This notice is a synopsis for a Draft Request for Proposal for the Idaho Cleanup Project. The U.S. Department of Energy Office of Environmental Management anticipates issuing the RFP within 15 to 45 days to complete closure activities at the Radioactive Waste Management Complex and achieve other mission objectives. Key work includes closing the RWMC, treating sodium-bearing waste, shipping spent nuclear fuel and transuranic waste, and performing environmental remediation. The successful offeror will maintain facilities, dispose of wastes, and conduct surveillance, maintenance, and stabilization activities over a ten-year period.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Idaho Cleanup Project (ICP) – DRAFT END STATE RFP Section C Solicitation NO. 89303319REM000034
C-1
Part I – The Schedule
Section C
Performance Work Statement
C-2
C.1.0 GENERAL AND BACKGROUND INFORMATION
C.1.1 Contract Purpose and Objectives
C.2.0 CONTRACT TRANSITION
C.2.1 Contract Transition Period
C.2.2 Government-Owned Property and Equipment Responsibilities for Contract Transition Period ..11
C.3.0 EM FACILITY INFRASTRUCTURE
C.3.1 RWMC
C.3.2 INTEC
C.3.3 Other Facility Infrastructure
C.4.0 CERCLA REMEDIATION
C.4.1 INTEC Tank Farm Cap
C.4.2 RWMC SDA Cap
C.4.2.01 Vadose Zone Rebound Study
C.4.2.02 Long-Term Monitoring Network
C.4.3 Idaho CERCLA Disposal Facility (ICDF)
C.4.3.01 ICDF New Cell Construction
C.4.3.02 ICDF CAP
C.4.4 Waste Area Groups
C.4.4.01 WAG 1 Test Area North (TAN)
C.4.4.02 WAG 3 INTEC CERCLA Remediation
C.4.4.03 WAG 7 RWMC CERCLA Remediation
C.4.4.04 WAG 10 Balance of Site Remediation
C.4.5 RWMC Low Level Waste Disposal Facility Closure
C.4.6 Additional Groundwater Monitoring Wells
C.5.0 WASTE MANAGEMENT
C.5.1 CH TRU Waste Disposition
C.5.1.01 AMWTP Permit
C.5.1.02 CH-TRU Characterization and Certification
C.5.1.03 CH-TRU Treatment
C.5.1.05 CH-TRU Packaging and Transportation
C.5.2 Buried Waste Exhumation
C-3
C.5.3 RH-TRU Waste Disposition
C.5.3.01 RH-TRU Characterization and Certification
C.5.3.02 RH-TRU Treatment
C.5.3.03 RH-TRU Storage and Movement
C.5.3.04 RH-TRU Packaging and Transportation
C.5.3.05 RH Waste LOT 11 (NE FUNDED)
C.5.4 Naval Nuclear Propulsion Program (NNPP) Pieces, Parts, and Fines (PPF) (NNPP FUNDED) .27
C.5.4.01 Naval Nuclear Propulsion Program (NNPP) RH-TRU Characterization and Certification 28
C.5.4.02 Naval Nuclear Propulsion Program (NNPP) RH-TRU Storage and Movement
C.5.4.03 Naval Nuclear Propulsion Program (NNPP) RH-TRU Packaging and Transportation
C.5.5 CH MLL LLW Disposition
C.5.5.01 Waste Generator Services
C.5.5.02 Special Requirements Wastes
C.5.5.03 Legacy Excess Radioactive/Hazardous Materials
C.5.6 RCRA Closure of RWMC Facilities
C.6.0 LIQUID WASTE FACILITY CLOSURE
C.6.1 Integrated Waste Treatment Unit (IWTU) Operations
C.6.2 Calcine Retrieval Demonstration Project
C.6.3 Liquid Waste Facility Closure
C.7.0 SPENT NUCLEAR FUEL (SNF) MANAGEMENT
C.7.1 Defense EM-Funded SNF Activities
C.7.1.01 Surveillance and Maintenance (S&M) of Materials and Facilities
C.7.1.02 Foreign and Domestic SNF Receipts Program
C.7.1.03 SNF Projects
C.7.1.04 SNF Programmatic Analysis
C.7.2 Non-Defense EM-Funded SNF Activities
C.7.2.01 Management of NRC-Licensed SNF Storage Facilities
C.7.2.02 Management of the ISFF License
C.7.3 Other DOE Organization-Funded SNF Activity
C.7.3.01 Advanced Test Reactor (ATR) SNF receipts
C.7.3.02 TRIGA Mining
C.7.3.03 Navy Nuclear Propulsion Program (NNPP) SNF
C.8.0 FACILITY DECONTAMINATION AND DECOMMISSIONING (D&D)
C.9.0 PROGRAM MANAGEMENT AND SUPPORT FUNCTIONS
C.9.1 Information Management and Technology
C-4
C.9.1.01 Information Technology and Cyber Security
C.9.1.02 Records Management and Document Control
C.9.1.03 Bod 19-02, Vulnerability Remediation Requirements for Internet-Accessible Systems is incorporated as follows:
C.9.2 General Management and Administration Services
C.9.2.01 Project Management/Support/Administration
C.9.2.02 Safeguards and Security
C.9.2.02.01 Safeguards and Security at the INL Site
C.9.2.02.02 Safeguards and Security at the FSV site
C.9.2.03 Property Management
C.9.2.04 Conduct of Maintenance
C.9.2.05 Outgoing Contract Transition - Phase Out and Closeout Activities
C.9.2.06 Mandatory and Optional Site Services
C.9.3 Environment, Safety, Health and Quality
C.9.3.01 Defense Nuclear Facility Safety Board
C.9.3.02 Regulatory Interaction and Environmental Services
C.9.3.03 Permits and Compliance Documents
C.9.3.04 Environmental Support to INL Contractor
C.9.3.05 Worker Safety and Health
C.9.3.06 Occupational Medical Program (OMP)
C.9.3.07 Integrated Safety Management System (ISMS)
C.9.3.08 Safety Culture
C.9.3.09 Industrial Hygiene
C.9.3.10 Emergency Management
C.9.3.11 Radiological Assistance Program (RAP)
C.9.3.12 Quality Assurance
C.9.3.13 Radiation Protection
C.9.3.14 Nuclear Safety
C.9.3.15 Criticality Safety
C.9.3.16 Environmental Sustainability
C.9.3.17 Other
C.9.4 General Facility Management
C.9.5 DOE-ID Support Activities
C.9.6 Interactions
C.9.6.01 External Affairs/Public Affairs
C-5
C.9.6.02 External Review and Support
C.9.7 Business Performance Requirements
C.9.7.01 Business Administration
C.9.7.02 Internal Audit
C.9.8 Defined Benefit Pension Plan Costs
C-6
Section C - Performance Work Statement
C.1.0 GENERAL AND BACKGROUND INFORMATION
Established in 1989, the Department of Energy’s (DOE) Office of Environmental Management
(EM) is charged with addressing the environmental legacy of over 50 years of nuclear weapons production and government sponsored research. The EM Mission statement is as follows:
The EM mission is to complete the safe cleanup of environmental legacy resulting from five decades of nuclear weapons development and government-sponsored nuclear energy research.
EM is responsible for managing and directing the cleanup of contaminated nuclear weapons manufacturing and testing sites across the United States. Integral to that responsibility is the need to safely disposition large volumes of nuclear waste, safeguard and prepare for disposition of nuclear materials that could be used in nuclear weapons, deactivate and decommission several thousand radiologically and chemically contaminated facilities no longer needed to support the Department of Energy's mission and remediate extensive surface and groundwater contamination.
DOE EM manages cleanup activities within the Department of Energy’s Idaho Operations Office at the Idaho National Laboratory (INL). Since its inception in 1949, the INL site has fulfilled numerous DOE missions including designing and testing nuclear reactors; reprocessing spent nuclear fuel to recover fissile materials; managing spent nuclear fuel; and storing, treating and disposing of various waste streams. Currently, EM is a tenant on the site, and the Office of
Nuclear Energy (NE) is the landlord and maintains site-wide infrastructure. The ICP Contractor shall support and implement actions in furtherance of this mission as it relates to the ICP activities.
The ICP involves the safe environmental cleanup of the INL site, contaminated with legacy wastes generated from World War II-era conventional weapons testing, government-owned research and defense reactors, spent nuclear fuel reprocessing, laboratory research, and defense missions at other DOE sites. The ICP is funded through the DOE EM and the project focuses on reducing risks to workers, the public, and the environment, and protecting the Snake River Plain
Aquifer, a sole source aquifer that sustains Idaho’s agricultural industry.
The majority of EM’s cleanup work at the INL site is driven by regulatory compliance agreements. The two foundational agreements are: the 1991 Comprehensive Environmental
Response Compensation and Liability Act (CERCLA)-based Federal Facility Agreement and
Consent Order (FFA/CO), which governs the cleanup of contaminant releases to the environment; and the 1995 Idaho Settlement Agreement (ISA), which governs the removal of transuranic waste, spent nuclear fuel and high level radioactive waste from the state of Idaho.
Other regulatory drivers include the Federal Facility Compliance Act-based Site Treatment Plan
(STP), and other environmental permits, closure plans, Federal and state regulations, Records of
Decision (RODs) and other implementing documents.
C-7
C.1.1 Contract Purpose and Objectives
The End State Contracting Model (ESCM) is as a single award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with the ability to issue both Cost-Reimbursement (CR) and Fixed-
Price (FP) Task Orders (TO). The ESCM was developed as the preferred contracting approach to provide EM the needed flexibility to partner with industry and its stakeholders at this critical juncture of the EM Program to openly negotiate the right end states to reach completion. The purpose of this end state contract is to achieve significant reduction in financial liability and environmental risk that provides the best overall optimal solution towards completion of the DOE-EM mission at the INL site by accomplishing the maximum amount of environmental cleanup in the least amount of time and at the best value to the U.S. taxpayer.
This IDIQ contract construct also provides Idaho the needed flexibility to task the Contractor with using a risk-based approach to better define discrete scopes of work for site closure or end states for more realistic, reliable pricing and appropriate incentive structures to yield significant reductions in EM’s environmental financial liability.
Specific task orders will be issued (Section J attachments) throughout the ten-year contract ordering period to implement various aspects of this master performance work statement. The
CO will issue a Request for Task Order Proposal (RTP) in accordance with the Master IDIQ Contract Section H. 51 Task Ordering Procedure, paragraph (c). The Contractor shall expediently provide the CO with the requested task order proposal(s) that are compliant with FAR Subpart 15.4 and paragraph (f) of the H.51 clause.
The Contractor shall comply with all Federal, State, and local laws and regulations, Executive
Orders, DOE Orders (and other type of directives), Regulatory Permits, Agreements and Orders and Regulatory Milestones (both State and Federal) in the performance of this contract.
The majority of the ICP work is performed at two primary INL site locations: the Radioactive
Waste Management Complex (RWMC) and the Idaho Nuclear Technology and Engineering
Center (INTEC). The ICP mission work encompasses: completing treatment of the liquid sodium bearing waste; stabilizing and storage of Spent Nuclear Fuel (SNF) and High-Level
Waste (HLW); shipping transuranic waste; treating and shipping remote handled waste;
maintaining and operating the INTEC; closing remaining tank farm tanks; maintaining CERCLA remedial actions; and closure of the RWMC.
The scope of the ICP contract is categorized per the following areas:
Facility Infrastructure: This principally includes INTEC and RWMC facility infrastructure. The Office of Nuclear Energy (NE) is the Lead Program Secretarial Office (LPSO) at Idaho and manages site-wide infrastructure.
Environmental Activities: This includes compliance with the Federal Facilities Compliance Act (FFCA) Site Treatment Plan (STP), Resource Conservation and
Recovery Act (RCRA), CERCLA, including ISA activities principally at INTEC and RWMC; the remediation of the Subsurface Disposal Areas (SDA) at the RWMC; Test
C-8
Area North (TAN) groundwater remediation; new CERCLA site remediation; site-wide Stewardship; and Idaho CERCLA Disposal Facility (ICDF) transition operations.
Waste Management: This includes shipping Contact Handled (CH)-TRU waste; Remote
Handled (RH)-TRU waste management; Mixed Low Level Waste/Low Level Waste (M/LLW) activities/disposition; and disposition of newly generated waste as needed.
Liquid Waste Facility Closure: This includes IWTU operations to treat nearly 900,000 gallons of sodium bearing waste; completion of the Calcine Retrieval Project; and closure of the HLW Tank Farm tanks and associated liquid waste facilities at INTEC.
Spent Nuclear Fuel: This includes SNF Operations and Management activities, as well as SNF Disposition. This includes the Nuclear Regulatory Commission (NRC) License-required activities for the Independent Spent Fuel Storage Installations (ISFSI) located at INTEC and the Fort St. Vrain (FSV) ISFSI near Platteville, CO.
Facility Decontamination and Decommissioning (D&D).
During the term of this Contract, the ICP Contractor (herein referred to as “the Contractor”) shall interface with the other site contractors. Performance of the ICP scope will require significant and ongoing integration with multiple federal and contractor entities from EM, Office of Nuclear
Energy (NE), and Department of the Navy (Navy) programs to accomplish cleanup without impacting ongoing site missions. The Contractor shall establish interface agreement(s) with other contractors, as necessary, to ensure performance of contract requirements.
Currently, EM is a tenant on the site, and NE is the landlord. The INL site landlord contractor conducting work for NE is referred to as “the INL contractor” and is responsible for site-wide infrastructure. The Contractor shall establish an interface agreement with the INL contractor in accordance with Section J, Attachment J-4, List of INL Mandatory and Optional Site Services.
The Interface Agreement with the INL contractor shall describe how the Contractor and the INL contractor will interface on cross-cutting issues such as security, facility and program transfers, regulatory compliance, assignment of subcontractors, and other commercial obligations, consistently presenting information to the public and other arrangements of mutual benefit.
The Contractor shall also establish an interface agreement with the FSV contractor responsible for providing physical security services for the FSV SNF storage facility under NRC licenses and regulations.
The Contractor shall work cooperatively to ensure a mutual understanding and seek resolutions in the best interest of the Government and the ICP mission. Interface Management is a key function for effective and efficient delivery of services between contractors on the INL site and
FSV. The role of Interface Management is to solve issues in the best interest of the Government at the lowest level possible in the respective organizations.
The Contractor shall submit a Graded Approach for Implementation of Contract Requirements
Plan for DOE approval to streamline processes, apply a graded approach, and identify efficiencies and performance improvements (e.g., DOE directives, regulations, and others) that are critical to accomplishing the site mission. The plan shall include a review and recommendations of changes to the current site standards and implementing procedures for the
C-9 elimination of requirements and/or streamline of processes. The Contractor shall interface with the other site Contractors on proposed changes, as necessary.
C.2.0 CONTRACT TRANSITION
The contract transition period is estimated to be 90 days. The first day of the Transition Period will be the effective date of the transition task order. DOE will issue a Notice to Proceed (NTP), identifying the effective date of the transition task order. During the transition period, the
Contractor shall perform those activities that are necessary to transition work from the previous
ICP and NRC Licensed Facilities contractors in a manner that: (1) ensures that all work for which the Contractor is responsible under the contract is continued without disruption; (2) provides for an orderly transfer of resources, responsibilities, and accountability from the previous contractor(s); and (3) provides for the ability of the Contractor to perform the work in an efficient, effective, and safe manner. Workforce transition shall be managed in accordance with the requirements of applicable Section H, Contractor Human Resource Management clauses.
C.2.1 Contract Transition Period
The Contractor shall establish the necessary logistical support (office space, computers, telephone, etc.) to execute the 90-day transition period (estimated) and shall ensure all necessary personnel, including key personnel for the Contractor, are available during the transition period, unless specifically directed otherwise by the Contracting Officer (CO). All key personnel shall be assigned full-time to their respective positions and shall meet the requirements detailed in
Section H.44, Key Personnel. A temporary duty station for transition activities shall be located in Idaho Falls, Idaho; and shall be provided to DOE for approval within five days after the effective date of the transition task order.
Public Release Statement: Within 72 hours following the effective date of the transition task order, the Contractor shall release, upon DOE approval, on its own website a brief Executive
Summary of its offer including the following elements:
Name of Contractor including the identification of teaming partners and subcontractors and a description of the experience that each party brings to the project.
Workforce Impacts
Organizational Structure and Identification of Key Personnel.
Summary/description of Contractor’s management approach.
Contractor performance commitments.
Brief overview of Contractor’s work on similar projects.
Commitments to the Community.
Commitments to Small Business Subcontracting.
During the Contract Transition Period, the Contractor shall brief workers, Federal staff, and stakeholders on the Contractor’s approach and commitments for accomplishing the Task Orders and overall PWS.
C-10
The Contractor shall submit a Transition Plan for DOE approval within 14 calendar days after the effective date of the transition task order. The objectives of the Transition Plan are to prepare for implementation of the contract and minimize the impacts on continuity of operations. The
Transition Plan shall cover the necessary activities during the transition period. The plan shall cause minimal impact to the INL contractor, its personnel, site tenants, and NE. The plan shall provide sufficient detail for all transition activities, including but not limited to: the transition schedule, a description of all necessary transition activities, coverage of key functional areas during the transition period, the planned strategy for developing required documents (including licenses and agreements), a brief description of all involved organizations, planned execution of
Interface Agreements with other DOE-ID site contractors and necessary Memoranda of
Understanding (MOUs) with outside support organizations (e.g. NRC, Bureau of Land
Management (BLM), etc.), required utilities and other transition activities such as acquisition of necessary equipment, hiring and training of personnel, and development or revisions of required plans and procedures. The Contractor shall perform due diligence to ensure that all transition activities are identified and completed during the Transition Period.
The Contractor shall establish any Transition Interface Agreements necessary between it and other DOE-ID site contractors/subcontractors to define necessary interface points, scope boundaries, and/or provision of services, as required. A purchase order, subcontract, or other contracting vehicle between the contractors may dually serve as the necessary Interface
Agreement where appropriate. The Contractor shall provide all Interface Agreements to DOE for approval as they are established.
To ensure continuity of operations, the Contractor shall adopt, as applicable, the incumbent contractors’ programs and procedures at the effective date of the transition task order (e.g. Safety
Analysis Reports (SAR), Technical Safety Requirement (TSR)s, operating procedures, etc.), provided the Contractor has formally reviewed the programs and procedures to ensure compliance with Contract requirements, current regulatory requirements, DOE Orders and directives, and the Contractors’ organizational roles and responsibilities. The Contractor shall revise those programs and procedures it deems necessary to accommodate their technical approach, provided the programs and procedures remain in compliance with DOE requirements, and shall maintain its plans, procedures, programs, etc. in accordance with this PWS. The
Contractor shall provide written notification to the CO of its intent to adopt existing programs and/or procedures prior to the end of contract transition. Note that the incumbent contractor operated its personal property system under DOE Order 580.1; however, the Contractor shall adhere to the 41 CFR 109, and the FAR 52.245-1 requirements.
Status Reports - Transition Activities
The Contractor shall provide weekly status reports of transition activities to DOE. The
Contractor shall establish routine status meetings with DOE and other affected contractors to review transition activities and issues. The frequency of the meetings may increase as the end of
Contract transition period approaches. The Contractor shall coordinate directly with DOE-ID, C-11 and other organizations and contractors to finalize any transition agreements required to assume full responsibility.
DOE Safeguards and Security Survey
During the Contract transition period and prior to assuming control and responsibility for
Safeguards and Security (S&S), the Contractor shall be subject to a DOE S&S initial survey conducted in accordance with U.S. DOE Order 470.4B, Safeguards and Security Program. The results of the survey shall be documented and form the basis for DOE authorization to assume
S&S responsibilities, in particular, responsibility for Special Nuclear Material (SNM), classified information and other applicable protection level assets identified in DOE Order 470.3C, Design
Basis Threat (DBT) Order. Following the receipt of DOE authorization, the Contractor shall assume responsibility at the end of contract transition for all applicable S&S resources, materials, facilities, documents, and equipment within the facilities for which the Contractor is responsible.
Assumption of Permits
In accordance with Section H.57 clause entitled Allocation of Responsibilities for Environmental
Compliance, the Contractor shall submit to DOE and/or the regulator, as required, no later than
30 days prior to the end of contract transition, certified permit modification requests (e.g., site-wide level RCRA permits, EM facility-specific air permits, and EM facility-specific Waste
Water Land Application permits) to assume ownership (i.e., change the “operator” name and identify a “responsible corporate officer” responsible for the permit).
INL Mandatory and Optional Site Services
By end of contract transition, the Contractor shall establish a formal interface agreement with the
INL contractor describing how the mandatory and optional site services per Section J, Attachment J-4, List of INL Mandatory and Optional Site Services, will be performed and reimbursed throughout the ICP contract period. This agreement shall also address services provided by the ICP Contractor for purchase by the INL contractor. This formal interface agreement shall be submitted to DOE for approval.
C.2.2 Government-Owned Property and Equipment Responsibilities for Contract
Transition Period
Upon completion of the transition period, the Contractor shall accept transfer of and accountability for Government-owned property and equipment, including special nuclear material, from the following incumbent contracts:
Idaho Cleanup Project (ICP) Core Contract # DE-EM0004083, Fluor Idaho, LLC
Nuclear Regulatory Commission Licensed Facilities Contract # DE-EM0003976, Spectra
Tech Inc.
C-12
All real and personal property currently accountable to the incumbent contractors for contract performance will be provided to the Contractor. During the contract transition period, an inventory record of such property in the DOE Facilities Information Management System
(FIMS) and incumbent contractors’ personal property databases will be provided to the
Contractor. Specifically, the following property acceptance requirements shall be implemented:
The Contractor shall perform a joint wall-to-wall physical inventory with the incumbent contractor(s) of all accountable high-risk and sensitive property during the transition period and accept full accountability for the high-risk and sensitive property at the end of transition. This requirement includes Government property in the possession or control of subcontractors.
The Contractor shall accept, at the end of transition, transfer of accountability for the remaining
Government-owned real and personal property and equipment, including special nuclear material, not covered under this paragraph, based on existing inventory records, on an “as-is, where-is” basis, or perform a wall-to-wall inventory within the transition period of the Contract.
Any discrepancies from the existing inventory records shall be reported to the CO. As the formal inventories are completed, the Contractor shall assume responsibility and liability for subsequent losses and damages in accordance with FAR 52.245-1, and 41 CFR 109. If the physical inventory is not accomplished within the allotted time frame, the previous contractors’ records will become the inventory baseline.
C.3.0 EM FACILITY INFRASTRUCTURE
The Contractor shall maintain existing facilities in an acceptable functional condition that supports current and projected future missions. Facilities shall be maintained and sustained in accordance with DOE O 430.1C, Real Property Asset Management; and DOE O 433.1, Maintenance Management Program for DOE Nuclear Facilities.
General Infrastructure support will be provided by the INL contractor to the Contractor in accordance with Section J, Attachment J-4, List of INL Mandatory and Optional Site Services over the contract period of performance as agreed to between the Idaho Office of Nuclear Energy and the Idaho Office of Environmental Management. The Contractor shall serve as Building
Code Official for EM buildings as described in DOE Order 420.1C, Facility Safety, and associated standards.
C.3.1 RWMC
The Contractor shall operate and maintain the EM-owned buildings and structures at RWMC unless and until they undergo D&D or transfer of ownership away from EM. This includes providing operators, maintenance crafts, engineers, support personnel (QA, Safety, etc.), and management. The Contractor shall maintain needed facilities, equipment, roads, and railroads within RWMC throughout the performance period to function at the same level and in the same condition as at the end of contract transition. This maintenance activity is a contract requirement in accordance with C.9.2.04 Conduct of Maintenance.
C-13
The Contractor shall operate and maintain the utility systems for RWMC unless and until they undergo D&D or transfer of ownership away from EM. In performing this scope, the Contractor shall reconfigure RWMC utility systems, as necessary, to accommodate the SDA cap and drainage system construction, and while doing so, ensure that necessary utilities are provided, as needed, to support other continuing mission activities. Utility services must provide adequate building protection including, but not limited to, fire protection (the INL contractor provides the site-wide Fire Department, but the Contractor shall maintain fire protection within RWMC areas), alarm systems, nuclear safety, and Life Safety Code requirements, specified in National
Fire Protection Association 101.
The Contractor shall be responsible for general facility maintenance and custodial services at
RWMC, including, but not limited to: sanitary systems, trash removal, recycling, grass mowing, weed control, housekeeping, floor maintenance, pest control, and snow removal. This maintenance activity is a contract requirement in accordance with C.9.2.04 Conduct of
Maintenance. The INL contractor provides electrical power to the RWMC substations. The
Contractor shall maintain the power distribution systems downstream from these substations and reimburse the INL contractor for power consumption.
C.3.2 INTEC
The Contractor shall operate and maintain the EM-owned buildings and structures at INTEC.
This includes providing operators, maintenance crafts, engineers, support personnel (QA, Safety, etc.), and management. The Contractor shall maintain needed facilities, equipment, roads, and railroads within INTEC throughout the performance period to function at the same level and in the same condition as at the end of contract transition. This maintenance activity is a contract requirement in accordance with C.9.2.04 Conduct of Maintenance. The Contractor shall refer to:
Section C.5.3RH-TRU Waste Disposition for specific scope requirements related to the operations, maintenance, monitoring and improvements of RH-TRU Program facilities at INTEC; and
Section C.7.0 Spent Nuclear Fuel (SNF) Management for required surveillance, maintenance, and stabilization of SNF facilities.
The Contractor shall operate and maintain the utility systems for INTEC. Utility services must provide adequate building protection including, but not limited to, fire protection (the INL contractor provides the site-wide Fire Department, but the Contractor shall maintain fire protection within INTEC areas), alarm systems, nuclear safety, and Life Safety Code requirements, specified in National Fire Protection Association 101.
The Contractor shall operate and maintain the INTEC Calcine Solids Storage Facility bin sets.
The Contractor shall be responsible for general facility maintenance and custodial services at
INTEC including, but not limited to: sanitary systems, trash removal, recycling, grass mowing, weed control, housekeeping, floor maintenance, pest control, and snow removal. The INL contractor provides electrical power to the INTEC substations. The Contractor shall maintain the
C-14 power distribution systems downstream from these substations, and reimburse the INL contractor for power consumption.
The Contractor shall provide material and storage control for TMI-2 and FSV spare parts that are currently located in Idaho.
The Contractor shall proactively reduce anthropogenic water sources at INTEC per the CERCLA
ROD for Tank Farm Soil and INTEC Groundwater, Operable Unit (OU) 3-14 (DOE/ID-11296).
C.3.3 Other Facility Infrastructure
The Contractor shall operate and maintain the EM-owned buildings and structures at the INL site, outside of RWMC and INTEC, including the FSV facility in Colorado, unless and until they undergo D&D or transfer of ownership away from EM. The Contractor shall maintain needed facilities, equipment, roads, and railroads within these other areas throughout the performance period to function at the same level and in the same condition as at the end of contract transition.
This maintenance activity is a contract requirement in accordance with C.9.2.04 Conduct of
Maintenance.
C.4.0 CERCLA REMEDIATION
The Contractor shall ensure compliance with the Comprehensive Environmental Response
Compensation and Liability Act (CERCLA) and the CERCLA-based Federal Facility Agreement and Consent Order (FFA/CO) for the Idaho National Engineering laboratory (1991), the
Agreement to Implement (2008), and with associated CERCLA Records of Decision and their implementing plans for Waste Area Groups (WAG) 1-7, and 10. CERCLA documents referred to are available at https://ar.icp.doe.gov. The Contractor shall develop, submit, and finalize reports in accordance with Section J, Attachment J-5, Environmental Regulatory Structure and
Interface Protocol for the ICP Contractor. Key CERCLA deliverables, including FFA/CO
Primary documents, are listed in Section J, Attachment J-2, Contract Deliverables.
This scope also includes, but is not limited to: hazardous substance release site evaluation and remediation, institutional controls, monitoring, operation and maintenance of remedial actions, and CERCLA Five-Year reviews. The Contractor shall implement the Quality Assurance Project
Plan (QAPjP) (DOE/ID-10587) as appropriate for data collection activities under the FFA/CO.
The Contractor shall implement the INL site Community Involvement Plan (DOE/ID-11518) as it applies to CERCLA Remediation work throughout the contract period of performance.
C.4.1 INTEC Tank Farm Cap
The Contractor shall maintain the Interim Tank Farm Low Permeability Cover 90% Design
(EDF-10116) and update it as necessary to reflect current field conditions and requirements until the Low Permeability Cover is complete. The 90% design drawings for Phase II include a design for installation of low permeability pavement on the Tank Farm. Part A was completed during
C-15
2017 (See Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater, Phase I and Phase II, Part A Interim Remedial Action Report – DOE/ID-11475, February 2018).
The Contractor shall construct a low-permeability pavement cover over the eastern third of the tank farm (including any activities necessary to prepare the tank farm area for low-permeability pavement) in accordance with Phase II Part B of the Operable Unit 3-14 Tank Farm Soil and
INTEC Groundwater Remedial Design/Remedial Action Work Plan (DOE/ID-11333) and the
Phase II 90% Design Drawings (EDF-10116 dated March 6, 2012 or current version), including completion and final regulatory approval of the associated Remedial Action Report. The
Contractor shall complete construction of Phase II Part B the low permeability pavement upon completion of RCRA closure of WM-187-190 tanks.
The Contractor shall maintain the entire low permeability cover and Recharge Control Zone asphalt throughout the contract period of performance in accordance with the Operable Unit 3-14
Tank Farm Soil and INTEC Groundwater Operation and Maintenance Plan (DOE/ID-11337).
C.4.2 RWMC SDA Cap
The Contractor shall construct an evapotranspiration surface barrier (cap) over the Subsurface
Disposal Area located at RWMC in accordance with the approved Phase 1 Remedial
Design/Remedial Action Work Plan for Operable Unit 7-13/14 (DOE/ID-11389), Remedial
Design Work Plan (DOE/ID-11482) and Operable Unit (OU) 7-13/14 Phase 3 Remedial Design
(DOE/ID-12015). The Contractor shall complete, submit, obtain regulatory approval as required, and implement construction-related documents in accordance with these work plans or associated documents, e.g. the Operable Unit 7-13/14 Phase 3 Remedial Design Work Plan
(DOE/ID-11482), and those included in Section 6 of the Remedial Design Report.
The Contractor shall document surface barrier completion and the entire completion of the OU 7-
13/14 ROD (DOE/ID-11359) implementation in a Comprehensive Remedial Action (RA)
Report, which shall be submitted in accordance with the above-noted Work Plans by December
31, 2028, and finalized in accordance with the FFA/CO. RA Report documentation shall also support CD-4 approval under DOE Order 413.3B and demonstrate compliance with DOE Order
435.1.
As construction of the surface barrier will be under DOE Order 413.3B, the Contractor shall complete documentation and activities (e.g., PARS II EVMS electronic reporting) necessary to support achieving CD-1, CD-2, CD-3, and CD-4, e.g., Hazard Analysis Report, Security
Vulnerability Assessment, and shall support associated project reviews, information requests, etc., as necessary.
The Contractor shall work with the U.S. Corps of Engineers and obtain a renewed determination, prior to its expiration in June of 2022, that the Spreading Areas are not waters of the U.S.
The Contractor shall complete borrow source restoration as addressed in the Design Report, in
Section 2.2 of Attachment 1, Technical and Functional Requirements.
C-16
The Contractor shall prepare all areas in the footprint of the SDA surface barrier and drainage channel for construction.
The Contractor shall implement the mitigation strategies in the Memorandum of Agreement between the U.S. DOE and the Idaho State Historic Preservation Office (e.g., construction and installation of an interpretive panel to provide historic information regarding the role of
Goodale’s Cutoff) regarding the Subsurface Disposal Area cap.
C.4.2.01 Vadose Zone Rebound Study
The Contractor shall complete a vadose zone rebound study in accordance with the Remedial
Design Work Plan (DOE/ID-11482, Section 3.2) (envisioned to be in two parts in the draft test plan), the associated Rebound Study Test Plan (DOE/ID-11569), and Field Sampling Plan
(DOE/ID-11569, Appendix A). Upon completion of the study, the Contractor shall submit a
Rebound Study Report for regulatory agency review per the FFA/CO review process by March
31, 2024, per the RD Work Plan.
C.4.2.02 Long-Term Monitoring Network
The Contractor shall develop, obtain approval of, and implement a well decommissioning plan and Post-remedy Long-term monitoring plan as discussed in the Long-term Monitoring Study for
Operable Unit 7-13/14 (DOE/ID-11568). The Contractor shall document decommissioning of wells and boreholes in the annual INL Water Use Report and Comprehensive well inventory submitted to IDWR each year.
C.4.3 Idaho CERCLA Disposal Facility (ICDF)
The Contractor shall operate ICDF and dispose of CERCLA soil and debris in the landfill, and dispose of CERCLA waste liquids in the evaporation ponds, in accordance with the Operable
Unit 3-13 Record of Decision (DOE/ID-10660) and the following documents:
ICDF Complex Remedial Action Work Plan (DOE/ID-10984)
ICDF Complex Operations and Maintenance (O&M) Plan (DOE/ID-11000)
ICDF Groundwater Monitoring Plan (DOE/ID-10955)
ICDF Operational and Monitoring Sampling and Analysis Plan (DOE/ID-11005)
ICDF Waste Acceptance Criteria (DOE/ID-10881)
ICDF Complex Waste Profile and Verification Sample Guidance (DOE/NE-ID-11175)
Health and Safety Plan for ICDF INEEL/EXT-01-01318
DOE M 435.1-1, Disposal Authorization Statement and associated technical basis documents (e.g. ICDF DOE Order 435.1 Annual Summary Reports)
ICDF Waste Placement Plan (EDF-ER-286).
C-17
C.4.3.01 ICDF New Cell Construction
The Contractor shall construct a new disposal cell at the ICDF upon direction from the DOE CO.
C.4.3.02 ICDF CAP
The Contractor shall close the ICDF in accordance with the Operable Unit 3-13 Remedial Design
Work Plan (DOE/ID-10984) upon direction from the DOE CO.
C.4.4 Waste Area Groups
C.4.4.01 WAG 1 Test Area North (TAN)
The Contractor shall implement the Technical Support Facility Injection Well (TSF-05) Record of
Decision (ROD) for WAG 1, Operable Unit (OU) 1-07B, and the associated ROD Amendment
(DOE/ID-10139, AMENDMENT). Accordingly, the Contractor shall implement the In-Situ
Bioremediation (ISB) Rebound Test Plan (DOE/ID-11444).
The Contractor shall implement the Groundwater Monitoring Plan for TAN OU 1-07B
(DOE/ID-11412).
The Contractor shall implement the Operations and Maintenance Plan for OU 1-07, TAN
Groundwater Remediation (DOE/ID 11558). The Contractor shall comply with the Waste
Management Plan for TAN Final Groundwater Remediation OU 1-07B (INEEL/EXT-98-
00267).
The Contractor shall maintain the TAN Demolition Landfill in accordance with the Post Closure
Care requirements pertaining to the period after the first six months following the Closure
Certification per the approved Closure Plan (DOE/ID-11347).
C.4.4.02 WAG 3 INTEC CERCLA Remediation
The Contractor shall implement the Record of Decisions (RODs) for WAG 3, OU 3-13
(DOE/ID-10660) and 3-14 (DOE/ID-11296), to ensure Remedial Action Objectives (RAO) are met.
The Contractor shall implement the 3-14 Tank Farm Soil and INTEC Groundwater Remedial
Design/Remedial Action (RD/RA) Work Plan (DOE/ID-11333).
The Contractor shall implement the OU 3-14 Tank Farm Soil and INTEC Groundwater Long-
Term Monitoring Plan (DOE/ID-11334).
The Contractor shall implement the OU 3-14 Tank Farm Soil and INTEC Groundwater
Operation and Maintenance Plan (DOE/ID-11337).
C-18
The Contractor shall comply with the OU 3-14 Tank Farm Soil and INTEC Groundwater Waste
Management Plan (DOE/ID-11335).
C.4.4.03 WAG 7 RWMC CERCLA Remediation
The Contractor shall perform WAG 7 remediation activities in accordance with the OU 7-13/14
ROD (DOE/ID-11359) and implementing documents. Remediation activities/approaches, and controlling documentation, shall be revised as necessary, with the full participation of the parties to the FFA/CO, as envisioned by the FFA/CO, as the final phases of ROD implementation are completed.
The Contractor shall implement the Vadose Zone Field Sampling Plan for OU 7-13/14 (DOE/ID-
11503), as long as the system continues to operate, with exceptions as needed to accommodate the vadose zone rebound test and removal of the vapor vacuum extraction system.
The Contractor shall implement the Field Sampling Plan for OU 7-13/14 Aquifer Monitoring
(DOE/ID-11492) and perform groundwater monitoring and Operation and Maintenance of the monitoring wells, with the understanding that the monitoring network and associated monitoring plans and work scope shall be revised to accommodate/support the SDA cap construction
The Contractor shall keep current and implement the Operable Unit 7-13/14 Operations and
Maintenance Plan (DOE/ID-11393); operate and maintain the vapor vacuum extraction system subject to above requirements; complete Pad A inspections and reports, etc. The Contractor shall revise the plan in accordance with the FFA/CO to allow the studies (e.g., vadose zone rebound test and system removal) necessary to complete the design for the final SDA cap.
The Contractor shall implement the Health and Safety Plan for OU 7-13/14 Field Activities
(ICP/EXT-04-00209) for applicable work at RWMC.
Upon completion of targeted waste exhumation, the Contractor shall transfer to the state of Idaho all required buried waste exhumation video and other applicable records in a format mutually acceptable and agreed-to.
C.4.4.04 WAG 10 Balance of Site Remediation
The Contractor shall implement the Comprehensive ROD for WAG 10, OU 10-08 (DOE/ID-11385), for Long-Term Management and Control of ICP sites to ensure remedial action objectives are met.
The Contractor shall maintain all CERCLA records and operate and maintain the environmental databases for all WAGs. This includes, but is not limited to, the Institutional Control (IC) database; the Geographical Information System; the CERCLA Action Tracking System; the
Environmental Data Warehouse (EDW); and the Administrative Record and Information
Repository.
C-19
The Contractor shall implement the Site-Wide Institutional Controls, and Operations and
Maintenance (IC & O&M) Plan (DOE/ID-11042).
The Contractor shall prepare a draft CERCLA 5-year review documents for submittal to regulatory agencies by August 15, 2025, 2030, and possibly 2035. The Contractor shall also be responsible for revising and finalizing the 5-year review document per agency comment.
The Contractor shall implement the OU 10-08 Post-Record of Decision Groundwater Monitoring and Field Sampling Plan for OU 10-08 (DOE/ID-11420). The Contractor shall maintain the current CERCLA monitoring well network, including well logging, routine maintenance of existing monitor wells, and the annual reporting of such activities.
The Contractor shall manage and maintain the New Site Process by identifying, tracking, remediating, and documenting the remediation of future new sites in accordance with OU 10-08
ROD and Remedial Design Remedial Action Work Plan (DOE/ID-11418). See Section 5 of
DOE/ID-11418. The Contractor shall perform remedial actions at new CERCLA sites identified through the New Site Identification (NSI) process.
The Contractor shall complete New Site Identification Forms (NSID), Part As, Part Bs, etc. as necessary. Part A NSI forms shall be submitted to the Agencies within 30 days of discovery of a
New Site.
The Contractor shall prepare a Plug-in Remedy Memorandum and an Explanation of Significant
Differences for the implementation of the plug-in remedies as needed:
The Contractor shall implement Field Sampling Plans (FSP) and remedial actions in the field as needed.
FSP documents for potential new sites will be posted to https://ar.icp.doe.gov when complete.
After the FSPs are implemented and characterization data are obtained, the Contractor shall complete Part B of the NSID process for each site and obtain regulatory agency approval.
The Contractor shall implement the Groundwater Monitoring Plan for ATRX OU 2-13
(DOE/ID-10626).
The Contractor shall implement the Central Facilities Area (CFA) Landfills Long-Term
Monitoring and Field Sampling Plan (DOE/ID-11374).
C.4.5 RWMC Low Level Waste Disposal Facility Closure
The Contractor shall close the Active Low Level Waste Disposal Facility and the two inactive soil vaults in Soil Vault Row (SVR) 21 in accordance with RPT-576 Interim Closure Plan for
ALLDF RWMC - 2016 - 435.1 to facilitate construction of the surface barrier.
C-20
C.4.6 Additional Groundwater Monitoring Wells
The Contractor shall abandon existing monitoring wells and install new monitoring wells (e.g.
the CFA Landfill monitoring and TAN Groundwater Remediation) for monitoring upon direction from the DOE CO.
Section C.5.0
C.5.0 WASTE MANAGEMENT
The Contractor shall manage all hazardous waste, Low Level Waste (LLW), Mixed Low Level
Waste (M/LLW) (including primary M/LLW from INTEC and AMWTP, which is stored Idaho
Settlement Agreement Contact Handled-Transuranic (CH-TRU) reclassified as M/LLW), CH-
TRU and Remote Handled (RH)-TRU waste, and exhumed buried CH-TRU waste generated by the ICP. Waste types anticipated to be encountered under this PWS include debris, solids, and soil. The Contractor shall establish and maintain a DOE Order 435.1-compliant LLW, M/LLW and TRU waste program. This includes, but is not limited to: treating waste (as necessary);
maintaining characterization and treatment equipment and facilities; supporting inspection, certification, and compliance audits (including multiple disciplines within the Department of
Energy Consolidated Audit Program (DOECAP) process); transporting and disposing of waste;
and interfacing with regulatory agencies including EPA, the state of Idaho (e.g. Attorney
General’s office, Governor’s office, Department of Environmental Quality, etc.), the state of
Nevada, and the state of New Mexico.
The Contractor shall be subject to the Department of Transportation (DOT) Hazardous Material
Regulations (HMR). If the Contractor prepares and/or conducts an offsite shipment that is not in accordance with the HMR, then the Contractor shall apply for a DOT Special Permit.
Applications shall be submitted to the responsible Head of Operations Office or the Field
Office/Site Office Manager for processing through the EM Headquarters Certifying Official
(HCO) to DOT. Applications shall follow the directions in 49 CFR 107.105.
All TRU waste generated or managed under this Contract, listed in the ISA, or encountered during the course of accomplishing this contract work shall be processed and shipped out of the state of Idaho in accordance with the receiving Treatment Storage and Disposal Facility (TSDF) or Waste Isolation Pilot Plant (WIPP) shipping schedules approved by the receiving TSDF or
Carlsbad Field Office (CBFO).
All TRU waste with a generation date of 1995 or earlier shall be managed as Idaho Settlement
Agreement TRU waste and is defined as “Legacy TRU waste.” Waste previously retrieved from the Transuranic Storage Area – Retrieval Enclosure (TSA-RE) includes waste that may fall out as M/LLW when final certification for shipping for disposal occurs and shall be shipped accordingly. All ISA CH-TRU waste shall be shipped out of the state of Idaho in accordance with the WIPP shipping schedule approved by the CBFO. All ISA CH-TRU waste and associated volumes that shall be shipped shall be accounted for by the Contractor by providing
C-21 objective evidence to DOE of compliance with provisions of the 1995 Idaho Settlement
Agreement and the INL Site Treatment Plan.
All targeted waste exhumed and packaged from the SDA under OU 7-13/14 activities, regardless of assay results, shall be processed and shipped out of the state of Idaho in compliance with the requirements defined in the Agreement to Implement. For WIPP disposal purposes, related to the exhumation of buried waste, the Contractor shall manage it in accordance with the applicable requirements of the Waste Analysis Plan of the WIPP Hazardous Waste Facility Permit, NM
4890139088-TSDF WIPP document repository available at http://www.wipp.energy.gov/Documents_All_Number.htm.
The Contractor shall perform work associated with the disposal of TRU waste at the WIPP, which includes, but is not limited to: retrieval from various on-site locations; development of acceptable knowledge documentation (including Tier 1-request development and support); visual examination as needed; waste characterization and certification; assembly of containers into payloads; and loading of approved transportation containers for shipment to and disposal at
WIPP. The Contractor shall certify TRU waste to meet the requirements of the most current version of the WIPP Waste Acceptance Criteria (WAC), which includes, but is not limited to:
development of data packages to show compliance with the WIPP WAC, defense of data packages, and negotiation with the state of New Mexico and EPA.
Payloads that are certified for disposal at WIPP shall meet the requirements for shipment in
TRUPACT-II containers, TRUPACT-III containers, HalfPACT containers, RH-72B containers, Shielded Container Assemblies, or other NRC-certified packaging as applicable. The container specifications for approved payload configurations are identified in the most current version of the WIPP WAC. The payload configurations can include a mixture of TRU waste and waste having TRU constituents provided the final disposal configuration is determined to be TRU waste.
The WIPP Shipping Baseline schedule is subject to CBFO approval and utilizes a week starting on Sunday and ending on Saturday. The Contractor shall ensure the WIPP Shipping Baseline schedule accounts for the following Idaho native Indian tribal holidays: [Treaty Days (July 3), Independence Day (July 4), Shoshone – Bannock Indian Festival (typically the second weekend in August, Thursday through Sunday) and Indian Days (typically the last Friday of September)].
The Contractor shall plan for approximately six weeks for the annual WIPP maintenance shutdown, typically during the second quarter of the Government fiscal year. CBFO will establish what constitutes the last shipment prior to a holiday or shutdown and when shipments can resume. Additionally, CBFO will suspend shipping while upgrades are being done to the
WIPP infrastructure and underground.
Agreement on specific dates for TRU waste shipments to WIPP are reached between DOE-ID and DOE-CBFO approximately one month in advance. The WIPP Shipping Baseline schedule is subject to changes based upon CBFO funding and DOE priorities.