This document outlines the deliverables required under the Idaho Cleanup Project contract. The contract will be competitively awarded to manage the closure of the Radioactive Waste Management Complex and other environmental remediation objectives at the Idaho National Laboratory. One hundred and fifty-four deliverables are identified to be provided to the Department of Energy throughout contract transition and performance. Key deliverables include transition plans, regulatory compliance documents, closure reports, and performance monitoring documentation required on various schedules defined in the document. Employee and pension plans, insurance documentation, and property management records must also be submitted periodically.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Idaho Cleanup Project (ICP) Draft RFP Section J, Attachment J-2
SOLICITATION NO. 89303319REM000034
ATTACHMENT J-2: LIST OF CONTRACT DELIVERABLES
The following Contract Deliverables list summarize the specific products the Contractor shall submit to the U.S. Department of Energy (DOE), and the date/timeframe the Contractor is required to submit the product over the life of the contract, inclusive of all task orders, and the type of action DOE will perform.
The DOE review period for Contract Deliverables shall be 30 days unless otherwise specified in the Deliverables or other agreement, such as the Partnering Agreement. Omission of applicable deliverables from this Section J Attachment entitled, List of Contract Deliverables, does not affect the obligation of the Contractor to submit required deliverables pursuant to this section or other sections of this Contract.
Deliverable Method of
Delivery
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-1 Transition Plan --Email to
Designated
Contracting Officer (CO) and Designated Contracting
Officer’s Representative
(COR)
C.2.1 Within 14 calendar days after the effective date of the transition task order
CO Approval
T-2 Written Notification of Adoption of the Incumbents
Programs and Procedures
--Email to CO and COR
C.2.1 Prior to the end of contact transition
Information
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-3 Interface Agreements with
INL contractor
Ft. St. Vrain Physical Security contractor
C.2.1
C.7.2.01.01 C.7.2.01.02 C.9.1.01.01
C.9.2.02
- Within 7 calendar days after agreement established
- Any agreement that requires DOE review and/or approval shall be submitted at least
30 days prior to the end of contract transition.
CO Approval
T-4 Weekly status reports of transition activities
C.2.1 Weekly during contract transition
CO and COR
T-5 Certified Permit Modification
Requests per Exhibit C-1
--Email to CO and COR and/or the regulator, as required
C.2.1; J Attachment
J-8;
H.56
No later than 30 days prior to end of transition.
CO Approval
T-6 Task Order Proposal for Implementation Period
H.51 Task Ordering Procedure
14 days after Request for Task
Order Proposal (RTP), or as directed by the CO
CO Approval
T-7 Task Order Proposal for IWTU Operations
30 days after Request for Task Order Proposal
(RTP), or as directed by the CO
CO Approval
T-8 Task Order Proposal for Essential Missions
30 days after Request for Task
Order Proposal (RTP) , or as directed by the CO
CO Approval
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-9 Worker Safety and Health
Plan (WSHP)
C.9.3.05
H.37(a)
10 CFR 851
At least 30 days prior to end of transition
COR Approval The WSHP must be approved by DOE by the end of contract transition date.
T-10 Emergency Management Plan --Email to CO
C.9.3.10 At least 30 days prior to end of transition
COR Approval The Emergency Management Plan must be approved by DOE by the end of contract transition date.
T-11 Continuity of Operations Plan --Email to CO
C.9.3.10 At least 30 days transition
COR Approval The Continuity of Operations Plan must be approved by DOE by the end of contract transition date.
T-12 Quality Assurance Program
(QAP)
C.9.3.12
10 CFR 830
DOE O 414.1
Within 30 days of the effective date of the transition task order, and review and update QAP annually
COR Approval The QAP must be approved by DOE by the end of contract transition date.
T-13 Radiation Protection Program
(RPP)
C.9.3.13
10 CFR 835
Within 180 days after the end of contact transition
COR Approval Only required if the existing RPP is NOT adopted during contact transition
T-14 Unreviewed Safety Question
(USQ) Process
C.9.3.14 When a change is proposed
COR Approval Only required if the existing USQ process is NOT adopted during contact transition
T-15 Criticality Safety Program
(CSP)
C.9.3.15 Prior to end of transition
COR Approval Only required if the existing CSP is NOT adopted during contact transition
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-16 Contractor Employee
Compensation Plan
--Email to CO
-- One (1) Hard Copy to
CO
H.5(a) By close of transition
CO Approval
T-17 List of Subcontractors that will flow down the requirement for continuation of benefits to eligible employees.
--Email to CO -- One (1)
Hard Copy to
CO
H.5(c)(1) 30 days prior to end of transition
With each subsequent task order
Information
T-18 (1) Proposed allowable base salaries for each key personnel position listed in the Contract for a determination of cost allowability for reimbursement under the Contract. Also provide compensation market survey data to support/justify the requested salary and any other information as requested by the CO
H.6(b) Within 20 days after the effective date of the transition task order
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-19 Workforce Transition Plan
(WF Transition Plan)
(a) List of contractor personnel who will be responsible for transitioning the employees of the incumbent contractor;
(b) Description of transition agreements with incumbent contractors;
(c) Communications Plan ;
(d) Provide description of the process for regularly obtaining updated information from the incumbent contractor.
H.7(A)(1)
Within 10 days date of the
DCO Approval
T-20 (continued)
(a) Processes and to implement and ensure compliance with the hiring preferences of Clause H. 4 and H.9,
(b) Final written communication plan in accordance with H.7(A)(2)(i) and (ii).
H.7(A)(2)
Within 15 days date of the transition task order
Approval
T-21 Final WF Transition Plan --Email to CO
H.7(A)(3) Within 30 days date of the
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-22 Final transition agreements --Email to CO
H.7(A)(4) Within 60 days date of the transition task order
Information
T-23 Reports on implementation of the hiring preferences
H.7(A)(5) (A) During the 90 day Contract
Transition Period such reports shall be provided to the CO on a weekly basis;
or
(B) More frequently if requested by the
CO.
Information
T-24 Final Benefits Transition Plan --Email to CO
H.7(B) Within 30 days date of the transition task order
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-25 Draft Benefits Transition Plan
(i) List of contractor personnel responsible for transitioning pension and other benefits;
(ii) information and documents necessary for the
Contractor to adhere to the requirements set forth in this Contract pertaining to sponsoring existing benefits plans and the establishment of any new benefits plans (iii) Estimated costs and detailed breakouts of the costs to accomplish workforce and benefits transition activities (including costs for enrolled actuaries and counsel)
H.7(B)(1)(A)
Within 30 days after the transition task order
(i)-(iii)Within 10 days after the effective date of the
T-26 Draft Benefits Transition Plan
(continued)
List of the information and documents that the Contractor has requested from the incumbent contractors, pertaining to the existing benefit plans.
H.7(B)(1)(B) (i) Within 15 days date of the transition task order
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-27 Draft Benefits Transition Plan
(continued)
Detailed description of its plans, processes, timeframes and specific projected dates for all activities to comply with the Clause H.5 and H.6
H.7(B)(1)(C)(i) -
(iii)
Within 20 days date of the transition task order
Information
T-28 Minutes of meeting to discuss execution of transition agreements with the incumbent contractor and other applicable entities.
H.7(B)(1)(C)(iv) Two days after the meeting
Information
T-29 Final Benefits Transition Plan (continued)
Written description of how the existing pension and other benefit plans will be amended or restated on or before the last day of the Transition
Period.
H.7(B)(1)(D) Within 30 days after the transition task order
CO Approval
T-30 Draft amendments or restatements of the pension and other benefit plans presently sponsored by the incumbent contractors. If applicable, the Contractor shall also submit all draft restated benefit plans and draft
Summary Plan Descriptions (SPDs) for pension and other benefit plans sponsored by the Incumbent Contractor(s).
H.7(B)(1)(E)(i) Within 30 days date of the
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-31 Drafts of any new benefit plan(s) as well as draft Summary Plan Documents (SPD) that the Contractor proposes to sponsor.
H.7(B)(1)(E)(ii) Within 45 days after the transition task order
Information
T-32 Draft copies of the transition agreements entered into with Fluor Idaho and Spectra Tech, to ensure compliance with
Clause H.5, Employee Compensation: Pay and
Benefits.
H.7(B)(1)(E)(iii) Within 45 days after the transition task order
Information
T-33 Final versions of Contractor
Employee Compensation
Plan, pension and benefit plan amendments or restatements, Summary Plan Documents for proposed new benefits and transition agreements with the incumbent contractors.
H.7(B)(1)(F) No later than 45 effective date of the transition task order and prior to the adoption
CO Approval
T-34 Copies of the executed transition agreements
H.7(B)(1)(G) No later than the end of the Contract
Transition Period
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-35 Copies of all insurance policies (including Worker’s
Compensation Insurance)
Email to CO
H.12
H.13(a)(5)
- No later than 30 days after purchase date
- Prior to commencement of work at the end of transition.
CO Approval Contractor shall have coverage in accordance with Section H. 12, by the end of transition for at least a one year period. Contract also requires continuous coverage throughout the performance period.
T-36 Diversity plan --Email to CO
H.33 Within 60 calendar effective date of the transition task order
CO Approval
T-37 Contractor shall submit to the Contacting Officer for approval any proposed modifications to the current Environmental Regulatory
Structure and Interface Protocol for the ICP Core Contractor incorporated as
Exhibit C-6 to the PWS
H.57 (a) Within 60 days date of the transition task order
CO Approval
T-38 Litigation Management Plan Email to CO
Section H.62(a); 10
CFR 719
Within 60 days of contract award
DOE Office of Chief Counsel review; CO
Approval
T-39 Affirmative Action Plan for Females & Minorities
--Email to ID Office of Civil
Rights and Diversity
(OCRD) and
CO
Section I.49 FAR 52.222-26
Section I.55 FAR 52.222-36
Within 30 days of the effective date of the transition task order and updated annually by September 30
ID OCRD review; CO approval
Driver
Requirement
Frequency/timing Approval Notes
TRANSITION DELIVERABLES
T-40 Affirmative Action Plan for
Veterans
--Email to ID
OCRD and
CO
Section I.50 FAR
52.222-35
Within 30 days of the effective date of the transition task order and updated annually by September 30
ID OCRD review; CO
T-41 Workplace Substance Abuse
Program
--Email to ID
Industrial Relations Specialist and
CO
FAR 52.223-6
DOE O 350.1
10 CFR 707
H.50
Within 30 days of the transition task order
ID Industrial Relations
Specialist review; CO
T-42 Employee Assistance Program Implementation Plan
--Email to Industrial Relations
Specialist and
CO
DOE 350.1 Within 60 days of the effective date of the transition task order
CO approval
T-43 Employee Concerns Program as required by DOE Order
442.1A, Department of Energy Employee Concerns Program.
DOE Order 442.1A, 30 days prior to end of contract transition
CO The Employee Concerns Program must be approved by DOE by the end of transition.
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
Subsurface Disposal Area
(SDA) cap Construction related regulatory documents (e.g., Remedial Action Work
Plan)
--Email to
CO, COR,
and FPD
C.4.2 TBD CO Approval These documents are identified as stated in Section C.4.2 (e.g., in Remedial Design
Report, Section 6) and may not be a complete list.
45 Subsurface Disposal Area (SDA) cap Construction related regulatory documents necessary to obtain approval of CD-1, 2-, 3, and 4 (e.g., Hazard Analysis Report) and FPD
C.4.2 TBD CO Approval These documents are identified as stated in
Section C.4.2 (e.g., in Remedial Design Report, Section 6) and may not be a complete list.
46 Comprehensive Remedial
Action Report for Operable Unit 7-13/14 and FPD
C.4.2 November 30, 2028 CO Approval
47 SDA well decommissioning plan
Email to CO and FPD
C.4.2 TBD CO Approval
48 Rebound Study Report Email to CO and FPD
C.4.2.01 March 31, 2024 CO Approval
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
49 Long Term Monitoring plan Email to CO and FPD
C.4.2.02 TBD CO Approval
50 Document SDA well decommissioning in annual
INL Water Use report and Comprehensive Well
Inventory
Email to CO and FPD
C.4.2 TBD CO Approval
51 Renewed US Army Corps of Engineers determination that spreading areas are not waters of the US
Email to CO and FPD
C.4.2 No later than June 13, 2022
Information
52 Monthly report required by
FFA/CO Section 17.1
--Email to
FPD
FFA/CO Section
17.1
By the 15th day of each month
Information
53 DOE Order 435.1, ICDF DOE Order 435.1 annual report
Email to CO and COR
C.4.3 Annually Information
54 2020 CERCLA 5-year review document
--Email to
CO and COR and/or the
C.4.4.04;
July 16, 2020 CO Approval The most recent 5-year review (December 2015) is available at https://ar.icp.doe.gov as document DOE/ID- 11513
55 The Contractor shall prepare a plug-in remedy memorandum and Explanation of Significant
Differences for CERCLA Plug-in remedies
--Email to
CO and COR and/or the
C.4.4.04; TBD CO Approval https://ar.icp.doe.gov/
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
56 New Site Part As --Email to
CO and COR and/or the regulator, as
C.4.4.04
30 days after discovery of a new site
Informational
57 New Site Part Bs --Email to CO and COR and/or the
C.4.4.04
TBD Informational Delivery date will be established after completion of field sampling.
58 Buried Waste Exhumation
Phase I Interim Remedial Action Report
--Email to
CO and COR and/or the
C.5.2
December 31, 2023 CO Approval
59 RCRA closure plan(s) for remaining RWMC RCRA facilities
--Email to
CO and COR and/or the
C.5.1.01;
C.5.6
TBD CO Approval
60 Transportation Safety
Document
--Email to
CO and COR and/or the
C.5.1.04 A minimum of 30 days prior to the first inter-site transfer
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
61 Professional Engineer’s
Certification to the state of Idaho in accordance with the final approved RCRA Closure
Plan
C.6.3 In accordance with the final approved RCRA Closure Plan
CO Approval
62 Final Version of DOE/ID-
11460 HWMA/RCRA
Closure Plan
--Email to CO and COR and/or the
C.6.3 TBD CO Approval
63 Final Version of DOE/ID-
11477 HWMA/RCRA
Closure Plan
--Email to CO and COR and/or the
C.6.3 TBD CO Approval
64 Final Incident Reports related to Any security incident
--Email to
CO, COR,
DOE facility director, and
DOE
Security
Director
C.7.2.01.01 TBD Notification
65 Graded Approach for
Implementation of Contract Requirements Plan
C.9.0 TBD CO Approval
66 Records Management Plan Inventory and File Plan, and
Electronic Information Systems
C.9.1.02 Within 90 days after the end of contract
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
67 Electronic Information
Systems list.
--Email to
CO and COR
C.9.1.02.06 annually Information Format will be provided by DOE
68 Monthly EEOICPA financial statements
--Email to CO and INL
Contractor
C.9.1.02.12 Monthly information
69 Earned Value Management System Description
C.9.2.01.01 TBD CO Approval
70 Project Management Plan
(PMP)
C.9.2.01.01
DOE O 413.3B
Within 90 days after the end of contract transition
CO Approval
71 Initial Performance
Measurement Baseline
C.9.2.01.01 TBD CO Approval
72 Project Performance Information
C.9.2.01.02 TBD Information To be provided at the request of the CO
73 Monthly Performance Report --Email to
C.9.2.01.02 15th of each month Information
74 Integrated Master Schedule --Email to
C.9.2.01.04 TBD CO Approval To be provided at the request of the CO
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
75 Risk Management Plan --Email to
C.9.2.01.05 Within 90 days after the end of contact transition
CO Approval
76 Contractor Personal Property Management System
C.9.2.03 Within 90 days after the end of contact transition
COR Approval
77 Nuclear Maintenance
Management Program (NMMP) description documents
C.9.2.04
DOE O 433.1
Within 90 days after the end of contract transition.
And at least every 3 years or as directed by DOE.
Minor changes or correction do not require new DOE approval
78 Phase-out Transition Plan --Email to
C.9.2.05.01 At least 60 days contract period
79 Closeout Plan --Email to
C.9.2.05.02 Within 60 days prior to the end of contract period
80 Permits and Compliance Documents
--Email to CO and COR and/or the
C.9.3.03 H.56
TBD (as required)
81 ISMS program description document for Phase I verification
C.9.3.07
48 CFR 970.5223-1
Within eight months after the end of contact transition
COR Approval
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
82 ISMS program description document for Phase II verification
48 CFR 970
Within twelve months after the end of contact transition
COR Approval
83 Annual ISMS Declaration
Report
48 CFR 970
Within 30 days following the end of each Government fiscal year
COR Approval
84 Revision to the Radiation
Protection Program
C.9.3.13 Within 180 days after the end of contact transition
COR Approval
85 Any changes to the established Unreviewed
Safety Question (USQ) Process
C.9.3.14 When a change is
COR Approval
86 Any changes to the Criticality Safety Program plans
C.9.3.15 When a change is
COR Approval
87 Environmental Sustainability
C.9.3.16
DOE O 436.1
Annually Information
88 Submission of vouchers Email to CO and COR and electronically to VIPERS
G.5 G.6
Not more frequently than Bi-weekly
(Twice per month)
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
89 (2) An Annual Contractor
Salary-Wage Increase Expenditure Report
(3) A list of the five most highly compensated executives. An Annual Report of Contractor
Expenditures for Employees Supplemental
Compensation Annual Report of Compensation and Benefits
--Email to
CO
-- One (1) Hard Copy to
CO
H.5(d) (1) Annually
(2) At the time of the effective date of the transition task order, and at the time of any subsequent change to their total cash compensation (3)
No later than March 1 of each year in iBenefits
Information
90 (A) Any proposed major compensation program design changes prior to implementation.
(D) An Annual Compensation Increase Plan (CIP).
(F) Individual compensation actions for the top contractor official (e.g., laboratory director/plant manager or equivalent) and key personnel not included in the CIP.
H.5(e)(3)(i) (A) prior to implementation
(D) Annually
(F) initial contract award and when key personnel are replaced during the life of the contract
CO determination of cost allowability under the contract
91 Employee Benefits Value
(Ben-Val) Study
H.5(g)(3)(i) Every two years for each benefit tier
92 Corrective Action Plan if net
Benefit Value exceeds comparator group by 5%
H.5(g)(3)(ii)(A) As required by CO following results of biennial Ben-Val Study
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
93 Employee Benefits Cost Study
Comparison
H.5(g)(3)(ii) Annually for each benefit tier
Updated studies to the Contracting Officer for approval prior to the adoption of any change to a pension or other benefit plan
CO Approval
94 Cost Analysis and Corrective Action Plan if average total benefit per capita or total benefit costs as a percent of payroll exceed comparator group by 5% or more.
H.5(g)(3)(ii)(B) When the average total benefit per capita cost or total benefit cost as a percent of payroll exceeds the comparator group by more than five percent
CO Approval If directed by the CO
95 ERISA section 103 audit results. In years in which a limited scope audit is conducted, the contractor must provide the contracting officer with a copy of the qualified trustee or custodian’s certification regarding the investment information that provides the basis for the plan sponsor to satisfy reporting requirements under ERISA section 104.
H.5(i)(2) Annually Information
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
96 The Pension Management
Plan (PMP)
H.5(i)(6) Annually no later than January 31 of each applicable year
CO Approval
97 Reporting Requirements
(1) Pension Plan Actuarial Valuation
Reports
(2) Forms 5500
(3) Forms 5300
H.5(k) As soon as possible after the last day of the plan year by the contractor responsible for each designated pension plan funded by
DOE but no later than the dates specified below:
(1) by the due date for filing IRS
Form 5500
(2) no later than that submitted to the IRS
(3) no later than that submitted to the IRS
Information
98 Proposed changes to pension plans and pension plan funding
H.5(l) At least sixty (60) adoption of any changes to a pension plan
CO Approval
99 New benefit plans and changes to plan design or funding methodology.
H.5(l)(2) At least sixty (60) adoption of any changes to a pension plan
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
100 Responses to any comments regarding the Contractor Employee Compensation Plan provided by the Contracting
Officer under any of the above paragraphs
H.7(B)(1)(H) Within two days of receipt of the comments
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
101 (i) Documents relating to benefit plans offered to
Contractor Employees, including but not limited to
SPDs, all Plan documents, applicable amendments, employee handbooks that summarize benefits provided to employees and other documents that describe benefits provided to employees of the Contractor who perform work on this
Contract;
(ii) Any and all other documents pertaining to implementation of and compliance with implementation of the compensation and benefit programs identified in Clause
H.5,
(iii) timely data responses to
Departmental annual and ad hoc pension and Post
Retirement Benefit (PRB) data requests
H.7(B)(2)(A)
Promptly upon the request of the
Contracting Officer
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
102 Economic Bargaining
Parameters prior to Collective
Bargaining
H.9(c) Prior to agreeing to any collective bargaining proposal
CO Approval
103 (h) A copy of all arbitration decisions issued by an arbitrator
(i) a “Report of Settlement” after ratification of a collective bargaining agreement by accessing and inputting the information into the Labor Relations module of DOE’s iBenefits reporting system
(j) A semi-annual report on grievances for which further judicial or administrative proceedings are anticipated, and all final step grievances.
H.9 (h) within one week of receipt of the decision.
(i) During next open quarter
(j) immediately on all arbitration requests. The reports are due June 30 and
December 31, of each year
Information
104 Business case for a Self-Select
Voluntary Separation Program
H.10(b)(4) 5 business days in advance of notification date
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
105 Workforce Restructuring Plan
(Specific Plan)
H.10(d) When the
Contractor determines that a reduction in work force is necessary (greater than 100 employees) Must be submitted to the CO at least 60 days in advance of the first communication given to the employees and public.
Any other Specific
Plans (Fewer than
100 employees) must be submitted to the CO 5 days in advance of the first communication to given to the employees and public.
CO Approval is required if the contractor plans to reduce the workforce by 100 or more employee through an involuntary separation action within a rolling 12 month period.
106 Office of Management and
Budget (OMB) Control
Number: 1910-5165, Semi-
Annual Davis-Bacon
Enforcement Report, H.11(e) By April 21 and
October 21 of each year.
Information Form submittal will be administered through the DOE iBenefits system or its successor system.
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
107 All new Worker’s
Compensation policies and all initial proposals for self-insurance
H.12(a) Prior to implementation
CO Approval
108 Workers’ compensation settlement claims above the established threshold.
H.12(c) Upon receipt of claim
CO Approval
109 Annual experience reports for each type of insurance
H.13(b)(1) Annually Information
110 Annual report of insurance costs and/or self-insurance charges
H.13(b)(2) Annually Information
111 Additional claim financial experience data
H.13(b)(3) As requested Information Case-by-case basis
112 Overtime Control Reporting --Email to
CO
H.14 six (6) months after
Task Order execution start and annually thereafter no later than
November 30 of each year.
Information
113 Business System Clauses --Email to
CO
H.15 H.16 H.17
H.18
As Required
CO Approval Includes corrective action plans and audits
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
114 Performance Guarantee
Agreement
H.22 Upon entering into proceedings related to bankruptcy
Information
115 Notify the CO annually if the Privacy Act Systems List is up to date
H.24 Annually CO Approval
116 Organizational Conflict of
Interest (OCI) Management Plan (Plan)
H.29 Within 15 calendar effective date of the transition task order
CO Approval
117 Community commitment activities
H.31 Annually for plan and semi-annually for progress report
Information
118 Annual diversity report --Email to
H.32(c) Annually Information
119 Reports itemizing information received as confidential or proprietary and setting forth the company or companies from which the Contractor received such information.
H.34(e) Upon request from the CO
Information
120 A copy of occupational safety and health self-assessments and/or inspections of work sites for job hazards for work performed at DOE facilities
H.36(c) Upon request of the CO or COR
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
121 Reports itemizing the confidential or proprietary information the Contractor receives under this contract and identify the source (company, companies or other organizations) of the information.
H.40(e) Upon request of the
Information
122 Written notice to the COR when Contractor no longer requires access to the Government Information Technology Systems.
H.41(b) Immediately upon access no longer being required
123 Changes to key personnel.
H.44(a)(1) At least 60 days in advance of any changes to key personnel
CO Approval
Notify Contracting Officer in writing of the potential impact of the Contractor's compliance with the revised list of Directives Section J, Attachment J-3, Requirements
Sources and Implementing Documents
H.45(b) Within 30 days after receipt of the Contracting
Officer's notice
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
125 Regarding workplace substance abuse programs for subcontracts – notify the CO of any subcontract the
Contractor believes may be subject to the requirements of 10 CFR part 707
H.50(c)(1)
10 CFR 707 and 49
CFR 40
In advance of, but not later than 30 days prior to, the award of any subcontract the Contractor believes may be subject to the requirements of 10 CFR part 707
Information Unless the CO agrees to a different date
126 Provide EEOICPA reports --Email to
H.55(b) As directed by CO Information
127 Return all EEOICPA claims to DOE in the Federal Compensation Program Act
(FCPA) electronic reporting system.
H.55(g) Within 45 calendar days of the date entered in the
Federal Compensation Program Act
(FCPA)
Information
128 The Contractor shall provide DOE copies of all environmental permits, authorizations, and regulatory approvals issued to the
Contractor by the regulatory agencies.
H.56(f) Upon issuance Information
129 All real estate actions to acquire, utilize, and dispose of real property assets.
H.64(b)(1) Prior to real estate action
CO Approval
130 Occurrence Reporting
Processing System (ORPS) Reports
- Electronic submission via ORPS
DOE O 232.2 As required Information
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
131 Equal Employment Report
(EEO-1)
- Electronic submission via DOE Workforce
Information System
(WFIS)
--Email to ID
CO
I.76 FAR 52.222-26 Annually by
September 30
Information
132 Federal Contractor Veterans’ Employment Report (VETS-
100A Report)
- Electronic submission to
U.S.
Department of Labor
--Email to ID
I.83 FAR 52.222-37 Annually by September 30
Information
133 Annual Reports on the
Product Types and Dollar Value of Any USDA- Designated Biobased Products
Purchased by the Contractor During the Previous Fiscal
Year
I.92
FAR 52.223-2
Annually by
October 31
Information
134 Material Safety Data Sheets --Email to COR and CO
I.93
29 CFR 1910
Prior to use of hazardous material
Information
135 Reports of loss, damage, destruction or theft of property
COR and CO
I.180 FAR 52.245-1
(f)(1) (vi)
As soon as facts become known
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
136 Reports of results for periodic physical inventories of property
I.180 FAR 52.245-
1(f)(1)(iv)
NLT September 30
Annually
CO
137 Input automated data into the Property Inventory Database
System (PIDS)
I.180 FAR 52.245-
1(f)(1)(iv)
NLT November 30 Annually
CO
138 GSA report of DOE property furnished to non-federal activities
41 CFR 102-36.295 NLT October 31 Annually
CO
139 GSA report of DOE property sales and exchange transactions
41 CFR 102-39.75 NLT October 31
CO
140 Plans and procedures for property management business system
I.180 FAR 52.245-1
(f)AL-2013-11
Revised
60 days following contract award
CO
141 Final property inventory for physically completed or terminated contracts
I.180FAR 52.245-1
(f)(1)(iv)
60 days prior to contract completion or upon notice of termination
CO
142 Fleet reports for assigned motor vehicles (FAST)
41CFR 102-34.345 NLT December 15
CO
143 Special reports for assigned motor vehicles
41 CFR 109-38.9 As required CO
144 ISMS Description Document Email to CO and COR;
one (1) hard copy to CO
DEAR 970.5223-1 Within 4 months after contract transition
CO Assumes adoption of existing ISMSDD at contract effective date.
Driver
Requirement
Frequency/timing Approval Notes
ICP POST-TRANSITION DELIVERABLES
145 Contractor Assurance System
Description (CAS D)
Email to CO and COR;
one (1) hard copy to CO
DOE O 226.1B Within 4 months after contract transition
COR Assumes adoption of existing CAS D at contract effective date.
146 Contractor Assurance System
Effectiveness Review
Email to CO and COR;
one (1) hard copy to CO
DOE O 226.1B Within 30 days following the end of each Government fiscal year
N/A May be waived for first year if < 6 months of performance
Driver
Requirement
Frequency/timing Approval Notes
FORT ST. VRAIN-SPECIFIC POST-TRANSITION DELIVERABLES
147 Revisions to FSV Emergency Management Program/Plan, including MOUs for medical, fire, and police services.
Must be compliant with the
NRC License
--Email to
CO and COR
--One (1)
Hard Copy to
COR
NRC License
As required COR approval Deliverable is only required, if Contractor revises the incumbent documents.
148 Follow-up Licensee Event
Report Documentation --Email to
CO and COR
--One (1) Hard Copy to
COR
NRC License As required COR approval. Deliverable is only required, as defined in the FSV Emergency Management Plan.
149 Security Training and Qualification Plan, and applicable Security Lesson
Plan(s)
--One (1) Hard Copy to
COR
NRC License Annually and as required
COR/DOE approval Deliverable is required, if Contractor revises the security lesson plans. Security Training and Qualification Plan requires annual review and report.
150 Schedule for submission of
NRC license-required plans and reports
--Email to
CO, COR and
DOE Office of Project
Assessment
--One (1) Hard Copy to
CO
NRC License Initially within 30 days of the effective date of the transition task order.
Subsequently, monthly; not later than the eighth business day prior to the end of each calendar month
COR and CO approval Included in the monthly progress reports
This includes a transition deliverable.
151 Training Schedule for Crane Operations
NRC License As required COR information
152 FSV NRC Compliance Report Email to CO and COR
NRC License Once within 90 days after contract
COR approval