858611004_-_Drawing_4_Revised.pdf
PDF 243 KB Posted
- Attached to
- General Aviation Terminal Building
- Solicitation number
- 25-011P
- Issued by
- Flagler County, Florida
About this file
This document is a technical drawing page (Drawing 4) containing General Notes for a Temporary Construction Sign Detail, part of the General Aviation Terminal Building project for Flagler County, Florida. The drawing provides detailed specifications and requirements for temporary construction signage, including guidelines for placement, maintenance, and specific technical specifications for on-site signage during the construction process.
The drawing includes comprehensive instructions for contractors regarding site management, safety protocols, and specific requirements for temporary traffic control and signage. It outlines key administrative details such as the contractor's responsibilities for site preparation, material handling, safety protocols, and documentation requirements. The notes also specify technical details like electrical requirements, equipment specifications, and general site management expectations, suggesting a comprehensive approach to managing the construction site's visual and operational elements during the project's implementation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
AutoCAD SHX Text
SITE AND SAFETY NOTES
AutoCAD SHX Text
GRAPHIC
AutoCAD SHX Text
WJM
AutoCAD SHX Text
ISA
AutoCAD SHX Text 858611004
AutoCAD SHX Text
FLAGLER EXECUTIVE AIRPORT
AutoCAD SHX Text 8586011
AutoCAD SHX Text
100%%% CONTRACT DOCS.
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
CADD FILE
AutoCAD SHX Text
DES. BY
AutoCAD SHX Text
DR. BY
AutoCAD SHX Text
CHKD. BY
AutoCAD SHX Text
OCT. 2024
AutoCAD SHX Text
WJM
AutoCAD SHX Text
GENERAL AVIATION TERMINAL BUILDING
AutoCAD SHX Text HTA-ORL:\\O:\1_PROJECTS\Flagler-County-FL\18_858611_00-Terminal-Bldng-Design\2-CADD\858611004.dwg 10/31/2024 10:11:29 AMO:\1_PROJECTS\Flagler-County-FL\18_858611_00-Terminal-Bldng-Design\2-CADD\858611004.dwg 10/31/2024 10:11:29 AM 10/31/2024 10:11:29 AM10/31/2024 10:11:29 AM
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DR.
AutoCAD SHX Text
APPD.
AutoCAD SHX Text
CHKD.
AutoCAD SHX Text
WILBUR J. MATHURIN
AutoCAD SHX Text
FL. LICENSE NO. 63921
AutoCAD SHX Text
ENGINEER OF RECORD
AutoCAD SHX Text 95 E. MITCHELL HAMMOCK ROAD, SUITE 200 OVIEDO, FL 32765 (407) 380-1919 Web:www.hoyletanner.com
AutoCAD SHX Text GENERAL NOTES 1. THE CONTRACTOR MUST HAVE A POWER SWEEPER ON THE SITE WHEN REQUIRED TO SWEEP THE CONTRACTOR MUST HAVE A POWER SWEEPER ON THE SITE WHEN REQUIRED TO SWEEP PAVEMENTS IN WORK AREAS AND HAUL ROUTES AS DIRECTED BY THE ENGINEER. 2. MATERIALS DELIVERY TO THE SITE: ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE MATERIALS DELIVERY TO THE SITE: ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE WORK SITE WILL USE THE HAUL ROUTE AND CONTRACTOR'S STAGING AREA AS DESIGNATED ON THE PLANS. 3. AFTER THE JOB IS COMPLETED, THE CONTRACTOR MUST RESTORE THE MATERIAL STORAGE, AFTER THE JOB IS COMPLETED, THE CONTRACTOR MUST RESTORE THE MATERIAL STORAGE, EQUIPMENT AREAS, AND ALL DISTURBED AREAS TO PRE-EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. 4. STATE AND LOCAL HIGHWAY LOAD LIMITS APPLY ON ALL HAUL ROUTES. ALL HAUL ROUTES MUST STATE AND LOCAL HIGHWAY LOAD LIMITS APPLY ON ALL HAUL ROUTES. ALL HAUL ROUTES MUST BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. 5. CONTRACTOR MUST BE RESPONSIBLE FOR KEEPING ALL HAUL ROADS SWEPT CLEAN OF ANY DEBRIS CONTRACTOR MUST BE RESPONSIBLE FOR KEEPING ALL HAUL ROADS SWEPT CLEAN OF ANY DEBRIS INTRODUCED BY HIS/HER CONSTRUCTION EQUIPMENT. 6. TEMPORARY DIRECTIONAL SIGNS MUST BE PROVIDED AND INSTALLED BY THE CONTRACTOR WHICH TEMPORARY DIRECTIONAL SIGNS MUST BE PROVIDED AND INSTALLED BY THE CONTRACTOR WHICH WILL CAREFULLY ROUTE TRAFFIC AWAY FROM BARRICADED AREAS, AS DIRECTED BY THE AIRPORT MANAGER AND SHOWN ON THESE PLANS (AS APPLICABLE). SIGNS MUST BE SIZED AND COLORED SIMILARLY TO EXISTING PERMANENT GUIDANCE SIGNS, ALTHOUGH WOOD AND PAINT WILL BE ACCEPTABLE AND LIGHTING IS NOT REQUIRED. INSCRIPTIONS MUST BE APPROVED BY THE ENGINEER PRIOR TO FABRICATION AND USE. ALL TEMPORARY GUIDANCE SIGNS MUST BE SECURED FROM WINDS BY WEIGHING WITH SAND BAGS. 7. CONTRACTOR'S STOCKPILE AREA FOR EXCESS CONSTRUCTION MATERIAL TO BE USED ONLY DURING CONTRACTOR'S STOCKPILE AREA FOR EXCESS CONSTRUCTION MATERIAL TO BE USED ONLY DURING CONSTRUCTION OF THIS PROJECT. ALL MATERIAL NOT ACCEPTED BY THE OWNER WILL BECOME THE PROPERTY OF THE CONTRACTOR AND MUST BE DISPOSED OF FROM THE SITE AT NO ADDITIONAL COST TO THE OWNER UNLESS OTHERWISE APPROVED IN WRITING. 8. EXCESS MATERIAL FROM EXCAVATION MUST NOT BE REMOVED FROM THE SITE WITHOUT THE EXCESS MATERIAL FROM EXCAVATION MUST NOT BE REMOVED FROM THE SITE WITHOUT THE OWNER'S APPROVAL, EXCEPT UNSUITABLE MATERIAL, WHICH MAY BE REMOVED FROM THE SITE BY THE CONTRACTOR. OWNER AND/OR ENGINEER WILL DETERMINE WHAT EXCESS MATERIAL IS UNSUITABLE. EXCESS STOCKPILE AREA TO BE DETERMINED BY THE OWNER. 9. AREAS SHOWN ON THE SITE AND SAFETY PLAN ARE ILLUSTRATIVE ONLY. REFER TO PLAN AND AREAS SHOWN ON THE SITE AND SAFETY PLAN ARE ILLUSTRATIVE ONLY. REFER TO PLAN AND PROFILE SHEETS FOR ACTUAL LIMITS. 10. THE CONTRACTOR WILL BE REQUIRED TO CONSTRUCT AND MAINTAIN THE TEMPORARY HAUL ROUTE THE CONTRACTOR WILL BE REQUIRED TO CONSTRUCT AND MAINTAIN THE TEMPORARY HAUL ROUTE TO THE CONTRACTOR STAGE/STORAGE AREA. GRADE AND ROUTE AS NECESSARY TO PROVIDE SAFE ACCESS TO THE CONSTRUCTION AREA. 11. THE SITE AND SAFETY PLAN IS PART OF THE CONSTRUCTION CONTRACT WHEN EXECUTED BY ALL THE SITE AND SAFETY PLAN IS PART OF THE CONSTRUCTION CONTRACT WHEN EXECUTED BY ALL CONCERNED PARTIES. 12. CONTRACTOR'S VEHICLE TRAFFIC MUST BE COORDINATED WITH THE ENGINEER'S REPRESENTATIVE IN CONTRACTOR'S VEHICLE TRAFFIC MUST BE COORDINATED WITH THE ENGINEER'S REPRESENTATIVE IN THE FIELD AND THE OWNER. 13. THE CONTRACTOR MUST PLACE A TEMPORARY "TRUCKS ENTERING HIGHWAY" SIGN A MINIMUM OF THE CONTRACTOR MUST PLACE A TEMPORARY "TRUCKS ENTERING HIGHWAY" SIGN A MINIMUM OF 1000' (FEET) FROM INTERSECTION OF HAUL ROUTE ACCESS ROAD. (SEE FDOT INDEX NO. 630, SHEET 1 OF 2, FOR DETAILS AND INFORMATION). 14. NO ADDITIONAL PAYMENT MUST BE MADE FOR THE WORK SHOWN ON THIS PLAN. ALL WORK FOR NO ADDITIONAL PAYMENT MUST BE MADE FOR THE WORK SHOWN ON THIS PLAN. ALL WORK FOR PROJECT PHASING AND SAFETY WILL BE INCLUDED IN OTHER WORK ITEMS. 15. ALL SECURITY/ACCESS GATES MUST REMAIN CLOSED AND LOCKED AT ALL TIMES. ALL SECURITY/ACCESS GATES MUST REMAIN CLOSED AND LOCKED AT ALL TIMES. 16. THE OWNER MUST HAVE FIRST RIGHT OF REFUSAL FOR ALL EXISTING IMPROVEMENTS WITHIN THE THE OWNER MUST HAVE FIRST RIGHT OF REFUSAL FOR ALL EXISTING IMPROVEMENTS WITHIN THE PROJECT AREA LIMITS. ANY ITEMS REFUSED BY THE OWNER MUST BE REMOVED FROM THE SITE AT THE OWNER'S DIRECTION AND AT NO COST TO THE OWNER. ENGINEER'S FIELD OFFICE THE CONTRACTOR SHALL PROVIDE DEDICATED SPACE FOR THE USE OF THE ENGINEER, RPR, AND INSPECTORS, AS A FIELD OFFICE FOR THE DURATION OF THE PROJECT. THIS SPACE SHALL BE LOCATED CONVENIENTLY NEAR THE CONSTRUCTION AND SHALL BE SEPARATE FROM ANY SPACE USED BY THE CONTRACTOR. THIS FACILITY SHALL BE AN APPROVED WEATHERPROOF BUILDING MEETING THE CURRENT STATE HIGHWAY SPECIFICATIONS (FOR EXAMPLE, CLASS I FIELD OFFICE OR TYPE C STRUCTURE). THE CONTRACTOR WILL FURNISH WATER, SANITARY FACILITIES, HEAT, AIR CONDITIONING, AND ELECTRICITY. IN ADDITION, THE FOLLOWING REQUIREMENTS WILL BE MET: MINIMUM 300 SQUARE FEET ELECTRIC LIGHT TO PROVIDE A MINIMUM ILLUMINATION LEVEL OF 100 FT.-CD AT DESK HEIGHT LEVEL ADEQUATE EQUIPMENT TO MAINTAIN AN AMBIENT AIR TEMPERATURE OF 70 ± 5° F HIGH SPEED WI-FI INTERNET HOTSPOT 1 PHOTOCOPY MACHINE 1 OFFICE CHAIR 4 STACKABLE CHAIRS 1 OFFICE TABLE (3 BY 6 FEET) 1 FILING CABINET, LEGAL SIZE, 4 DRAWER, FIRE RESISTANT 1 WATER COOLER (MAINTAIN WATER SUPPLY DURING CONSTRUCTION PERIOD) AN ENCLOSED ROOM WITH TOILET, SINK, AND RUNNING WATER (CAN BE NON-POTABLE), AND WITH PROPER SEWER CONNECTION OR SEPTIC TANK THE OFFICE WILL BE LOCATED ON-SITE NEAR THE ELECTRICAL VAULT AND STAGING/STORAGE AREAS THE FIELD OFFICE SHALL BE AVAILABLE FOR USE BEGINNING 10 CALENDAR DAYS BEFORE CONTRACT TIME BEGINS AND REMAINING FOR 30 CALENDAR DAYS AFTER FINAL ACCEPTANCE. THERE SHALL BE A $500 PER CALENDAR DAY PENALTY FOR EACH CALENDAR DAY THAT THE FIELD TRAILER IS NOT IN PLACE AND FULLY OPERATIONAL AFTER THE NOTICE TO PROCEED DATE. COST FOR THIS BUILDING LABOR, MATERIALS, GROUND RENTAL, OR OTHER EXPENSE IN CONNECTION THEREWITH MUST BE INCLUDED IN TOTAL BID PRICE. THE CONTRACTOR AND HIS/HER SUPERINTENDENT SHALL PROVIDE ALL REASONABLE FACILITIES TO ENABLE TO THE ENGINEER TO INSPECT THE WORKMANSHIP AND MATERIALS ENTERING INTO THE WORK.
AutoCAD SHX Text SIGN MUST BE IN PLACE THROUGH-OUT CONSTRUCTION, AND AT ALL LOCATIONS SHOWN ON PREVIOUS SHEET. SIGN MUST BE REFLECTIVE AND MUST CONFORM TO FDOT STANDARDS. SIGN MUST HAVE AN ORANGE FLAG AND AN AMBER FLASHING LIGHT. CONTRACTOR MUST MAINTAIN ALL EXISTING ROADWAYS AND CONSTRUCTION SIGNAGE THROUGHOUT THE PROJECT.
AutoCAD SHX Text
FLASHING AMBER/ORANGE LIGHT
AutoCAD SHX Text
ORANGE SAFETY FLAG
AutoCAD SHX Text
MOUNT ON SINGLE COLUMN GROUND SIGN POST OR U-CHANNEL PER FDOT INDEX 11860
AutoCAD SHX Text
TYPICAL TEMPORARY CONSTRUCTION SIGN DETAIL NTS
AutoCAD SHX Text
TRUCKS ENTERING ROADWAY 1000 FT
AutoCAD SHX Text NOTE: TEMPORARY TRAFFIC CONTROL MUST BE PER FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) AND MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) REQUIREMENTS.
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .