858611-Bid_Form.pdf

PDF 81 KB Posted

Attached to
General Aviation Terminal Building
Solicitation number
25-011P
Issued by
Flagler County, Florida

About this file

This is a Bid Form for the Flagler County Bid No. 25-011P, issued by Flagler County, Florida for the Flagler Executive Airport (FIN) General Aviation Terminal Building project. The bid solicits construction services for the General Aviation Terminal Building, including associated parking lot and obtaining Certificate of Occupancy, with a comprehensive scope covering construction permitting, demolition, excavation, site work, parking lot construction, striping, signage, fencing, landscaping, irrigation, and utilities. The bid includes two primary schedules (Schedule A and Schedule B) and an alternate option (Alternate #1), with a stated allowance of $100,000 for project permit fees and electric power connection. Bidders are required to submit one original and one copy of their bid, which must be received by the date and time specified in the Advertisement.

The bid form does not list specific pricing but provides a structure for bidders to quote their total bid for the base project and alternate option. A detailed schedule of values will be required within 10 days after the bid opening for each schedule. The stated allowance of $100,000 is designated for project permit fees and electric power connection. The bid covers multiple construction elements including site preparation, infrastructure development, and terminal building construction, with the county reserving the right to accept or reject the alternate access road configuration at its sole discretion. The document emphasizes that bids submitted in any format other than this form will not be accepted, and late bids will not be considered.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QTY UNIT PRICE

Bid Schedule A 1 LS

Bid Schedule B 1 LS

Stated Allowance 100,000.00$ LS $100,000

Alternate #1 1 LS

Company Name Telephone

Name (Print) Fax

Title Federal Employer ID#

Street Address E-mail Address

City, State Zip Authorized Signature

BID SIGNATURE SECTION

Bids to include one original and one copy.

Construct Roundabout and Road Tie-ins, including construction permitting and associated fees, demolition, excavation, temporary access, stormwater construction, site work, striping, signage, landscaping, and utilities as per project contract documents, technical specifications, and construction plans. A detailed schedule of values will be required no more than 10 days after the bid opening.

FLAGLER COUNTY BID NO.: 25-011P

INSTRUCTIONS

Total Bid Alternate

Construct General Aviation Terminal Building and Associated Parking Lot and obtain Certificate of Occupancy, including construction permitting and associated fees, demolition, excavation, temporary access, stormwater construction, site work, parking lot construction, striping, signage, fencing, landscaping, irrigation, and utilities as per project contract documents, technical specifications, and construction plans. A detailed schedule of values will be required no more than 10 days after the bid opening.

Construct Alternate Terminal Access Road, including construction permitting and associated fees, demolition, excavation, site work, striping, signage, landscaping, and utilities as per project contract documents, technical specifications, and construction plans. A detailed schedule of values will be required no more than 10 days after the bid opening.

Stated allowance for project permit fees and electric power connection.

Bids must be received no later than the date and time stated in the Advertisement. Bids received after that time & date will not be considered.

This form must be returned with bid. Bids in any other format will not be accepted.

FLAGLER EXECUTIVE AIRPORT (FIN)

DESCRIPTION

Total Bid

FLAGLER COUNTY, FLORIDA

GENERAL AVIATION TERMINAL BUILDING

Bid Form

BidForm