About this file

This document contains the Section I solicitation clauses for a Department of Energy nationwide deactivation, decommissioning, and removal procurement. Key details include that the solicitation seeks services for decontamination, decommissioning, and removal activities at various DOE sites nationwide. The total contract period of performance is five years with the potential for additional option periods. The solicitation incorporates standard FAR and agency-specific clauses covering areas such as contract type, ordering procedures, subcontracting requirements, and other standard terms and conditions. It identifies the applicable wage determinations and labor standards. The document provides standard language for clauses related to small business participation goals, environmental and nuclear safety standards, and other regulatory requirements.

View the file

Other files

File Type Posted
Section L Amend. 3.pdf PDF
Amendment 0003 Summary of Changes.pdf PDF
SF30 Amendment 3.pdf PDF
Section M Amend. 3.pdf PDF
Attachment L-11_Estimating Flat File Amend. 2.xlsx XLSX spreadsheet
Attachment L-10_Task Order 1_LLNL Building 251 DD&R Amend. 2.pdf PDF
SF30 Amendment 2.pdf PDF
Amendment 0002 Summary of Changes.pdf PDF
Attachment L-5_Cost Summary Worksheets Amend. 1.xlsx XLSX spreadsheet
Attachment L-10_Task Order 1_LLNL Building 251 DD&R Amend. 1.pdf PDF
Section C Amend. 1.pdf PDF
Attachment L-6_Consolidated Direct Cost Schedules Amend. 1.xlsx XLSX spreadsheet
Section L Amend. 1.pdf PDF
Amendment 0001 Summary of Changes.pdf PDF
SF30 Amendment 1.pdf PDF
Section M Amend. 1.pdf PDF
Attachment L-11_Estimating Flat File Amend. 1.xlsx XLSX spreadsheet
5. Attachment L-10_Task Order 1_LLNL Building 251 DDR.pdf PDF
4. Attachment L-6_Consolidated Direct Cost Schedules.xlsx XLSX spreadsheet
2. Final RFP Sol. No. 89303319REM000052 (except Attachments L-5, L-6, L-10 and L-11).pdf PDF
3. Attachment L-5_Cost Summary Worksheets.xlsx XLSX spreadsheet
6. Attachment L-11_Estimating Flat File.xlsx XLSX spreadsheet
1. EMCBC-00125-20_Nationwide DDR Final RFP Cover Letter.pdf PDF
7. Final RFP Question Template_Sol. No. 89303319REM000052.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONWIDE DD&R– FINAL RFP SECTION I

SOLICITATION NO. 89303319REM000052

I-1

Part II – Contract Clauses

Section I Contract Clauses

I-2

I.1 FAR 52.252-2 Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

https://www.acquisition.gov/?q=browsefar http://energy.gov/management/downloads/searchable-electronic-department-energy-acquisition-regulation

I.2 FAR 52.252-6 Authorized Deviations in Clauses (Apr 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Department of Energy Acquisition Regulation (48 CFR

Chapter 9) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

Table I-1. Clauses

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.3 52.202-1 Definitions (Nov 2013)

I.4 52.203-3 Gratuities (Apr 1984)

I.5 52.203-5 Covenant Against Contingent Fees (May 2014)

I.6 52.203-6 Restrictions on Subcontractor Sales to the Government

(Sep 2006)

I.7 52.203-7 Anti-Kickback Procedures (May 2014)

I.8 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014)

I.9 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity

(May 2014)

I.10 52.203-12 Limitation on Payments to Influence Certain Federal

Transactions (Oct 2010)

I.11 52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015)

I.12 52.203-14 Display of Hotline Poster(s) (Oct 2015) (b)(3) DOE IG

Hotline Poster

I.13 52.203-17 Contractor Employee Whistleblower Rights and

Requirement to Inform Employees of Whistleblower Rights

(Apr 2014)

I.14 52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements (Jan 2017)

I.15 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper (May 2011) https://www.acquisition.gov/?q=browsefar http://energy.gov/management/downloads/searchable-electronic-department-energy-acquisition-regulation http://energy.gov/management/downloads/searchable-electronic-department-energy-acquisition-regulation https://energy.gov/sites/prod/files/igprod/documents/Hotline_poster.pdf

I-3

Table I-1. Clauses

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.16 52.204-9 Personal Identity Verification of Contractor Personnel

(Jan 2011)

I.17 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards (Oct 2018)

I.18 52.204-13 System for Award Management Maintenance (Oct 2018)

I.19 52.204-15 Service Contract Reporting Requirements for Indefinite-

Delivery Contracts (Oct 2016)

I.20 52.204-18 Commercial and Government Entity Code Maintenance

(Jul 2016)

I.21 52.204-19

Incorporation by Reference of Representations and

Certifications (Dec 2014)

I.22 52.204-21

Full Text

Below

Basic Safeguarding of Covered Contractor Information

Systems (Jun 2016)

I.23 52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and

Other Covered Entities (Jul 2018)

I.24 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2019)

I.25 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for

Debarment (Oct 2015)

I.26 52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters (Oct 2018)

I.27 52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations (Nov 2015)

I.28 52.210-1 Market Research (Apr 2011)

I.29 52.215-2 Audit and Records – Negotiation (Oct 2010)

I.30 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997)

I.31 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data

(Aug 2011)

I.32 52.215-11 Price Reduction for Defective Certified Cost or Pricing

Data-Modifications (Aug 2011)

I.33 52.215-12 Subcontractor Certified Cost or Pricing Data (Oct 2010)

I.34 52.215-13 Subcontractor Certified Cost or Pricing Data – Modifications

(Oct 2010)

I.35 52.215-14 Integrity of Unit Prices (Oct 2010) – Alt. I (Oct 1997)

I-4

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.36 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010)

I.37 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997)

NOTE: This clause will not be included in the contract if awardee proposes Facilities Capital Cost of Money in its proposal.

I.38 52.215-18 Reversion or Adjustment of Plans for Post-Retirement

Benefits (PRB) Other Than Pensions (Jul 2005)

I.39 52.215-19 Notification of Ownership Changes (Oct 1997)

I.40 52.215-21 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data—Modifications

(Oct 2010) – Alt III (Oct 1997)

(c) CD-ROM, as requested by the

Contracting Officer.

I.41 52.215-23 Limitations on Pass-Through Charges (Oct 2009)

I.42 52.216-7 Allowable Cost and Payment (Aug 2018) as modified by

DEAR 952.216-7 (Applies to CR Task Orders Only)

(a)(3) 14th (cost invoices) and 14th (fee invoices)

I.43 52.216-8 Fixed Fee (Jun 2011)

I.44 52.216-9 Fixed Fee – Construction (Jun 2011)

I.45 52.216-10 Incentive Fee (Jun 2011) (e)(1) 30, 30, 15, zero

I.46 52.216-11 Cost Contract – No Fee (Apr 1984)

Applies to CR Task Orders without fee only)

I.47 52.216-18

Below

Ordering (Oct 1995) (a) from effective date of contract award through the end of the total contract ordering period

I.48 52.216-19

Full Text

Below

Order Limitations (Oct 1995) (a) $50,000

(b)(1) $3,000,000,000

(b)(2) $3,000,000,000

(b)(3) 365

(d) 5

I.49 52.216-22

Full Text

Below

Indefinite Quantity (Oct 1995) (d) five years beyond the expiration date of the contract o rd er ing period

I.50 52.217-8 Option to Extend Services (Nov 1999) Any time prior to the expiration of the

Contract or Task Order, as applicable

I-5

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.51 52.217-9

Full Text

Below

Option to Extend the Term of the Contract (Mar 2000)

(Applies to Task Orders with an Option(s) only)

(a) TBD on Task Order

Level; TBD on Task

Order level

(c) TBD on Task Order level.

I.52 52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns (Oct 2014)

[Offeror Fill-in]

I.53

I.54 52.219-8 Utilization of Small Business Concerns (Oct 2018)

I.55 52.219-9 Small Business Subcontracting Plan (Aug 2018) –

Alternate II (Nov 2016)

I.56 52.219-13 Notice of Set-Aside of Orders (Nov 2011)

I.57 52.219-14 Limitations on Subcontracting (Jan 2017)

I.58 52.219-16 Liquidated Damages – Subcontracting Plan (Jan 1999)

I.59 52.219-28 Post-Award Small Business Program Re-representation

(Jul 2013)

(g) [Offeror Fill-In]

I.60 52.222-1 Notice to the Government of Labor Disputes (Feb 1997)

I.61 52.222-2 Payment for Overtime Premiums (Jul 1990) (Applies to non-

CPIF CR Task Orders only)

(a) zero

I.62 52.222-3 Convict Labor (Jun 2003)

I.63 52.222-4 Contract Work Hours and Safety Standards – Overtime

Compensation (May 2018)

I.64 52.222-6 Construction Wage Rate Requirements (Aug 2018) (Applies to construction work only)

I.65 52.222-7 Withholding of Funds (May 2014) (Applies to construction work only)

I.66 52.222-8 Payrolls and Basic Records (Aug 2018) (Applies to construction work only)

I.67 52.222-9 Apprentices and Trainees (Jul 2005) (Applies to construction

I.68 52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

(Applies to construction work only)

I.69 52.222-11 Subcontracts (Labor Standards) (May 2014) (Applies to

I.70 52.222-12 Contract Termination—Debarment (May 2014) (Applies to

I-6

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.71 52.222-13 Compliance with Construction Wage Rate Requirements and

Related Regulations (May 2014) (Applies to construction

I.72 52.222-14 Disputes Concerning Labor Standards (Feb 1988) (Applies

I.73 52.222-15 Certification of Eligibility (May 2014) (Applies to

I.74 52.222-16 Approval of Wage Rates (May 2014) (Applies to

I.75 52.222-17 Nondisplacement of Qualified Workers (May 2014)

I.76 52.222-19 Child Labor – Cooperation with Authorities and Remedies

(Oct 2019)

I.77 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000 (May 2014)

I.78 52.222-21 Prohibition of Segregated Facilities (Apr 2015)

I.79 52.222-26 Equal Opportunity (Sep 2016)

I.80 52.222-27 Affirmative Action Compliance Requirements for

Construction (Apr 2015) (Applies to construction work only)

I.81 52.222-30 Construction Wage Rate Requirements—Price Adjustment

(None or Separately Specified Method) (Aug 2018) (Applies

I.82 52.222-31 Construction Wage Rate Requirements – Price Adjustment

(Percentage Method) (Aug 2018) (Applies to FFP Task

Orders only) (Applies to construction work only)

(b)(1) TBD on Task

Order level

(b)(2) TBD on Task

Order level

I.83 52.222-32 Construction Wage Rate Requirements—Price Adjustment

(Actual Method) (Aug 2018) (Applies to FFP Task Orders only) (Applies to construction work only)

I.84 52.222-34 Project Labor Agreement (May 2010) (Applies to construction or D&D work only)

I.85 52.222-35

Below

Equal Opportunity for Veterans (Oct 2015)

I.86 52.222-36

Full Text

Below

Equal Opportunity for Workers With Disabilities (Jul 2014)

I.87 52.222-37 Employment Reports on Veterans (Feb 2016)

I-7

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.88 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act (Dec 2010)

I.89 52.222-41 Service Contract Labor Standards (Aug 2018) (Applies to services work only)

I.90 52.222-42

Below

Statement of Equivalent Rates for Federal Hires (May 2014) See full text below

I.91 52.222-43 Fair Labor Standards Act and Service Contract Labor

Standards – Price Adjustment (Multiple Year and Option

Contracts) (Aug 2018)

I.92 52.222-44 Fair Labor Standards Act and Service Contract Labor

Standards-Price Adjustment (May 2014) (Applies to FFP

Task Orders only)

I.93 52.222-50 Combating Trafficking in Persons (Jan 2019)

I.94 52.222-54 Employment Eligibility Verification (Oct 2015)

I.95 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015)

I.96 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017)

I.97 52.223-2 Affirmative Procurement of Biobased Products Under

Service and Construction Contracts (Sep 2013)

I.98 52.223-3 Hazardous Material Identification and Material Safety Data

(Jan 1997) – Alternate I (Jul 1995)

(b) Offeror Fill-In

I.99 52.223-5

Pollution Prevention and Right-to-Know Information

(May 2011)

I.100 52.223-6 Drug-Free Workplace (May 2001)

I.101 52.223-9

Full Text

Below

Estimate of Percentage of Recovered Material Content for

EPA Designated Items (May 2008)

(b)(2) the Contracting

Officer

I.102 52.223-10 Waste Reduction Program (May 2011)

I.103 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons (Jun 2016)

I.104 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration

Equipment and Air Conditioners (Jun 2016)

I.105 52.223-13 Acquisition of EPEAT®-Registered Imaging Equipment

(Jun 2014)

I.106 52.223-14 Acquisition of EPEAT®-Registered Televisions (Jun 2014)

I.107 52.223-15 Energy Efficiency in Energy-Consuming Products

(Dec 2007)

I-8

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.108 52.223-16 Acquisition of EPEAT®-Registered Personal Computer

Products (Oct 2015)

I.109 52.223-17 Affirmative Procurement of EPA-designated Items in

Service and Construction Contracts (Aug 2018)

I.110 52.223-18 Encouraging Contractor Policies to Ban Text Messaging

While Driving (Aug 2011)

I.111 52.223-19 Compliance with Environmental Management Systems

(May 2011)

I.112 52.223-20 Aerosols (Jun 2016)

I.113 52.223-21 Foams (Jun 2016)

I.114 52.224-1 Privacy Act Notification (Apr 1984)

I.115 52.224-2 Privacy Act (Apr 1984)

I.116 52.224-3 Privacy Act Training (Jan 2017)

I.117 52.225-1 Buy American – Supplies (May 2014)

I.118 52.225-8 Duty-Free Entry (Oct 2010)

I.119 52.225-9

Full Text

Below

Buy American – Construction Materials (May 2014) (b)(2) None

I.120 52.225-11

Full Text

Below

Buy American – Construction Materials Under Trade

Agreements (DOE DEVIATION) (Feb 2008)

(b)(3) None

I.121 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)

I.122 52.226-1 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises (Jun 2000)

I.123 52.227-1 Authorization and Consent (Dec 2007)

I.124 52.227-2 Notice and Assistance Regarding Patent and Copyright

Infringement (Dec 2007)

I.125 52.227-3 Patent Indemnity (Apr 1984)

I.126 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007)

I.127 52.227-9 Refund of Royalties (Apr 1984)

I.128 52.227-14 Rights in Data – General (May 2014) – Alt II (Dec 2007, Alt

III (Dec 2007), Alt V (Dec 2007) (as modified by DEAR

927.409)

I.129 52.227-16 Additional Data Requirements (Jun 1987)

I.130 52.227-23 Rights to Proposal Data (Technical) (Jun 1987) [Offeror Fill-In]

I-9

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.131 52.228-2 Additional Bond Security (Oct 1997)

I.132 52.228-5 Insurance – Work On A Government Installation (Jan 1997)

(Applies to FFP Task Orders only)

I.133 52.228-11 Pledges of Assets (Aug 2018)

I.134 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014)

I.135 52.228-14 Irrevocable Letter of Credit (Nov 2014)

I.136 52.228-15 Performance and Payment Bonds-Construction (Oct 2010)

I.137 52.229-3 Federal, State, and Local Taxes (Feb 2013)

I.138 52.230-2 Cost Accounting Standards (Oct 2015) [Class Deviation

CAAC Letter 2018-03 – May 3, 2018 (Issued by DOE Policy

Flash 2018-30)] (DEVIATION)

I.139 52.230-6 Administration of Cost Accounting Standards (Jun 2010)

I.140 52.232-1 Payments (Apr 1984)

I.141 52.232-5 Payments under Fixed-Price Construction Contracts (May

2014)

I.142 52.232-8 Discounts for Prompt Payment (Feb 2002)

I.143 52.232-9 Limitation on Withholding of Payments (Apr 1984)

I.144 52.232-11 Extras (Apr 1984)

I.145 52.232-17 Interest (May 2014)

I.146 52.232-18 Availability of Funds (Apr 1984)

I.147 52.232-22 Limitation of Funds (Apr 1984)

I.148 52.232-23 Assignment of Claims (May 2014)

I.149 52.232-25 Prompt Payment (Jan 2017) – Alternate I (Feb 2002)

(Alternate I applies to CR Task Orders Only)

I.150 52.232-27 Prompt Payment for Construction Contracts (Jan 2017)

(Applies to construction work only)

I.151 52.232-33 Payment by Electronic Funds Transfer-System for Award

Management (Oct 2018)

I.152 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

I.153 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Dec 2013)

I.154 52.233-1 Disputes (May 2014) – Alternate I (Dec 1991)

I.155 52.233-3 Protest after Award (Aug 1996) – Alternate I (Jun 1985)

I-10

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.156 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)

I.157 52.236-1 Performance of Work by the Contractor (Apr 1984) (Applies to FFP construction work only)

TBD on Task Order level

I.158 52.236-2 Differing Site Conditions (Apr 1984) (Applies to FFP

I.159 52.236-3 Site Investigation and Conditions Affecting the Work (Apr

1984) (Applies to FFP construction or D&D work only)

I.160 52.236-5 Material and Workmanship (Apr 1984) (Applies to

I.161 52.236-6 Superintendence by the Contractor (Apr 1984) (Applies to

FFP construction or D&D work only)

I.162 52.236-7 Permits and Responsibilities (Nov 1991) (Applies to

I.163 52.236-8 Other Contracts (Apr 1984) (Applies to FFP construction or

D&D work only)

I.164 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) (Applies to FFP

I.165 52.236-10 Operations and Storage Areas (Apr 1984) (Applies to FFP

I.166 52.236-11 Use and Possession Prior to Completion (Apr 1984) (Applies to FFP construction work only)

I.167 52.236-12 Cleaning Up (Apr 1984) (Applies to FFP construction or

D&D work only)

I.168 52.236-13 Accident Prevention (Nov 1991) – Alt I (Nov 1991) (Applies to FFP construction or D&D work only)

I.169 52.236-14 Availability and Use of Utility Services (Apr 1984) (Applies to FFP construction or D&D work only)

I.170 52.236-15 Schedules for Construction Contracts (Apr 1984) (Applies to

FFP construction or D&D work only)

I.171 52.236-18 Work Oversight in Cost-Reimbursement Construction

Contracts (Apr 1984) (Applies to CR construction work only)

I.172 52.236-19 Organization and Direction of the Work (Apr 1984) (Applies to CR construction work only)

I.173 52.236-21 Specifications and Drawings for Construction (Feb 1997) -

Alt I (Apr 1984) or Alt II (Apr 1984), as appropriate

(Applies to FFP construction or D&D work only)

[Alt II fill-in TBD on

Task Orders, when applicable]

I-11

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.174 52.237-2 Protection of Government Buildings, Equipment, and

Vegetation (Apr 1984) (Applies to CR construction work

I.175 52.237-3 Continuity of Services (Jan 1991)

I.176 52.239-1 Privacy or Security Safeguards (Aug 1996)

I.177 52.242-1 Notice of Intent to Disallow Costs (Apr 1984)

I.178 52.242-3 Penalties for Unallowable Costs (May 2014)

I.179 52.242-4 Certification of Final Indirect Costs (Jan 1997)

I.180 52.242-5 Payments to Small Business Subcontractors (Jan 2017)

I.181 52.242-13 Bankruptcy (Jul 1995)

I.183 52.243-1 Changes – Fixed Price (Aug 1987) – Alt II (Apr 1984)

I.184 52.243-2 Changes – Cost-Reimbursement (Aug 1987) – Alt I (Apr

1984), Alt II (Apr 1984), Alt III (Apr 1984)

I.185 52.243-4 Changes (Jun 2007)

I.186 52.243-6 Change Order Accounting (Apr 1984)

I.187 52.243-7 Notification of Changes (Jan 2017)

I.188 52.244-2 Subcontracts (Oct 2010) – Alternate I (Jun 2007) (d) The DOE

Contracting Officer will issue within 30 days from Notice to Proceed a letter to the Contractor setting thresholds for consent to subcontract for all subcontract types;

(j) [Contracting Officer fill in at award]

I.189 52.244-5 Competition in Subcontracting (Dec 1996)

I.190 52.244-6 Subcontracts for Commercial Items (Aug 2019)

I.191 52.245-1 Government Property (Jan 2017)

I.192 52.245-9 Use and Charges (Apr 2012)

I.193 52.246-25 Limitation of Liability – Services (Feb 1997)

I.194 52.247-1 Commercial Bill of Lading Notations (Feb 2006) (a) Department of

Energy

(b) Department of

Energy;

Contract No.

(Contracting Officer fill

I-12

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d) in at award); the

Contract Administration

Office specified in

Section G

I.195 52.247-63 Preference for U.S.-Flag Air Carriers (June 2003)

I.196 52.247-64 Preference for Privately Owned U.S.-Flag Commercial

Vessels (Feb 2006)

I.197 52.247-67

Below

Submission of Transportation Documents for Audit

(Feb 2006)

I.198 52.247-68 Report of Shipment (REPSHIP) (Feb 2006)

I.199 52.248-1 Value Engineering (Oct 2010) (m) Contracting Officer fill in at award

I.200 52.248-3 Value Engineering—Construction (Oct 2015) (Applies to construction work only)

(i) Contract number will be inserted at time of award

I.201 52.249-2 Termination for the Convenience of the Government (Fixed-

Price) (Apr 2012) (Applies to FFP Task Orders only)

I.202 52.249-3 Termination for Convenience of the Government

(Dismantling, Demolition, or Removal of Improvements)

(Apr 2012) (Applies to FFP D&D Task Orders only)

I.203 52.249-6 Termination (Cost-Reimbursement) (May 2004) –

Alternate I (Sep 1996) (Alt I Applies to CR Task Orders for construction only)

I.204 52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984)

(Applies to FFP Task Orders only)

I.205 52.249-10 Default (Fixed-Price Construction) (Apr 1984) – Alt I (Apr

1984) (Alt I Applies to FFP construction or D&D Task

Orders only)

I.206 52.249-14 Excusable Delays (Apr 1984) (Applies to CR Task Orders

I.207 52.251-1 Government Supply Sources (Apr 2012)

I.208 52.251-2 Interagency Fleet Management System Vehicles and Related

Services (Jan 1991)

I.209 52.253-1 Computer Generated Forms (Jan 1991)

I.210 952.202-1 Definitions (Feb 2011)

I.211 952.203-70

Whistleblower Protection for Contractor Employees

(Dec 2000)

I-13

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.212 952.204-2 Security Requirements (Aug 2016)

I.213 952.204-70 Classification/Declassification (Sep 1997)

I.214 952.204-75 Public Affairs (Dec 2000)

I.215 952.204-77 Computer Security (Aug 2006)

I.216 952.208-7 Tagging of Leased Vehicles (Apr 1984)

I.217 952.208-70 Printing (Apr 1984)

I.218 952.209-72

Organizational Conflicts of Interest (Aug 2009) – Alternate I

(Feb 2011)

(b)(1)(i) zero (0)

I.219 952.215-70 Key Personnel (Dec 2000)

I.220 952.216-7 Allowable Cost and Payment (Feb 2011)

I.221 952.217-70 Acquisition of Real Property (Mar 2011)

I.222 952.223-72 Radiation Protection and Nuclear Criticality (Apr 1984)

I.223 952.223-75

Preservation of Individual Occupational Radiation Exposure

Records (Apr 1984)

I.224 952.223-78

Sustainable Acquisition Program (Oct 2010) – Alt I

(Oct 2010) (Alt I applies to Task Orders for construction

I.225 952.225-70 Subcontracting for Nuclear Hot Cell Services (Mar 1993)

I.226 952.225-71

Compliance with Export Control Laws and Regulations

(Nov 2015)

I.227 952.226-74 Displaced Employee Hiring Preference (Jun 1997)

I.228 952.231-71 Insurance—Litigation and Claims (Jul 2013)

I.229 952.242-70 Technical Direction (Dec 2000)

I.230 952.245-5 Government Property (Cost-Reimbursement, Time-and-Materials, or Labor-Hour Contracts) (Dec 2012)

I.231 952.247-70 Foreign Travel (Jun 2010)

I.232 952.250-70 Nuclear Hazards Indemnity Agreement (Aug 2016)

I.233 952.251-70 Contractor Employee Travel Discounts (Aug 2009)

I.234 970.5204-3

Full Text

Below

Access to and Ownership of Records (Oct 2014)

(DEVIATION)

I.235 970.5204-1 Counterintelligence (Dec 2010)

I.236 970.5204-2 Laws, Regulations, and DOE Directives (Dec 2000)

I-14

Clause

No.

FAR/DEAR

Reference

Title Fill-In Information;

See FAR 52.104(d)

I.237 970.5215-3 Conditional Payment of Fee, Profit, and Other Incentives—

Facility Management Contracts (Aug 2009) –Alt II (Aug

2009)

I.238 970.5217-1 Strategic Partnership Project Program (Non-DOE Funded

Work ) (Apr 2015)

I.239 970.5223-1

Integration of Environment, Safety, and Health into Work

Planning and Execution (Dec 2000)

I.240 970.5226-2 Workforce Restructuring Under Section 3161 of the National

Defense Authorization Act for Fiscal Year 1993 (Dec 2000)

I.241 970.5227-1

Rights in Data-Facilities (Dec 2000) [Contracting Officer Fill-

In at Award]

I.242 970.5231-4 Preexisting Conditions (Dec 2000)

I.243 970.5232-3

Alt. 19 II

Accounts, Records, and Inspection (Dec 2010)

Acronyms:

CPIF = cost plus incentive fee

CR = cost reimbursement

D&D = decontamination and decommissioning

DEAR = U.S.Department of Energy Acquisition Regulation

DOE = U.S. Department of Energy

EPA = U.S. Environmental Protection Agency

FAR = Federal Acquisition Regulation

FFP = firm fixed price

HUBZone = Historically Underutilized Business Zone

PRB = post-retirement benefit

TBD = to be determined

This contract incorporates one or more clauses by reference as indicated in the matrix above.

Any clauses that are included in full text are listed below and include the same Section I identifier in parentheses as was used above.

(I.22) FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems

(Jun 2016)

(a) Definitions. As used in this clause–

“Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the

Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.

“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual

(Committee on National Security Systems Instruction (CNSSI) 4009).

I-15

“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information

(44 U.S.C. 3502).

“Safeguarding” means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement sub-networks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor http://uscode.house.gov/

I-16 information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(I.47) FAR 52.216-18 Ordering (Oct 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the effective date of contract award, as defined in Section F.3, DOE-F-2003 entitled, Period of Performance, through the end of the total contract ordering period as specified in Section F.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(I.48) FAR 52.216-19 Order Limitations (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $50,000.00 the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $3B;

(2) Any order for a combination of items in excess of $3B; or

(3) A series of orders from the same ordering office within 365 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the

Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(I.49) FAR 52.216-22 Indefinite Quantity (Oct 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

I-17

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the

Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the

Contractor shall not be required to make any deliveries under this contract five years beyond the expiration date of the ordering period.

(I.50) FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000) (Applies to

Task Orders with an option(s) only)

(a) The Government may extend the term of this contract by written notice to the Contractor within TBD on Task Order level; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least TBD on Task Order level. The preliminary notice does not commit the

Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed TBD on Task Order level (months) (years).

(I.85) FAR 52.222-35 Equal Opportunity for Veterans (Oct 2015)

(a) Definitions. As used in this clause—

“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,”

“disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2022_13.html#wp1085590

I-18

(I.86) FAR 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of

Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(I.90) FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of

Labor (29 CFR part 4), this clause will be tailored in the Request for Task Order Proposal on individual

Task Orders to identify the classes of service employees expected to be employed under the Task Order and state the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only: It is not a Wage Determination (please refer to Section J, Attachment J-6 for Wage Determinations applicable to this Contract).

Table I-2. Classes of Service, Wage, and Fringe Benefits

Classifications Grade Equivalent Pay

TBD on Task Orders TBD on Task Orders TBD on Task Orders

(I.101) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA

Designated Items (May 2008)

(a) Definitions. As used in this clause—

“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”

“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall:

(1) Estimate the percentage of the total recovered material content for EPA designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to the Contracting Officer.

I-19

(I.119) FAR 52.225-9, Buy American – Construction Materials (May 2014)

(a) Definitions. As used in this clause:

“Commercially available off-the-shelf (COTS) item”

(1) Means any item of supply (including construction material) that is:

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means:

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means:

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if:

(i) The cost of its components mined, produced, or manufactured in the United States exceeds

50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non-availability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

I-20

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the

Buy American statute is waived for construction material that is a COTS item.

(See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[None]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph

(b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i) Any Contractor request to use foreign construction material in accordance with paragraph

(b)(3) of this clause shall include adequate information for Government evaluation of the request, including:

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

I-21

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iv) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(v) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the

Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)

Item 1

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

Item 2

Foreign construction material _______ _______ _______

Domestic construction material

I-22

(I.120) FAR 52.225-11 Buy American—Construction Materials Under Trade Agreements

(DOE DEVIATION) (Feb 2008)

(a) Definitions. As used in this clause-

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the

Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Designated country” means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement country (Aruba, Austria, Belgium, Bulgaria, Canada, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, or United

Kingdom);

(2) A Free Trade Agreement country (Australia, Bahrain, Canada, Chile, Dominican Republic, El

Salvador, Guatemala, Honduras, Mexico, Morocco, Nicaragua, or Singapore); or

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Cape Verde, Central African Republic, Chad, Comoros, Democratic

Republic of Congo, Djibouti, East Timor, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Madagascar, Malawi, Maldives, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, Tanzania, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia).

“Designated country construction material” means a construction material that is a WTO GPA country construction material, an FTA country construction material, or a least developed country construction material.

“Domestic construction material” means-

(1) An unmanufactured construction material mined or produced in the United States; or

I-23

(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.

“Foreign construction material” means a construction material other than a domestic construction material.

“Free Trade Agreement country construction material” means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

“Least developed country construction material” means a construction material that-

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

“United States” means the 50 States, the District of Columbia, and outlying areas.

“WTO GPA country construction material” means a construction material that-

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In addition, the Contracting Officer has determined that the WTO

GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American

Act restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to the construction materials or components listed by the Government as follows:

None

(4) The Contracting Officer may add other foreign construction material to the list in paragraph

(b)(3) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

I-24

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate…

This is the start of the file's text. The full file is on GovTribe.