9 17 20 VA SYRACUSE 100 SET.pdf

PDF 17 MB Posted

Attached to
Z1DA--528A7-18-720 COVID-19: REPLACE AHU 04, 06, 22, 34, 36
Solicitation number
36C24221B0003
Issued by

About this file

This pre-solicitation notice announces an upcoming competitive solicitation to replace air handler equipment at the Syracuse VA Medical Center. The solicitation will be posted on November 2nd, 2020, seeking bids to upgrade five air handlers under project number 528A7-18-720 in two phases. Phase one will replace air handlers 04 and 06, while phase two will replace air handlers 22, 34, and 36. Bids are required to include self-performance of 25% of the work and breakdowns of labor and materials. Payment and performance bonds as well as a 20% bid bond will be required. The solicitation is designated as a 100% set-aside for service-disabled veteran-owned small businesses and has an estimated value between $2-5 million. The period of performance is 365 calendar days from notice to proceed.

View the file

Other files

File Type Posted
Bid Walk Thru Attendees.pdf PDF
20532 Fellenzer Engineering VAMC Asbestos Sampling 7.22.20.pdf PDF
36C24221B0003 0004.docx DOCX document
36C24221B0003 0003.docx DOCX document
230923 rev Oct 2020 Siemens and JCI no POT.pdf PDF
36C24221B0003 0002.docx DOCX document
TRANE 2019 AHU Spec Sheets.pdf PDF
232500 HVAC Water Treatment.pdf PDF
RFI 36C24221B0003 Replace AHU 04 06 22 34 36 rev 2.docx DOCX document
100 Bid Document Specifications.pdf PDF
P07- NY202000026 9-25-2020 02.pdf PDF
36C24221B0003_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

C

U s e r s s r b

A p p

D a t a L o c a l T e m p A c P u b l i s h

G

I d w g

L a y o u t

G

I

D a t e

T h u

S e p

A

M

N a m e s r b

B

I

D

O

C

U

M

E

N

T

S

1-GI-001

TITLE SHEET

ROOF KEY PLAN

PHASE II

PHASE II

PHASE II PHASE I

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

H U

R

E P

L A

C E

M E

N T

G

I d a y o u t

G

I

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-GI-002

PHASING & ICRA PLAN

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of

1. Execute work by methods to minimize raising duct rrom construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.C l a s

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.C l a

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transportation in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

C l a s s

I V

C l a

I

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

4. Wet mop area with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

PATIENT RISK GROUP FOR "TYPE C" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

CLASS II

CLASS III

Class III / IV

Class III / IV

ICRA NOTES:

ROOF KEY PLAN

PHASING NOTES:

GENERAL NOTES ON RIGGING:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -1

A

.d

(L ay ou t:

S-

1A

D at e:

F ri, S ep

1,

- 3 :2

PM

am e:

J

O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-101A

SHAFT 1 8TH AND 9TH FLOOR

FRAMING, AHU-4 & EF-4 NEW

CONSTRUCTION PLANS

W6x20

W6x20

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -1

B

.d ou t:

S-

1B

D at e:

F ri, S ep

1,

- 3 :2 am e:

J

O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-101B

SHAFT 1 ROOF FRAMING

AHU-4 & EF-4 NEW

CONSTRUCTION PLANS

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -1

A

.d ou t:

S-

2A

D at e:

F ri, S ep

1,

- 3 :2 am e:

J

O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-102A

SHAFT 2 8TH AND 9TH FLOOR

FRAMING, AHU-6 & EF-6 NEW

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -1

B

.d ou t:

S-

2B

D at e:

F ri, S ep

1,

- 3 :2 am e:

J

O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-102B

SHAFT 2 ROOF FRAMING

AHU-6 & EF-6 NEW

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -1

.d ou t:

S-

D at e:

F ri, S ep

1,

- 3

:2 am e:

J O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-103

AUDITORIUM ROOF

FRAMING, AHU-22 & EF-22

NEW CONSTRUCTION PLANS

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -1

.d ou t:

S-

D at e:

F ri, S ep

1,

- 3

:2 am e:

J O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-104

3rd FLOOR ROOF FRAMING, AHU-34 & AHU-36 NEW

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -5

.d ou t:

S-

D at e:

F ri, S ep

1,

- 3

:2 am e:

J O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-500

STRUCTURAL DETAILS

ABBREVIATIONS LEGEND

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

Fi le

N am e:

F

:\S H

A R

E\

\1

\1

\D

W G

\S -5

.d ou t:

S-

D at e:

F ri, S ep

1,

- 3

:2 am e:

J O gl e)

/ 1

1 /

0%

BID DOCUMENTS

S-501

STRUCTURAL DETAILS

AND NOTES

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-001

HVAC SYMBOLS,

ABBREVIATIONS & NOTES

VALVE SYMBOLS

GENERAL NOTES:

ABBREVIATIONSDUCTWORK SYMBOLS

GENERAL SYMBOLS

PIPING SYMBOLS

HVAC LINE TYPES

HVAC DEMOLITION NOTES:

8" x 8" COLUMN TYP.

AHU - 3

CONCRETE FLOORMETAL GRATE FLOOR

AHU - 4

H C

F I L

T E

R S

A C

M

I D

H R

C

UH-10, TO BE

RELOCATED

U

H

HWS-3

HWH-101

EF-4

4" CHWS UP

4" CHWR UP

4" HWHR DN.

4" HWH DN.

2½" CHWR UP

2½" CHWS UP

2" MPR FROM

ABOVE

2" MPR

4" ERS

4"

4" ERR

4" LPS UP (N)

HWS - 3

1"

HWH

HWHR

4"

HWH-101

2-1/2" UP & DN

FD (E)

UP TO 9th

FLOOR

4" HWH & R (195GPM)

UP TO AHU-03 HEATING

COIL

CONCRETE

PAD

LPS

L P

R

4" LPS (1856 LBH)

EF-4

1"ø HWH ø

W H

P R

4" HWHR

2" CHWS

2"ø HWH

H W

H R

5"

6"

1"

H W

H R

H W

H

GR

HWH

HWH

HWHR

PRV-101

ERS

(DN TO LPR)

(DN THRU

FLOOR)

ERR

(DN THRU FLOOR.

CONNECT TO HWS-101)

6"

HCP-4

6"

(DN TO

HWS-03)

(DN TO HWH-101/ HWS-03)

UH-10, TO BE

RELOCATED

AHU - 3

METAL GRATE FLOOR CONCRETE FLOOR

AHU - 4

C X

C

H X

4" CHWS DN.

4" CHWR DN.

2½" CHWR DN.

2½" CHWS DN.

2" MPR DN.

HWHR

HWH

GLYCOL

CHWR

CHWS

LPS MPS

CHWR

CHWS

C H

W R

C H

W S

6"

5"

1"

6"

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

T

H A

F d a y o u t

M

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MD-101

HVAC SHAFT 1, AHU-4 & EF-4

DEMOLITION FLOOR PLANS

9th FLOOR DEMOLITION PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 1,

8th FLOOR DEMOLITION PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 1,

9th FLOOR DEMOLITION PLAN - PIPING

MECHANICAL ROOM SHAFT 1,

8th FLOOR DEMOLITION PLAN - PIPING

MECHANICAL ROOM SHAFT 1,

B924

SHAFT 2

x

36x50

50x30

38x38

(E) 18x18 DN

(N) 16"Ø UP TO

EF-78 ON ROOF

F S

D

F S

D

F S

D

24x16

UP TO

EF-30

UP TO

EF-42

20x20

DN

24x16

DN

24x12

DN

38x38

DN

50x36

DN

38x30

DN

24x12

BOD 100"

BOD 89.5"

BOD 135"

x

30x22

22x18 x

30x22

36x20

SLOPE DN

TO BOD ±93"

56x14

BOD 137"

BOD 113"

BOD 113"

BOD 137"

36x20

HHW EQUIP.

(HX-5,CX-5,C-5)

EF-7

AHU-5

x

BOD 127"

BOD 103"

S L O

CHWR

CHWS

AHU - 5

EF - 7

CX-5, C-5

HX-5

HWHR

HWH HWH

H W

H R

H W

H R

HWHR

HWH HWH

H W

H H

W H

HHW EQUIP.

(HX-5,CX-5,C-5)

AHU - 42

AHU - 7

AHU - 6

METAL GRATE FLOORINGCONCRETE FLOORING

METAL GRATE FLOORING

AHU - 42

AHU - 6

CONCRETE FLOORING

GRR

GR

GR

E R

S

E R

R

HWH

HWHR

MPS

AHU - 7

MPR

MPR

M P

R

HWHR

CHWR

HWH

CHWS

C H

W S

CHWR

HPS

P R

V

M P

S

E R

R

E R

S

MPR

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

H A d a y o u t

M

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MD-102

HVAC SHAFT 2, AHU-6 & EF-6

DEMOLITION FLOOR PLANS

9th FLOOR DEMOLITION PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 2,

8th FLOOR DEMOLITION PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 2,

9th FLOOR DEMOLITION PLAN - PIPING

MECHANICAL ROOM SHAFT 2,

8th FLOOR DEMOLITION PLAN - PIPING

MECHANICAL ROOM SHAFT 2,

EX.CD EX.CD EX.CD EX.CD EX.CD

X

C

D

EF - 22

AHU - 22

EF - 22

AHU - 22

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

U D

I T

O R

I U

M d a y o u t

M

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MD-103

HVAC AUDITORIUM,

AHU-22 & EF-22

DEMOLITION FLOOR PLANS

PENTHOUSE DEMOLITION PLAN - DUCTWORK

MECHANICAL ROOM AUDITORIUM

PENTHOUSE DEMOLITION PLAN - PIPING

MECHANICAL ROOM AUDITORIUM

AUDITORIUM STAGE DEMOLITION PLAN - DUCTWORK

AUDITORIUM STAGE DEMOLITION PLAN - PIPING

GENERAL NOTES:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

M

H

R

O O

F d a y o u t

M

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MD-104

HVAC 3rd FLOOR ROOF, AHU-34 & AHU-36

DEMOLITION PLAN

3rd FLOOR ROOF PLAN

GENERAL NOTE:

24x24 GOOSENECK

DISCHARGE

24x24 DN

PATCHED HOLE IN ROOF

EF-101

PATCHED HOLE IN ROOF

108x42 DN

EF-3 GOOSENECK

PATCH HOLE IN

ROOF AFTER NEW

EF-4 GOOSENECK

INSTALLATION

EF-77 DUCT

PENETRATION

PATCHED HOLE IN ROOF

EF-101

PATCHED HOLE IN ROOF

108x42 DN

EF-3 GOOSENECK

TEMPORARY AHU-4

EF-77 DUCT

PENETRATION

CHR CHR CHR

CHS CHS CHS

C H

R

C H

S

34"Ø

4"Ø

3"Ø

DOUBLE-WALLED

INSULATED DUCTWORK

UNISTRUT DUCT

SUPPORT (TYP.)

" PLYWOOD UNDERNEATH

UNISTRUT. CONTRACTOR

MUST KEEP LOADING ON THE

ROOF 40 LBS/FT.² OR BELOW.

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

R

O O

F d a y o u t

M

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MD-105

HVAC SHAFT 1, 9th FLOOR

ROOF DEMOLITION &

TEMPORARY PLANS

SHAFT 1 ROOF PLAN DEMOLITION

KEYED NOTES:

SHAFT 1 ROOF PLAN TEMPORARY

EF-6 GOOSENECK

TO BE REPLACED.

EF-30

EF-42

EF-78

EF-201

EF-21D

EF-21C

VERIZON

EQUIPMENT

16"Ø

C

A B

A

Y

T

O

V

E R

I Z

Q U

I P

M E

N T

EF-06T

EF-6

EF-30

EF-42

EF-78

EF-201

EF-21D

EF-21C

VERIZON

EQUIPMENT

16"Ø

C

A B

A

Y

T

O

V

E R

I Z

U

I P

M E

N T

EF-06T

TEMPORARY AHU - 6

208V TO 460V TRANSFORMER

CHWR

CHWS

EF-06T

EF-6

HWH

HWHR

HWH

HWHR

UNISTRUT DUCT

SUPPORT (TYP.)

" PLYWOOD UNDERNEATH

UNISTRUT. CONTRACTOR

MUST KEEP LOADING ON THE

ROOF 40 LBS/FT.² OR BELOW.

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

R

O O

F

M

H

R

O O

F d a y o u t

M

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MD-106

HVAC SHAFT 2, 9th FLOOR

ROOF DEMOLITION &

TEMPORARY PLANS

SHAFT 2 ROOF PLAN DEMOLITION

SHAFT 2 ROOF PLAN TEMPORARY

KEYED NOTES:

8" x 8" COLUMN TYP.

CONCRETE FLOORMETAL GRATE FLOOR

U

H

HWS-3

HWH-101

EF - 4

4" CHWS UP

4" CHWR UP

4" HWHR DN.

4" HWH DN.

2½" CHWR UP

2½" CHWS UP

2" MPR FROM

ABOVE

2" MPR

4" LPS UP (N)

HWS - 3

1"

HWH

HWHR

4"

HWH-101

2-1/2" UP & DN

FD (E)

UP TO 9th

FLOOR

4" HWH & R (195GPM)

UP TO AHU-03 HEATING

COIL

CONCRETE

PAD

LPS

L P

R

4" LPS (1856 LBH)

1"ø HWH

W H

R

4" HWHR

2" CHWS

2"ø HWH

EF - 4

5"

6"

PRV-101

(DN TO LPR)

(DN THRU FLOOR.

CONNECT TO HWS-101)

6"

6"

(DN TO

HWS-03)

(DN TO HWH-101/ HWS-03)

AHU - 3

METAL GRATE FLOOR CONCRETE FLOOR

4" CHWS DN.

4" CHWR DN.

2½" CHWR DN.

2½" CHWS DN.

2" MPR DN.

HWHR

HWH

GLYCOL

CHWR

CHWS

LPS MPS

CHWR

CHWS

C H

W R

C H

W S

6"

5"

1"

6"

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

H A d a y o u t

M

H a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-101T

HVAC SHAFT 1, AHU-4 & EF-4

TEMPORARY FLOOR PLANS

9th FLOOR TEMPORARY PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 1,

8th FLOOR TEMPORARY PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 1,

9th FLOOR TEMPORARY PLAN - PIPING

MECHANICAL ROOM SHAFT 1,

8th FLOOR TEMPORARY PLAN - PIPING

MECHANICAL ROOM SHAFT 1,

B924

SHAFT 2

x

36x50

50x30

38x38

(E) 18x18 DN

(N) 16"Ø UP TO

EF-78 ON ROOF

F S

D

F S

D

F S

D

24x16

UP TO

EF-30

UP TO

EF-42

20x20

DN

24x16

DN

24x12

DN

38x38

DN

50x36

DN

38x30

DN

24x12

BOD 100"

BOD 89.5"

BOD 135"

x

30x22

22x18 x

30x22

36x20

SLOPE DN

TO BOD ±93"

56x14

BOD 137"

BOD 113"

BOD 113"

BOD 137"

36x20

EF-7

AHU-5

x

BOD 127"

BOD 103"

S L O

CHWR

CHWS

AHU - 5

EF - 7

AHU - 42

AHU - 7

METAL GRATE FLOORINGCONCRETE FLOORING

METAL GRATE FLOORING

AHU - 42

CONCRETE FLOORING

MPS

AHU - 7

HWH

CHWS

C H

W S

CHWR

HPS

E R

R

E R

S

MPR

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

H A d a y o u t

M

H a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-102T

HVAC SHAFT 2, AHU-6 & EF-6

TEMPORARY FLOOR PLANS

9th FLOOR TEMPORARY PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 2,

8th FLOOR TEMPORARY PLAN - DUCTWORK

MECHANICAL ROOM SHAFT 2,

9th FLOOR TEMPORARY PLAN - PIPING

MECHANICAL ROOM SHAFT 2,

8th FLOOR TEMPORARY PLAN - PIPING

EX.CD EX.CD EX.CD EX.CD EX.CD

X

C

D

TEMPORARY

AHU - 22

CHWS

C H

W S

CHWR

C H

W R

CHWR CHWR CHWR

CHWS CHWS CHWS

C H

W S

C H

W R

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

U D

I T

O R

I U

M d a y o u t

M

H a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-103T

HVAC AUDITORIUM,

AHU-22 & EF-22

TEMPORARY FLOOR PLANS

PENTHOUSE TEMPORARY PLAN - DUCTWORK

MECHANICAL ROOM AUDITORIUM

PENTHOUSE TEMPORARY PLAN - PIPING

MECHANICAL ROOM AUDITORIUM

AUDITORIUM STAGE TEMPORARY PLAN - DUCTWORK

AUDITORIUM STAGE TEMPORARY PLAN - PIPING

NOTES:

C202F

INGREDIENT STORAGE

C263

FACULTY CIO

C261A

NUTRITION SEC

C261

DIETARY

SF

C265

CONFERENCE

C202G

COOLER

C202A

OFFICE

C265B

STAFF AREA

B202

KITCHEN

C202E

SALAD PREP

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

M

H

R

O O

F d a y o u t

M

H a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-104T

HVAC 3rd FLOOR ROOF, AHU-34 & AHU-36

TEMPORARY PLANS

3rd FLOOR ROOF TEMPORARY PLAN

GENERAL NOTE:

2nd FLOOR TEMPORARY PLAN

HRP-4

CONTROLLER

HWP101A VFD

HWP101B VFD

48"x8"

40"x10"40"x36"

"x

40"x34"

56"x56"

TRANSITION

TO 40"x18" IN

8TH FLOOR

HWS-4

HWS-3

HWH-101

UH-11

H/S P

30"x30"

AHU-4

48"x24"

44"x36"

H/S P

UH-10

8"x8" COLUMN TYP.

AHU-3

CONTROL PANEL

12" STEP UP TO

METAL GRATE FLOOR

SF-03 VFD

EF-03 VFD

EXISTING LOUVER TO

REMAIN. NEW DAMPER &

MOTORIZED ACTUATOR.

SPRING-LOADED PRESSURE

RELIEF DAMPER ON

RETURN DUCT BEFORE EF.

40x18 RETURN UP FROM 8TH

FLOOR INTO EF ON TOP OF

AHU-4, CO2 TRANSMITTER

INSIDE RETURN DUCT.

PANEL FEU 9/3

CONTROL PANEL FOR AHU-4

& HWH-101 "E9C AC CIR-1"

PANEL EF-22 "SPC-A"

TRANSIENT VOLTAGE

SUPPRESSION SYSTEM

PANEL "E9A AC CIR-1"

CONTROL PANEL

"E9A AC #24 NAE-1"

(UNDERNEATH DUCT)

SPRING-LOADED

PRESSURE

RELIEF DAMPER.

480/277V

POWER PANEL

E9A-HVI

120/208V

POWER PANEL

E9A-AC

208V POWER

PANEL 9A-AC

JOHNSON

CONTROL PANEL

AHU-4 VFD

CONTROL PANELS &

DISCONNECT

SWITCHES (CHP101)

DS

AT

DS

SD

SD

40"x18"

54"x36"

4" CHWS UP

4" CHWR UP

4" HWHR DN.

4" HWH DN.

2½" CHWR UP

2½" CHWS UP

2" LPR FROM

ABOVE

2" MPR

1"ø FS

1"ø FS

4" ø

H W

H

1"ø HWH

1"ø FS

UNDER DUCT

CAP

2" ø

LP

R

2" ø

FS

2 1/2"ø FS

1"ø FS

HWS-4

3/ 4" ø

PG

S

3"ø GR

3"ø GRR

5"ø LPS

3/4"⌀ GLYCOL MAKE-UP

FROM TANK ON HWS-3

1 1/2"ø LPR

STEAM TRAP

3"ø HWHR 3"ø HWH

UP TO 9TH

FLOOR

CONCRETE PAD

4" CHWS DN.

4" CHWR DN.

2½" CHWR DN.

2½" CHWS DN.

2" LPR DN.

5"ø LPS 3" ø

G R3" ø G

R R

3" ø

H W

H 3" ø H

W H

R

AHU-4

1"ø LPR

STEAM TRAP

FD

2"ø CD

2-1/2" LPS DOWN

TO HUMIDIFIER

5" ø

LP

S

1"ø HWHR 1"ø HWH

AHU-3

(DN TO HWH-101/HWS-03)

(DN TO

HWS-03)

(DN TO LPR)

(DN THROUGH

FLOOR. CONNECT

TO HWS-101)

5" ø

C H

W R

5" ø

C H

W S

6"ø CHWS

6"ø CHWR

5"ø LPS

6"ø HWHR 6"ø HWH

UH-10

6"ø LPS

6"ø LPS

4"ø CHWS

4"ø CHWR

1" GLYCOL

2 1/2"ø ERS 2 1/2"ø ERR

HRP-4

ENGINEERING LLP

0%

BID DOCUMENTS

9 /

/2 www.fellp.com

UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN

BEARING A LICENSED PROFESSIONAL ENGINEER'S

SEAL IS A VIOLATION OF STATE EDUCATION LAW.

FE PROJECT #: 19-075

VAMC, S

YRACUSE

VA

Ve te ra ns A ffa irs

D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot

VA FORM 08-6231, OCT 1978

Revisions

Date

1 2 3 4

VAMC, SYRACUSE, NY

5 6 7

Approved:

Drawing Title

Approved:

Project Title

Location

Building Number

8 9

Drawing No.

Project No.

Date

DrawnChecked

F

E

D

C

B

A th re e in ch es o ne fo ot

A

6"

1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot

F

E on e ha lf in ch o ne fo ot

D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6"

C

6"

B

6"

528A7-18-720

STAMP:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

Dwg. of 60

VA SYRACUSE AHU-4,6,22,34&36

REPLACEMENT

JD/SRBEDF

9/

/2

9:

:0

AM

1-MH-101

09-11-20HVAC SHAFT 1, AHU-4 & EF-4

NEW CONSTRUCTION FLOOR

PLANS

1/4" = 1'-0"1 MECHANICAL ROOM SHAFT 1, 8th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK 1/4" = 1'-0"2 MECHANICAL ROOM SHAFT 1, 9th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK

1/4" = 1'-0"3 MECHANICAL ROOM SHAFT 1, 8th FLOOR NEW CONSTRUCTION PLAN - PIPING 1/4" = 1'-0"4 MECHANICAL ROOM SHAFT 1, 9th FLOOR NEW CONSTRUCTION PLAN - PIPING

KEYED NOTE:

GENERAL NOTE:

1. BUILD AHU-4 8" HIGH MINIMUM

AFF USING NEW STEEL

FRAMING TO ALLOW FOR

SECTION DRAIN PIPING AND

WATER FLOW UNDER THE UNIT.

PIPE ALL AHU SECTION DRAINS

AND CONDENSATE PIPES TO

FLOOR DRAIN UNDERNEATH AHU-4.

AHU-6

24"x20"

40"x14"

40"x36"

JOHNSON CONTROL

PANEL "NCE-14"

CONTROL PANELS

FOR AHU-7 & AHU-42,

HW/CHWS-201

O/A FOR AHU-42

(HIGH) & AHU-7 (LOW)

POWER PANEL "E8B-AC"

POWER PANEL "8B-AC"

POWER PANEL "8B-AC"

HWP201A VFD

HCP-07 DISCONNECT SWITCH

HWP201B VFD

HCP-06 DISCONNECT SWITCH

NEW 480V PP

CHP201A VFD

CHP201B VFD

AHU-42

AHU-7

SPRING-LOADED

PRESSURE

RELIEF DAMPER

AHU-6 RETURN

UP TO EF-6 ON

9TH FLOOR

SPRING-LOADED

PRESSURE

RELIEF DAMPER

O/A FOR AHU-6

EXISTING LOUVER TO

REMAIN. NEW DAMPER &

MOTORIZED ACTUATOR

"x

DS

DS

DS

SD

RELOCATED AHU-7

DISCONNECT SWITCH

RELOCATED

AHU-7 VFD

CONTROL PANEL

1-MH-601

1-MH-601

1-MH-601

1-MH-601

1-MH-601

1-MH-601

NEW SF-6 VFD

22"x22"

22"x22" SUPPLY DUCT TOP

CONNECTION TO BE MADE

IN THE FUTURE.

22"x22" SUPPLY DUCT

BOTTOM CONNECTION TO

BE MADE IN THE FUTURE.

AHU-63"

ø

ER

R

3" ø

ER

S 1"ø MPR

5"ø CHWS 5"ø CHWR

4" ø

G R

R 4" ø G

R

MP CLEAN STEAM UP

AHU-42

AHU-7

1 1/2"ø ERR1 1/2"ø ERS

8"ø HPS

1"ø MPR

5"ø CHWR

5"ø CHWS

4"ø HWH4"ø HWH

6"ø MPS

FLOOR DRAIN UNDER AHU

1-MH-601

1-MH-601

1-MH-601

1-MH-601

1-MH-601

1-MH-601

UP TO 9TH. FLOOR GR & GRR DFA

3"ø MPS 1 1/2"ø ERR

1 1/2"ø ERS

3" ø

M

PR

1/

2" ø

ER

S

1/

2" ø

ER

R

8"ø MPS

3"ø MPR

1"ø CD

BALL VALVE

DRAIN DFA

50"x36"

EF-6

NEW EF-6 EXHAUST

FAN CONTROLLER

SPRING LOADED PRESSURE

RELIEF DAMPER LOCATED ON

MAIN RERURN DUCT BEFORE EF.

1-MH-601

1-MH-601

DS

AT

SD

CO2 NEW AHU-5/6 HEAT SKID

CARBON DIOXIDE

TRANSMITTER IN

RETURN DUCT

EXHAUST

PLENUM INTO

FACE OF EF-6

30"x60" DROP

30"x22" 22"x18"

22"x18"

30"x22"

EF-7

AHU-5

(E) 18"x18" DN

(N) 16"⌀ UP TO

EF-78 ON ROOF

24"x16"

24"x12"

20"x20" DN

UP TO

EF-30

UP TO

EF-42

24"x16" DN

24"x12" DN

38"x38" DN

50"x36" DN

38"x38"

36"x50"

50"x30"

36"x20"

36"x20"

20"x20"

50"x30" 56"x14"

BOD 137"

BOD 113"

BOD 137"

BOD 113"

BOD 103"

BOD 127"

BOD 89.5"

38"x30" DNBOD 100"

PREHEAT COIL

CONTROL PANEL "B904"

JOHNSON CONTROL

PANEL "NAE-2"

SLOP DN

TO BOD ±93"

SL

O

P D

N x3

FSD

FSD

FSD

RELOCATED

EF-78 VFD

3"ø ERR 3"ø ERS

4" ø

G R

R

4" ø

G R

3"ø GR 3"ø GRR

GR+GRR DN TO AHU-6 HEATING COIL

GR+GRR DN TO

AHU-5 HEATING COIL

STEAM

TRAP

2" MPR DN INTO EXISTING

MPR IN CEILING BELOW

NEW ENERGY

RECOVERY

PUMP HRP-6

NEW EF-6

EXHAUST FAN

CONTROLLER

NEW AHU-5/6 HEAT SKID

EF-6

AHU-5

EF-7

AHU-5 ERV

CONTROL PANEL

ENERGY RECOVERY SUPPLY

AND RETURN DROP DOWN TO

AHU-6 TO RECOVERY COILS

EF-5 CONTROL

PANEL

EF-21D

DISCONNECT

SWITCH

EF-21C

DISCONNECT

SWITCH

EF-42 VFD

AHU-5 SF

CONTROL PANEL

1-MH-601

1-MH-601

DISCONNECT

SWITCHES FOR

HRP-43, SF-43,

EF-43, & HCP-43

JOHNSON CONTROL

VFD'S

HRP-7

DISCONNECT

EF-7

DISCONNECT

EF-201

DISCONNECT

EF-6 VFD

HRP-6

DISCONNECT

SWITCH

4"ø CHWS

4"ø CHWR

6" ø

M

PS

4"ø HWH 4"ø HWHR

CAP PIPING FURTHER

BACK TO MAKE ROOM FOR

NEW EXHAUST DUCTWORK

CONDENSATE AND

DRAIN SECTIONS

DFA. TRAP DRAIN IN

8TH FLOOR CIELING.

ENGINEERING LLP

/2 www.fellp.com

UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN

BEARING A LICENSED PROFESSIONAL ENGINEER'S

SEAL IS A VIOLATION OF STATE EDUCATION LAW.

FE PROJECT #: 19-075

VAMC, S

YRACUSE

VA

Ve te ra ns A ffa irs

D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot

VA FORM 08-6231, OCT 1978

Revisions

Date

1 2 3 4

VAMC, SYRACUSE, NY

5 6 7

Approved:

Drawing Title

Approved:

Project Title

Location

Building Number

8 9

Drawing No.

Project No.

Date

DrawnChecked

F

E

D

C

B

A th re e in ch es o ne fo ot

A

6"

1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot

F

E on e ha lf in ch o ne fo ot

D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6"

C

6"

B

6"

528A7-18-720

STAMP:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

Dwg. of 60

VA SYRACUSE AHU-4,6,22,34&36

REPLACEMENT

JD/SRBEDF

9/

/2

:2 6:

A

M

1-MH-102

09-11-20HVAC SHAFT 2, AHU-6 & EF-6

NEW CONSTRUCTION FLOOR

PLANS

1/4" = 1'-0"1 MECHANICAL ROOM SHAFT 2, 8th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK

1/4" = 1'-0"3 MECHANICAL ROOM SHAFT 2, 8th FLOOR NEW CONSTRUCTION PLAN - PIPING

1/4" = 1'-0"2 MECHANICAL ROOM SHAFT 2, 9th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK

1/4" = 1'-0"4 MECHANICAL ROOM SHAFT 2, 9th FLOOR NEW CONSTRUCTION PLAN - PIPING

KEYED NOTE:

GENERAL NOTE:

1. BUILD AHU-6 8" HIGH AFF USING

NEW STEEL FRAMING TO

ALLOW FOR SECTION DRAIN

PIPING AND WATER FLOW

UNDER THE UNIT.

PIPE ALL AHU SECTION DRAINS

AND CONDENSATE PIPES TO

FLOOR DRAIN UNDERNEATH AHU-6.

22"x22" TO BE INSTALLED AS

SHOWN BUT FINAL CONNECTIONS

INTO MAIN SUPPLY DUCTWORK

ARE NOT TO BE MADE.

40"x20"

AHU-22

HWS-22

EA

VFD FOR EF-22

CUTOUT IN CONCRETE

VFD FOR SF-22

AT

DS

CO2

CARBON DIOXIDE TRANSMITTER

IN MAIN RETURN DUCT

SMOKE DAMPER LOCATED

IN EXHAUST DUCT

SPRING-LOADED PRESSURE

RELIEF DAMPEREF-22

HRP-22 CONTROLLER

FD

EXISTING PANEL

14" HIGH STEP. PENTHOUSE

FLOOR AND ROOF FLOOR ARE

AT THE SAME ELEVATIONS.

MECHANICAL ROOM

VENTILATION AIR INTAKE

PANEL

PP-22

PANEL

2CD

HWH-901

CONTROLLERS

T

EF-901 LOCATED ON

ROOF TO REMAIN

JOHNSON CONTROL PANELS

UNIT

HEATER

EXISTING

ROOF

HATCH

DS

SPRING-LOADED PRESSURE

RELIEF DAMPER LOCATED

ON MAIN SUPPLY DUCT

BEFORE ANY TAKE-OFFS.

PRE-FAB HEAVY GAUGE

GALVANIZED STEEL ROOF

CURB SIZED TO SUPPORT

EF-22 WHERE IT OVERHANG

THE EXISTING CURB.

CONTRACTOR TO VIF SIZE

OF CURB NEEDED.

3"ø CHWR 3"ø CHWS

2"ø MPS

AHU-22

HWS-22

3"ø HWH

3"ø HWHR

3"ø GR 3"ø GRR

FD

STEAM TRAP

TAP INTO EXISTING

CONDENSATE LINE

TAP INTO EXISTING

CONDENSATE LINE

1 1/4"ø MPR

STEAM TRAP 1"ø MPR

EF-22

PARAPET WALL VFD FOR EF-22

VFD FOR SF-22

HRP-22 CONTROLLER

EXISTING PANELPANEL

PP-22

PANEL

2CD

JOHNSON CONTROL PANELS RPZ2 1/2"ø HPS

3/4"ø D. CW

PRV-901

UNIT

HEATER

2" MPS DN TO

HUMIDIFIER

HOSPITAL

WALL

GLYCOL REC SUPPLY &

RETURN DROPS

T

EXISTING

ROOF

HATCH

3"ø MPS

RELOCATE MPS & CW PIPING

HIGHER TO PROVIDE PROPER

CLEARANCES FOR PANELS

1 1/2"ø MPS 3/4"ø D. CW

3"ø ERS &

ERR UP

3"ø ERR 3"ø ERS

3"ø HPR

5"ø HPS6"ø CHWS

6"ø CHWR

GLYCOL REC SUPPLY &

RETURN PIPED UNDER THE

ROOF TO RISE UP INTO THE

MECH. ROOM.

UP TO

AHU-22

UP TO

EF-22

50"x14"

8"x6"

30"x12"

18"x10"

40"x20"

50"x10"

40x20 UP

TO EF-22

24x24 RETURN

AIR GRILLES TYP.

ENGINEERING LLP

/2 www.fellp.com

UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN

BEARING A LICENSED PROFESSIONAL ENGINEER'S

SEAL IS A VIOLATION OF STATE EDUCATION LAW.

FE PROJECT #: 19-075

VAMC, S

YRACUSE

VA

Ve te ra ns A ffa irs

D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot

VA FORM 08-6231, OCT 1978

Revisions

Date

1 2 3 4

VAMC, SYRACUSE, NY

5 6 7

Approved:

Drawing Title

Approved:

Project Title

Location

Building Number

8 9

Drawing No.

Project No.

Date

DrawnChecked

F

E

D

C

B

A th re e in ch es o ne fo ot

A

6"

1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot

F

E on e ha lf in ch o ne fo ot

D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6"

C

6"

B

6"

528A7-18-720

STAMP:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

Dwg. of 60

VA SYRACUSE AHU-4,6,22,34&36

REPLACEMENT

JD/SRBEDF

9/

/2

:2 6:

A

M

1-MH-103

09-11-20HVAC AUDITORIUM, AHU-22 &

EF-22 NEW CONSTRUCTION

FLOOR PLANS

1/4" = 1'-0"2 MECHANICAL ROOM AUDITORIUM, NEW CONSTRUCTION PLAN - DUCTWORK

1/4" = 1'-0"4 MECHANICAL ROOM AUDITORIUM, NEW CONSTRUCTION PLAN - PIPING

1/4" = 1'-0"3 AUDITORIUM STAGE, NEW CONSTRUCTION PLAN - PIPING

1/4" = 1'-0"1 AUDITORIUM STAGE, NEW CONSTRUCTION PLAN - DUCTWORK

KEYED NOTES:

GENERAL NOTE:

1. BUILD AHU-22 3.5" HIGH MINIMUM AFF

USING SHIMS/EXISTING AHU-22 STEEL

FRAMING MOUNT TO ALLOW FOR

SECTION DRAIN PIPING AND WATER

FLOW UNDER THE UNIT.

2. MAXIMUM OF 40 LBS/FT² OF

EQUIPMENT/MATERIALS ON THE ROOF.

THIS INCLUDES DURING DEMOLITION,

STAGING/RIGGING AND INSTALLATION

OF EQUIPMENT. NEW OR TEMPORARY

EQUIPMENT THAT ARRIVES ON SITE IN

PIECES MUST BE 40 LBS/FT² OR LESS

BEFORE BEING PLACED ON THE ROOF.

ROOF MUST BE PROTECTED IN HIGH

TRAFFIC AREAS AND LOCATIONS

WHERE EQUIPMENT/MATERIALS ARE

PLACED WITH 2 LAYERS OF 3/4"

PLYWOOD. PROPERLY WEIGH DOWN

PLYWOOD TO KEEP FROM MOVING OR

BEING BLOWN AWAY.

PIPE ALL SECTION DRAINS AND

CONDENSATE PIPES TO FLOOR DRAIN

IN PENTHOUSE MECH. ROOM.

PIPE EF CONDENSATE AND SECTION

DRAINS TO OUTSIDE OF UNIT ON ROOF.

REMOVE & REPLACE ALL INSULATION

ON HWH-901.

C202F

INGREDIENT STORAGE

C263

FACULTY CIO

C261A

NUTRITION SEC

C261

DIETARY

SF

C265

CONFERENCE

C202G

COOLER

C202A

OFFICE

C265B

STAFF AREA

B202

KITCHEN

" CA UP

6" HPS UP

6" CHWS UP

6" CHWR UP

" COND. DRAIN

4" HWH & HWHR

ABOVE CEILING

4"CMU

CORE THROUGH MASONARY

WALL

C202E

SALAD PREP

2" LPR UP

3" CHWR UP

3" CHWS UP

2" HPS UP

" HWHR UP

" HWH UP

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

M

H

R

O O

F d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-104

HVAC 3rd FLOOR ROOF, AHU-34 & AHU-36 NEW

CONSTRUCTION PLANS

3rd FLOOR ROOF NEW CONSTRUCTION PLAN

2ND FLOOR PIPING PLAN

NOTE:

NOTE:

PATCHED HOLE IN ROOF

EF-101

108x42 DN

EF-3 GOOSENECK

EF-77 DUCT

PENETRATION

NEW EF-4

GOOSENECK TO BE

SEISMICALLY

BRACED PER

DETAIL 7/1-MH-504.

PATCH HOLE FROM

TEMPORARY HOT &

CHILLED WATER PIPE

PENETRATIONS IN ROOF.

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

M

H

R

O O

F d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-105

HVAC SHAFT 1, 9th FLOOR

ROOF NEW CONSTRUCTION

PLAN

SHAFT 1 ROOF NEW CONSTRUCTION PLAN

EF-30

EF-42

EF-78

EF-201

EF-21D

EF-21C

VERIZON

EQUIPMENT

16"Ø

C

A B

A

Y

T

O

V

E R

I Z

U

I P

M E

N T

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

D

R

O O

F

M

H

R

O O

F d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-106

HVAC SHAFT 2, 9th FLOOR

ROOF NEW CONSTRUCTION

PLAN

SHAFT 2 ROOF NEW CONSTRUCTION PLAN

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-401

HVAC CONTROLS DIAGRAM

AND POINTS LIST

AHU-4 CONTROL SYSTEM SCHEMATIC

AHU-6 CONTROL SYSTEM SCHEMATIC

AHU-22 CONTROL SYSTEM SCHEMATIC

AHU-34/36 CONTROL SYSTEM SCHEMATIC

CARBON DIOXIDE TRANSMITTER

AIR FLOW MEASURING STATION EBTRON FAN ARRAY

MEASURING DEVICE. PROVIDE & INSTALLED BY AHU

VENDOR. CONTROL WIRING BY CONTROLS CONTRACTOR.

CONTACT SWITCH

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-402

HVAC SEQUENCE OF

OPERATIONS

SEQUENCE OF OPERATIONS: SEQUENCE OF OPERATIONS: ABBREVIATIONS:ABBREVIATIONS:

93"

[7'-9"]

126"

[10'-6"]

366"

[30'-6"]

366"

[30'-6"]

94"

[7'-10"]

103"

[8'-7"]

173"

[14'-5"]

173"

[14'-5"]

66"

[5'-6"]

66"

[5'-6"]

281 5/8"

[23'-5

281 5/8"

[23'-5

121 3/4"

[10'-1

247 1/8"

[20'-7

61 1/8"

[5'-1

58 5/8"

[4'-10

144"

[12']

66"

[5'-6"]

67"

[5'-7"]

201"

[16'-9"]

201"

[16'-9"]

99"

[8'-3"]

32"

[2'-8"]

U

N

A

T

E

R

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T u e

S a m e s r b

B

C

U

M

E

N

T

1-MH-501

HVAC DETAILS

CUSTOM UNIT AHU-4 & EF-4

CUSTOM UNIT AHU-6

CUSTOM UNIT EF-6

CUSTOM UNIT AHU-22

CUSTOM UNIT EF-22

CUSTOM UNIT AHU-34 & AHU-36

NOTES:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-502

HVAC SCHEDULES

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-503

HVAC SCHEDULES

AIR HANDLING

UNIT

ITEM

MINIMUM

OUTSIDE AIR

TWO BEDS OF

FILTERS VAV

MINIMUM

OUTSIDE AIR

THREE BEDS OF

FILTERS CV

100%

OUTSIDE AIR

TWO BEDS

OF FILTERS

CV

100% OUTSIDE

AIR THREE

BEDS OF

FILTERS CV

* MIXING BOX 1 YES YES NO NO

* BLENDER SECTION 2 YES YES NO NO

PRE-FILTERS (SIDE

ACCESS)

3 YES YES YES YES

INSPECTION

SECTION, SMALL

4 YES YES YES YES

AFTER FILTER

(SIDE ACCESS)

5 YES YES YES YES

ACCESS SECTION,

MED-LARGE

6 YES YES YES YES

HEAT RECOVERY

COIL

7 NO NO YES YES

ACCESS SECTION,

MED-LARGE

8 NO NO YES YES

* PRE-HEAT COIL 9 YES YES YES YES

INSPECTION

SECTION,SMALL

10 YES YES YES YES

HUMIDIFIER 11 YES YES YES YES

COOLING COIL 12 YES YES YES YES

FAN 13 YES YES YES YES

* DIFFUSER PLATE 14 NO NO NO YES

ACCESS

SECTION,MED-LAR

GE

15 NO NO YES YES

* HEPA FILTER 16 NO NO NO YES

DISCHARGE

PLENUM

(VERTICAL)

17 YES YES YES YES

* AS REQUIRED

KEYED NOTE:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

M o n

S a m e a h

B

C

U

M

E

N

T

1-MH-504

HVAC DETAILS

V

G

R

R

G

R

CURB DETAIL

8TH LEVEL FLOOR PLAN

0' - 0"

9th Level Floor Plan 12' - 6"

3" ø

ER

S

4" ø

G R

NEW AHU-6

AHU-42

3"ø MPS

22"x22"

1 1/2"ø ERS

1 1/2"ø ERR

(BEHIND)

OUTDOOR

AIR INTAKE

4"ø CHWR 4"ø HWHR

4"ø CHWR

4"ø HWHR

EXISTING

AHU-6

RELOCATE CHWR & HWHR PIPES

APPROXIMATELY 10" UP

TOWARDS THE CEILING.

NEW AHU-6

4"ø CHWR

4"ø HWHR

4"ø CHWR

4"ø HWHR

1'

1"

9'

3/

4"ø GR 4"ø GRR

4"ø CHWR

1"ø MPR

2"ø HWHR

3"ø MPR

5"ø CHWR

5"ø CHWS

4"ø HWH

5"ø HWHR

3"ø MPC

ENGINEERING LLP

/2 www.fellp.com

UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN

BEARING A LICENSED PROFESSIONAL ENGINEER'S

SEAL IS A VIOLATION OF STATE EDUCATION LAW.

FE PROJECT #: 19-075

VAMC, S

YRACUSE

VA

Ve te ra ns A ffa irs

D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot

VA FORM 08-6231, OCT 1978

Revisions

Date

1 2 3 4

VAMC, SYRACUSE, NY

5 6 7

Approved:

Drawing Title

Approved:

Project Title

Location

Building Number

8 9

Drawing No.

Project No.

Date

DrawnChecked

F

E

D

C

B

A th re e in ch es o ne fo ot

A

6"

1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot

F

E on e ha lf in ch o ne fo ot

D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6"

C

6"

B

6"

528A7-18-720

STAMP:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

Dwg. of 60

VA SYRACUSE AHU-4,6,22,34&36

REPLACEMENT

JD/SRBEDF

9/

/2

:2 6:

A

M

1-MH-601

09-11-20SHAFT 2, 8th FLOOR

MECHANICAL ROOM SECTION

VIEWS

3/4" = 1'-0"3 SHAFT 2, 8TH FLOOR FUTURE DUCTWORK FREE SPACE

3/4" = 1'-0"1 SHAFT 2, 8TH FLOOR DEMO PIPE RELOCATION

3/4" = 1'-0"2 SHAFT 2, 8TH FLOOR NEW PIPE RELOCATION

AHU-42

AHU-6

22"x22"

5"ø CHWS5"ø CHWR

8"ø MPS

3"ø MPC

1 1/2"ø ERR 1 1/2"ø ERS

1"ø MPR

4"ø CHWR

3"ø HPS

22"x22"

40"x36"

8"ø MPS

8"ø HPS

5"ø CHWS

5"ø CHWR

4"ø HWHR

4"ø CHWR

1 1/2"ø ERS

1 1/2"ø ERR

3"ø HPS

ENGINEERING LLP

/2 www.fellp.com

UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN

BEARING A LICENSED PROFESSIONAL ENGINEER'S

SEAL IS A VIOLATION OF STATE EDUCATION LAW.

FE PROJECT #: 19-075

VAMC, S

YRACUSE

VA

Ve te ra ns A ffa irs

D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot

VA FORM 08-6231, OCT 1978

Revisions

Date

1 2 3 4

VAMC, SYRACUSE, NY

5 6 7

Approved:

Drawing Title

Approved:

Project Title

Location

Building Number

8 9

Drawing No.

Project No.

Date

DrawnChecked

F

E

D

C

B

A th re e in ch es o ne fo ot

A

6"

1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot

F

E on e ha lf in ch o ne fo ot

D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot

6"

C

6"

B

6"

528A7-18-720

STAMP:

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

Dwg. of 60

VA SYRACUSE AHU-4,6,22,34&36

REPLACEMENT

JD/SRBEDF

9/

/2

:2 6:

A

M

1-MH-602

09-11-20SHAFT 2, 8th FLOOR

MECHANICAL ROOM 3D VIEWS

1 SHAFT 2, 8th FLOOR MECHANICAL ROOM 3D VIEW-1 2 SHAFT 2, 8th FLOOR MECHANICAL ROOM 3D VIEW-2

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

M

H d a y o u t

M

H

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-MH-801

HVAC SCHEDULES

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E d a y o u t

E

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-E-001

HVAC SYMBOLS,

ABBREVIATIONS & NOTES

COMMUNICATION SYMBOLS

GENERAL SYMBOLS

ELECTRICAL DEMOLITION NOTES:

POWER SYMBOLS

ELECTRICAL LINE TYPES

ABBREVIATIONS

AHU - 4

U

H

HWS-3

HWH-101

EF-4

EXISTING POWER PANEL - (E9A-HV1)

EXISTING POWER PANEL - (E9A-AC)

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

S

H A d a y o u t

E

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-ED-101

ELECTRICAL SHAFT 1,

AHU-4 & EF-4

DEMOLITION PLANS

9th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 1,

8th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 1,

PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM

HHW EQUIP.

(HX-5,CX-5,C-5)

AHU - 42

AHU - 7

AHU - 6

EXISTING POWER PANEL - (E8B-AC)

EXISTING POWER PANEL - (8B-AC) (SECTION 1) EXISTING POWER PANEL - (8B-AC) (SECTION 2)

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

S

H A d a y o u t

E

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-ED-102

ELECTRICAL SHAFT 2,

AHU-6 & EF-6 DEMOLITION

FLOOR PLANS

9th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 2,

8th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 2,

PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM

EF - 22

AHU - 22

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

A

U D

I T

O R

I U

M d a y o u t

E

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-ED-103

ELECTRICAL AUDITORIUM,

AHU-22 & EF-22

DEMOLITION FLOOR PLANS

PENTHOUSE DEMOLITION/TEMPORARY PLAN

MECHANICAL ROOM AUDITORIUM

PARTIAL DEMOLITION ELECTRICAL ONE-LINE DIAGRAM

EXISTING POWER PANEL - (CE)

PARTIAL TEMPORARY ELECTRICAL ONE-LINE DIAGRAM

PARTIAL DEMOLITION ELECTRICAL ONE-LINE DIAGRAM

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

R

O O

F d a y o u t

E

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-ED-104

ELECTRICAL 3rd FLOOR

ROOF, AHU-34 & AHU-36

DEMOLITION PLAN

3rd FLOOR ROOF PLAN

PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM

PARTIAL TEMPORARY ELECTRICAL ONE-LINE DIAGRAM

3rd FLOOR ROOF TEMPORARY PLAN

TEMPORARY AHU-4

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

R

O O

F d a y o u t

E

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-ED-105

ELECTRICAL SHAFT 1,

9th FL. ROOF DEMOLITION

& TEMPORARY PLAN

SHAFT 1 ROOF PLAN

EF-30

EF-42

EF-78

EF-201

EF-21D

EF-21C

VERIZON

EQUIPMENT

C

A B

A

Y

T

O

V

E R

I Z

U

I P

M E

N T

EF-06T

TEMPORARY AHU - 6

208V TO 460V TRANSFORMER

PROVIDED BY CONTRACTOR FROM

TRANE WITH TEMP AHU-6

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

R

O O

F d a y o u t

E

D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-ED-106

ELECTRICAL SHAFT 2, 9th

FLOOR ROOF DEMOLITION &

TEMPORARY PLAN

SHAFT 2 ROOF PLAN

AHU - 4

UH - 10

U

H

HWS-3

HWH-101

HWS - 4

REVISED POWER PANEL - (E9A-HV1)

REVISED POWER PANEL - (E9A-AC)

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

S

H A d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-101

ELECTRICAL SHAFT 1,

AHU-4 & EF-4

NEW CONSTRUCTION PLANS

9th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 1,

8th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 1,

PARTIAL REVISED ELECTRICAL ONE-LINE DIAGRAM

AHU - 5

EF - 7

NEW AHU-5/6 HEAT SKID

AHU - 42

AHU - 7

AHU - 6

EXISTING POWER PANEL - (E8B-AC)

EXISTING POWER PANEL - (8B-AC) (SECTION 1) EXISTING POWER PANEL - (8B-AC) (SECTION 2)

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

S

H A d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-102

ELECTRICAL SHAFT 2, AHU-6

& EF-6 NEW CONSTRUCTION

FLOOR PLANS

9th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 2,

8th FLOOR NEW CONSTRUCTION PLAN

NEW POWER PANEL - (PP-HV-SHAFT 2)

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

A

U D

I T

O R

I U

M d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-103

ELECTRICAL AUDITORIUM,

AHU-22 & EF-22 NEW

CONSTRUCTION PLANS

PENTHOUSE NEW CONSTRUCTION PLAN

MECHANICAL ROOM AUDITORIUM

ELECTRICAL ONE-LINE DIAGRAM

KEYED NOTE:

NEW POWER PANEL - (PP-22)

PARTIAL NEW CONSTRUCTION

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

D

E

P

R

O O

F d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-104

ELECTRICAL 3rd FLOOR

ROOF, AHU-34 & AHU-36

NEW CONSTRUCTION PLAN

3rd FLOOR ROOF NEW CONSTRUCTION PLAN

PARTIAL REVISED ELECTRICAL ONE-LINE DIAGRAM

NEW POWER PANEL - (PP-34/36)

U N

Y

U

T E

Z O

S T

A

H

A F

T

A L A

B L

B L

B L A

B L B

B L

C L

C L

C L

C L

C L

C L

C L A

C L

C L

CL40

C L

C L

C L

L A

U N

Y

U

T E

Z O

O

A

Z O

S T

A

L

S H

A F

T

C L

C L B

S H

A F

T

I

I

J

K

K

K

K

J

L

L

L

L

L

M

M

I

J

M

I

J

M

I

J

K

M

H

I

J

K

L

M

I

I

J

J

K

K

L

L

M

M

I

J

K

L

M

I

J

L

M

J

K

L

S H

A F

T

I

I

J

K

K

K

K

J

L

L

L

L

L

M

M

I

J

M

I

J

M

I

J

K

M

H

I

J

K

L

M

I

I

J

J

K

K

L

L

M

M

I

J

K

L

M

I

J

L

M

J

K

L

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

P

S

U B

B

A S

E M

E N

B

S

E M

E N

T d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-201

ELECTRICAL SUB-BASEMENT

& BASEMENT NEW

CONSTRUCTION PLAN

PARTIAL BASEMENT 480V POWER FEED

PARTIAL SUB-BASEMENT 480V POWER FEED

A1000

A1000A

10S1

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

P

T

H

F

L O

O R d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-202

ELECTRICAL 10TH FLOOR

NEW CONSTRUCTION PLAN

10TH FLOOR 480V POWER FEED

C908F

AO

49 SF

C908H

I.T. CLOSET

47 SF

C908D

PROGRAM

SUPPORT

84 SF

C908E

MSA

SUPERVISOR

76 SF

C908C

SURGEONS OFFICE

148 SF

C908B

CHIEF OF SURGERY

97 SF

C908A

SUPPLY

74SF

B903

SURGEONS OFFICE

142 SF

B901

ELEVATOR LOBBY

148 SF

A900

MENS

141 SF

B900

WOMENS

168 SF

B902

ORTHO CHIEF

132 SF

B904

ORTHO

152 SF

B906

ORTHO

129 SF

B908

GENERAL THORACIC

SURGEONS

134 SF

B905

RESIDENTS

179 SF

B907

SURGEONS OFFICE

118 SF

B909

ELEC.

10 SF

B911

SURGEONS OFFICE

128 SF

B913

NP/RN/NCM

181 SF

B915

NP/RN/NCM

194 SF

B919

GENERAL

SURGERY CHIEF

145 SF

B921

SUPPLY

100 SF

B923

PODIATRY

195 SF

B910

GENERAL THORACIC

SURGEONS

154 SF

B912

MSA

190SF

B914

MSA

339 SF

B916

THORACIC AND

VASCULAR CHIEF

174 SF

B918

GTV

RESIDENTS

176 SF

B917

ELEC.

10 SF

A904

HOUSEKEEPING

44 SF

C908J

CARELINE

MANAGER

134 SF

9S5

STAIR

C908I

SHAFT #8

58 SF

A908

CONFERENCE ROOM

141 SF

C908G

AO

48 SF

B920

NCM ORTHO

126 SF

C908

CORRIDOR

C908K

I.T. STORAGE

58 SF

A911

A911A

SHAFT5

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

E

P

T

H

F

L O

O R d a y o u t

E

P

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-EP-203

ELECTRICAL 9TH FLOOR NEW

CONSTRUCTION PLAN

9TH FLOOR 480V POWER FEED

FIRE PROTECTION: SYMBOLS,

ABBREVIATIONS & NOTES.

LEGEND AND SCHEDULE OF FIRE PROTECTION EQUIPMENT

FIRE PROTECTION SYSTEM NOTES:

SPRINKLER DEMOLITION NOTES:

FIRE PROTECTION LINE TYPES

PIPING SYMBOLS

GENERAL SYMBOLS

ABBREVIATIONS

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

X d a y o u t

F

X

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

FX-001

FS FS

FS

FS

FS FS

UNDER DUCT

HWS - 3

HWH-101

UNDER EF

F S

FS

EF-4

DROP

SPRINKLER

PIPE DROP

TO 8th FL.

AHU - 3

METAL GRATE FLOOR CONCRETE FLOOR

FSFS

F S

F S

F S

F S

F S

FS

F S

F S

F S

F S

F S

F S

METAL GRATE FLOORING

AHU - 42

CONCRETE FLOORING

AHU - 7

FS

F S

FS FS

F S

FS FS FSFS

F S

FS FSFS FS FS

F S

FSFS FS FSFS

FSFSFS

AHU - 6

AHU - 5

EF - 7

F S

F S

FS

F S

F S

F S

FS

F S

FS

F S

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

X D

F

X

S

H A d a y o u t

F

X D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FXD-101

FIRE PROTECTION SHAFT 1,

& SHAFT 2 FIRE SPRINKLER,

DEMOLITION FLOOR PLANS

9th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 1,

8th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 1,

9th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 2,

8th FLOOR DEMOLITION PLAN www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

X D

F

X

R

O O

F

A U

D I T

O R

I U

M d a y o u t

F

X D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FXD-102

FIRE PROTECTION AUDITORIUM PENTHOUSE FIRE

SPRINKLER DEMOLITION FLOOR PLANS

PENTHOUSE DEMOLITION PLAN

MECHANICAL ROOM AUDITORIUM

KEYED NOTE:

FS FS

FS

FS

FS FS

UNDER DUCT

HWS - 3

HWH-101

HWS - 4

DROP

SPRINKLER

PIPE DROP

TO 8th FL.

AHU - 3

METAL GRATE FLOOR CONCRETE FLOOR

FSFS

F S

F S

F S

F S

F S

FS

F S

F S

F S

F S

F S

F S

AHU - 5

EF - 7

F S

F S

FS

F S

F S

F S

FS

F S

FS

F S

NEW AHU-5/6 HEAT SKID

METAL GRATE FLOORING

AHU - 42

CONCRETE FLOORING

AHU - 7

FS

F S

FS FS

F S

FS FS FSFS

F S

FS FSFS FS FS

F S

FSFS FS FSFS

FSFSFS

AHU - 6

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

X D

F

X

S

H A d a y o u t

F

X

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FX-101

FIRE PROTECTION SHAFT 1,

AHU-4 & EF-4 NEW

CONSTRUCTION FLOOR PLANS

9th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 1,

8th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 1,

9th FLOOR NEW CONSTRUCTION PLAN

8th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 2,

FS FS FS FS FS

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

X D

F

X

R

O O

F

A U

D I T

O R

I U

M d a y o u t

F

X

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FX-102

FIRE PROTECTION AUDITORIUM PENTHOUSE FIRE

SPRINKLER NEW CONSTRUCTION FLOOR PLANS

PENTHOUSE NEW CONSTRUCTION PLAN

MECHANICAL ROOM AUDITORIUM

FIRE ALARM: SYMBOLS,

ABBREVIATIONS & NOTES.

LEGEND AND SCHEDULE OF FIRE ALARM EQUIPMENT

FIRE ALARM NOTES:

1.

NOTES:

2.

NOTES:

MOUNTING HEIGHTS OF FIRE ALARM EQUIPMENT

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

A d a y o u t

F

A

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

FA-001

HWS - 3

HWH-101

EF-4

AHU - 3

METAL GRATE FLOOR CONCRETE FLOOR

AHU-4

METAL GRATE FLOORING

AHU - 42

AHU - 6

CONCRETE FLOORING

AHU - 7

EF - 7

B924

SHAFT 2

x

36x50

50x30

38x38

(E) 18x18 DN

(N) 16"Ø UP TO

EF-78 ON ROOF

F S

D

F S

D

F S

D

24x16

UP TO

EF-30

UP TO

EF-42

20x20

DN

24x16

DN

24x12

DN

38x38

DN

50x36

DN

38x30

DN

24x12

BOD 100"

BOD 89.5"

BOD 135"

x

30x22

22x18 x

30x22

36x20

SLOPE DN

TO BOD ±93"

56x14

BOD 137"

BOD 113"

BOD 113"

BOD 137"

36x20

HHW EQUIP.

(HX-5,CX-5,C-5)

EF-7

AHU-5

x

BOD 127"

BOD 103"

S L

O P

E

D

N

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

A D

F

A

S

H A d a y o u t

F

A D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FAD-101

FIRE ALARM SHAFT 1 &

SHAFT 2 DEMOLITION

FLOOR PLANS

9th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 1,

8th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 1,

9th FLOOR DEMOLITION PLAN

MECHANICAL ROOM SHAFT 2,

8th FLOOR DEMOLITION PLAN

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

A D

F

A

R

O O

F

A U

D I T

O R

I U

M d a y o u t

F

A D

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FAD-102

FIRE ALARM AUDITORIUM

PENTHOUSE, & 3RD FLOOR KITCHEN

ROOF DEMOLITION FLOOR PLANS

PENTHOUSE DEMOLITION PLAN

MECHANICAL ROOM AUDITORIUM

3rd FLOOR ROOF PLAN

HWS - 3

HWH-101

AHU - 3

METAL GRATE FLOOR CONCRETE FLOOR

AHU-4

EF - 7

B924

SHAFT 2

x

36x50

50x30

38x38

(E) 18x18 DN

(N) 16"Ø UP TO

EF-78 ON ROOF

F S

D

F S

D

F S

D

24x16

UP TO

EF-30

UP TO

EF-42

20x20

DN

24x16

DN

24x12

DN

38x38

DN

50x36

DN

38x30

DN

24x12

BOD 100"

BOD 89.5"

BOD 135"

x

30x22

22x18 x

30x22

36x20

SLOPE DN

TO BOD ±93"

56x14

BOD 137"

BOD 113"

BOD 113"

BOD 137"

36x20

EF-7

AHU-5

x

BOD 127"

BOD 103"

S L O

METAL GRATE FLOORING

AHU - 42

CONCRETE FLOORING

AHU - 7

AHU - 6

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-075

F i l e

N a m e

F

V

A

S

Y R

A C

U S

E

A

P

L A

C E

M E

N T

F

A D

F

A

S

H A d a y o u t

F

A

D a t e

T h u

S a m e s r b

B

C

U

M

E

N

T

1-FA-101

FIRE ALARM SHAFT 1 & SHAFT

2 NEW CONSTRUCTION

FLOOR PLANS

9th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM SHAFT 1,

8th FLOOR NEW CONSTRUCTION PLAN

MECHANICAL ROOM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .