

A 3 AUTO PATIENT POSITIONING DEPTH

CAMERA - 7 - 3.2

B 4 MAIN DISCONNECT PANEL (MDP) - 63 - 28.6

A 5 POWER DISTRIBUTION UNIT

(NGPDU-92) 1201 1074 352 487

A 6 PARTIAL UPS 14.4 KVA 5122 609 1501.1 276

A 7 SYSTEM CABINET VII 10577 410 3100 186

A 8 GE STORAGE CABINET - 150 - 68

A 9 AURORA SWS TABLE - 88 - 40

A 10 OPERATOR'S CHAIR - - - -

A 11 SCANNER DESKTOP V 5118 31 1500 13.92

A 12 POWER BOX - 15 - 7

A 13 SMART SUBSCRIPTION SERVER FOR CT 6135 121 1798 55

EXAM ROOM HEIGHT

FINISHED FLOOR TO SLAB HEIGHT

FALSE CEILING HEIGHT

15'-0"

9'-0"

C 14 LEAD GLASS WINDOW

C 15 MINIMUM OPENING FOR EQUIPMENT DELIVERY IS 1168 mm x 1980 mm [46 in x 78 in], CONTINGENT ON A 2438 mm [96 in] CORRIDOR WIDTH

LEGEND

A GE SUPPLIED D AVAILABLE FROM GE

B GE SUPPLIED/CONTRACTOR INSTALLED E EQUIPMENT EXISTING IN ROOM

C CUSTOMER/CONTRACTOR SUPPLIED AND

INSTALLED * ITEM TO BE REINSTALLED FROM

ANOTHER SITE

For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic A2 - Equipment Layout 041/4"=1'-0"

11 1213

EXAM

ROOM

CONTROL

ROOM

EXST. 3'-2"

EXST. 7'-0"

17'-0"

EX

ST

. 1 0'

-3

2' -1

1" 5'-2"

'-0

4'-8"

'-2

RADIATION PROTECTION TABLES

A cylindrical PMMA phantom with a diameter of 32 cm [12.60 in] and a length of 20 cm [7.87 in] (for the 40 mm [1.57 in] collimation measurements) is centered in the scan plane and scanned. Scatter radiation measurements are made for both the vertical and the horizontal planes which include the axis of rotation. The horizontal plane is 1.03 m [3.38 ft] above the floor.

Tables below show scatter radiation for 40 mm [1.57 in] collimation. The air kerma per 100 mAs (μGy / 100 mAs) is provided at 0.5 m [1.6 ft] intervals within each plane. The CT scan technique that results in the maximum scatter radiation per unit mAs is used for all measurements as follows:

· Detector Coverage = 40 mm [1.57 in]

· Tube voltage = 140 kV

· SFOV = Medium Body

Typical Scatter Radiation in μGy/100 mAs - Horizontal Plane 40 mm [1.57 in] Collimation

X-axis (m [ft]) Z-axis (m [ft])

3.5 [11.4] 3 [9.8] 2.5 [8.2] 2 [6.6] 1.5 [4.9] 1 [3.3] 0.5 [1.6] 0 [0] -0.5 [-1.6] -1 [-3.3] -1.5[-4.9]

-1.5 [-4.9] 0.98 1.30 1.69 2.27 2.77 2.00 0.95 0.22 0.04 0.10 0.46 -1 [-3.3] 1.01 1.38 1.88 2.84 4.17 6.37 4.23

ISO

0.59 3.03 -0.5 [-1.6] 0.86 1.24 1.89 3.24 4.95 11.11 23.37 15.13 6.82

0 [0] 0.63 0.91 1.34 2.17 4.74 11.84 50.28 18.14 7.44

0.5 [1.6] 0.81 1.12 1.63 2.58 4.99 10.29 28.86 15.74 7.00 1 [3.3] 0.85 1.18 1.70 2.59 4.52 7.27 3.15 2.43 4.86

1.5 [4.9] 0.90 1.21 1.65 2.53 3.25 2.50 0.90 0.20 0.04 0.10 0.56

Typical Scatter Radiation in μGy/100 mAs - Vertical Plane 40 mm [1.57 in] Collimation

Y-axis (m [ft]) Z-axis (m [ft])

3.5 [11.4] 3 [9.8] 2.5 [8.2] 2 [6.6] 1.5 [4.9] 1 [3.3] 0.5 [1.6] 0 [0] -0.5 [-1.6] -1 [-3.3] -1.5[-4.9]

1.5 [4.9] 1.13 1.41 1.92 2.64 3.36 2.47 0.84 0.28 0.02 0.10 0.40 1 [3.3] 1.13 1.52 2.15 3.29 5.09 7.91 3.69 0.46 2.98

0.5 [1.6] 1.06 1.46 2.16 3.46 5.93 12.26 24.87

ISO

14.02 6.97 0 [0] 0.63 0.91 1.34 2.17 4.74 11.84 50.28 18.14 7.44

-0.5 [-1.6] Table

9.84 4.51

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic A3 - Radiation Protection 05

POWER DISTRIBUTION UNIT (PDU)

SCALE 1:20 Indicates air flow (Convection)

Center of Gravity

[35.4 in]

[5.9 in]

[14.2 in]

[5 .9 in

[2 1.

in

[3

5.

in ] 700

[27.6 in]

Service Area

TOP VIEW

Minimum air flow clearance

FRONT VIEW SIDE VIEW

[4 1.

in

[4 .9 in

Seismic mounting brackets Weight: 10 kg [22 lbs]

[2 0.

in

[17.1 in]

[13.5 in]

[1 0.

in

[3 .7 in

SCALE 1:20

SYSTEM CABINET

TOP VIEW

Indicates air flow (Convection)Center of Gravity

Minimum air flow clearance

SIDE VIEW FRONT VIEW

Cable inlet at the rear back of the equipment

Seismic mounting brackets60

[2 3.

in

2.

[6 in

2.

[6 in

[2 3.

in

152.4 [6 in]152.6

[6 in]

[3 1.

in

[24.5 in]

[45.8 in]

3.

[1

5.

in ] 326

[12.8 in]

556.2 [21.9 in]

[24.5 in]

[11.9 in]

254.2 [10 in]

[22 in]

GANTRY WITH TABLE

SCALE 1:50

SIDE VIEW FRONT VIEW

Sc an c en te rli ne

FrontRear

Sc an c en te rli ne

[3 7.

in

936.5 [36.9 in]

936.5 [36.9 in]

[14.6 in]

[15.5 in]

[5.2 in]

[90.6 in]

[52.4 in]

[8 0.

in

[2

9.

in

[111.4 in]

[30.3 in]

[98.1 in]

[16 in]

[85.4 in]

[67.7 in] 5146±10

[202.6 in±.4 in]

[4.3 in]

[2 1.

in

TOP VIEW

OPERATOR CONSOLE

SCALE 1:20

SMART WORKSPACE DESK

FRONT VIEWSIDE VIEW

[51 in]

[3 in

[3 in

[24 in]

SMART WORKSPACE DESK AND OPEN CONSOLE

[3 in

FRONT VIEW

TOP VIEW

Center of Gravity

[1 in

[7 in

[18 in]

[10 in]

[6 in]

[7 in]

[5 in

[8 in

[4 in]

[1 in

[2 in

[18 in]

[2 in

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic A4 - Equipment Dimensions (1) 06

UNINTERRUPTIBLE POWER SUPPLY

[12 in]

[4 7.

in

[33.5 in]

[4 7.

in

[12 in]

[3 3.

in

[2 in

[1 7.

in

[3.2 in]

TOP VIEW FRONT VIEW SIDE VIEW

Center of GravitySCALE 1:20

[5 .9 in

[3 in

MAIN DISCONNECT PANEL

FRONT VIEW SIDE VIEWTOP VIEW

[14.5 in]

[2 8.

in

[16.7 in]

[3 0.

in

[8.3 in]

[10 in]

SCALE 1:10

4xØ10

[Ø

0.4 in]

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic A5 - Equipment Dimensions (2) 07

DELIVERY

STATIONARY ASSEMBLY

L = 2753 [108.4 in]

L = 2878 [113.3 in]

ROTATING ASSEMBLY

H

[8 0.

in

W = 1149 [45.2 in]

*Assuming that the lowest point of the rotating assembly is 97 mm [3.8 in] above the floor.

H

[7 in

W = 1018 [40.1 in]

*Assuming that the lowest point of the stationary assembly is 101 mm [4 in] above the floor.

THE CUSTOMER/CONTRACTOR SHOULD:

· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

NOT TO SCALE

DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT

EQUIPMENT DIMENSIONS WEIGHT

GANTRY

STATIONARY

ASSEMBLY

LENGTH 2753 mm [108.4 in]

1738.8 kg 3830 lbsWIDTH 1149 mm [45.2 in]

HEIGHT 2049 mm [80.7 in]

ROTATING

ASSEMBLY

LENGTH 2878 mm [113.3 in]

1681.6 kg 3704 lbsWIDTH 1018 mm [40.1 in]

HEIGHT 1905 mm [75 in]

NG-1700SV PATIENT TABLE

LENGTH 2664 mm [104.9 in]

710.4 kg 1566 lbsWIDTH 934 mm [36.8 in] HEIGHT 1340 mm [52.8 in]

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic A6 - Delivery 08

STRUCTURAL NOTES

· all steel work and parts necessary to support ceiling mounted equipment is to be supplied by the customer or his contractors.

· methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.

· all units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan and detail sheets for suggested locations and mounting hole locations.

· all ceiling mounted fixtures, air vents, sprinklers, etc. To be flush mounted, or shall not extend more than 1/4" below the finished ceiling.

· floor slabs on which equipment is to be installed must be level to 1/4" in 10'-0"

· dimensions are to finished surfaces of room.

· customers contractor must provide all penetrations in post tension floors.

· customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.

· customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.

· it is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit"

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic S1 - Structural Notes 09

ITEM DESCRIPTION

(CONTRACTOR SUPPLIED & INSTALLED)

1 Gantry anchor "A". Refer to Anchoring/loading Distribution To The Floor detail on sheet S3.

2 Table leveling pads. Refer to Anchoring/loading Distribution To The Floor detail on sheet S3.

3 Support Backing, locate as shown

Unistrut or equivalent for mounting patient positioning camera mounting plate on ceiling.

Support designed and supplied by customer. Supports to be at least 2' [610mm] in length and located per dimensions on Positioning Camera Mounting Plate structural detail.

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic S2 - Structural Layout 101/4"=1'-0"

EXAM

ROOM

CONTROL

ROOM

EXST. 3'-2" [958]

EXST. 7'-0" [2137]

EX

ST

. 1 0'

-3

4'-8" [1411]

EXST. 6'-3" [1905]

9'-2" [2807]

7' -3

9' -5

3'-4" [1022]

FLOOR SPECIFICATIONS

Notes:

· Anchors must be embed at least 127 mm [5.0 in] from any existing old cut off anchor, concrete edge, metal conduit or duct edge embedded in the concrete, concrete joint or crack.

· Anchors, nuts and drill bits required for seismic installations are not provided by GE. The type and length of the anchors, nuts, and drill bit must be defined in the alternative seismic anchoring plan and purchased separately by the customer.

Leveling pad or footpad

Adjuster lock ring Gantry stationary base

Levelling screw Anchor washer

Screw 25 mm [0.98 in] max after proper torque 13 mm [0.51 in] min after proper torque

Nut

Anchor bolt

43.5 mm [1.71 in] +/- 11 mm [0.43 in]

· Installation requires a finished floor in the scan and control rooms.

· The floor surface in the scan room directly under the gantry and table must be level.

· The floor levelness tolerance of the floor surface that the gantry and table will rest on is 6 mm [0.25 in] over a 3000 mm [9.8 ft] distance.

· Shims should not be used to compensate for a floor that does not meet this requirement.

· If the concrete floor has a floor covering installed over it (such as floor tile), the foot pad load bearing areas under the gantry and the patient table shall be cut into the flooring to ensure the table and gantry rest on a solid surface. (Openings cut during installation.)

· These floor penetrations can be sealed if required.

· Concrete floors must have a minimum strength of f'c = 1.4 x10⁷ Pa [2000 PSI] at 28 days for (curing time) mounting floor anchors. It is the responsibility of each customer to have appropriate tests performed to determine and measure concrete strength.

· These requirements apply to all installation types.

NOT TO SCALE

m m [3

.3 in m m [2

.9 in

M in m m

[4 in th ic k co nc re te

GE SUPPLIED GANTRY ANCHORS FINISHED FLOOR REQUIREMENTS

ANCHORING/LOADING DISTRIBUTION TO THE FLOOR

SCALE 1:20

Revolution CT Gantry

2874.5 kg [6335 lbs] Revolution CT ES Gantry

2820.4 kg [6218 lbs] Revolution APEX Gantry

2798.7 kg [6170 lbs] Revolution APEX Select Gantry

2676.2 kg [5900 lbs]1

[1 4.

in

· NG1700V Table: 650 kg [1430 lbs] with 306.5 kg [675 lbs] patient

· NG1700SV Table: 660 kg [1453 lbs] with 306.5 kg [675 lbs] patient

(1) Scan plane centerline

(2) Longitudinal axis

(3) Cable inlet area

(4) First anchor to be drilled

(5) 12 anchoring points for Gantry

(6) 12 anchoring points for Patient Table

(7) 2 leveling pads

(8) 2 table calibration brackets

Center of gravity Main anchoring points Backup anchoring points

.6 [4

0.

in

.9

[1 .7 in

7.

[3

1.

in

2.

[3

4.

in

.2 [4

7.

in

.2 [5 in

.5 [6

8.

in

[21 in]

146.8 [5.8 in]

221.8 [8.7 in]

224.8 [8.9 in]

221.8 [8.7 in]

.4 [6

9.

in

8 24 [.9 in]

113.5 [4.5 in]

161.5 [6.4 in]97

2.

[3 8.

in

736.5 [29 in]

953.5 [37.5 in]

953.5 [37.5 in]

2.

[5

.2 in

936.5 [36.9 in]

936.5 [36.9 in]

5.

[4

.2 in

736.5 [29 in]

2.

[2

4.

in

[2 4.

in

[7

.4 in

] 305 [12 in]

[1 5.

in

836.5 [32.9 in]

836.5 [32.9 in]

836.5 [32.9 in]

736.5 [29 in] 836.5

[32.9 in]

736.5 [29 in]

[4 .3 in

N G1

0V

N G1

0S V

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic S3 - Structural Details (1) 11

≥190 [7.5 in]

[6.7 in]

POSITIONING CAMERA MOUNTING PLATE

NOT TO SCALE

4xM5-0.8mm Welding Nut

JUNCTION PLATE SUPPLIED BY CUSTOMER

≥1

[7 .5 in

[5 .1 in

Welding Nut: Meet GB-T 13681-1992 requirement or equivalent M5-0.8 mm M6-1.0 mm

Thickness (mm [in]) 3.7-4 [0.15-0.16] 4.7-5 [0.19-0.20] Pledge load (N) 11000 15500

8xM6-1.0mm Welding Nut

Ø110

[Ø4.3 in]

Material: Steel material with a min. tensile strength of 375 MPa Plate thickness: 2.5 mm [0.10 in]

JUNCTION PLATE SUPPLIED BY GE

[5 .9 in

[5.9 in] 4xØ11 [0.43 in] Anchor hole

[1.6 in]

[1

.6 in

NOTE: The system manufacturer will NOT inspect and test that the fixing methods between the Junction Plate and the building structure meet the loading capacity specified (recommend a 6x safety factor), which is the customer’s responsibility. The weight of the camera assembly is approximately 3.2 kg [7.05 lbs], suggest the safety load on the Junction Plate is no less than 20 kg [44.09 lbs]. If the Anchor Bolt is not applicable for site requirement, the customer’s architect can consider other methods (such as welding...) to fix the Junction Plate. Presetting for site preparation of the Camera installation, customer had better install the Junction Plate in advance before the system installation.

GE will provide a Junction Plate, shipped with the system. If the Junction Plate supplied by GE can not meet the requests of the customer or the building structure, the customer’s architect can design and install the Junction Plate (refer to the right side of the detail) with sufficient strength to hold the camera assembly.

[7 .5 in

[7.5 in]

45° 45°

[1.4 in]

Ø56 [Ø2.2 in]

[5.1 in]

77.8 [3.1 in]

POSITIONING CAMERA INSTALLATION POSITION

FINISHED CEILING

FINISHED FLOOR

Junction Plate

Minimum Finished Ceiling Height is 2286 mm [90 in]

CONCRETE CEILING

Pipe kit 190/390 mm [7.48/15.35 in] 110 mm

[4.33 in]

Finished Ceiling Height is from 2383 mm [93.82 in] to 2880 mm [113.39 in]

Finished Ceiling Height is greater than 2880 mm [113.39 in]

Rectangle hole

Junction Plate Junction

Plate

Case A: Camera below finished ceiling. Order extender kit, install Junction Plate 200/400 mm [7.87/15.75 in] above the desired camera position.

Case B: Camera attached to the finished ceiling.

Case C: Camera above finished ceiling. Install height is finished ceiling's upper surface height plus 110 mm [4.33 in]. A rectangle hole needs to opened in the finished ceiling.

NOT TO SCALE

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic S4 - Structural Details (2) 12

HEAT DISSIPATION DETAILS

ROOM DESCRIPTION

Max (btu)

Max (kW)

Exam Room Gantry and Patient Table 27150 7.95

TOTAL 27150 8.0

Exam Room or Technical Room*

Power Distribution Unit 1200 0.352 System Cabinet IV, V, VI or VII 10578 3.1

Partial UPS - Powerware 9355-15-14GE 5122 1.5

TOTAL 16900 5

Control Room

Operator console (including 2 monitors) 5100 1.5 Smart Subscription Server ML350G10 6134 1.8

TOTAL 11234 3.3

*Technical Room is not mandatory, the placements of these elements are recommended in the Exam Room.

TEMPERATURE AND HUMIDITY SPECIFICATIONS

STORAGE CONDITIONS

IN-USE CONDITIONS

Temperature +4°C to +27°C

40°F to +80°F

Temperature gradient ≤ 3°C/h

≤ 5.4°F/h Relative humidity (1) 20% to 60% Humidity gradient ≤ 5%/h

EXAM ROOM CONTROL ROOM

Temperature (From -150 m [-492 ft] to 1600 m [5249 ft])

Min Recommended Max Min Recommended Max

18°C 22°C 26°C 18°C 22°C 26°C

64°F 72°F 79°F 64°F 72°F 79°F

Temperature (From 1600 m [5249 ft] to 3000 m [9843 ft])

Min Recommended Max Min Recommended Max

18°C 22°C 25°C 18°C 22°C 25°C

64°F 72°F 77°F 64°F 72°F 77°F Relative humidity (1) 30% to 70% 30% to 70%

AIR RENEWAL

According to local standards.

Storage longer than 6 months is not recommended.

(1) Non-condensing

NOTE

In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic M1 - HVAC 13

CONNECTIVITY REQUIREMENTS

Your new GE Healthcare imaging modality will require local and remote connectivity to enable our full range of digital support:

· Local connectivity - This allows your system to connect to local devices such as PACS and modality worklist.

We will require network information to configure the system(s), and a live ethernet port(s) prior to the delivery of the system(s).

· Remote connectivity - Your GE Healthcare service warranty includes InSite™ (applicable to InSite capable products), a powerful broadband-based service which enables digital tools that can help guard your hospital against equipment downtime and revenue loss by quickly connecting you to a GE Healthcare expert.

Depending on product family and software version, imaging systems can be connected in one of the following methods:

1. TLS over TCP Port 443 (Preferred method for new products) via:

a. DNS resolution

b. Customer-provided Proxy or

c. GE Proxy (Available in some regions)

2. Site-to-Site IPsec VPN tunnel

Please provide the GE project manager with the contact information for the resource that can provide information required to set up these connections. GEHC will send out communication to these contacts, which will include the project's Connectivity requirements, and a Connectivity form. This form will need to be completed and returned to GEHC prior to delivery of the system to ensure the system is tested and connectivity is enabled prior to the completion of the installation.

ELECTRICAL NOTES

· All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor. All junction boxes shall be provided with covers.

· Conduit and duct runs shall have gradual sweep radius bends.

· Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.

· Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.

· All ductwork must meet the following requirements:

1.Ductwork shall be metal with dividers and have removable, accessible covers.

2. Ductwork shall be certified/rated for electrical power purposes.

3. Ductwork shall be electrically and mechanically bonded together in an approved manner.

4. PVC as a substitute must be used in accordance with all local and national codes.

· All openings in raceway and access flooring are to be cut out and finished off with grommet material by the customers contractor.

· Electrical contractor to provide measured pull strings in all conduit and raceway runs.

· Provide 10 foot pigtails at all junction points.

· Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.

1. Aluminum or solid wires are not allowed.

2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.

3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.

4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.

5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distribution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.

6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights.

Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used. Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except MR). Do not mount lights directly above areas where ceiling mounted accessories will be parked.

7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).

8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.

9. In some cases GEHC will specify ground wires to be sized larger than code. In these situations, the GEHC specification must be followed.

10. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.

11. The maximum point to point distances illustrated on this drawing must not be exceeded.

12. Physical connection of primary power to GEHC equipment is to be made by customers electrical contractor with the supervision of a GEHC representative. The GEHC representative would be required to identify the physical connection location, and insure proper handling of GEHC equipment.

13. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.

14. Every installation is unique. The electrical contractor will be required to support the installation of the GEHC equipment by providing knockouts, grommeted openings, bushings, etc. as required. All power connections to be performed by the electrician.

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic E1 - Electrical Notes 14

A

Existing Electrical Note:

Use existing duct/conduits where possible. Additional duct/conduit runs may be necessary if existing system is inadequate in size and/or location for this installation. Verify existing size and location.

ITEM QTY

Electrical Outlet Legend

Customer/contractor supplied and installed items unless otherwise specified.

Height above floor determined by local codes unless otherwise specified.

Duplex hospital grade, dedicated wall outlet 120-v, single phase power

Dedicated telephone line(s)

Network outlet System emergency off (SEO), (recommended height 1.2m [48"] above floor) X-Ray room warning light control panel

X-Ray ON lamp (L1) - 24V

Door interlock switch (needed only if required by state/local codes)

Item Electrical Layout Item List

1 Main disconnect panel (MDP)

2 Suitable chase nipples, refer to Anchoring/Loading Distribution to the Floor detail on sheet S3 (Gantry)

3 Grommeted opening (System Cabinet)

4 Grommeted opening (Power Distribution Unit)

5 Grommeted opening (Operator's console)

6 6" x 6" x 4" [150 x 150 x 100] box (Partial UPS)

7 2 1/2" [64] conduit above ceiling

8 Existing 2 1/2" [64] conduit above ceiling

9 Existing 3 1/2" [89] conduit above ceiling

10 Cable inlet above ceiling (Express Camera)

11 Existing 10" x 3 1/2" [250 x 100] flush wall duct with minimum 2 dividers

12 Existing Box above ceiling - size per local code (Exam room)

13 Existing Box above ceiling - size per local code (Control room)

14 Existing 12" x 3" [300 x 100] trench duct with minimum 2 dividers

15 10" x 3 1/2" [250 x 100] surface wall duct with minimum 2 dividers

Additional Conduit Runs (Contractor Supplied and Installed)

From (Bubble # / Item)

To (Bubble # / Item) Qty

Size In. mm

3 Phase Power 1 Main Disconnect Panel 1 As req'd As req'd

1 Main Disconnect Panel Emergency Off 1 1/2 13

12 Power Distribution Unit 1 As req'd As req'd

12 Power Distribution Unit Door Switch 1 1/2 13

Warning Light Control 1 1/2 13

Warning Light 1 1/2 13

1 Phase Power 1 1/2 13

1 Main Disconnect Panel 6 Partial UPS

1 1 1/4 30

4 Power Distribution Unit 1 2 50

13 Operator's Console 6 Partial UPS 1 1 25

10 Express Camera 13 Operator's Console 1 1 1/2 38 DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic E2 - Electrical Layout 151/4"=1'-0"

1211 14

EXAM

ROOM

CONTROL

ROOM

EXST. 3'-2"

EXST. 7'-0"

EX

ST

. 1 0'

-3

4'-8"

7'-8"

8'-0"

1'-9"

EXST. 6'-3"

A

* * * EXISTING ROOM * * *

NOTE: ALL OTHER JUNCTION POINTS IN ELEVATIONS ARE EXISTING, AND

THUS ARE NOT SHOWN.

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic E3 - Electrical Elevations 161/4"=1'-0"

15'-0"

0'-0"

9'-0"

0' -9

1' -6

T.

B.

D

5' -0

POWER DISTRIBUTION

SEO3

24 V

PDU

For Scan Room

Warning Light and Door Interlock

Connections Detail refer to the next page

Emergency OFF (Control room)

Emergency OFF (Exam room) If applicable

Emergency OFF (Technical room)

If applicable

Notes :

(1) Wire size: 4x2mm² [14AWG] and 1x2mm² [14AWG] GND

(2) Power control cable: 3 meter [10 ft], multi-conductor, 24V DC

(3) Optional for Revolution CT systems

(4) GE supplied MDP option E45021BC/BG includes a 10 meter long power cable (H07RN-F) with wire size 4x50mm² and a 50 meter long control cable with wire size 2x1.5mm²

Refer to Table1

Table1:

MDP MDP Main Disconnect Panel PDU Power Distribution Unit SEO Emergency OFF Button latching twist-to release style with two normally closed (NC) contacts

Y Remote Operator Control Station with "ON" and "OFF" buttons

Table2:

24 V

24 V (1)

Cable SUPPLIED BY CUSTOMER Cable SUPPLIED BY GEHC Equipment SUPPLIED BY

CUSTOMER

Equipment SUPPLIED BY GEHC

(1)

(1)

YRemote ON/OFF (Control room)

If applicable 24 V

(2)

SEO2

SEO1

Main Supply (3 phases)

For Sub-Feeder and Ground wire size refer to Table 2 (4)

Feeder Table The information below assumes the use of copper wire, rated 75 C and run in steel conduit. All ampacity is determined in accordance with the National Electrical Code (NFPA 70), Table 310-16 (2002). The ampacity of the circuit protection device listed above determines the minimum feeder size, except where total source regulation limits require a larger size. If the wire size does not match the list below, please select the nearest wire size as per to local standards.

Sub-Feeder length from MDP to PDU

- ft (m)

Minimum Wire Size, AWG or MCM (mm²)/VAC

380 VAC 400 VAC 420 VAC 440 VAC 460 VAC 480 VAC

50 (15) 3/0 (95) 3/0 (95) 3/0 (95) 2/0 (70) 2/0 (70) 2/0 (70) Grounding

Run a dedicated 1/0 [50 mm²] or larger insulated copper ground wire from the power source to the MDP and from MDP to the PDU. Run the ground wire in the same raceway with the three-phase wires.

GE Supplied Main Disconnect Panel (MDP)

Region CAT number Amps Global except

EMEA(440~480 V)

E4502BE 125

E4502BG 175

Global except

EMEA(380~420 V) E4502BF 150

EMEA(400 V)

E45021BC(4) 160

E45021BG(4) 200

Partial UPS (3)

· Power supply should come into a main disconnect panel (MDP) containing the protective units and controls.

· Governing electrical codes may require a neutral wire. If present, neutral must be terminated in MDP.

· The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.

· There must be discrimination between supply cable protective device at the beginning of the installation

(main low-voltage transformer side) and the protective devices in the MDP.

· Potential future upgrade may require a Maximum Power Demand of 200 kVA to be compatible.

SUPPLY CHARACTERISTICS

· Power input must be separate from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...).

· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.

· The minimum recommended size for a dedicated distribution transformer is: 225 kVA, rated 2.4% regulation at unity power factor. Resultant maximum allowable feeder regulation is 3.6%.

· Phase imbalance 2% maximum.

· Transients must be less than 1500V peak. (on a 400V line)

· Maximum source regulation allowable is 6%. The combination of daily voltage variation (no load) and source regulation under full load shall not exceed + 10/-13% of nominal.

GROUND SYSTEM

· System of equipotential grounding.

· Equipotential: The equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE system units are located.

CABLES

· Power and cable installation must comply with the distribution diagram.

· All cables must be isolated and flexible, cable color codes must comply with standards for electrical installation.

· The cables from signaling and remote control (Y, SEO, L...) will go to MDP with a pigtail length of 1.5m [4.9 ft], and will be connected during installation. Each conductor will be identified and isolated (screw connector).

CABLEWAYS

The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:

· Protecting cables against water (cableways should be waterproof).

· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts).

· Protecting cables against temperature shocks.

· Replacing cables (cableways should be large enough for cables to be replaced).

· Metal cableways should be grounded.

POWER REQUIREMENTS

POWER SUPPLY

3 PHASES+G (4-Wire Wye system, neutral not used) 380/400/420/440/460/480 V ± 10%

FREQUENCIES 50/60 Hz ± 3 Hz MAXIMUM POWER DEMAND 150 kVA AVERAGE (CONTINUOUS) POWER DEMAND 11 kVA

POWER FACTOR 0.85

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic E4 - Power Requirements 17

SCAN ROOM WARNING LIGHT AND DOOR INTERLOCK

PDU

DOOR SWITCH (2)

EXP_INTLK

PGND

CONTROL

BOARD

KD6

KD5

KD7

TS6

FUSE

24V max

READY LIGHT

SYS-ON LIGHT

L N

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

(1)

X-RAY LIGHTR1 R1

R2

R3

Facility Input Power (3)

PDU Power Distribution Unit TS6 Terminal Block 6

Cable SUPPLIED BY CUSTOMER Cable SUPPLIED BY GE Equipment SUPPLIED BY CUSTOMER Equipment SUPPLIED BY GE

Fuse Relay coil and contact -normally open (de-energized state)

Control power transformer

R2

R3

Notes :

(1) Wire size: 2mm² [14 AWG] at 24V

(2) Door Interlock circuit is jumpered out if a door switch is not provided.

(3) Grounding not shown on the detail, but must comply with local codes.

TYPICAL CABLE MANAGEMENT

FLUSH FLOOR DUCT

Waterproof joint removable cover Dividers as required per local code

NOT TO SCALE

Removable coverplate

WALL DUCT

Dividers as required per local code

INTERCONNECTIONS

23.80 m or 26.00 m [78.1' or 85.3']

MDP can be ordered from GE

MDP

Customer supply

PDU13.20 m [43.3']

5.20 m [17.0']

7.50 m or 18.50 m [24.6' or 60.7']

22.80 m or 26.80 m [74.8' or 87.9'] OC

Gantry

Table

System Cabinet

11.50 m or 24.50 m [37.7' or 80.4']

12.80 m or 25.80 m [42' or 84.6']

21.00 m or 25.00 m [68.9' or 82']

0.91 m or 2.91 m [3' or 9.5']

Partial UPS

33.00 m [108.3']

CONTROL ROOMEXAM ROOM / TECHNICAL ROOM

AVIMOS

Camera (3x)

(Option) 30 m [98']

AVIMOS

Console (Option)

30 m [98']

Express Camera (Option)

EXAM ROOM

DateRev /18CT-M447725-FIN-00-A.DWG A 19/MAY/2025REVOLUTION APEX ELITE POWER COREHarris Health Smith Clinic E5 - Electrical Details - Interconnect 18

Sheets and Views
CT-M447725-FIN-00-A-C1 - Cover Sheet
CT-M447725-FIN-00-A-C2 - Disclaimer - Site Readiness Checklist
CT-M447725-FIN-00-A-A1 - General Notes
CT-M447725-FIN-00-A-A2 - Equipment Layout
CT-M447725-FIN-00-A-A3 - Radiation Protection
CT-M447725-FIN-00-A-A4 - Equipment Dimensions (1)
CT-M447725-FIN-00-A-A5 - Equipment Dimensions (2)
CT-M447725-FIN-00-A-A6 - Delivery
CT-M447725-FIN-00-A-S1 - Structural Notes
CT-M447725-FIN-00-A-S2 - Structural Layout
CT-M447725-FIN-00-A-S3 - Structural Details (1)
CT-M447725-FIN-00-A-S4 - Structural Details (2)
CT-M447725-FIN-00-A-M1 - HVAC
CT-M447725-FIN-00-A-E1 - Electrical Notes
CT-M447725-FIN-00-A-E2 - Electrical Layout
CT-M447725-FIN-00-A-E3 - Electrical Elevations
CT-M447725-FIN-00-A-E4 - Power Requirements
CT-M447725-FIN-00-A-E5 - Electrical Details - Interconnect

File details come from the government source that posted it. Updated .