This is a presentation from NASA's JSC Flight Operations Directorate's Flight Integration Division discussing safety considerations for space station communication links and payload operations. The presentation examines the complex interplay between safety, security, and cost factors in designing space station communications systems, using a hypothetical example of "Podunk University" developing a payload. Key technical considerations include end-to-end communication architecture, hazardous commanding protocols, encryption requirements, and integration with station control center systems.

The presentation emphasizes that safety is only one factor among many competing priorities, with notable points including: the trade-offs between security and operational utility, the high integration costs of implementing safety controls through station control centers, and the challenges of managing hazardous commands while maintaining data security. The document includes detailed examples of communication architecture options and their implications for safety, security, and cost. It concludes by noting that design decisions have significant second and third-order effects on payload development burden, station control center operations, and overall system safety/security posture.

View the file

Other files for this federal contract opportunity

Other files attached to Commercial Low Earth Orbit (LEO) Development Program Phase 2 Requirements and Safety Technical Interchange Meeting, newest first.
File Type Posted
Questions and Answers_Safety and Requirements TIM.xlsx XLSX spreadsheet
CLDP Export Control Request Form-template-rev1.pdf PDF
CLDP-REQ-3102 searchable.pdf PDF
1130 Baseline Requirement and Verification.xlsx XLSX spreadsheet
History of Safety.pdf PDF
CLDP Export Control Request Form- template.pdf PDF
CLDP-REQ-3102 updated markings.pdf PDF
Requirements and Standards Workshop Supplemental.pdf PDF
1130 updates.pdf PDF
CLDP-REQ-1130.pdf PDF
CLDP-REQ-1130 Response Form.xlsx XLSX spreadsheet
ISS Reliability Overview.pdf PDF
Agenda.pdf PDF
CLDP-REQ-3102 Response Form.xlsx XLSX spreadsheet
Safety_TIM_2_UZ.pdf PDF
Advancing NASA Supply Chain Resiliency.pdf PDF
Safety Approach.pdf PDF
Safety TIM 2025 - Health and Medical Domain Areas.pdf PDF
Joint Safety Review Board.pdf PDF
OCAD - Ops Control Content Guidelines.pdf PDF
CLDP-REQ-3102.pdf PDF
Quality Assurance -More Than Just Compliance.pdf PDF
CLDP Requirements and Standards Workshop.pdf PDF
ISS Emer Ops - CLDP.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JSC Flight Operations Directorate Flight Integration Division

Flight Ops Safety Office

Observations from the Trenches

(aka Lessons Learned)

CK12/N Kluksdahl December 5, 2024

Observations from the Trenches�(aka Lessons Learned)
Contents
Safety as a Factor in Design Decisions
Slide Number 4
And if Life Wasn‘t Complicated Enough
Slide Number 6
What I Will and Will NOT Say
Security Interlude
End-to-end Comm Considerations
Simple Example
Simple Example – cont’d
Simple Example – Cont’d
Simple Example – Cont’d
And for more fun…
More Complex Example
More Complex Example – cont’d
More Complex Example – cont’d
More Complex Example – cont’d
Thoughts from Examples
Thoughts from Example – cont’d
Thoughts from Example – cont’d
Closing Thought
Slide Number 23

File details come from the government source that posted it. Updated .