4. Attachment L-6_Consolidated Direct Cost Schedules.xlsx

XLSX spreadsheet 223 KB Posted

Attached to
U. S. Department of Energy (DOE) Office of Environmental Management (EM) - Nationwide Deactivation, Decommissioning and Removal (DD&R) Procurement
Solicitation number
89303319REM000052
Issued by

About this file

This document provides templates and instructions for completing cost proposals for the Central Plateau Cleanup Contract solicitation. Offerors must complete multiple cost worksheets and schedules providing details of direct costs by labor categories, materials, equipment, subcontractors, and other cost elements. Templates are provided for labor hours and rates, material and supply quantities and unit costs, equipment items, travel, and relocation. Instructions specify including WBS structure in cost rollups and reconciling subtotals to other cost documents. Indirect rates must be clearly assigned to direct labor categories. Completed cost proposals will include fully burdened labor rates, quantity-based costs for materials and supplies, unit costs for equipment and subcontractors, and travel, testing, waste transport and disposal estimates.

View the file

Other files

File Type Posted
Section L Amend. 3.pdf PDF
Amendment 0003 Summary of Changes.pdf PDF
SF30 Amendment 3.pdf PDF
Section M Amend. 3.pdf PDF
Attachment L-11_Estimating Flat File Amend. 2.xlsx XLSX spreadsheet
Attachment L-10_Task Order 1_LLNL Building 251 DD&R Amend. 2.pdf PDF
SF30 Amendment 2.pdf PDF
Amendment 0002 Summary of Changes.pdf PDF
Attachment L-5_Cost Summary Worksheets Amend. 1.xlsx XLSX spreadsheet
Attachment L-10_Task Order 1_LLNL Building 251 DD&R Amend. 1.pdf PDF
Section C Amend. 1.pdf PDF
Attachment L-6_Consolidated Direct Cost Schedules Amend. 1.xlsx XLSX spreadsheet
Section L Amend. 1.pdf PDF
Amendment 0001 Summary of Changes.pdf PDF
SF30 Amendment 1.pdf PDF
Section I Amend. 1.pdf PDF
Section M Amend. 1.pdf PDF
Attachment L-11_Estimating Flat File Amend. 1.xlsx XLSX spreadsheet
5. Attachment L-10_Task Order 1_LLNL Building 251 DDR.pdf PDF
2. Final RFP Sol. No. 89303319REM000052 (except Attachments L-5, L-6, L-10 and L-11).pdf PDF
3. Attachment L-5_Cost Summary Worksheets.xlsx XLSX spreadsheet
6. Attachment L-11_Estimating Flat File.xlsx XLSX spreadsheet
1. EMCBC-00125-20_Nationwide DDR Final RFP Cover Letter.pdf PDF
7. Final RFP Question Template_Sol. No. 89303319REM000052.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Instructions Instructions and Examples

1. Each WBS should roll cumulatively to the higher tiered WBS level.

2. Worksheets should contain no blank rows.

3. The Total Values by WBS shall reconcile to the values in the associated cost element line item in the respective Section L, Attachment L-5 Cost Worksheets.

4. Replace Labor Category and Item Descriptions with the proposed Job Title/Category (Program Manager, Laborer, Rad Tech, etc.) and item descriptions. Three placeholders per WBS have been provided. Add rows as necessary to accommodate the number of labor categories and item descriptions proposed for each WBS.

5. If the indirect rate structure includes more than one fringe rate (i.e. hourly vs salary, full time vs part time), the direct labor categories should be identified accordingly so that is readily apparent which fringe rate applies to each proposed labor rate category. See examples below. The examples provided below are not all inclusive. The examples are provided only to illustrate the completion of the cost templates if the contractor's indirect rate structure includes more than one fringe rate.

Example 1GFY 2020
HoursRateTotal
Labor Category - Hourly Fringe- 0$ - 0$ - 0
Labor Category - Hourly Fringe- 0$ - 0$ - 0
Labor Category - Salary Fringe- 0$ - 0$ - 0
Labor Category - Salary Fringe- 0$ - 0$ - 0
Labor Category - Hourly Fringe- 0$ - 0$ - 0
GFY 2020
Example 2HoursRateTotal
Labor Category - Full Fringe Rate- 0$ - 0$ - 0
Labor Category - Full Fringe Rate- 0$ - 0$ - 0
Labor Category - Part-Time Fringe Rate- 0$ - 0$ - 0
Labor Category - Full Fringe Rate- 0$ - 0$ - 0
Labor Category - Part-Time Fringe Rate- 0$ - 0$ - 0

6. If the indirect rate structure includes more than one direct labor overhead (i.e. hourly vs salary, on site vs. off site), the direct labor categories should identify the applicable Direct Labor Overhead Category so that is readily apparent which overhead rates apply to which labor rate categories. See the example below. The example provided below is not all inclusive. The example provided only illustrates the completion of the cost templates if the contractor's indirect rate structure includes more than one direct labor overhead rate. If the rate structure includes both multiple fringe and multiple overhead rates, both must be idenfied.

GFY 2020
Example 1HoursRateTotal
Labor Category - On Site Overhead- 0$ - 0$ - 0
Labor Category - On Site Overhead- 0$ - 0$ - 0
Labor Category - Off Site Overhead- 0$ - 0$ - 0
Labor Category - Off Site Overhead- 0$ - 0$ - 0
Labor Category - On Site Overhead- 0$ - 0$ - 0
GFY 2020
Example 2HoursRateTotal
Labor Category - Full Fringe Rate - On Site Overhead- 0$ - 0$ - 0
Labor Category - Full Fringe Rate - On Site Overhead- 0$ - 0$ - 0
Labor Category - Part-Time Fringe Rate - Off Site Overhead- 0$ - 0$ - 0
Labor Category - Full Fringe Rate - Offsite Overhead- 0$ - 0$ - 0
Labor Category - Part-Time Fringe Rate - On Site Overhead- 0$ - 0$ - 0

Section L, Attachment L-6 Cost Detail Worksheets

Labor

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Labor Hour and Labor Rate Schedule
Add rows as needed to accommodate individual labor categories
Task ImplementationContract Period 1Contract Period 2
Oct 3, 2020 - Dec 31, 2020Jan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSLabor Category DescriptionHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursTotalHoursTotal
C.Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Labor Category- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

Proposed Labor Rate Offerors Labor Resource Category Offerors Base Labor Rate Fringe Benefit % Overhead% G&A % Fee% Offerors Burdened Labor Rate

&"Arial,Regular"&10CENTRAL PLATEAU CLEANUP CONTRACT - REVISED DRAFT RFP SOLICITATION NO. 89303318REM000008 &"Arial Narrow,Bold"&18Offeror Proposed Labor Rate Buildup &"Arial,Regular"&10Section L Attachment L-6 &A

&"Arial,Regular"&10Page &P of &N

J-14 Proposed Labor Rates

J-14 Proposed Labor Rates - Government Fiscal Year (FY) 2020

Offerors Labor Resource Category Offerors Burdened Labor Rate

&"Arial,Regular"&10CENTRAL PLATEAU CLEANUP CONTRACT - REVISED DRAFT RFP SOLICITATION NO. 89303318REM000008 &"Arial,Regular"&10Section L Attachment L-6 &A

&"Arial,Regular"&10Page &P of &N

Materials

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Material Quantities and Material Unit Cost Schedule
Add rows as needed to accommodate individual labor categories
Contract Period 1Contract Period 2
ImplementationJan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSItem DescriptionQty and Unit $ DesignationQtyUnit CostTotalQtyUnit CostTotalQtyUnit CostTotalHoursRateTotalHoursTotalQtyTotal
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

Supplies

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Supplies Quantities and Supplies Unit Cost Schedule
Add rows as needed to accommodate individual labor categories
Contract Period 1Contract Period 2
ImplementationJan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSItem DescriptionQty and Unit $ DesignationQtyUnit CostTotalQtyUnit CostTotalQtyUnit CostTotalHoursRateTotalHoursTotalQtyTotal
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

Equipment

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Equipment Schedule
Add rows as needed to accommodate individual labor categories
Contract Period 1Contract Period 2
ImplementationJan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSItem DescriptionQtyUnit CostTotalQtyUnit CostTotalQtyUnit CostTotalHoursRateTotalHoursTotalQtyTotal
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

Subcontractors

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Subcontractor Cost Schedule
Add rows as needed to accommodate individual labor categories
Contract Period 1Contract Period 2
ImplementationJan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSItem DescriptionQtyUnit CostTotalQtyUnit CostTotalQtyUnit CostTotalHoursRateTotalHoursTotalQtyTotal
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

Analytical Testing

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Offsite Sampling-Analytical Schedule
Add rows as needed to accommodate individual labor categories
Contract Period 1Contract Period 2
ImplementationJan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSItem DescriptionQtyUnit CostTotalQtyUnit CostTotalQtyUnit CostTotalHoursRateTotalHoursTotalQtyTotal
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item Description- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

PPE

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated PPE Schedule
Add rows as needed to accommodate individual labor categories
Contract Period 1Contract Period 2
ImplementationJan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022Contract Period 4Contract Period 5Total
PWSTotal by PWSItem DescriptionQty and Unit $ DesignationQtyUnit CostTotalQtyUnit CostTotalQtyUnit CostTotalHoursRateTotalHoursTotalQtyTotal
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C. - Total to L-5 Cost Worksheet
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.1 .2 - Total to L-5 Cost Worksheet
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2 - Total to L-5 Cost Worksheet
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.1 - Total to L-5 Cost Worksheet
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.2 - Total to L-5 Cost Worksheet
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.3 - Total to L-5 Cost Worksheet
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.2.10 - Total to L-5 Cost Worksheet
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3 - Total to L-5 Cost Worksheet
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.1 - Total to L-5 Cost Worksheet
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.3.2 - Total to L-5 Cost Worksheet
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4Item DescriptionEach, Cubic Yard, Ton, etc.- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0$ - 0- 0$ - 0- 0$ - 0
C.4 - Total to L-5 Cost Worksheet

Waste Transportation Attachment L-6 Consolidated Direct Cost Schedules - Waste Transportation

Waste TransportationContract Period 1Contract Period 2
Generating PWS*Jan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Nov 1, 2022
Item DescriptionQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
Rail / Truck (provided as example only)
Description
Description
Description
Description
Description
Description
Description
Description
Total Waste Transportation Costs

Waste Disposal Attachment L-6 Consolidated Direct Cost Schedules - Waste Disposal

Waste DisposalContract Period 1Contract Period 2
Generating PWS*Jan 1, 2021 - Sept 30, 2021Oct 1, 2021 - Sept 30, 2022
Item DescriptionLocationQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
Landfill (provided as example only)Onsite (provided as example only)
DescriptionIdentify Location
DescriptionIdentify Location
DescriptionIdentify Location
DescriptionIdentify Location
DescriptionIdentify Location
DescriptionIdentify Location
DescriptionIdentify Location
DescriptionIdentify Location
Total Waste Disposal Costs

Travel

Attachment L-6 Consolidated Direct Cost Schedules
Consolidated Travel Schedule
Add rows as needed
Task ImplementationContract Period 1Contract Period 2
PWSTotal by PWSBrief Description of TripOriginDestinationNo. of TravelersMileageAirFareLodgingPer DiemTotalBrief Description of TripOriginDestinationNo. of TravelersMileageAirFareLodgingPer DiemTotalBrief Description of TripOriginDestinationNo. of TravelersMileageAirFareLodgingPer DiemTotalTotal
C.
C.
C.
C. - Total to L-5 Cost Worksheet
C.1.2
C.1.2
C.1.2
C.1 .2 - Total to L-5 Cost Worksheet
C.2
C.2
C.2
C.2 - Total to L-5 Cost Worksheet
C.2.1
C.2.1
C.2.1
C.2.1 - Total to L-5 Cost Worksheet
C.2.2
C.2.2
C.2.2
C.2.2 - Total to L-5 Cost Worksheet
C.2.3
C.2.3
C.2.3
C.2.3 - Total to L-5 Cost Worksheet
C.2.4
C.2.4
C.2.4
C.2.4 - Total to L-5 Cost Worksheet
C.2.6-C.2.9
C.2.6-C.2.9
C.2.6-C.2.9
C.2.6-C.2.9 - Total to L-5 Cost Worksheet
C.2.10
C.2.10
C.2.10
C.2.10 - Total to L-5 Cost Worksheet
C.3
C.3
C.3
C.3 - Total to L-5 Cost Worksheet
C.3.1
C.3.1
C.3.1
C.3.1 - Total to L-5 Cost Worksheet
C.3.2
C.3.2
C.3.2
C.3.2 - Total to L-5 Cost Worksheet
C.4
C.4
C.4
C.4 - Total to L-5 Cost Worksheet
C.4.2 - C.4.6
C.4.2 - C.4.6
C.4.2 - C.4.6
C.4.2 to C.4.6 - Total to L-6 Cost Worksheet
C.5.0
C.5.0
C.5.0
C.5.0 - Total to L-6 Cost Worksheet
C.6.0
C.6.0
C.6.0
C.6.0 - Total to L-6 Cost Worksheet
C.7.0
C.7.0
C.7.0
C.7.0 - Total to L-6 Cost Worksheet
C.8.0
C.8.0
C.8.0
C.8.0 - Total to L-6 Cost Worksheet
C.9.0
C.9.0
C.9.0
C.9.0 - Total to L-6 Cost Worksheet
C.10.0
C.10.0
C.10.0
C.10.0 - Total to L-6 Cost Worksheet
C.10.1
C.10.1
C.10.1
C.10.1 - Total to L-6 Cost Worksheet
C.10.2
C.10.2
C.10.2
C.10.2 - Total to L-6 Cost Worksheet
C.10.3 - C.10.11
C.10.3 - C.10.11
C.10.3 - C.10.11

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .