About this file

This is an Equipment Solution Planning (ESP) specification report prepared by Smith Seckman Reid, Inc. for Harris Health's renovation of the CT Scan Suite and CT Simulator Suite at Smith Clinic in Texas, with an estimated project budget of $1,700,000. The document contains detailed specification coversheets for 16 medical equipment items and associated infrastructure components required for the CT imaging facility upgrade. Major equipment includes two CT scanners (GE Healthcare Discovery RT and Revolution Apex models), a contrast media injector (Ulrich Medical syringeless system), a patient alignment laser system (LAP DORADOnova 3), vital signs monitoring equipment, medical-grade refrigeration, and various ancillary equipment such as emergency carts, patient transfer boards, defibrillator cabinets, and hand hygiene dispensers. Equipment quantities range from one to four units depending on the item type and room designation (CT imaging, CT simulation, control rooms, and support areas). Lead times for major equipment range from 30 to 120 days, with the GE Discovery RT and Ulrich injector requiring 120 days and the Revolution Apex requiring 112 days.

The specifications detail comprehensive electrical, structural, HVAC, and operational requirements for installation and commissioning of all equipment. The GE Revolution Apex CT system requires 480V three-phase power with 200,000 watts maximum draw and 283 amps, while the Discovery RT requires 480V power with dedicated circuits. Infrastructure requirements include radiation protection measures with shielding specifications, vibration isolation requirements, structural floor and ceiling modifications, cable management systems, and climate control specifications (operating temperature 18-26°C with 30-60% relative humidity). Installation specifications are provided by equipment manufacturers including GE Healthcare's comprehensive pre-installation manuals containing site readiness checklists, electrical layouts, radiation protection details, and customer responsibility requirements. All equipment specifications are formatted as standardized coversheets documenting physical dimensions, electrical requirements, utility connections, mounting types, architectural codes, and ordering information, with lead times and installation instructions prepared to support the overall facility renovation project.

View the file

Other files

File Type Posted
14-Harris Health Finish Hardware Specifications.pdf PDF
11-Equipment Solution Planning - Equipment Room-by-Room Report.pdf PDF
18-Replacement Room Signage Message Schedule.pdf PDF
26-250286 Radiographic X-Ray Room Renovation at Multiple Clinics for Harris Health.pdf PDF
3-Bid Bond and Bid Check Authorization Form.pdf PDF
15-Project Manual.pdf PDF
5-GE Final – CT 1 GE HealthCare Pre-Installation Manual Drawings.pdf PDF
17-Signage Removal Location Plans.pdf PDF
6-GE Final – CT 2 GE HealthCare Pre-Installation Manual Drawings.pdf PDF
12-General and Supplemental Conditions.pdf PDF
13-Harris Health Facilities Engineering Policies and Procedures.pdf PDF
24-Bid Guaranty and Performance.pdf PDF
1-Tax Residence Certification.pdf PDF
20-Q4 - 2025 - Building Construction Prevailing Wage Rates.pdf PDF
22-Harris Health Rolling Owner Insurance Program Manual.pdf PDF
19-Harris Health CSP Proposal Acknowledgement.pdf PDF
25-Harris Health Safety Performance Program (SPP).pdf PDF
23-Harris Health Insurance and Bonding Requirements.pdf PDF
21-MWBE Utilization Plan.pdf PDF
8-GE Final – CT Sim GE HealthCare Pre-Installation Manual Drawings.pdf PDF
10-Division 27 Communications Specification.pdf PDF
2-Workers Compensation Insurance Requirements.pdf PDF
7-GE Final – CT 3 GE HealthCare Pre-Installation Manual Drawings.pdf PDF
4-Policy Bond Construction Requirements Exhibit A.pdf PDF
9-Drawings.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/29/25 Smith Seckman Reid, Inc.

Equipment Solution Planning - ESP Harris Health Smith Clinic - CT

Specification Coversheet

Item #: BRD03100 Alt ID:

Description: Patient Transfer, Board Manufacturer: Armstrong Medical Industries, Inc. Model: AE-150 Slippery Slider

Basic: Furnish Install: O/O Drawings: N

Arch Code: 3 - Minor movable Arch Sig: N

Lead time: 30 days

Physical Requirements Mounting: N/A Clear. left:

Width: 22.00 in Right:

Height: 72.00 in Top:

Depth: 0.25 in Bottom:

Weight: 12.00 lb Front:

Back: Door swing:

Rough in:

Electrical Requirements Volts: Watts:

Hz: BTU/HR:

Phase: Amps

UPS: N Data: N

Ded. Circuit: N Compressed Air: N

Connection: N/A

Utility Requirements Hot Water: N Cold Water: N

Spec. Water: N Vent: N

Steam: N Gases: N

Drain: N Vacuum: N

* This cover sheet is for quick reference only. For full technical specification details please refer to the attached vendor document.

Qty N/E Ord Floor/Room Room Name Department Notes 1 Exist No CT Imaging 1 Exist No CT Imaging 1 Exist No CT Imaging

Product No.: AE-150

Patient Slippery Slider, 22" x 72" Weight: 12 lbs.

Alleviate lifting strain, lift large patients with minimum staff, and ensure patient comfort.

Armstrong offers three sizes of Slippery Sliders. Each has an ultra-smooth polyethylene surface that makes patient transfer virtually free of friction.

• Reduces overexertion related back injuries

• Usable during x-rays; Slippery Slider is radiolucent

• Allows for easy grip with cut-out hand holes

• Strong, lightweight, and thin - all models are only 3/16" thick katilano Text Box

Equipment Solution Planning - ESP Harris Health Smith Clinic - CT

Specification Coversheet

Item #: CAB21501 Alt ID:

Description: Cabinet, Defibrillator Manufacturer: Medtronic Inc. - Physio-Control Division Model: 11220-000079 Surface Mount Cabinet

Basic: Furnish Install: O/C Drawings:

Arch Code: 1 - Fixed Arch Sig: Y

Lead time:

Physical Requirements Mounting: W Clear. left:

Width: 17.25 in Right:

Height: 17.25 in Top:

Depth: 7.25 in Bottom:

Weight: 20.00 lb Front:

Back: Door swing:

Rough in:

Electrical Requirements Volts: Watts:

Hz: BTU/HR:

Phase: Amps

UPS: N Data: N

Ded. Circuit: N Compressed Air: N

Connection: N/A

Utility Requirements Hot Water: N Cold Water: N

Spec. Water: N Vent: N

Steam: N Gases: N

Drain: N Vacuum: N

Detailed Specs Cabinets are available with or without audible alarms and strobe lights. Built-in strobe lights are available for flush mount cabinets equipped with an audible alarm. Cabinets equipped with an alarm have an on-off switch on the cabinet and on the alarm unit.

Electrical Notes 9V battery provides power for the audible alarm and strobe light

* This cover sheet is for quick reference only. For full technical specification details please refer to the attached vendor document.

Qty N/E Ord Floor/Room Room Name Department Notes 1 Exist No Nurse Station Imaging

TECHNICAL SPECS

Alarmed AED Cabinet- Protect your AED with one of our Alarmed AED Cabinets.

Our metal alarmed wall AED Cabinets offered with an alarm and have the following features:

AED Cabinet with Alarm Features

Economical Design Easy to Install Fits most brands of AED's 1/8" thick clear acrylic window Alarmed cabinet AED cabinet alarm requires 1- 9-volt battery (included) AED cabinet alarm is beasily attached to existing building alarm system

Smooth finish Very Loud Alarm!!

Includes 2 keys to arm/disarm alarm (AED cabinet does not lock) Extra Keys are available!

Alarmed AED Cabinet Outside Dimensions: 17" H x 17" W 7" D

Equipment Solution Planning - ESP Harris Health Smith Clinic - CT

Specification Coversheet

Item #: CRT03116 Alt ID:

Description: Cart, Resuscitation

Manufacturer: Armstrong Medical Industries, Inc. Model: PAR-30 Premier 6-Drawer Breakaway Lock

Basic: Furnish Install: O/O Drawings:

Arch Code: 3 - Minor movable Arch Sig: N

Lead time:

Physical Requirements Mounting: F Clear. left:

Width: 33.50 in Right:

Height: 45.50 in Top:

Depth: 25.00 in Bottom:

Weight: 92.00 lb Front:

Back: Door swing:

Rough in:

Electrical Requirements Volts: Watts:

Hz: BTU/HR:

Phase: Amps

UPS: N Data: N

Ded. Circuit: N Compressed Air: N

Connection: N/A

Utility Requirements Hot Water: N Cold Water: N

Spec. Water: N Vent: N

Steam: N Gases: N

Drain: N Vacuum: N

* This cover sheet is for quick reference only. For full technical specification details please refer to the attached vendor document.

1 Exist No Nurse Station Imaging

• Armstrong Medical Industries, Inc. 800-323-4220

Premier Solid Color Aluminum Emergency Cart Solid Color Premier Emergency Carts include these standard features:

• Side shelf

• Plastic top

• Push handles (2)

• Accessory panels (2)

• Locking casters (2)

• Swivel caster

• Tracking caster

• Breakaway locking bar (length of bar is equal to Cart size)

• Stabilizing frame with bumper

• Carts require some assembly

Aluminum Premier Red 6-Drawer, Breakaway Lock, 30in.

• Overall dimensions: 45 1/2"H x 25"D x 33 1/2"W (includes bumper/handles/casters)

• Drawer Size: 17 1/16"D x 22 1/4"W

• Drawer sizes: 3"H(3), 6"H(2), 9"H (1)

Weight: 92 lbs.

Product No.: PAR-30

Equipment Solution Planning - ESP Harris Health Smith Clinic - CT

Specification Coversheet

Item #: CTS-10840 Alt ID:

Description: CT, SPECT/FAC Manufacturer: GE Healthcare - Imaging Systems Model: Discovery RT

Basic: Furnish Install: O/V Drawings:

Arch Code: 1 - Fixed Arch Sig: Y

Lead time: 120 days

Physical Requirements Mounting: F Clear. left:

Width: Right:

Height: Top:

Depth: Bottom:

Weight: Front:

Back: Door swing:

Rough in:

Electrical Requirements Volts: 480 Watts:

Hz: 60 BTU/HR:

Phase: Amps

UPS: Rec Data: Y

Ded. Circuit: Y Compressed Air: N

Connection: HW

Utility Requirements Hot Water: N Cold Water: N

Spec. Water: N Vent: N

Steam: N Gases: N

Drain: N Vacuum: N

Electrical Notes See vendor typical drawing for detailed electrical information.

* This cover sheet is for quick reference only. For full technical specification details please refer to the attached vendor document.

1 New No CT Sim Imaging

01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness Checklist 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Radiation Protection 06 - A4 - Radiation Protection Details 07 - A5 - Equipment Dimensions (1) 08 - A6 - Equipment Dimensions (2) 09 - A6 - Delivery

REVOLUTION RT

RET

GE HealthCare does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawings. GE HealthCare cannot accept responsibility for any damage due to the partial use of GE HealthCare final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE HealthCare accepts no responsibility or liability for defective work due to scaling from these drawings. /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG

RET 5938483-1EN

1/4"=1'-0"

21/Jan/2025

REV DATE MODIFICATIONS

A mandatory component of this drawing set is the GE HealthCare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.

Pre Installation documents for GE HealthCare products can be accessed on the web at: https://www.gehealthcare.com/support/manuals -

Drawn by Verified by PIM Manual

SheetFormat

Concession

Scale DateFile Name

RevGON/Quote

A3

FINAL STUDY

10 - S1 - Structural Notes 11 - S2 - Structural Layout 12 - S3 - Structural Details (1)

13 - M1 - HVAC

14 - E1 - Electrical Notes 15 - E2 - Electrical Layout 16 - E3 - Electrical Elevations 17 - E4 - Power Requirements 18 - E5 - Electrical Details - Interconnect

GENERAL SPECIFICATIONS

· GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.

· The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.

· The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.

· The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.

· Dimensions apply to finished surfaces of the room.

· Actual configuration may differ from options presented in some typical views or tables.

· If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.

· The equipment layout indicates the placement and interconnection of the indicated equipment components.

There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.

· All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.

· These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.

CUSTOMER RESPONSIBILITIES

· It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.

· Prior to installation, a structural engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.

RADIO-PROTECTION

· Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.

DISCLAIMER

THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.

DATE NAME SIGNATURE

· A mandatory component of this drawing set is the GE HealthCare Pre-installation manual. Failure to reference the Pre-installation manual will result in incomplete documentation required for site design and preparation.

· The items on the GE HealthCare Site Readiness Checklists listed below are REQUIRED to facilitate equipment delivery to the site. Equipment will not be delivered if these requirements are not satisfied.

CUSTOMER SITE READINESS REQUIREMENTS

REQUIRED MANUALS FOR SYSTEM PRE-INSTALLATION

Description Document Number*

Product specific Pre-installation Manual Refer to cover page

*documents can be accessed in multiple languages at https://www.gehealthcare.com/support/manuals

· Any deviation from these drawings must be communicated in writing to and reviewed by your local GE HealthCare installation project manager prior to making changes.

· Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE HealthCare installation project manager can supply a reference list of rigging contractors.

· New construction requires the following;

1. Secure area for equipment,

2. Power for drills and other test equipment,

3. Restrooms.

· Provide for refuse removal and disposal (e.g. crates, cartons, packing)

· For CT systems it is required to minimize vibrations within the scan room. It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system Pre-installation manual for vibration specifications.

REQUIRED SITE-READINESS CHECKLISTS FOR SYSTEM PRE-INSTALLATION

Modality Document Number*

Computerized Tomography DOC2949059

Radiology, Radiology and Fluouroscopy, Mammography, Bone Mass Densitometry DOC2949063

All modality Customer/Contractor Worksheet DOC2949068 *documents can be accessed in multiple languages at https://www.gehealthcare.com/support/manuals

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- Delivery - Disclaimer 02

ENVIRONMENT

ALTITUDE

· The system shall meet all functional and performance specifications when placed in a room that is at an elevation of -150 m to 2,400 m [-492 ft to 7,875 ft] above sea level. For different altitudes refer to the PIM.

MAGNETIC FIELD SPECIFICATIONS

· Limit the magnetic interference to guarantee specified imaging performance.

GANTRY:

· Ambient static magnetic fields less than 1 Gauss.

· Ambient AC magnetic fields less than 0.01 Gauss peak.

OPERATOR CONSOLE:

· Ambient static magnetic fields less than 10 Gauss.

SYSTEM COMPONENT NOISE LEVEL

· Maximum Gantry Audible Noise Level: The maximum ambient noise level is produced by the gantry during a CT scan acquisition. It is less than 75 dBA when measured at a distance of 1 m [3.3 ft] from the nearest gantry surface, in any direction.

· Maximum Console Audible Noise Level: The maximum ambient noise levels is less than or equal to 56 dBA when measured 1 m [3.3 ft] up and 1 m [3.3 ft] away from the console at an ambient temperature of 26°C [79°F].

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- Delivery - Disclaimer 03

LEGEND

A GE SUPPLIED D AVAILABLE FROM GE

B GE SUPPLIED/CONTRACTOR INSTALLED E EQUIPMENT EXISTING IN ROOM

C CUSTOMER/CONTRACTOR SUPPLIED AND

INSTALLED * ITEM TO BE REINSTALLED FROM

ANOTHER SITE

For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- A2 - Equipment Layout 041/4"=1'-0"

BY ITEM DESCRIPTION

MAX

HEAT

OUTPUT

(BTU/h)

WEIGHT

(lbs)

MAX

HEAT

OUTPUT

(W)

WEIGHT

(kg)

A 1 GANTRY 30585 4115 8964 1866

A 2 GT1700 TABLE 1024 983 300 446

B 3 MAIN DISCONNECT PANEL (MDP) - 63 - 28.6

A 4 STORAGE CABINET - 90 - 41

A 5 AURORA SWS TABLE - 88 - 40

A 6 PARTIAL UPS 2832 265 830 120

A 7 POWER DISTRIBUTION UNIT (PDU) 3412 816 1000 370

A 8 REAR CABLE COVER - - - -

A 9 OPEN CONSOLE 8189 142 2400 64.2

EXAM ROOM HEIGHT

FINISHED FLOOR TO SLAB HEIGHT

FALSE CEILING HEIGHT

TBD

8'-9"

C 10 LEAD GLASS VIEWING WINDOW

C 11 MINIMUM OPENING FOR EQUIPMENT DELIVERY IS 1400 mm x 2150 mm [55 in x 85 in], CONTINGENT ON A 2438 mm [96 in] CORRIDOR WIDTH

9' -7

7'-7"

14'-7"

'-6

9' -0

CONTROL ROOM

EXAM ROOM

0.65

1.3

2.6

5.2

5.2

2.6

1.3

0.65

RADIATION PROTECTION LAYOUT

SHIELDING REQUIREMENTS SCALING

CHANGED PARAMETER (mAs) MULTIPLICATION FACTOR (new mAs/100)

80 kV 0.21

120 kV 0.71

140 kV 1.00 4x3.75 mm images 0.82

16x0.625 LD 8x1.25 LD Fluro 5 mm

0.59

4x1.25 LD 5 mm (1i) Fluro 2.5 mm

0.40

1x1.25 mm images 0.20

4x0.625 LD 1x1.25 0.10

SHIELDING REQUIREMENTS:

Engage a qualified radiological health physicist to review your scan room shielding requirements, taking into consideration:

· Scatter radiation levels within the scanning room

· Equipment placement

· Weekly projected work-loads (number of patients/day technique (kvp*ma))

· Materials used for construction of walls, floors, ceiling, doors, and windows

· Access to surrounding scan room areas

· Equipment in surrounding scan room areas (e.g., film developer, film storage)

The illustration on this page depicts measurable radiation levels within the scanning room while scanning a 32 cm CTDI phantom (body) with the technique shown:

- 140 kVA

- 100 mA

- 1 sec

- 4x5.00 mm

NOTE: All measurements have an accuracy of ± 20% because of measurement equipment, technique, and system-to-system variation. Use the correction factors shown in the table above to adjust exposure levels to the usual scan technique at your site.

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- A3 - Radiation Protection 051/4"=1'-0"

9' -7

7'-7"

CONTROL ROOM

EXAM ROOM

RADIATION SCATTER - BODY PHANTOM

NOTE: 140 kV

100 mAs/scan 1 sec 4 x 5.00m scan acquisition

0.65 μGy/scan

5.2

2.6

[19.7in]

[1 9.

7i n]

[19.7in]

[1 9.

7i n]

PLAN VIEW

ELEVATION VIEW

1.3 2.6

5.20.65 μGy/scan

1.3

1.3 2.6 5.2 0.65 μGy/scan 0.65 μGy/scan5.2 2.6 1.3

RADIATION SCATTER - HEAD PHANTOM

NOTE: 140 kV

100 mAs/scan 1 sec 4 x 5.00m scan acquisition

0.33 μGy/scan

0.65

1.3

2.6

[19.7 in]

[1 9.

in

[19.7 in]

[1 9.

in

PLAN VIEW

ELEVATION VIEW

0.65 1.3

2.60.33 μGy/scan

0.33 μGy/scan0.65

1.3

2.62.61.30.65 0.33 μGy/scan

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- A4 - Radiation Protection Details 061/4"=1'-0"

AURORA SWS TABLE

FRONT VIEW TOP VIEW

[51 in]

[3 in

[3 in

[24 in]

[26 in]

[1 in ] 50

[2 in

] 74

[2 in

[3 in

SCALE 1:20

Weight: 40 kg [88 lbs]

OPERATOR CONSOLE

SIDE VIEW FRONT VIEW

SCALE 1:20

TOP VIEW

[16 in]

[2 in

[16 in]

[24 in]

[2 in]

[2 in

Weight: 64.2 kg [141.5 lbs]

1.

[1 in

[7 in]

[1 in

Center of Gravity Indicates air flow (Convection)

GANTRY WITH GT1700 TABLE

SCALE 1:50

Sc an c en te rli ne

Rear Front

Sc an c en te rli ne

[94 in]

[7 in

[25 in]

[40 in]

INTAKE

EXHAUST

[24.8 in]

302.2 [11.9 in]

936.5 [36.9 in]

936.5 [36.9 in]

[3 in

[14 in]

[58 in]

[124 in]

[4 in

[4 in

[196 in]

POWER DISTRIBUTION UNIT (PDU)

SCALE 1:20 Indicates air flow (Convection)

Center of Gravity

[35.4 in]

[14.2 in]

[5 .9 in

[2 1.

in

[3

5.

in ] 700

[27.6 in]

[9.3 in]

Service Area

TOP VIEW

Minimum air flow clearance

FRONT VIEW SIDE VIEW

[4 1.

in

[1 9.

in

[13.8 in] 12

[5

.1 in

[5.9 in]

[5 .5 in

[8 .7 in

[15.3 in]

[15.3 in]

Seismic mounting brackets Weight: 10 kg [22 lbs]

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- A5 - Equipment Dimensions (1) 07

PARTIAL UNINTERRUPTIBLE POWER SUPPLY

SCALE 1:20

[3 0.

in

[10.3 in] 52

[2

0.

in

[26.8 in]

[30.3 in]

Plan view Front view Side view

MAIN DISCONNECT PANEL

FRONT VIEW SIDE VIEWTOP VIEW

SCALE 1:10

[14.5 in]

[2 8.

in

[16.7 in]

[3 0.

in

[8.3 in]

[10 in]

4xØ10

[Ø

0.4 in]

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- A6 - Equipment Dimensions (2) 08

DELIVERY

THE CUSTOMER/CONTRACTOR SHOULD:

· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.

· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.

· Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.

· Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.

DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT

EQUIPMENT DIMENSIONS WEIGHT

GANTRY

LENGTH 3170 mm 124.8 in 2064 kg (new dolly) 2262 kg (old dolly)

4550 lbs (new dolly) 4987 lbs (old dolly)WIDTH 1290 mm 50.8 in

HEIGHT 1969 - 2306 mm 77.5 - 90.8 in

GT1700 TABLE

LENGTH 2370 mm 93.3 in 537 kg 1184 lbsWIDTH 650 mm 25.6 in

HEIGHT 991 mm 39 in

GANTRY DELIVERY

· The gantry is shipped on a dolly equipped with elevating casters (normal shipping configuration).

NOT TO SCALE

[124.8 in]

[40.3 in]

[50.8 in]

W=

L=

[7

7.

- 9 0.

in

[94.1 in]

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- A6 - Delivery 09

STRUCTURAL NOTES

· all steel work and parts necessary to support ceiling mounted equipment is to be supplied by the customer or his contractors.

· methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.

· all units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan and detail sheets for suggested locations and mounting hole locations.

· all ceiling mounted fixtures, air vents, sprinklers, etc. To be flush mounted, or shall not extend more than 1/4" below the finished ceiling.

· floor slabs on which equipment is to be installed must be level to 1/4" in 10'-0"

· dimensions are to finished surfaces of room.

· customers contractor must provide all penetrations in post tension floors.

· customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.

· customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.

· it is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit"

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- S1 - Structural Notes 10

ITEM DESCRIPTION

1 Gantry leveling pads. See Structural Detail

2 Table leveling pads. See Structural Detail

(CONTRACTOR SUPPLIED & INSTALLED)

3 Support Backing, locate as shown

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- S2 - Structural Layout 111/4"=1'-0"

9' -7

7'-7"

CONTROL ROOM

EXAM ROOM

8' -0

4'-6"

10'-8"

5'-3"

[32.3 in]

[2 4.

in

[8 in

[5 4.

in

[1 9.

in

[5

.2 in

]936 [36.9 in]

[41.4 in]

[45.1 in]

[73.7 in]

ANCHORING/LOADING DISTRIBUTION TO THE FLOOR

Gantry 1866 kg [4114 lbs]

SCALE 1:20

GT1700 Table 673 kg [1484 lbs] with 227 kg [500 lbs] patient

[1 in

[7.9 in]

[5 in

[8 in

[28.6 in]

(1) Tilting axis

(2) Longitudinal axis

(3) Cable inlet area

(4) 8 Gantry anchoring points

(5) First anchor to be drilled "Anchor A"

(6) 8 Table anchoring points

Center of gravity Main anchoring points Backup anchoring points

[1 in

[1 8.

in

[3 .9 in

[7.9 in]

NOT TO SCALE

FLOOR REQUIREMENTS

FINISHED FLOOR REQUIREMENTS

· Installation requires a finish floor in the scan and control rooms

· The floor surface in the scan room directly under the gantry and table must be level.

· The floor levelness tolerance of the floor surface that the gantry and table will rest on is 6 mm [1/4 in] over a 3048 mm [10 ft] distance.

· Shims should not be used to compensate for a floor that does not meet this requirement.

· Eight or more floor covering openings that are 102 mm [4 in] in diameter are made to ensure the table and gantry rest on a solid surface.

These floor penetrations can be sealed if required.

· Concrete floors must have a minimum strength of f'c = 1.4 X10⁷ Pa [2000 PSI] at 28 days for (curing time) mounting floor anchors. It is the responsibility of each customer to have appropriate tests performed to determine and measure concrete strength.

· These requirements apply to all installation types.

M in m m

[4 in th ic k co nc re te

Leveling pad

Adjuster lock ring (gantry only) Gantry/Table stationary base

Leveling screw Anchor washer

13 mm [0.5 in] min - 25 mm [1 in] max after proper torque

Anchor bolt

GE SUPPLIED TABLE/GANTRY ANCHORS

NOTES:

· The distance from central line of anchor to the edge of concrete basement of Gantry/Table should not be less than 178 mm [7 in].

· Torque anchor to 54 Nm [40 ft-lb]

25 mm [1 in] for Table 13 mm [0.5 in] for Gantry

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- S3 - Structural Details (1) 12

HEAT DISSIPATION DETAILS

ROOM DESCRIPTION Max W Max

BTU/hr

Exam Room

Gantry 8964 30570

Patient Table 300 1030

TOTAL 9264 31600

Exam Room or Technical Room*

Power Distribution Unit 1000 3400

Partial UPS 830 2828

TOTAL 1830 6228

Control Room Operator Console with 2 LCD monitors 2400 8189

TOTAL 2400 8189

*Technical Room is not mandatory, the placements of these elements are recommended in the Exam Room.

NOTE

In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.

TEMPERATURE AND HUMIDITY SPECIFICATIONS

STORAGE CONDITIONS

IN-USE CONDITIONS

AIR RENEWAL

According to local standards.

Temperature 0°C to 30°C

32°F to 86°F Relative humidity (1) up to 70%

Temperature gradient ≤ 3C/h

5°F/h Humidity gradient ≤ 5%/h

Material should not be stored for more than 6 months.

(1) non-condensing

EXAM ROOM CONTROL ROOM

Temperature Min Recommended Max Min Recommended Max

18°C 22°C 26°C 18°C 22°C 26°C

64°F 72°F 79°F 64°F 72°F 79°F Relative humidity (1) 30% to 60% 30% to 60%

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- M1 - HVAC 13

ELECTRICAL NOTES

· All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor. All junction boxes shall be provided with covers.

· Conduit and duct runs shall have gradual sweep radius bends.

· Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.

· Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.

· All ductwork must meet the following requirements:

1.Ductwork shall be metal with dividers and have removable, accessible covers.

2. Ductwork shall be certified/rated for electrical power purposes.

3. Ductwork shall be electrically and mechanically bonded together in an approved manner.

4. PVC as a substitute must be used in accordance with all local and national codes.

· All openings in raceway and access flooring are to be cut out and finished off with grommet material by the customers contractor.

· Electrical contractor to provide measured pull strings in all conduit and raceway runs.

· Provide 10 foot pigtails at all junction points.

· Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.

1. Aluminum or solid wires are not allowed.

2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.

3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.

4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.

5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distribution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.

6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights.

Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used. Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except MR). Do not mount lights directly above areas where ceiling mounted accessories will be parked.

7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).

8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.

9. In some cases GEHC will specify ground wires to be sized larger than code. In these situations, the GEHC specification must be followed.

10. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.

11. The maximum point to point distances illustrated on this drawing must not be exceeded.

12. Physical connection of primary power to GEHC equipment is to be made by customers electrical contractor with the supervision of a GEHC representative. The GEHC representative would be required to identify the physical connection location, and insure proper handling of GEHC equipment.

13. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.

14. Every installation is unique. The electrical contractor will be required to support the installation of the GEHC equipment by providing knockouts, grommeted openings, bushings, etc. as required. All power connections to be performed by the electrician.

CONNECTIVITY REQUIREMENTS

Your new GE Healthcare imaging modality will require local and remote connectivity to enable our full range of digital support:

· Local connectivity - This allows your system to connect to local devices such as PACS and modality worklist.

We will require network information to configure the system(s), and a live ethernet port(s) prior to the delivery of the system(s).

· Remote connectivity - Your GE Healthcare service warranty includes InSite™ (applicable to InSite capable products), a powerful broadband-based service which enables digital tools that can help guard your hospital against equipment downtime and revenue loss by quickly connecting you to a GE Healthcare expert.

Depending on product family and software version, imaging systems can be connected in one of the following methods:

1. TLS over TCP Port 443 (Preferred method for new products) via:

a. DNS resolution

b. Customer-provided Proxy or

c. GE Proxy (Available in some regions)

2. Site-to-Site IPsec VPN tunnel

Please provide the GE project manager with the contact information for the resource that can provide information required to set up these connections. GEHC will send out communication to these contacts, which will include the project's Connectivity requirements, and a Connectivity form. This form will need to be completed and returned to GEHC prior to delivery of the system to ensure the system is tested and connectivity is enabled prior to the completion of the installation.

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- E1 - Electrical Notes 14

B

A

Item Electrical Layout Item List

1 Main disconnect panel (MDP)

2 Suitable bushings & lock nuts (Power Distribution Unit)

3 Suitable bushings & lock nuts (Gantry)

4 Suitable bushings & lock nuts (Operator's Console)

5 4" x 4" x 4" [100 x 100 x 100] box (Partial UPS)

6 12" x 16" x 4" [150 x 150 x 100] box (Power Distribution Unit)

7 2 1/2" [63] conduit below floor

8 3 1/2" [90] conduit below floor

Additional Conduit Runs (Contractor Supplied and Installed)

From (Bubble # / Item)

To (Bubble # / Item) Qty

Size In. mm

3 Phase Power 1 Main Disconnect Panel 1 As req'd As req'd

1 Main Disconnect Panel Emergency Off 1 1/2 13

6 Power Distribution Unit 1 As req'd As req'd

6 Power Distribution Unit Door Switch 1 1/2 13

Warning Light Control 1 1/2 13

Warning Light 1 1/2 13

1 Phase Power 1 1/2 13

1 Main Disconnect Panel 5 Partial UPS

1 1 1/4 30

6 Power Distribution Unit 1 2 50

ITEM QTY

Electrical Outlet Legend

Customer/contractor supplied and installed items unless otherwise specified.

Height above floor determined by local codes unless otherwise specified.

Duplex hospital grade, dedicated wall outlet 120-v, single phase power

Dedicated telephone line(s)

Network outlet System emergency off (SEO), (recommended height 1.2m [48"] above floor)

X-Ray room warning light control panel

X-Ray ON lamp (L1) - 24V

Door interlock switch (needed only if required by state/local codes)

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- E2 - Electrical Layout 151/4"=1'-0"

9' -7

7'-7"

CONTROL ROOM

EXAM ROOM

2' -4

0'-4" 0'-10"

2'-6" 2'-11"

3'-4"

0' -3

7'-10" 8'-3"

0' -3

5'-3"

A

B

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- E3 - Electrical Elevations 161/4"=1'-0"

0'-0"

8'-9"

T.B.D.

0'-0"

8'-9"

T.B.D.

5'

-0

1' -0

1'

-6

5 6

POWER DISTRIBUTION

SEO3

24 V

PDU

For Scan Room

Warning Light and Door Interlock

Connections Detail refer to the next page

Emergency OFF (Control room)

Emergency OFF (Exam room) If applicable

Emergency OFF (Technical room)

If applicable

Notes :

(1) Wire size: 4x2.5mm² [14AWG] and 1x2.5mm² [14AWG] GND

(2) Power control cable: 3 Meter [10 ft], multi-conductor, 24V DC

(3) GE supplied MDP option E45021BC includes a 10 meter long power cable (H07RN-F) with wire size

4x50mm² and a 50 meter long control cable with wire size 2x1.5mm²

Refer to Table1

Table1:

MDP MDP Main Disconnect Panel PDU Power Distribution Unit SEO Emergency OFF Button latching twist-to release style with two normally closed (NC) contacts

Y Remote Operator Control Station with "ON" and "OFF" buttons

Table2:

24 V

24 V (1)

Cable SUPPLIED BY CUSTOMER Cable SUPPLIED BY GE Equipment SUPPLIED BY

CUSTOMER

Equipment SUPPLIED BY GE

(1)

(1)

YRemote ON/OFF (Control room)

If applicable 24 V

(2)

SEO2

SEO1

For Main Supply (3 phases) Feeder and Ground wire size Refer to Table2

For Sub-Feeder and Ground wire size refer to Table2 (3)

Feeder Table The information below assumes the use of copper wire, rated 75 C and run in steel conduit. All ampacity is determined in accordance with the National Electrical Code (NFPA 70), Table 310-16 (2002). The ampacity of the circuit protection device listed above determines the minimum feeder size, except where total source regulation limits require a larger size. If the wire size does not match the lists below, please select the nearest wire size as per to local standards.

Feeder length from Power Substation to MDP - ft (m)

Minimum Wire Size, AWG or MCM (mm²)/VAC

380 VAC 400 VAC 420 VAC 440 VAC 460 VAC 480 VAC

50 (15) 1/0 (50) 1/0 (50) 1/0 (50) 1 (35) 1 (35) 1 (35)

100 (30) 1/0 (50) 1/0 (50) 1/0 (50) 1 (35) 1 (35) 1 (35)

150 (46) 1/0 (50) 1/0 (50) 1/0 (50) 1 (35) 1 (35) 1 (35)

200 (61) 1/0 (50) 1/0 (50) 1/0 (50) 1 (35) 1 (35) 1 (35)

250 (76) 2/0 (70) 2/0 (70) 1/0 (50) 1/0 (50) 1 (35) 1 (35)

300 (91) 3/0 (95) 3/0 (95) 2/0 (70) 2/0 (70) 1/0 (50) 1/0 (50)

350 (107) 4/0 (120) 3/0 (95) 3/0 (95) 2/0 (70) 2/0 (70) 1/0 (50)

400 (122) 250 (120) 4/0 (120) 3/0 (95) 3/0 (95) 3/0 (95) 2/0 (70)

Sub-Feeder length from MDP to PDU

- ft (m)

32 (9.7536) 1/0 (50) 1/0 (50) 1/0 (50) 1 (35) 1 (35) 1 (35) Grounding

Run a dedicated 1/0 [50 mm²] or larger insulated copper ground wire from the power source to the MDP and from MDP to the PDU. Run the ground wire in the same raceway with the three-phase wires.

GE Supplied Main Disconnect Panel (MDP)

Region CAT number Amps Global except

EMEA(440~480 V) E4502BE 125

Global except

EMEA(380~420 V) E4502BF 150

EMEA(400 V) E45021BC (3) 160

Partial UPS (option)

POWER REQUIREMENTS

GROUND SYSTEM

· System of equipotential grounding.

· Equipotential: The equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE system units are located.

CABLES

· Power and cable installation must comply with the distribution diagram.

· All cables must be isolated and flexible, cable color codes must comply with standards for electrical installation.

· The cables from signaling and remote control (Y, SEO, L...) will go to PDB with a pigtail length of 1.5m [4.9'], and will be connected during installation. Each conductor will be identified and isolated (screw connector).

CABLEWAYS

The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:

· Protecting cables against water (cableways should be waterproof).

· Protecting cables against abnormal temperatures (proximity to heating pipes or ducts).

· Protecting cables against temperature shocks.

· Replacing cables (cableways should be large enough for cables to be replaced).

· Metal cableways should be grounded.

POWER SUPPLY 3 PHASES+G 380/400/420/440/460/480 V ± 10%

FREQUENCIES 50/60 Hz ± 3 Hz MAXIMUM POWER DEMAND 150 kVA AVERAGE (CONTINUOUS) POWER DEMAND 30 kVA

POWER FACTOR 0.85

· Power supply should come into a Main Disconnect Panel (MDP) containing the protective units and controls.

· Governing electrical codes may require a neutral wire. If present, neutral must be terminated in MDP.

· The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops.

· There must be discrimination between supply cable protective device at the beginning of the installation

(main low-voltage transformer side) and the protective devices in the PDB.

SUPPLY CHARACTERISTICS

· Power input must be separate from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...).

· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.

· The minimum recommended transformer size for a dedicated distribution transformer provided for the system is 225kVA, rated 2.4% regulation at unity power factor.

· Phase imbalance 2% maximum.

· Maximum voltage variation at 150kVA = 5% (Including line impedance.)

· Transients must be less than 1500V peak. (on a 400V line)

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- E4 - Power Requirements 17

TYPICAL CABLE MANAGEMENT

Hardware if required

Sweep bend radius per local code

Finished ceiling

Finished floor

CONDUIT BELOW FLOORRev Date:

15.Dec.21

NOT TO SCALE

INTERCONNECTIONS

Available from GE

CONTROL ROOM

PARTIAL

UPS

(OPTION)

MDP

PDU11.00 m [37']

2.00 m [7']

18.30 m or 22.90 m [60' or 75']

6.10 m or 16.80 m [20' or 55']

18.30 m or 22.90 m [60' or 75']

Operator Console

EXAM ROOMEXAM ROOM / TECHNICAL ROOM

3.00 m [9.8']

Customer supplied

LCD Monitor on Ceiling (Option)

21.20 m [70']

Gantry

Table

DateRev /18EN-CT-TYP-REVOLUTION_RT-1700-NF.DWG A 21/Jan/2025REVOLUTION RT---- E5 - Electrical Details - Interconnect 18

Equipment Solution Planning - ESP Harris Health Smith Clinic - CT

Specification Coversheet

Item #: CTS13637 Alt ID:

Description: CT Manufacturer: GE Healthcare - Imaging Systems Model: Revolution Apex

Basic: Furnish Install: O/V Drawings: Y

Arch Code: 1 - Fixed Arch Sig: Y

Lead time: 112 days

Physical Requirements Mounting: F Clear. left:

Width: 79.00 in Right:

Height: 129.00 in Top:

Depth: 263.00 in Bottom:

Weight: 7644.00 lb Front:

Back: Door swing:

Rough in:

Electrical Requirements Volts: 480 Watts: 200000

Hz: 60 BTU/HR: 27150.00

Phase: 3 Phase Amps 283

UPS: Y Data: Y

Ded. Circuit: Y Compressed Air: N

Connection: HW

Utility Requirements Hot Water: N Cold Water: N

Spec. Water: N Vent: N

Steam: N Gases: N

Drain: N Vacuum: N

Detailed Specs For detailed information see spec sheet.

* This cover sheet is for quick reference only. For full technical specification details please refer to the attached vendor document.

Qty N/E Ord Floor/Room Room Name Department Notes 1 New No CT Imaging 1 New No CT Imaging 1 New No CT Imaging

REVOLUTION APEX ™

The new way to your best image.

Product Data Sheet

DOC2201819 Revision 1*

*Latest update on November 20, 2018.

Product Data Sheet DOC2201819 Revision 1

REVOLUTION APEX

The new way to your best image.

Latest update on November 20, 2018 Page � of �2 21

Table of Contents

3 Introduction

3 Indications for Use

4 Clinical Highlights

6 System Hardware: Tube and Generator

7 System Hardware: Detector

8 System Hardware: Gantry and Slipring

9 System Hardware: Table

10 System Hardware: Operator Console

11 System Software: Smart Workflow

12 System Software: Smart Dose technologies

13 Scan Modes and Image Reconstruction

19 Image Quality

20 Compatible Options

21 DICOM Interchange, Siting Requirements and Industry Standards

DOC2201819 Revision 1

REVOLUTION APEX

The new way to your best image.

Latest update on November 20, 2018 Page � of �3 21

Introduction

Revolution Apex is the GE next-generation flagship ultra-pre-mium Computed Tomography scanner to provide the new way to your best image.

With the power of a new image chain, Revolution Apex has elevated what you can expect from industry leading spatial resolution, temporal resolution, coverage, and spectral imaging:

• Maximum 1,300 mA X-ray output

• 160 mm z-coverage in a single axial exposure

• 1-beat Cardiac with 29 ms effective temporal resolution 1

• High Definition imaging with 0.23 mm spatial resolution

• 437 mm/s volumetric scan with 50 cm FOV 2

• Ultra-fast kV switching

• 80 cm bore size

Revolution Apex has achieved a breakthrough in Image Quality to have outstanding image definition, natural image appear-ance and low dose, all at the same time. You will have the im-age quality that you need to deliver a powerful first impression every time.

Revolution Apex delivers an uncompromised set of clinical solu-tions for your most challenging patients to ensure you achieve your best images for all patients:

• 1-beat Cardiac at any heart rate, even in Atrial Fibrillation.

• High resolution coronary imaging, even for patients with heavily calcified coronaries.

• Low kV TAVI planning, even for patients with impaired re-nal function.

• Dynamic whole-heart myocardial perfusion, without the need to shuttle the table.

• Low kV imaging, even for adults and obese patients.

• Uncompromised image quality for excessively obese pa-tients.

• Low-dose chest CT within one second for patients who can not hold their breath

• Acute ischemia stroke CT workup in less than 5 minutes . 3

• Pediatric imaging, with minimal need for sedation.

Revolution Apex has been designed with future upgradability as a key goal to ensure longevity of the state of the art technology to help you continually provide best in class care to your pa-tients.

Indications for Use The Revolution Apex Computed Tomography scanner is intend-ed to produce cross-sectional images of the body by computer reconstruction of x-ray transmission projection data from the same axial plane taken at different angles. The system has the capability to image whole organs in a single rotation. Whole organs include but are not limited to brain, heart, liver, kidney, pancreas, etc. The system may acquire data using Axial, Cine, Helical, Cardiac and Gated CT scan techniques from patients of all ages. These images may be obtained either with or without contrast. This device may include signal analysis and display equipment, patient and equipment supports, components and accessories.

This device may include data and image processing to produce images in a variety of trans-axial and reformatted planes. Fur-ther, the images can be post-processed to produce additional imaging planes or analysis results.

The system is indicated for head, whole body, cardiac, and vas-cular X-ray Computed Tomography applications.

The device output is a valuable medical tool for the diagnosis of disease, trauma, or abnormality, and for planning, guiding, and monitoring therapy.

Intelligent motion correction with SnapShot™ Freeze is designed to reduce blurring artifacts due to motion in coronary vessels that cannot be addressed by gantry speed alone. A 6x improvement of 1 motion-blur reduction while maintaining high spatial resolution is demonstrated in cardiac phantom testing. The reduction in motion artifacts is comparable to a 0.058s Equivalent Gantry Rotation Speed with effective temporal resolution of 29 msec, as demonstrated in mathematical phantom testing.

Enabled by HyperDrive option.2

Enabled by Neuro Multiphase CTA Protocols on Revolution Apex and FastStroke application on AW and AW Server. 3

DOC2201819 Revision 1

REVOLUTION APEX

The new way to your best image.

Latest update on November 20, 2018 Page � of �4 21

Clinical Highlights

Cardiovascular

1-Beat, High definition, motion free coronary images at any heart rate is enabled by a prospectively ECG-gated whole heart cardiac axial acquisition protocol that utilizes 160 mm of high-definition coverage with 0.28s rotation speed and real-time control to complete the scan in a single beat to ensure robust, low dose and high definition cardiac imaging for all heart rates, with or without beta blockers

• Whole heart coverage: 160 mm of high-definition detec-tor coverage with smart collimation to achieve IV contrast uniformity & temporal uniformity across the whole vol-ume.

• 1-beat Auto Gating: intelligently identifies the ideal time within the heart cycle to scan the entire heart in a single beat at any heart rate.

• Smart Phase : analyzes the motion of the coronaries 4 throughout the volume to auto-select the best cardiac phase with the least motion.

• Intelligent motion correction with SnapShot™ Freeze is designed to provide a 6x reduction of motion-blur while maintaining high spatial resolution and as demonstrated in cardiac phantom testing. The reduction in motion arti-facts is comparable to a 0.058s equivalent gantry rotation speed with effective temporal resolution of 29 msec, as demonstrated in mathematical phantom testing.

• Smart Arrhythmia Management: The system has been designed to improve the robustness of cardiac exams for patients with high or irregular heart rates and in situations involving irregular heartbeats, arrhythmia, atrial fibrilla-tions, PVC’s, etc. The system can monitor and alert the user to these situations and also recommend turning on Smart Arrhythmia Management mode. This mode avoids scanning during an irregular beat and rescans during the next regular beat using the same contrast bolus.

• Best in class spatial resolution at 18.2 lp/cm in z-direc-tion and 14.8 lp/cm in X-Y direction (measured at 2% MTF).

This spatial resolution provides clear images to help the physician with tasks such as accurately quantifying steno-sis in coronaries and other vascular structures.

1-Beat, comprehensive cardiac assessment enables acquir-ing motion free coronaries, rest or stress perfusion and func-tional data in a single beat, giving you a comprehensive as-sessment and potentially reducing the need for additional imaging tests. Integrated beam hardening reduction capabili-ties allows accurate perfusion assessment. The ability to per-form stress perfusion with motion free CCTA in a single exam can potentially reduce unnecessary dose by not requiring a rest perfusion exam in case no defects are found in the stress dy-namic perfusion acquisition modes

The Revolution Apex enables whole organ dynamic perfusion acquisition with up to 16 cm of coverage. This allows perfusion acquisition of the heart, brain, liver, kidneys and other organ and tissues with uniform contrast along with integrated beam hardening reduction. The scanner also allows a flexible aperture size and sampling rate during dynamic perfusion acquisitions, which is particularly beneficial in localizing anatomy of interest for brain and other perfusion acquisitions. This is enabled by selecting supported collimations from 5 mm to 160 mm for different aperture sizes and variable sampling rate groups, de-pending on the phase of the contrast - typically a faster sam-pling rate when the contrast bolus is arriving in the tissue, fol-lowed by a slower sampling during washout.

Revolution Apex also provides the ability to acquire a prospec-tively gated dynamic perfusion acquisition of the entire heart using up to 16 cm of coverage.

The scanner is also capable of 4D imaging to acquire both morphology and perfusion information from a single exam. This can help assess conditions such as congenital heart disease and visualize blood flow through vascular structures.

TAVR planning

Dedicated TAVR/TAVI protocols allow mixed acquisitions of the heart, aorta, and femoral arteries, with ECG-gated axial scans and non-ECG-gated axial or helical scans, using a single injec-tion of contrast media, covering 700 mm of anatomy in less than 10 seconds.

Calcium Scoring

The system also allows single beat acquisition for cardiac calci-um scoring.

Triple RuleOut™

The system enables robust Triple Rule Out studies with motion free coronaries, PE & aorta evaluation in a single exam. The system can cover the entire thorax anatomy in under 3 seconds to provide contrast uniformity at low dose.

Smart Phase is a purchasable software option.4

DOC2201819 Revision 1

REVOLUTION APEX

The new way to your best image.

Latest update on November 20, 2018 Page � of �5 21

Clinical Highlights

Neurology Routine non-contrast whole brain scans can be performed in a single rotation without moving the table. VHD reconstruction technology ensures CT number uniformity across the entire volume. Iterative MMAR can reduce the beam hardening arti-facts at bone/brain interface and posterior fossa region. En-hanced Contrast can achieve excellent grey white matter dif-ferentiation.

Smart Stroke , the stroke-dedicated hardware, software and 5 post-processing solution on Revolution Apex, can help physi-cians to reduce “CT scan-to-report” time and “door-to-treat-ment” time, to save more brain tissue of patients with stroke.

Whole brain CT perfusion with 70kVp, smart collimation and variable sampling can acquire temporally uniform dynamic blood flow information to achieve accurate volumetric perfu-sion values at lower dose.

Single phase or dynamic 4D whole brain CTA can be acquired within a single exam of whole brain CT perfusion to achieve comprehensive functional & anatomical assessment of the brain.

The system can also acquire cardiac…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .