9-24-180 BID SCHEDULE.xlsx

XLSX spreadsheet 285 KB Posted

Attached to
IFB - ST GEORGE INDUSTRIAL 2 MG TANK PROJECT
Solicitation number
24-180
Issued by
Washington County, Utah

About this file

The document is a bid schedule for the City of St. George Industrial 2MG Tank Project, located in Utah, detailing a comprehensive water infrastructure replacement and expansion initiative. The project involves constructing a new 2 million-gallon concrete water tank and associated infrastructure, including earthwork, pipe installations, valves, fencing, and system connections. The bid schedule itemizes 21 distinct line items covering mobilization, removals, earthwork, tank construction, piping (12-inch ductile iron and 4-inch PVC), valves, fittings, fence installations, and utility connections. Quantities range from individual lump sum items to specific linear foot and unit measurements for various components.

The project requires a 5% bid bond and will ultimately necessitate a 100% performance and labor materials bond. The City of St. George reserves the right to reject any proposals or waive technicalities. The project appears to be a critical infrastructure upgrade focusing on water storage and distribution capabilities, with specific environmental considerations evident in the inclusion of tortoise fencing and careful system integration. While precise budget details are not specified in the document, the comprehensive scope suggests a significant municipal investment in water system infrastructure modernization.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025-02-21

City of St. George
Industrial 2MG Tank Project
SEPT. 2025
BID SCHEDULE
ITEM NO.ITEM DESCRIPTIONQUANTITYUNITS
1Mobilization1L.S.
2Removals1L.S.
3Earthwork & Grading (Cut)18,184C.Y.
4Earthwork & Grading (Fill)18,286C.Y.
5Furnish & Install 2 MG Concrete Water Tank & Appurtenances1L.S.
6Furnish & Install 12-Inch D.I. Culinary Water Pipe w/Poly979L.F.
7Furnish & Install 4-Inch SDR-35 PVC Drain Pipe252L.F.
8Furnish & Install 4" Cleanout3Each
9Furnish & Install Concrete Headwall w/Rip Rap at Drain1Each
10Furnish & Install 12-Inch Butterfly Valve2Each
11Furnish & Install 12" Tee2Each
12Furnish & Install 12” 22.5° Elbow11Each
13Furnish & Install 12” 90° Elbow
2Each
14Remove & Replace 12-Inch Butterfly Valve3Each
15Remove & Replace 6-Inch Butterfly Valve1Each
16Connect to Existing Overflow Drain1L.S.
17Connect to Existing Tee1L.S.
18Cut into Existing System with 12” Tee and (3) 12” BF Valves1L.S.
19Furnish & Install Temporary Tortoise Fence135L.F.
20Furnish & Install Barbed Wired Fence478L.F.
21Salvage and Service Power Equipment to New Tank1L.S.

&G &D image1.png

File details come from the government source that posted it. Updated .