This pre-solicitation notice announces an upcoming competitive solicitation to replace air handler equipment at the Syracuse VA Medical Center. The solicitation will be posted on November 2nd, 2020, seeking bids to upgrade five air handlers under project number 528A7-18-720 in two phases. Phase one will replace air handlers 04 and 06, while phase two will replace air handlers 22, 34, and 36. Bids are required to include self-performance of 25% of the work and breakdowns of labor and materials. Payment and performance bonds as well as a 20% bid bond will be required. The solicitation is designated as a 100% set-aside for service-disabled veteran-owned small businesses and has an estimated value between $2-5 million. The period of performance is 365 calendar days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Walk Thru Attendees.pdf | ||
| 20532 Fellenzer Engineering VAMC Asbestos Sampling 7.22.20.pdf | ||
| 36C24221B0003 0004.docx | DOCX document | |
| 36C24221B0003 0003.docx | DOCX document | |
| 230923 rev Oct 2020 Siemens and JCI no POT.pdf | ||
| 36C24221B0003 0002.docx | DOCX document | |
| TRANE 2019 AHU Spec Sheets.pdf | ||
| 232500 HVAC Water Treatment.pdf | ||
| RFI 36C24221B0003 Replace AHU 04 06 22 34 36 rev 2.docx | DOCX document | |
| 100 Bid Document Specifications.pdf | ||
| P07- NY202000026 9-25-2020 02.pdf | ||
| 36C24221B0003_1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
C
U s e r s s r b
A p p
D a t a L o c a l T e m p A c P u b l i s h
G
I d w g
L a y o u t
G
I
D a t e
T h u
S e p
A
M
N a m e s r b
B
I
D
O
C
U
M
E
N
T
S
1-GI-001
TITLE SHEET
ROOF KEY PLAN
PHASE II
PHASE II
PHASE II PHASE I
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
H U
R
E P
L A
C E
M E
N T
G
I d a y o u t
G
I
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-GI-002
PHASING & ICRA PLAN
Description of Required Infection Control Precautions by Class
During Construction Project Upon Completion of
1. Execute work by methods to minimize raising duct rrom construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.C l a s
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area.
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.C l a
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transportation in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
C l a s s
I V
C l a
I
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Section and Infection Control Department, and thoroughly cleaned by the owner's Environment Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
PATIENT RISK GROUP FOR "TYPE C" CONSTRUCTION
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
CLASS II
CLASS III
Class III / IV
Class III / IV
ICRA NOTES:
ROOF KEY PLAN
PHASING NOTES:
GENERAL NOTES ON RIGGING:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -1
A
.d
(L ay ou t:
S-
1A
D at e:
F ri, S ep
1,
- 3 :2
PM
am e:
J
O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-101A
SHAFT 1 8TH AND 9TH FLOOR
FRAMING, AHU-4 & EF-4 NEW
CONSTRUCTION PLANS
W6x20
W6x20
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -1
B
.d ou t:
S-
1B
D at e:
F ri, S ep
1,
- 3 :2 am e:
J
O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-101B
SHAFT 1 ROOF FRAMING
AHU-4 & EF-4 NEW
CONSTRUCTION PLANS
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -1
A
.d ou t:
S-
2A
D at e:
F ri, S ep
1,
- 3 :2 am e:
J
O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-102A
SHAFT 2 8TH AND 9TH FLOOR
FRAMING, AHU-6 & EF-6 NEW
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -1
B
.d ou t:
S-
2B
D at e:
F ri, S ep
1,
- 3 :2 am e:
J
O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-102B
SHAFT 2 ROOF FRAMING
AHU-6 & EF-6 NEW
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -1
.d ou t:
S-
D at e:
F ri, S ep
1,
- 3
:2 am e:
J O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-103
AUDITORIUM ROOF
FRAMING, AHU-22 & EF-22
NEW CONSTRUCTION PLANS
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -1
.d ou t:
S-
D at e:
F ri, S ep
1,
- 3
:2 am e:
J O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-104
3rd FLOOR ROOF FRAMING, AHU-34 & AHU-36 NEW
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -5
.d ou t:
S-
D at e:
F ri, S ep
1,
- 3
:2 am e:
J O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-500
STRUCTURAL DETAILS
ABBREVIATIONS LEGEND
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
Fi le
N am e:
F
:\S H
A R
E\
\1
\1
\D
W G
\S -5
.d ou t:
S-
D at e:
F ri, S ep
1,
- 3
:2 am e:
J O gl e)
/ 1
1 /
0%
BID DOCUMENTS
S-501
STRUCTURAL DETAILS
AND NOTES
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-001
HVAC SYMBOLS,
ABBREVIATIONS & NOTES
VALVE SYMBOLS
GENERAL NOTES:
ABBREVIATIONSDUCTWORK SYMBOLS
GENERAL SYMBOLS
PIPING SYMBOLS
HVAC LINE TYPES
HVAC DEMOLITION NOTES:
8" x 8" COLUMN TYP.
AHU - 3
CONCRETE FLOORMETAL GRATE FLOOR
AHU - 4
H C
F I L
T E
R S
A C
M
I D
H R
C
UH-10, TO BE
RELOCATED
U
H
HWS-3
HWH-101
EF-4
4" CHWS UP
4" CHWR UP
4" HWHR DN.
4" HWH DN.
2½" CHWR UP
2½" CHWS UP
2" MPR FROM
ABOVE
2" MPR
4" ERS
4"
4" ERR
4" LPS UP (N)
HWS - 3
1"
HWH
HWHR
4"
HWH-101
2-1/2" UP & DN
FD (E)
UP TO 9th
FLOOR
4" HWH & R (195GPM)
UP TO AHU-03 HEATING
COIL
CONCRETE
PAD
LPS
L P
R
4" LPS (1856 LBH)
EF-4
1"ø HWH ø
W H
P R
4" HWHR
2" CHWS
2"ø HWH
H W
H R
5"
6"
1"
H W
H R
H W
H
GR
HWH
HWH
HWHR
PRV-101
ERS
(DN TO LPR)
(DN THRU
FLOOR)
ERR
(DN THRU FLOOR.
CONNECT TO HWS-101)
6"
HCP-4
6"
(DN TO
HWS-03)
(DN TO HWH-101/ HWS-03)
UH-10, TO BE
RELOCATED
AHU - 3
METAL GRATE FLOOR CONCRETE FLOOR
AHU - 4
C X
C
H X
4" CHWS DN.
4" CHWR DN.
2½" CHWR DN.
2½" CHWS DN.
2" MPR DN.
HWHR
HWH
GLYCOL
CHWR
CHWS
LPS MPS
CHWR
CHWS
C H
W R
C H
W S
6"
5"
1"
6"
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
T
H A
F d a y o u t
M
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MD-101
HVAC SHAFT 1, AHU-4 & EF-4
DEMOLITION FLOOR PLANS
9th FLOOR DEMOLITION PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 1,
8th FLOOR DEMOLITION PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 1,
9th FLOOR DEMOLITION PLAN - PIPING
MECHANICAL ROOM SHAFT 1,
8th FLOOR DEMOLITION PLAN - PIPING
MECHANICAL ROOM SHAFT 1,
B924
SHAFT 2
x
36x50
50x30
38x38
(E) 18x18 DN
(N) 16"Ø UP TO
EF-78 ON ROOF
F S
D
F S
D
F S
D
24x16
UP TO
EF-30
UP TO
EF-42
20x20
DN
24x16
DN
24x12
DN
38x38
DN
50x36
DN
38x30
DN
24x12
BOD 100"
BOD 89.5"
BOD 135"
x
30x22
22x18 x
30x22
36x20
SLOPE DN
TO BOD ±93"
56x14
BOD 137"
BOD 113"
BOD 113"
BOD 137"
36x20
HHW EQUIP.
(HX-5,CX-5,C-5)
EF-7
AHU-5
x
BOD 127"
BOD 103"
S L O
CHWR
CHWS
AHU - 5
EF - 7
CX-5, C-5
HX-5
HWHR
HWH HWH
H W
H R
H W
H R
HWHR
HWH HWH
H W
H H
W H
HHW EQUIP.
(HX-5,CX-5,C-5)
AHU - 42
AHU - 7
AHU - 6
METAL GRATE FLOORINGCONCRETE FLOORING
METAL GRATE FLOORING
AHU - 42
AHU - 6
CONCRETE FLOORING
GRR
GR
GR
E R
S
E R
R
HWH
HWHR
MPS
AHU - 7
MPR
MPR
M P
R
HWHR
CHWR
HWH
CHWS
C H
W S
CHWR
HPS
P R
V
M P
S
E R
R
E R
S
MPR
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
H A d a y o u t
M
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MD-102
HVAC SHAFT 2, AHU-6 & EF-6
DEMOLITION FLOOR PLANS
9th FLOOR DEMOLITION PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 2,
8th FLOOR DEMOLITION PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 2,
9th FLOOR DEMOLITION PLAN - PIPING
MECHANICAL ROOM SHAFT 2,
8th FLOOR DEMOLITION PLAN - PIPING
MECHANICAL ROOM SHAFT 2,
EX.CD EX.CD EX.CD EX.CD EX.CD
X
C
D
EF - 22
AHU - 22
EF - 22
AHU - 22
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
U D
I T
O R
I U
M d a y o u t
M
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MD-103
HVAC AUDITORIUM,
AHU-22 & EF-22
DEMOLITION FLOOR PLANS
PENTHOUSE DEMOLITION PLAN - DUCTWORK
MECHANICAL ROOM AUDITORIUM
PENTHOUSE DEMOLITION PLAN - PIPING
MECHANICAL ROOM AUDITORIUM
AUDITORIUM STAGE DEMOLITION PLAN - DUCTWORK
AUDITORIUM STAGE DEMOLITION PLAN - PIPING
GENERAL NOTES:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
M
H
R
O O
F d a y o u t
M
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MD-104
HVAC 3rd FLOOR ROOF, AHU-34 & AHU-36
DEMOLITION PLAN
3rd FLOOR ROOF PLAN
GENERAL NOTE:
24x24 GOOSENECK
DISCHARGE
24x24 DN
PATCHED HOLE IN ROOF
EF-101
PATCHED HOLE IN ROOF
108x42 DN
EF-3 GOOSENECK
PATCH HOLE IN
ROOF AFTER NEW
EF-4 GOOSENECK
INSTALLATION
EF-77 DUCT
PENETRATION
PATCHED HOLE IN ROOF
EF-101
PATCHED HOLE IN ROOF
108x42 DN
EF-3 GOOSENECK
TEMPORARY AHU-4
EF-77 DUCT
PENETRATION
CHR CHR CHR
CHS CHS CHS
C H
R
C H
S
34"Ø
4"Ø
3"Ø
DOUBLE-WALLED
INSULATED DUCTWORK
UNISTRUT DUCT
SUPPORT (TYP.)
" PLYWOOD UNDERNEATH
UNISTRUT. CONTRACTOR
MUST KEEP LOADING ON THE
ROOF 40 LBS/FT.² OR BELOW.
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
R
O O
F d a y o u t
M
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MD-105
HVAC SHAFT 1, 9th FLOOR
ROOF DEMOLITION &
TEMPORARY PLANS
SHAFT 1 ROOF PLAN DEMOLITION
KEYED NOTES:
SHAFT 1 ROOF PLAN TEMPORARY
EF-6 GOOSENECK
TO BE REPLACED.
EF-30
EF-42
EF-78
EF-201
EF-21D
EF-21C
VERIZON
EQUIPMENT
16"Ø
C
A B
A
Y
T
O
V
E R
I Z
Q U
I P
M E
N T
EF-06T
EF-6
EF-30
EF-42
EF-78
EF-201
EF-21D
EF-21C
VERIZON
EQUIPMENT
16"Ø
C
A B
A
Y
T
O
V
E R
I Z
U
I P
M E
N T
EF-06T
TEMPORARY AHU - 6
208V TO 460V TRANSFORMER
CHWR
CHWS
EF-06T
EF-6
HWH
HWHR
HWH
HWHR
UNISTRUT DUCT
SUPPORT (TYP.)
" PLYWOOD UNDERNEATH
UNISTRUT. CONTRACTOR
MUST KEEP LOADING ON THE
ROOF 40 LBS/FT.² OR BELOW.
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
R
O O
F
M
H
R
O O
F d a y o u t
M
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MD-106
HVAC SHAFT 2, 9th FLOOR
ROOF DEMOLITION &
TEMPORARY PLANS
SHAFT 2 ROOF PLAN DEMOLITION
SHAFT 2 ROOF PLAN TEMPORARY
KEYED NOTES:
8" x 8" COLUMN TYP.
CONCRETE FLOORMETAL GRATE FLOOR
U
H
HWS-3
HWH-101
EF - 4
4" CHWS UP
4" CHWR UP
4" HWHR DN.
4" HWH DN.
2½" CHWR UP
2½" CHWS UP
2" MPR FROM
ABOVE
2" MPR
4" LPS UP (N)
HWS - 3
1"
HWH
HWHR
4"
HWH-101
2-1/2" UP & DN
FD (E)
UP TO 9th
FLOOR
4" HWH & R (195GPM)
UP TO AHU-03 HEATING
COIL
CONCRETE
PAD
LPS
L P
R
4" LPS (1856 LBH)
1"ø HWH
W H
R
4" HWHR
2" CHWS
2"ø HWH
EF - 4
5"
6"
PRV-101
(DN TO LPR)
(DN THRU FLOOR.
CONNECT TO HWS-101)
6"
6"
(DN TO
HWS-03)
(DN TO HWH-101/ HWS-03)
AHU - 3
METAL GRATE FLOOR CONCRETE FLOOR
4" CHWS DN.
4" CHWR DN.
2½" CHWR DN.
2½" CHWS DN.
2" MPR DN.
HWHR
HWH
GLYCOL
CHWR
CHWS
LPS MPS
CHWR
CHWS
C H
W R
C H
W S
6"
5"
1"
6"
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
H A d a y o u t
M
H a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-101T
HVAC SHAFT 1, AHU-4 & EF-4
TEMPORARY FLOOR PLANS
9th FLOOR TEMPORARY PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 1,
8th FLOOR TEMPORARY PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 1,
9th FLOOR TEMPORARY PLAN - PIPING
MECHANICAL ROOM SHAFT 1,
8th FLOOR TEMPORARY PLAN - PIPING
MECHANICAL ROOM SHAFT 1,
B924
SHAFT 2
x
36x50
50x30
38x38
(E) 18x18 DN
(N) 16"Ø UP TO
EF-78 ON ROOF
F S
D
F S
D
F S
D
24x16
UP TO
EF-30
UP TO
EF-42
20x20
DN
24x16
DN
24x12
DN
38x38
DN
50x36
DN
38x30
DN
24x12
BOD 100"
BOD 89.5"
BOD 135"
x
30x22
22x18 x
30x22
36x20
SLOPE DN
TO BOD ±93"
56x14
BOD 137"
BOD 113"
BOD 113"
BOD 137"
36x20
EF-7
AHU-5
x
BOD 127"
BOD 103"
S L O
CHWR
CHWS
AHU - 5
EF - 7
AHU - 42
AHU - 7
METAL GRATE FLOORINGCONCRETE FLOORING
METAL GRATE FLOORING
AHU - 42
CONCRETE FLOORING
MPS
AHU - 7
HWH
CHWS
C H
W S
CHWR
HPS
E R
R
E R
S
MPR
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
H A d a y o u t
M
H a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-102T
HVAC SHAFT 2, AHU-6 & EF-6
TEMPORARY FLOOR PLANS
9th FLOOR TEMPORARY PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 2,
8th FLOOR TEMPORARY PLAN - DUCTWORK
MECHANICAL ROOM SHAFT 2,
9th FLOOR TEMPORARY PLAN - PIPING
MECHANICAL ROOM SHAFT 2,
8th FLOOR TEMPORARY PLAN - PIPING
EX.CD EX.CD EX.CD EX.CD EX.CD
X
C
D
TEMPORARY
AHU - 22
CHWS
C H
W S
CHWR
C H
W R
CHWR CHWR CHWR
CHWS CHWS CHWS
C H
W S
C H
W R
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
U D
I T
O R
I U
M d a y o u t
M
H a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-103T
HVAC AUDITORIUM,
AHU-22 & EF-22
TEMPORARY FLOOR PLANS
PENTHOUSE TEMPORARY PLAN - DUCTWORK
MECHANICAL ROOM AUDITORIUM
PENTHOUSE TEMPORARY PLAN - PIPING
MECHANICAL ROOM AUDITORIUM
AUDITORIUM STAGE TEMPORARY PLAN - DUCTWORK
AUDITORIUM STAGE TEMPORARY PLAN - PIPING
NOTES:
C202F
INGREDIENT STORAGE
C263
FACULTY CIO
C261A
NUTRITION SEC
C261
DIETARY
SF
C265
CONFERENCE
C202G
COOLER
C202A
OFFICE
C265B
STAFF AREA
B202
KITCHEN
C202E
SALAD PREP
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
M
H
R
O O
F d a y o u t
M
H a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-104T
HVAC 3rd FLOOR ROOF, AHU-34 & AHU-36
TEMPORARY PLANS
3rd FLOOR ROOF TEMPORARY PLAN
GENERAL NOTE:
2nd FLOOR TEMPORARY PLAN
HRP-4
CONTROLLER
HWP101A VFD
HWP101B VFD
48"x8"
40"x10"40"x36"
"x
40"x34"
56"x56"
TRANSITION
TO 40"x18" IN
8TH FLOOR
HWS-4
HWS-3
HWH-101
UH-11
H/S P
30"x30"
AHU-4
48"x24"
44"x36"
H/S P
UH-10
8"x8" COLUMN TYP.
AHU-3
CONTROL PANEL
12" STEP UP TO
METAL GRATE FLOOR
SF-03 VFD
EF-03 VFD
EXISTING LOUVER TO
REMAIN. NEW DAMPER &
MOTORIZED ACTUATOR.
SPRING-LOADED PRESSURE
RELIEF DAMPER ON
RETURN DUCT BEFORE EF.
40x18 RETURN UP FROM 8TH
FLOOR INTO EF ON TOP OF
AHU-4, CO2 TRANSMITTER
INSIDE RETURN DUCT.
PANEL FEU 9/3
CONTROL PANEL FOR AHU-4
& HWH-101 "E9C AC CIR-1"
PANEL EF-22 "SPC-A"
TRANSIENT VOLTAGE
SUPPRESSION SYSTEM
PANEL "E9A AC CIR-1"
CONTROL PANEL
"E9A AC #24 NAE-1"
(UNDERNEATH DUCT)
SPRING-LOADED
PRESSURE
RELIEF DAMPER.
480/277V
POWER PANEL
E9A-HVI
120/208V
POWER PANEL
E9A-AC
208V POWER
PANEL 9A-AC
JOHNSON
CONTROL PANEL
AHU-4 VFD
CONTROL PANELS &
DISCONNECT
SWITCHES (CHP101)
DS
AT
DS
SD
SD
40"x18"
54"x36"
4" CHWS UP
4" CHWR UP
4" HWHR DN.
4" HWH DN.
2½" CHWR UP
2½" CHWS UP
2" LPR FROM
ABOVE
2" MPR
1"ø FS
1"ø FS
4" ø
H W
H
1"ø HWH
1"ø FS
UNDER DUCT
CAP
2" ø
LP
R
2" ø
FS
2 1/2"ø FS
1"ø FS
HWS-4
3/ 4" ø
PG
S
3"ø GR
3"ø GRR
5"ø LPS
3/4"⌀ GLYCOL MAKE-UP
FROM TANK ON HWS-3
1 1/2"ø LPR
STEAM TRAP
3"ø HWHR 3"ø HWH
UP TO 9TH
FLOOR
CONCRETE PAD
4" CHWS DN.
4" CHWR DN.
2½" CHWR DN.
2½" CHWS DN.
2" LPR DN.
5"ø LPS 3" ø
G R3" ø G
R R
3" ø
H W
H 3" ø H
W H
R
AHU-4
1"ø LPR
STEAM TRAP
FD
2"ø CD
2-1/2" LPS DOWN
TO HUMIDIFIER
5" ø
LP
S
1"ø HWHR 1"ø HWH
AHU-3
(DN TO HWH-101/HWS-03)
(DN TO
HWS-03)
(DN TO LPR)
(DN THROUGH
FLOOR. CONNECT
TO HWS-101)
5" ø
C H
W R
5" ø
C H
W S
6"ø CHWS
6"ø CHWR
5"ø LPS
6"ø HWHR 6"ø HWH
UH-10
6"ø LPS
6"ø LPS
4"ø CHWS
4"ø CHWR
1" GLYCOL
2 1/2"ø ERS 2 1/2"ø ERR
HRP-4
ENGINEERING LLP
0%
BID DOCUMENTS
9 /
/2 www.fellp.com
UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN
BEARING A LICENSED PROFESSIONAL ENGINEER'S
SEAL IS A VIOLATION OF STATE EDUCATION LAW.
FE PROJECT #: 19-075
VAMC, S
YRACUSE
VA
Ve te ra ns A ffa irs
D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot
VA FORM 08-6231, OCT 1978
Revisions
Date
1 2 3 4
VAMC, SYRACUSE, NY
5 6 7
Approved:
Drawing Title
Approved:
Project Title
Location
Building Number
8 9
Drawing No.
Project No.
Date
DrawnChecked
F
E
D
C
B
A th re e in ch es o ne fo ot
A
6"
1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot
F
E on e ha lf in ch o ne fo ot
D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6"
C
6"
B
6"
528A7-18-720
STAMP:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
Dwg. of 60
VA SYRACUSE AHU-4,6,22,34&36
REPLACEMENT
JD/SRBEDF
9/
/2
9:
:0
AM
1-MH-101
09-11-20HVAC SHAFT 1, AHU-4 & EF-4
NEW CONSTRUCTION FLOOR
PLANS
1/4" = 1'-0"1 MECHANICAL ROOM SHAFT 1, 8th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK 1/4" = 1'-0"2 MECHANICAL ROOM SHAFT 1, 9th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK
1/4" = 1'-0"3 MECHANICAL ROOM SHAFT 1, 8th FLOOR NEW CONSTRUCTION PLAN - PIPING 1/4" = 1'-0"4 MECHANICAL ROOM SHAFT 1, 9th FLOOR NEW CONSTRUCTION PLAN - PIPING
KEYED NOTE:
GENERAL NOTE:
1. BUILD AHU-4 8" HIGH MINIMUM
AFF USING NEW STEEL
FRAMING TO ALLOW FOR
SECTION DRAIN PIPING AND
WATER FLOW UNDER THE UNIT.
PIPE ALL AHU SECTION DRAINS
AND CONDENSATE PIPES TO
FLOOR DRAIN UNDERNEATH AHU-4.
AHU-6
24"x20"
40"x14"
40"x36"
JOHNSON CONTROL
PANEL "NCE-14"
CONTROL PANELS
FOR AHU-7 & AHU-42,
HW/CHWS-201
O/A FOR AHU-42
(HIGH) & AHU-7 (LOW)
POWER PANEL "E8B-AC"
POWER PANEL "8B-AC"
POWER PANEL "8B-AC"
HWP201A VFD
HCP-07 DISCONNECT SWITCH
HWP201B VFD
HCP-06 DISCONNECT SWITCH
NEW 480V PP
CHP201A VFD
CHP201B VFD
AHU-42
AHU-7
SPRING-LOADED
PRESSURE
RELIEF DAMPER
AHU-6 RETURN
UP TO EF-6 ON
9TH FLOOR
SPRING-LOADED
PRESSURE
RELIEF DAMPER
O/A FOR AHU-6
EXISTING LOUVER TO
REMAIN. NEW DAMPER &
MOTORIZED ACTUATOR
"x
DS
DS
DS
SD
RELOCATED AHU-7
DISCONNECT SWITCH
RELOCATED
AHU-7 VFD
CONTROL PANEL
1-MH-601
1-MH-601
1-MH-601
1-MH-601
1-MH-601
1-MH-601
NEW SF-6 VFD
22"x22"
22"x22" SUPPLY DUCT TOP
CONNECTION TO BE MADE
IN THE FUTURE.
22"x22" SUPPLY DUCT
BOTTOM CONNECTION TO
BE MADE IN THE FUTURE.
AHU-63"
ø
ER
R
3" ø
ER
S 1"ø MPR
5"ø CHWS 5"ø CHWR
4" ø
G R
R 4" ø G
R
MP CLEAN STEAM UP
AHU-42
AHU-7
1 1/2"ø ERR1 1/2"ø ERS
8"ø HPS
1"ø MPR
5"ø CHWR
5"ø CHWS
4"ø HWH4"ø HWH
6"ø MPS
FLOOR DRAIN UNDER AHU
1-MH-601
1-MH-601
1-MH-601
1-MH-601
1-MH-601
1-MH-601
UP TO 9TH. FLOOR GR & GRR DFA
3"ø MPS 1 1/2"ø ERR
1 1/2"ø ERS
3" ø
M
PR
1/
2" ø
ER
S
1/
2" ø
ER
R
8"ø MPS
3"ø MPR
1"ø CD
BALL VALVE
DRAIN DFA
50"x36"
EF-6
NEW EF-6 EXHAUST
FAN CONTROLLER
SPRING LOADED PRESSURE
RELIEF DAMPER LOCATED ON
MAIN RERURN DUCT BEFORE EF.
1-MH-601
1-MH-601
DS
AT
SD
CO2 NEW AHU-5/6 HEAT SKID
CARBON DIOXIDE
TRANSMITTER IN
RETURN DUCT
EXHAUST
PLENUM INTO
FACE OF EF-6
30"x60" DROP
30"x22" 22"x18"
22"x18"
30"x22"
EF-7
AHU-5
(E) 18"x18" DN
(N) 16"⌀ UP TO
EF-78 ON ROOF
24"x16"
24"x12"
20"x20" DN
UP TO
EF-30
UP TO
EF-42
24"x16" DN
24"x12" DN
38"x38" DN
50"x36" DN
38"x38"
36"x50"
50"x30"
36"x20"
36"x20"
20"x20"
50"x30" 56"x14"
BOD 137"
BOD 113"
BOD 137"
BOD 113"
BOD 103"
BOD 127"
BOD 89.5"
38"x30" DNBOD 100"
PREHEAT COIL
CONTROL PANEL "B904"
JOHNSON CONTROL
PANEL "NAE-2"
SLOP DN
TO BOD ±93"
SL
O
P D
N x3
FSD
FSD
FSD
RELOCATED
EF-78 VFD
3"ø ERR 3"ø ERS
4" ø
G R
R
4" ø
G R
3"ø GR 3"ø GRR
GR+GRR DN TO AHU-6 HEATING COIL
GR+GRR DN TO
AHU-5 HEATING COIL
STEAM
TRAP
2" MPR DN INTO EXISTING
MPR IN CEILING BELOW
NEW ENERGY
RECOVERY
PUMP HRP-6
NEW EF-6
EXHAUST FAN
CONTROLLER
NEW AHU-5/6 HEAT SKID
EF-6
AHU-5
EF-7
AHU-5 ERV
CONTROL PANEL
ENERGY RECOVERY SUPPLY
AND RETURN DROP DOWN TO
AHU-6 TO RECOVERY COILS
EF-5 CONTROL
PANEL
EF-21D
DISCONNECT
SWITCH
EF-21C
DISCONNECT
SWITCH
EF-42 VFD
AHU-5 SF
CONTROL PANEL
1-MH-601
1-MH-601
DISCONNECT
SWITCHES FOR
HRP-43, SF-43,
EF-43, & HCP-43
JOHNSON CONTROL
VFD'S
HRP-7
DISCONNECT
EF-7
DISCONNECT
EF-201
DISCONNECT
EF-6 VFD
HRP-6
DISCONNECT
SWITCH
4"ø CHWS
4"ø CHWR
6" ø
M
PS
4"ø HWH 4"ø HWHR
CAP PIPING FURTHER
BACK TO MAKE ROOM FOR
NEW EXHAUST DUCTWORK
CONDENSATE AND
DRAIN SECTIONS
DFA. TRAP DRAIN IN
8TH FLOOR CIELING.
ENGINEERING LLP
/2 www.fellp.com
UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN
BEARING A LICENSED PROFESSIONAL ENGINEER'S
SEAL IS A VIOLATION OF STATE EDUCATION LAW.
FE PROJECT #: 19-075
VAMC, S
YRACUSE
VA
Ve te ra ns A ffa irs
D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot
VA FORM 08-6231, OCT 1978
Revisions
Date
1 2 3 4
VAMC, SYRACUSE, NY
5 6 7
Approved:
Drawing Title
Approved:
Project Title
Location
Building Number
8 9
Drawing No.
Project No.
Date
DrawnChecked
F
E
D
C
B
A th re e in ch es o ne fo ot
A
6"
1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot
F
E on e ha lf in ch o ne fo ot
D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6"
C
6"
B
6"
528A7-18-720
STAMP:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
Dwg. of 60
VA SYRACUSE AHU-4,6,22,34&36
REPLACEMENT
JD/SRBEDF
9/
/2
:2 6:
A
M
1-MH-102
09-11-20HVAC SHAFT 2, AHU-6 & EF-6
NEW CONSTRUCTION FLOOR
PLANS
1/4" = 1'-0"1 MECHANICAL ROOM SHAFT 2, 8th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK
1/4" = 1'-0"3 MECHANICAL ROOM SHAFT 2, 8th FLOOR NEW CONSTRUCTION PLAN - PIPING
1/4" = 1'-0"2 MECHANICAL ROOM SHAFT 2, 9th FLOOR NEW CONSTRUCTION PLAN - DUCTWORK
1/4" = 1'-0"4 MECHANICAL ROOM SHAFT 2, 9th FLOOR NEW CONSTRUCTION PLAN - PIPING
KEYED NOTE:
GENERAL NOTE:
1. BUILD AHU-6 8" HIGH AFF USING
NEW STEEL FRAMING TO
ALLOW FOR SECTION DRAIN
PIPING AND WATER FLOW
UNDER THE UNIT.
PIPE ALL AHU SECTION DRAINS
AND CONDENSATE PIPES TO
FLOOR DRAIN UNDERNEATH AHU-6.
22"x22" TO BE INSTALLED AS
SHOWN BUT FINAL CONNECTIONS
INTO MAIN SUPPLY DUCTWORK
ARE NOT TO BE MADE.
40"x20"
AHU-22
HWS-22
EA
VFD FOR EF-22
CUTOUT IN CONCRETE
VFD FOR SF-22
AT
DS
CO2
CARBON DIOXIDE TRANSMITTER
IN MAIN RETURN DUCT
SMOKE DAMPER LOCATED
IN EXHAUST DUCT
SPRING-LOADED PRESSURE
RELIEF DAMPEREF-22
HRP-22 CONTROLLER
FD
EXISTING PANEL
14" HIGH STEP. PENTHOUSE
FLOOR AND ROOF FLOOR ARE
AT THE SAME ELEVATIONS.
MECHANICAL ROOM
VENTILATION AIR INTAKE
PANEL
PP-22
PANEL
2CD
HWH-901
CONTROLLERS
T
EF-901 LOCATED ON
ROOF TO REMAIN
JOHNSON CONTROL PANELS
UNIT
HEATER
EXISTING
ROOF
HATCH
DS
SPRING-LOADED PRESSURE
RELIEF DAMPER LOCATED
ON MAIN SUPPLY DUCT
BEFORE ANY TAKE-OFFS.
PRE-FAB HEAVY GAUGE
GALVANIZED STEEL ROOF
CURB SIZED TO SUPPORT
EF-22 WHERE IT OVERHANG
THE EXISTING CURB.
CONTRACTOR TO VIF SIZE
OF CURB NEEDED.
3"ø CHWR 3"ø CHWS
2"ø MPS
AHU-22
HWS-22
3"ø HWH
3"ø HWHR
3"ø GR 3"ø GRR
FD
STEAM TRAP
TAP INTO EXISTING
CONDENSATE LINE
TAP INTO EXISTING
CONDENSATE LINE
1 1/4"ø MPR
STEAM TRAP 1"ø MPR
EF-22
PARAPET WALL VFD FOR EF-22
VFD FOR SF-22
HRP-22 CONTROLLER
EXISTING PANELPANEL
PP-22
PANEL
2CD
JOHNSON CONTROL PANELS RPZ2 1/2"ø HPS
3/4"ø D. CW
PRV-901
UNIT
HEATER
2" MPS DN TO
HUMIDIFIER
HOSPITAL
WALL
GLYCOL REC SUPPLY &
RETURN DROPS
T
EXISTING
ROOF
HATCH
3"ø MPS
RELOCATE MPS & CW PIPING
HIGHER TO PROVIDE PROPER
CLEARANCES FOR PANELS
1 1/2"ø MPS 3/4"ø D. CW
3"ø ERS &
ERR UP
3"ø ERR 3"ø ERS
3"ø HPR
5"ø HPS6"ø CHWS
6"ø CHWR
GLYCOL REC SUPPLY &
RETURN PIPED UNDER THE
ROOF TO RISE UP INTO THE
MECH. ROOM.
UP TO
AHU-22
UP TO
EF-22
50"x14"
8"x6"
30"x12"
18"x10"
40"x20"
50"x10"
40x20 UP
TO EF-22
24x24 RETURN
AIR GRILLES TYP.
ENGINEERING LLP
/2 www.fellp.com
UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN
BEARING A LICENSED PROFESSIONAL ENGINEER'S
SEAL IS A VIOLATION OF STATE EDUCATION LAW.
FE PROJECT #: 19-075
VAMC, S
YRACUSE
VA
Ve te ra ns A ffa irs
D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot
VA FORM 08-6231, OCT 1978
Revisions
Date
1 2 3 4
VAMC, SYRACUSE, NY
5 6 7
Approved:
Drawing Title
Approved:
Project Title
Location
Building Number
8 9
Drawing No.
Project No.
Date
DrawnChecked
F
E
D
C
B
A th re e in ch es o ne fo ot
A
6"
1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot
F
E on e ha lf in ch o ne fo ot
D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6"
C
6"
B
6"
528A7-18-720
STAMP:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
Dwg. of 60
VA SYRACUSE AHU-4,6,22,34&36
REPLACEMENT
JD/SRBEDF
9/
/2
:2 6:
A
M
1-MH-103
09-11-20HVAC AUDITORIUM, AHU-22 &
EF-22 NEW CONSTRUCTION
FLOOR PLANS
1/4" = 1'-0"2 MECHANICAL ROOM AUDITORIUM, NEW CONSTRUCTION PLAN - DUCTWORK
1/4" = 1'-0"4 MECHANICAL ROOM AUDITORIUM, NEW CONSTRUCTION PLAN - PIPING
1/4" = 1'-0"3 AUDITORIUM STAGE, NEW CONSTRUCTION PLAN - PIPING
1/4" = 1'-0"1 AUDITORIUM STAGE, NEW CONSTRUCTION PLAN - DUCTWORK
KEYED NOTES:
GENERAL NOTE:
1. BUILD AHU-22 3.5" HIGH MINIMUM AFF
USING SHIMS/EXISTING AHU-22 STEEL
FRAMING MOUNT TO ALLOW FOR
SECTION DRAIN PIPING AND WATER
FLOW UNDER THE UNIT.
2. MAXIMUM OF 40 LBS/FT² OF
EQUIPMENT/MATERIALS ON THE ROOF.
THIS INCLUDES DURING DEMOLITION,
STAGING/RIGGING AND INSTALLATION
OF EQUIPMENT. NEW OR TEMPORARY
EQUIPMENT THAT ARRIVES ON SITE IN
PIECES MUST BE 40 LBS/FT² OR LESS
BEFORE BEING PLACED ON THE ROOF.
ROOF MUST BE PROTECTED IN HIGH
TRAFFIC AREAS AND LOCATIONS
WHERE EQUIPMENT/MATERIALS ARE
PLACED WITH 2 LAYERS OF 3/4"
PLYWOOD. PROPERLY WEIGH DOWN
PLYWOOD TO KEEP FROM MOVING OR
BEING BLOWN AWAY.
PIPE ALL SECTION DRAINS AND
CONDENSATE PIPES TO FLOOR DRAIN
IN PENTHOUSE MECH. ROOM.
PIPE EF CONDENSATE AND SECTION
DRAINS TO OUTSIDE OF UNIT ON ROOF.
REMOVE & REPLACE ALL INSULATION
ON HWH-901.
C202F
INGREDIENT STORAGE
C263
FACULTY CIO
C261A
NUTRITION SEC
C261
DIETARY
SF
C265
CONFERENCE
C202G
COOLER
C202A
OFFICE
C265B
STAFF AREA
B202
KITCHEN
" CA UP
6" HPS UP
6" CHWS UP
6" CHWR UP
" COND. DRAIN
4" HWH & HWHR
ABOVE CEILING
4"CMU
CORE THROUGH MASONARY
WALL
C202E
SALAD PREP
2" LPR UP
3" CHWR UP
3" CHWS UP
2" HPS UP
" HWHR UP
" HWH UP
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
M
H
R
O O
F d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-104
HVAC 3rd FLOOR ROOF, AHU-34 & AHU-36 NEW
CONSTRUCTION PLANS
3rd FLOOR ROOF NEW CONSTRUCTION PLAN
2ND FLOOR PIPING PLAN
NOTE:
NOTE:
PATCHED HOLE IN ROOF
EF-101
108x42 DN
EF-3 GOOSENECK
EF-77 DUCT
PENETRATION
NEW EF-4
GOOSENECK TO BE
SEISMICALLY
BRACED PER
DETAIL 7/1-MH-504.
PATCH HOLE FROM
TEMPORARY HOT &
CHILLED WATER PIPE
PENETRATIONS IN ROOF.
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
M
H
R
O O
F d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-105
HVAC SHAFT 1, 9th FLOOR
ROOF NEW CONSTRUCTION
PLAN
SHAFT 1 ROOF NEW CONSTRUCTION PLAN
EF-30
EF-42
EF-78
EF-201
EF-21D
EF-21C
VERIZON
EQUIPMENT
16"Ø
C
A B
A
Y
T
O
V
E R
I Z
U
I P
M E
N T
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
D
R
O O
F
M
H
R
O O
F d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-106
HVAC SHAFT 2, 9th FLOOR
ROOF NEW CONSTRUCTION
PLAN
SHAFT 2 ROOF NEW CONSTRUCTION PLAN
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-401
HVAC CONTROLS DIAGRAM
AND POINTS LIST
AHU-4 CONTROL SYSTEM SCHEMATIC
AHU-6 CONTROL SYSTEM SCHEMATIC
AHU-22 CONTROL SYSTEM SCHEMATIC
AHU-34/36 CONTROL SYSTEM SCHEMATIC
CARBON DIOXIDE TRANSMITTER
AIR FLOW MEASURING STATION EBTRON FAN ARRAY
MEASURING DEVICE. PROVIDE & INSTALLED BY AHU
VENDOR. CONTROL WIRING BY CONTROLS CONTRACTOR.
CONTACT SWITCH
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-402
HVAC SEQUENCE OF
OPERATIONS
SEQUENCE OF OPERATIONS: SEQUENCE OF OPERATIONS: ABBREVIATIONS:ABBREVIATIONS:
93"
[7'-9"]
126"
[10'-6"]
366"
[30'-6"]
366"
[30'-6"]
94"
[7'-10"]
103"
[8'-7"]
173"
[14'-5"]
173"
[14'-5"]
66"
[5'-6"]
66"
[5'-6"]
281 5/8"
[23'-5
281 5/8"
[23'-5
121 3/4"
[10'-1
247 1/8"
[20'-7
61 1/8"
[5'-1
58 5/8"
[4'-10
144"
[12']
66"
[5'-6"]
67"
[5'-7"]
201"
[16'-9"]
201"
[16'-9"]
99"
[8'-3"]
32"
[2'-8"]
U
N
A
T
E
R
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T u e
S a m e s r b
B
C
U
M
E
N
T
1-MH-501
HVAC DETAILS
CUSTOM UNIT AHU-4 & EF-4
CUSTOM UNIT AHU-6
CUSTOM UNIT EF-6
CUSTOM UNIT AHU-22
CUSTOM UNIT EF-22
CUSTOM UNIT AHU-34 & AHU-36
NOTES:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-502
HVAC SCHEDULES
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-503
HVAC SCHEDULES
AIR HANDLING
UNIT
ITEM
MINIMUM
OUTSIDE AIR
TWO BEDS OF
FILTERS VAV
MINIMUM
OUTSIDE AIR
THREE BEDS OF
FILTERS CV
100%
OUTSIDE AIR
TWO BEDS
OF FILTERS
CV
100% OUTSIDE
AIR THREE
BEDS OF
FILTERS CV
* MIXING BOX 1 YES YES NO NO
* BLENDER SECTION 2 YES YES NO NO
PRE-FILTERS (SIDE
ACCESS)
3 YES YES YES YES
INSPECTION
SECTION, SMALL
4 YES YES YES YES
AFTER FILTER
(SIDE ACCESS)
5 YES YES YES YES
ACCESS SECTION,
MED-LARGE
6 YES YES YES YES
HEAT RECOVERY
COIL
7 NO NO YES YES
ACCESS SECTION,
MED-LARGE
8 NO NO YES YES
* PRE-HEAT COIL 9 YES YES YES YES
INSPECTION
SECTION,SMALL
10 YES YES YES YES
HUMIDIFIER 11 YES YES YES YES
COOLING COIL 12 YES YES YES YES
FAN 13 YES YES YES YES
* DIFFUSER PLATE 14 NO NO NO YES
ACCESS
SECTION,MED-LAR
GE
15 NO NO YES YES
* HEPA FILTER 16 NO NO NO YES
DISCHARGE
PLENUM
(VERTICAL)
17 YES YES YES YES
* AS REQUIRED
KEYED NOTE:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
M o n
S a m e a h
B
C
U
M
E
N
T
1-MH-504
HVAC DETAILS
V
G
R
R
G
R
CURB DETAIL
8TH LEVEL FLOOR PLAN
0' - 0"
9th Level Floor Plan 12' - 6"
3" ø
ER
S
4" ø
G R
NEW AHU-6
AHU-42
3"ø MPS
22"x22"
1 1/2"ø ERS
1 1/2"ø ERR
(BEHIND)
OUTDOOR
AIR INTAKE
4"ø CHWR 4"ø HWHR
4"ø CHWR
4"ø HWHR
EXISTING
AHU-6
RELOCATE CHWR & HWHR PIPES
APPROXIMATELY 10" UP
TOWARDS THE CEILING.
NEW AHU-6
4"ø CHWR
4"ø HWHR
4"ø CHWR
4"ø HWHR
1'
1"
9'
3/
4"ø GR 4"ø GRR
4"ø CHWR
1"ø MPR
2"ø HWHR
3"ø MPR
5"ø CHWR
5"ø CHWS
4"ø HWH
5"ø HWHR
3"ø MPC
ENGINEERING LLP
/2 www.fellp.com
UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN
BEARING A LICENSED PROFESSIONAL ENGINEER'S
SEAL IS A VIOLATION OF STATE EDUCATION LAW.
FE PROJECT #: 19-075
VAMC, S
YRACUSE
VA
Ve te ra ns A ffa irs
D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot
VA FORM 08-6231, OCT 1978
Revisions
Date
1 2 3 4
VAMC, SYRACUSE, NY
5 6 7
Approved:
Drawing Title
Approved:
Project Title
Location
Building Number
8 9
Drawing No.
Project No.
Date
DrawnChecked
F
E
D
C
B
A th re e in ch es o ne fo ot
A
6"
1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot
F
E on e ha lf in ch o ne fo ot
D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6"
C
6"
B
6"
528A7-18-720
STAMP:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
Dwg. of 60
VA SYRACUSE AHU-4,6,22,34&36
REPLACEMENT
JD/SRBEDF
9/
/2
:2 6:
A
M
1-MH-601
09-11-20SHAFT 2, 8th FLOOR
MECHANICAL ROOM SECTION
VIEWS
3/4" = 1'-0"3 SHAFT 2, 8TH FLOOR FUTURE DUCTWORK FREE SPACE
3/4" = 1'-0"1 SHAFT 2, 8TH FLOOR DEMO PIPE RELOCATION
3/4" = 1'-0"2 SHAFT 2, 8TH FLOOR NEW PIPE RELOCATION
AHU-42
AHU-6
22"x22"
5"ø CHWS5"ø CHWR
8"ø MPS
3"ø MPC
1 1/2"ø ERR 1 1/2"ø ERS
1"ø MPR
4"ø CHWR
3"ø HPS
22"x22"
40"x36"
8"ø MPS
8"ø HPS
5"ø CHWS
5"ø CHWR
4"ø HWHR
4"ø CHWR
1 1/2"ø ERS
1 1/2"ø ERR
3"ø HPS
ENGINEERING LLP
/2 www.fellp.com
UNAUTHORIZED ALTERATION OR ADDITION TO A PLAN
BEARING A LICENSED PROFESSIONAL ENGINEER'S
SEAL IS A VIOLATION OF STATE EDUCATION LAW.
FE PROJECT #: 19-075
VAMC, S
YRACUSE
VA
Ve te ra ns A ffa irs
D ep ar tm en t o f on e qu ar te r i nc h on e fo ot on e ei gh th in ch o ne fo ot
VA FORM 08-6231, OCT 1978
Revisions
Date
1 2 3 4
VAMC, SYRACUSE, NY
5 6 7
Approved:
Drawing Title
Approved:
Project Title
Location
Building Number
8 9
Drawing No.
Project No.
Date
DrawnChecked
F
E
D
C
B
A th re e in ch es o ne fo ot
A
6"
1 2 3 4 5 6 7 8 th re e ei gh th s in ch o ne fo ot
F
E on e ha lf in ch o ne fo ot
D 4 on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot
6"
C
6"
B
6"
528A7-18-720
STAMP:
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
Dwg. of 60
VA SYRACUSE AHU-4,6,22,34&36
REPLACEMENT
JD/SRBEDF
9/
/2
:2 6:
A
M
1-MH-602
09-11-20SHAFT 2, 8th FLOOR
MECHANICAL ROOM 3D VIEWS
1 SHAFT 2, 8th FLOOR MECHANICAL ROOM 3D VIEW-1 2 SHAFT 2, 8th FLOOR MECHANICAL ROOM 3D VIEW-2
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
M
H d a y o u t
M
H
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-MH-801
HVAC SCHEDULES
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E d a y o u t
E
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-E-001
HVAC SYMBOLS,
ABBREVIATIONS & NOTES
COMMUNICATION SYMBOLS
GENERAL SYMBOLS
ELECTRICAL DEMOLITION NOTES:
POWER SYMBOLS
ELECTRICAL LINE TYPES
ABBREVIATIONS
AHU - 4
U
H
HWS-3
HWH-101
EF-4
EXISTING POWER PANEL - (E9A-HV1)
EXISTING POWER PANEL - (E9A-AC)
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
S
H A d a y o u t
E
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-ED-101
ELECTRICAL SHAFT 1,
AHU-4 & EF-4
DEMOLITION PLANS
9th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 1,
8th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 1,
PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM
HHW EQUIP.
(HX-5,CX-5,C-5)
AHU - 42
AHU - 7
AHU - 6
EXISTING POWER PANEL - (E8B-AC)
EXISTING POWER PANEL - (8B-AC) (SECTION 1) EXISTING POWER PANEL - (8B-AC) (SECTION 2)
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
S
H A d a y o u t
E
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-ED-102
ELECTRICAL SHAFT 2,
AHU-6 & EF-6 DEMOLITION
FLOOR PLANS
9th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 2,
8th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 2,
PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM
EF - 22
AHU - 22
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
A
U D
I T
O R
I U
M d a y o u t
E
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-ED-103
ELECTRICAL AUDITORIUM,
AHU-22 & EF-22
DEMOLITION FLOOR PLANS
PENTHOUSE DEMOLITION/TEMPORARY PLAN
MECHANICAL ROOM AUDITORIUM
PARTIAL DEMOLITION ELECTRICAL ONE-LINE DIAGRAM
EXISTING POWER PANEL - (CE)
PARTIAL TEMPORARY ELECTRICAL ONE-LINE DIAGRAM
PARTIAL DEMOLITION ELECTRICAL ONE-LINE DIAGRAM
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
R
O O
F d a y o u t
E
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-ED-104
ELECTRICAL 3rd FLOOR
ROOF, AHU-34 & AHU-36
DEMOLITION PLAN
3rd FLOOR ROOF PLAN
PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM
PARTIAL TEMPORARY ELECTRICAL ONE-LINE DIAGRAM
3rd FLOOR ROOF TEMPORARY PLAN
TEMPORARY AHU-4
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
R
O O
F d a y o u t
E
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-ED-105
ELECTRICAL SHAFT 1,
9th FL. ROOF DEMOLITION
& TEMPORARY PLAN
SHAFT 1 ROOF PLAN
EF-30
EF-42
EF-78
EF-201
EF-21D
EF-21C
VERIZON
EQUIPMENT
C
A B
A
Y
T
O
V
E R
I Z
U
I P
M E
N T
EF-06T
TEMPORARY AHU - 6
208V TO 460V TRANSFORMER
PROVIDED BY CONTRACTOR FROM
TRANE WITH TEMP AHU-6
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
R
O O
F d a y o u t
E
D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-ED-106
ELECTRICAL SHAFT 2, 9th
FLOOR ROOF DEMOLITION &
TEMPORARY PLAN
SHAFT 2 ROOF PLAN
AHU - 4
UH - 10
U
H
HWS-3
HWH-101
HWS - 4
REVISED POWER PANEL - (E9A-HV1)
REVISED POWER PANEL - (E9A-AC)
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
S
H A d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-101
ELECTRICAL SHAFT 1,
AHU-4 & EF-4
NEW CONSTRUCTION PLANS
9th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 1,
8th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 1,
PARTIAL REVISED ELECTRICAL ONE-LINE DIAGRAM
AHU - 5
EF - 7
NEW AHU-5/6 HEAT SKID
AHU - 42
AHU - 7
AHU - 6
EXISTING POWER PANEL - (E8B-AC)
EXISTING POWER PANEL - (8B-AC) (SECTION 1) EXISTING POWER PANEL - (8B-AC) (SECTION 2)
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
S
H A d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-102
ELECTRICAL SHAFT 2, AHU-6
& EF-6 NEW CONSTRUCTION
FLOOR PLANS
9th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 2,
8th FLOOR NEW CONSTRUCTION PLAN
NEW POWER PANEL - (PP-HV-SHAFT 2)
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
A
U D
I T
O R
I U
M d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-103
ELECTRICAL AUDITORIUM,
AHU-22 & EF-22 NEW
CONSTRUCTION PLANS
PENTHOUSE NEW CONSTRUCTION PLAN
MECHANICAL ROOM AUDITORIUM
ELECTRICAL ONE-LINE DIAGRAM
KEYED NOTE:
NEW POWER PANEL - (PP-22)
PARTIAL NEW CONSTRUCTION
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
D
E
P
R
O O
F d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-104
ELECTRICAL 3rd FLOOR
ROOF, AHU-34 & AHU-36
NEW CONSTRUCTION PLAN
3rd FLOOR ROOF NEW CONSTRUCTION PLAN
PARTIAL REVISED ELECTRICAL ONE-LINE DIAGRAM
NEW POWER PANEL - (PP-34/36)
U N
Y
U
T E
Z O
S T
A
H
A F
T
A L A
B L
B L
B L A
B L B
B L
C L
C L
C L
C L
C L
C L
C L A
C L
C L
CL40
C L
C L
C L
L A
U N
Y
U
T E
Z O
O
A
Z O
S T
A
L
S H
A F
T
C L
C L B
S H
A F
T
I
I
J
K
K
K
K
J
L
L
L
L
L
M
M
I
J
M
I
J
M
I
J
K
M
H
I
J
K
L
M
I
I
J
J
K
K
L
L
M
M
I
J
K
L
M
I
J
L
M
J
K
L
S H
A F
T
I
I
J
K
K
K
K
J
L
L
L
L
L
M
M
I
J
M
I
J
M
I
J
K
M
H
I
J
K
L
M
I
I
J
J
K
K
L
L
M
M
I
J
K
L
M
I
J
L
M
J
K
L
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
P
S
U B
B
A S
E M
E N
B
S
E M
E N
T d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-201
ELECTRICAL SUB-BASEMENT
& BASEMENT NEW
CONSTRUCTION PLAN
PARTIAL BASEMENT 480V POWER FEED
PARTIAL SUB-BASEMENT 480V POWER FEED
A1000
A1000A
10S1
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
P
T
H
F
L O
O R d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-202
ELECTRICAL 10TH FLOOR
NEW CONSTRUCTION PLAN
10TH FLOOR 480V POWER FEED
C908F
AO
49 SF
C908H
I.T. CLOSET
47 SF
C908D
PROGRAM
SUPPORT
84 SF
C908E
MSA
SUPERVISOR
76 SF
C908C
SURGEONS OFFICE
148 SF
C908B
CHIEF OF SURGERY
97 SF
C908A
SUPPLY
74SF
B903
SURGEONS OFFICE
142 SF
B901
ELEVATOR LOBBY
148 SF
A900
MENS
141 SF
B900
WOMENS
168 SF
B902
ORTHO CHIEF
132 SF
B904
ORTHO
152 SF
B906
ORTHO
129 SF
B908
GENERAL THORACIC
SURGEONS
134 SF
B905
RESIDENTS
179 SF
B907
SURGEONS OFFICE
118 SF
B909
ELEC.
10 SF
B911
SURGEONS OFFICE
128 SF
B913
NP/RN/NCM
181 SF
B915
NP/RN/NCM
194 SF
B919
GENERAL
SURGERY CHIEF
145 SF
B921
SUPPLY
100 SF
B923
PODIATRY
195 SF
B910
GENERAL THORACIC
SURGEONS
154 SF
B912
MSA
190SF
B914
MSA
339 SF
B916
THORACIC AND
VASCULAR CHIEF
174 SF
B918
GTV
RESIDENTS
176 SF
B917
ELEC.
10 SF
A904
HOUSEKEEPING
44 SF
C908J
CARELINE
MANAGER
134 SF
9S5
STAIR
C908I
SHAFT #8
58 SF
A908
CONFERENCE ROOM
141 SF
C908G
AO
48 SF
B920
NCM ORTHO
126 SF
C908
CORRIDOR
C908K
I.T. STORAGE
58 SF
A911
A911A
SHAFT5
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
E
P
T
H
F
L O
O R d a y o u t
E
P
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-EP-203
ELECTRICAL 9TH FLOOR NEW
CONSTRUCTION PLAN
9TH FLOOR 480V POWER FEED
FIRE PROTECTION: SYMBOLS,
ABBREVIATIONS & NOTES.
LEGEND AND SCHEDULE OF FIRE PROTECTION EQUIPMENT
FIRE PROTECTION SYSTEM NOTES:
SPRINKLER DEMOLITION NOTES:
FIRE PROTECTION LINE TYPES
PIPING SYMBOLS
GENERAL SYMBOLS
ABBREVIATIONS
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
X d a y o u t
F
X
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
FX-001
FS FS
FS
FS
FS FS
UNDER DUCT
HWS - 3
HWH-101
UNDER EF
F S
FS
EF-4
DROP
SPRINKLER
PIPE DROP
TO 8th FL.
AHU - 3
METAL GRATE FLOOR CONCRETE FLOOR
FSFS
F S
F S
F S
F S
F S
FS
F S
F S
F S
F S
F S
F S
METAL GRATE FLOORING
AHU - 42
CONCRETE FLOORING
AHU - 7
FS
F S
FS FS
F S
FS FS FSFS
F S
FS FSFS FS FS
F S
FSFS FS FSFS
FSFSFS
AHU - 6
AHU - 5
EF - 7
F S
F S
FS
F S
F S
F S
FS
F S
FS
F S
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
X D
F
X
S
H A d a y o u t
F
X D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FXD-101
FIRE PROTECTION SHAFT 1,
& SHAFT 2 FIRE SPRINKLER,
DEMOLITION FLOOR PLANS
9th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 1,
8th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 1,
9th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 2,
8th FLOOR DEMOLITION PLAN www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
X D
F
X
R
O O
F
A U
D I T
O R
I U
M d a y o u t
F
X D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FXD-102
FIRE PROTECTION AUDITORIUM PENTHOUSE FIRE
SPRINKLER DEMOLITION FLOOR PLANS
PENTHOUSE DEMOLITION PLAN
MECHANICAL ROOM AUDITORIUM
KEYED NOTE:
FS FS
FS
FS
FS FS
UNDER DUCT
HWS - 3
HWH-101
HWS - 4
DROP
SPRINKLER
PIPE DROP
TO 8th FL.
AHU - 3
METAL GRATE FLOOR CONCRETE FLOOR
FSFS
F S
F S
F S
F S
F S
FS
F S
F S
F S
F S
F S
F S
AHU - 5
EF - 7
F S
F S
FS
F S
F S
F S
FS
F S
FS
F S
NEW AHU-5/6 HEAT SKID
METAL GRATE FLOORING
AHU - 42
CONCRETE FLOORING
AHU - 7
FS
F S
FS FS
F S
FS FS FSFS
F S
FS FSFS FS FS
F S
FSFS FS FSFS
FSFSFS
AHU - 6
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
X D
F
X
S
H A d a y o u t
F
X
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FX-101
FIRE PROTECTION SHAFT 1,
AHU-4 & EF-4 NEW
CONSTRUCTION FLOOR PLANS
9th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 1,
8th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 1,
9th FLOOR NEW CONSTRUCTION PLAN
8th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 2,
FS FS FS FS FS
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
X D
F
X
R
O O
F
A U
D I T
O R
I U
M d a y o u t
F
X
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FX-102
FIRE PROTECTION AUDITORIUM PENTHOUSE FIRE
SPRINKLER NEW CONSTRUCTION FLOOR PLANS
PENTHOUSE NEW CONSTRUCTION PLAN
MECHANICAL ROOM AUDITORIUM
FIRE ALARM: SYMBOLS,
ABBREVIATIONS & NOTES.
LEGEND AND SCHEDULE OF FIRE ALARM EQUIPMENT
FIRE ALARM NOTES:
1.
NOTES:
2.
NOTES:
MOUNTING HEIGHTS OF FIRE ALARM EQUIPMENT
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
A d a y o u t
F
A
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
FA-001
HWS - 3
HWH-101
EF-4
AHU - 3
METAL GRATE FLOOR CONCRETE FLOOR
AHU-4
METAL GRATE FLOORING
AHU - 42
AHU - 6
CONCRETE FLOORING
AHU - 7
EF - 7
B924
SHAFT 2
x
36x50
50x30
38x38
(E) 18x18 DN
(N) 16"Ø UP TO
EF-78 ON ROOF
F S
D
F S
D
F S
D
24x16
UP TO
EF-30
UP TO
EF-42
20x20
DN
24x16
DN
24x12
DN
38x38
DN
50x36
DN
38x30
DN
24x12
BOD 100"
BOD 89.5"
BOD 135"
x
30x22
22x18 x
30x22
36x20
SLOPE DN
TO BOD ±93"
56x14
BOD 137"
BOD 113"
BOD 113"
BOD 137"
36x20
HHW EQUIP.
(HX-5,CX-5,C-5)
EF-7
AHU-5
x
BOD 127"
BOD 103"
S L
O P
E
D
N
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
A D
F
A
S
H A d a y o u t
F
A D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FAD-101
FIRE ALARM SHAFT 1 &
SHAFT 2 DEMOLITION
FLOOR PLANS
9th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 1,
8th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 1,
9th FLOOR DEMOLITION PLAN
MECHANICAL ROOM SHAFT 2,
8th FLOOR DEMOLITION PLAN
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
A D
F
A
R
O O
F
A U
D I T
O R
I U
M d a y o u t
F
A D
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FAD-102
FIRE ALARM AUDITORIUM
PENTHOUSE, & 3RD FLOOR KITCHEN
ROOF DEMOLITION FLOOR PLANS
PENTHOUSE DEMOLITION PLAN
MECHANICAL ROOM AUDITORIUM
3rd FLOOR ROOF PLAN
HWS - 3
HWH-101
AHU - 3
METAL GRATE FLOOR CONCRETE FLOOR
AHU-4
EF - 7
B924
SHAFT 2
x
36x50
50x30
38x38
(E) 18x18 DN
(N) 16"Ø UP TO
EF-78 ON ROOF
F S
D
F S
D
F S
D
24x16
UP TO
EF-30
UP TO
EF-42
20x20
DN
24x16
DN
24x12
DN
38x38
DN
50x36
DN
38x30
DN
24x12
BOD 100"
BOD 89.5"
BOD 135"
x
30x22
22x18 x
30x22
36x20
SLOPE DN
TO BOD ±93"
56x14
BOD 137"
BOD 113"
BOD 113"
BOD 137"
36x20
EF-7
AHU-5
x
BOD 127"
BOD 103"
S L O
METAL GRATE FLOORING
AHU - 42
CONCRETE FLOORING
AHU - 7
AHU - 6
ENGINEERING LLP
www.fellp.com
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986
FE PROJECT #: 19-075
F i l e
N a m e
F
V
A
S
Y R
A C
U S
E
A
P
L A
C E
M E
N T
F
A D
F
A
S
H A d a y o u t
F
A
D a t e
T h u
S a m e s r b
B
C
U
M
E
N
T
1-FA-101
FIRE ALARM SHAFT 1 & SHAFT
2 NEW CONSTRUCTION
FLOOR PLANS
9th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM SHAFT 1,
8th FLOOR NEW CONSTRUCTION PLAN
MECHANICAL ROOM…
This is the start of the file's text. The full file is on GovTribe.