Attachment L-5_Cost Summary Worksheets Amend. 1.xlsx
XLSX spreadsheet 50 KB Posted
- Solicitation number
- 89303319REM000052
About this file
This document contains cost summary worksheets and supporting documentation for a Department of Energy solicitation for nationwide deactivation, decommissioning and removal services. Key details include:
-
The solicitation from the DOE Office of Environmental Management is for indefinite-delivery/indefinite-quantity contracts to provide project support services, DD&R of facilities, facility and soil characterization, and waste support services over multiple contract periods and task orders. Services will be performed at various DOE sites nationwide.
-
Cost summary worksheets provide detailed cost estimates by work breakdown structure element, contract period, and fiscal year for tasks including project management, reporting, ESH&Q, security, business services, and characterization, removal and waste support activities. Labor, materials, subcontracts, fees and other direct costs are estimated. DOE will also provide some defined costs such as for transition.
-
Pricing will be determined by cost reimbursement contracts with cost-plus-fixed-fee and cost-plus-award-fee terms awarded based on best value determinations considering technical and management approaches, past performance and price.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Checklist
| PWS/WBS Number | Task Order PWS/WBS Description | L-6 | L-5 | BOE | Volume II |
| Task Order Implementation | |||||
| C.1.2 | Task Order Implementation | Yes | Yes | Yes | Detailed Technical Approach |
| Master IDIQ PWS Section C.2, Program Support Services | |||||
| C.2 | Program Support Services | Yes | Yes | ||
| C.2.1 | Project Support Performance Requirements | Yes | Yes | Yes | |
| C.2.1.1 | Project Management | BOE Shall be Included in C.2.1 | |||
| C.2.1.2 | Project Integration and Control and Earned Value Management | BOE Shall be Included in C.2.1 | |||
| C.2.1.3 | Performance Measurement Baseline | BOE Shall be Included in C.2.1 | |||
| C.2.1.3.1 | Performance Measurement Baseline Submittals | BOE Shall be Included in C.2.1 |
| C.2.2 | Project Performance Reporting | Yes | Yes | Yes |
| C.2.2.1 | Monthly Performance Report | BOE Shall be Included in C.2.2 | ||
| C.2.2.2 | Project Review Meetings | BOE Shall be Included in C.2.2 | ||
| C.2.2.3 | Cost Estimating | BOE Shall be Included in C.2.2 | ||
| C.2.2.4 | Scheduling | BOE Shall be Included in C.2.2 | ||
| C.2.2.5 | Risk Management | BOE Shall be Included in C.2.2 |
| C.2.3 | Environment, Safety, Health & Quality | Yes | Yes | Yes |
| C.2.3.1 | Worker Safety and Health | BOE Shall be Included in C.2.3 | ||
| C.2.3.1.1 | Workplace Substance Abuse Programs | BOE Shall be Included in C.2.3 | ||
| C.2.3.1.2 | Safety Culture | BOE Shall be Included in C.2.3 | ||
| C.2.3.2 | Industrial Hygiene | BOE Shall be Included in C.2.3 | ||
| C.2.3.4 | Site Wide Safety Systems | BOE Shall be Included in C.2.3 | ||
| C.2.3.5 | Radiation Protection | BOE Shall be Included in C.2.3 | ||
| C.2.3.6 | Quality Assurance | BOE Shall be Included in C.2.3 | ||
| C.2.3.6.1 | Requirements and Procedure Management Program | BOE Shall be Included in C.2.3 | ||
| C.2.3.7 | Training | BOE Shall be Included in C.2.3 | ||
| C.2.3.8 | Environmental Regulatory Management | BOE Shall be Included in C.2.3 | ||
| C.2.3.9 | Conduct of Operations | BOE Shall be Included in C.2.3 | ||
| C.2.3.10 | Nuclear Safety | BOE Shall be Included in C.2.3 | ||
| C.2.3.11 | Personal Property Management | BOE Shall be Included in C.2.3 | ||
| C.2.3.12 | Government-Furnished Services and Information | BOE Shall be Included in C.2.3 | ||
| C.2.3.13 | Records | BOE Shall be Included in C.2.3 | ||
| C.2.3.14 | Contractor Assurance System | BOE Shall be Included in C.2.3 |
| C.2.4 | Security and Emergency | Yes | Yes | Yes | |
| C.2.4.1 | Safeguards and Security Coordination | BOE Shall be Included in C.2.4 | |||
| C.2.4.2 | Classified Visits | BOE Shall be Included in C.2.4 | |||
| C.2.4.3 | Incidents of Security Concern | BOE Shall be Included in C.2.4 | |||
| C.2.4.4 | Information Security | BOE Shall be Included in C.2.4 | |||
| C.2.4.5 | Badging and Access Authorization (Clearance) Processing | BOE Shall be Included in C.2.4 | |||
| BOE Shall be Included in C.2.4 | |||||
| C.2.6-C.2.9 | C.2.6-C.2.9 | Yes | Yes | Yes | |
| C.2.6 | Telecommunications | BOE Shall be Included in C.2.6-C.2.9 | |||
| C.2.7 | Emergency Services & Operations | BOE Shall be Included in C.2.6-C.2.9 | |||
| C.2.8 | External Affairs | BOE Shall be Included in C.2.6-C.2.9 | |||
| C.2.9 | External Review and Support | BOE Shall be Included in C.2.6-C.2.9 | |||
| BOE Shall be Included in C.2.6-C.2.9 | |||||
| C.2.10 | Business Performance Requirements | Yes | Yes | Yes | |
| C.2.10.1 | Business Administration | BOE Shall be Included in C.2.10 | |||
| C.2.10.2 | Internal Audit | BOE Shall be Included in C.2.10 | |||
| C.2.10.3 | Employee Concerns Program (ECP) | BOE Shall be Included in C.2.10 | |||
| C.2.10.4 | Strategic Partnership Projects | BOE Shall be Included in C.2.10 | |||
| C.2.10.5 | Outgoing Transition | BOE Shall be Included in C.2.10 | |||
| C.2.10.6 | Pensions | BOE Shall be Included in C.2.10 | |||
| DD&R of Facilities and Waste Support Services | |||||
| C.3 | Deactivation, Decommissioning, and Removal (DD&R) of Facilities | Yes | Yes | Detailed Technical Approach | |
| C.3.1 | Facility Characterization Program | Yes | Yes | Yes | Detailed Technical Approach |
| C.3.2 | DD&R of Facilities | Yes | Yes | Yes | Detailed Technical Approach |
| C.4 | Waste Support Services | Yes | Yes | Yes | Detailed Technical Approach |
&"Calibri,Bold"Summary of Cost & Fee By WBS Section L, Attachment L-7 Cost Summary Worksheets
Total Cost By PWS
PWS/WBS Number Task Order PWS/WBS Description Total (Costs Only)
| Task Order Implementation | |
| C.1.2 | Task Order Implementation |
| Master IDIQ PWS Section C.2, Program Support Services | |
| C.2 | Program Support Services |
| C.2.1 | Project Support Performance Requirements |
| C.2.2 | Project Performance Reporting |
| C.2.3 | Environment, Safety, Health & Quality |
| C.2.4 | Security and Emergency |
| C.2.6 - C.2.9 | Telecommunications |
| C.2.10 | Business Performance Requirements |
| DD&R of Facilities and Waste Support Services | |
| C.3 | Deactivation, Decommissioning, and Removal (DD&R) of Facilities |
| C.3.1 | Facility & Soil Characterization Program |
| C.3.2 | DD&R of Facilities |
| C.4 | Waste Support Services |
| Total Proposed Cost Excluding Fee |
| Task Order WBS Number | Task Order WBS Description | Total Target Fee Only |
| T.1 | Task Order 1 - Transition | $0 |
| T.2 | Task Order 2 - End States Cleanup Work | |
| T.3 | Task Order 3 - Core Functions | |
| Total Proposed Fee Only |
C- Total Cost By Cost Element
| Task Order Implementation | Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Oct 3, 2020 - Dec. 31- 2020 | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | ||||
| Fringe Benefits | ||||
| Direct Labor Overhead | ||||
| Materials (From L-6 Materials) | ||||
| Material Handling Overhead | ||||
| Supplies (From L-6 Supplies) | ||||
| Equipment and FOGM (From L-6 Equipment) | ||||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | ||||
| Analytical Testing (From L-6 Analytical Testing) | ||||
| PPE (From L-6 PPE) | ||||
| Waste Transportation (From L-6) | ||||
| Waste Disposal (From L-6) | ||||
| Off-Site Waste Treatment (From L-6) | ||||
| Waste Container Costs (From L-6) | ||||
| Sales and Use Tax (From L-6) | ||||
| Travel (From L-6 Travel) | ||||
| Relocation (From L-6 Relocation) | ||||
| Other Direct Costs (From L-6 ODC) | ||||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | ||||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | ||||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | ||||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ | $ |
| DOE Provided Cost | 0 | 95,000 | 95,000 | 190,000 |
| Subtotal | $ | $ | $ | $ |
| G&A | ||||
| Total Proposed Estimated Cost | $ | $ | $ | $ |
Target Fee $ $ $ $
Total Estimated Price $ $ $ $
&"Calibri,Bold"Summary of Cost By Element Worksheet (Total) Section L, Attachment L-7 Cost Summary Worksheets
C.1.2 Task Order Implementation
| Task Order Implementation | ||
| FY 2020 | ||
| Government Fiscal Year --> | Oct 3, 2020 - Dec. 31- 2020 | Total |
| Direct Labor (From L-6 Labor) | ||
| Fringe Benefits | ||
| Direct Labor Overhead | ||
| Materials (From L-6 Materials) | ||
| Material Handling Overhead | ||
| Supplies (From L-6 Supplies) | ||
| Equipment and FOGM (From L-6 Equipment) | ||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | ||
| Analytical Testing (From L-6 Analytical Testing) | ||
| PPE (From L-6 PPE) | ||
| Waste Transportation (From L-6) | ||
| Waste Disposal (From L-6) | ||
| Off-Site Waste Treatment (From L-6) | ||
| Waste Container Costs (From L-6) | ||
| Sales and Use Tax (From L-6) | ||
| Travel (From L-6 Travel) | ||
| Relocation (From L-6 Relocation) | ||
| Other Direct Costs (From L-6 ODC) | ||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | ||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | ||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | ||
| Subtotal Offeror Proposed Estimated Cost | $ | $ |
| DOE Provided Cost | ||
| Subtotal | $ | $ |
| G&A | ||
| Total Proposed Estimated Cost Excluding Fee | $ | $ |
Target Fee $ $
Total Estimated Price $ $
&"Calibri,Bold"Summary of Cost By Element Worksheet (Transition) Section L, Attachment L-7 Cost Summary Worksheets
C.2
| Program Support Services | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | 85,000 | 85,000 | 170,000 |
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
&"Calibri,Bold"Summary of Cost By Element Worksheet (TO 2 Total) Section L, Attachment L-7 Cost Summary Worksheets
C.2.1
| Project Support Performance Requirements | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
&"Calibri,Bold"Summary of Cost By Element Worksheet (TO 2 WBS C.2.X) Section L, Attachment L-7 Cost Summary Worksheets
C.2.2
| Project Performance Reporting | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.2.3
| Environment, Safety, Health & Quality | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
&"Calibri,Bold"Summary of Cost By Element Worksheet (TO 3 Total) Section L, Attachment L-7 Cost Summary Worksheets
C.2.4
| Security and Emergency | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.2.6-C.2.9
| Telecommunications, Emergency Services & Operations, External Affairs, External Review and Support | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.2.10
| Business Performance Requirements | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.3
| Deactivation, Decommissioning, and Removal (DD&R) of Facilities | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | 10,000 | 10,000 | |
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.3.1
| Facility Characterization Program | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.3.2
| DD&R of Facilities | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $
C.4
| Waste Support Services | |||
| Task Order | |||
| Contract Period 1 | Contract Period 2 | ||
| Government Fiscal Year --> | Jan 1, 2021 - Sept 30, 2021 | Oct 1, 2021 - Sept 30, 2022 | Total |
| Direct Labor (From L-6 Labor) | |||
| Fringe Benefits | |||
| Direct Labor Overhead | |||
| Materials (From L-6 Materials) | |||
| Material Handling Overhead | |||
| Supplies (From L-6 Supplies) | |||
| Equipment and FOGM (From L-6 Equipment) | |||
| Non Teaming Subcontracts (From L-6 Non Teaming Subcontracts) | |||
| Analytical Testing (From L-6 Analytical Testing) | |||
| PPE (From L-6 PPE) | |||
| Waste Transportation (From L-6) | |||
| Waste Disposal (From L-6) | |||
| Off-Site Waste Treatment (From L-6) | |||
| Waste Container Costs (From L-6) | |||
| Sales and Use Tax (From L-6) | |||
| Travel (From L-6 Travel) | |||
| Relocation (From L-6 Relocation) | |||
| Other Direct Costs (From L-6 ODC) | |||
| Teaming Subcontractor 1 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 2 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Teaming Subcontractor 3 / Joint Venture (From Teaming SubK/ JV / L-5) | |||
| Subtotal Offeror Proposed Estimated Cost | $ | $ | $ |
| DOE Provided Cost | |||
| Subtotal | $ | $ | $ |
| G&A | |||
| Total Proposed Estimated Cost Excluding Fee | $ | $ | $ |
Target Fee $ $ $
Total Estimated Price $ $ $