MTIC Industry Update Charts.pdf
PDF 4 MB Posted
- Attached to
- Mission Technical Integration Contract (MTIC) Federal contract opportunity
- Solicitation number
- 80JSC024MTIC
About this file
This document is a pre-solicitation notice for the Mission Technical Integration Contract (MTIC), which is the follow-on acquisition for the Human Space Flight Technical Integration Contract (HSFTIC). The MTIC is anticipated to be a competitive small business set-aside with a period of performance from October 1, 2025 to September 30, 2031, including five one-year option periods.
The MTIC will provide program management, business management, configuration management, IT, systems engineering and integration, mission integration, operations, safety and mission assurance, and program research and communication support services for NASA's human spaceflight programs, including the International Space Station, Gateway, Orion, Commercial Crew, and Commercial LEO Development. The government is seeking capability statements from interested parties, including small businesses and underserved communities, to determine the appropriate level of competition and small business subcontracting goals. The government is also requesting information on potential organizational conflicts of interest and mitigation strategies. Responses are due by June 17, 2024, and the solicitation is expected to be released in November 2024 with a contract award on July 1, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MTIC Draft Request For Proposal Questions And Answers.pdf | ||
| Draft Request For Proposal 80JSC024MTIC L-10.zip | ZIP file | |
| MTIC Template for Submission of Comments.xlsx | XLSX spreadsheet | |
| MTIC DRFP 80JSC025R7002.zip | ZIP file | |
| MTIC Industry Update Questions And Answers.pdf | ||
| MTIC Technical Library Reference Document Part One and Two.pdf | ||
| MTIC Requirements Points of Contacts.pdf | ||
| MTIC Technical Library Request Form.pdf | ||
| MTIC Industry Update Interested Parties List.pdf | ||
| MTIC Industry Day Questions And Answers.pdf | ||
| MTIC Interested Parties List.pdf | ||
| MTIC Industry Day Charts.pdf | ||
| Historical Scope of Work.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T h e c o r n e r s t o n e o f N A S A ’ s c u r r e n t a n d f u t u r e m i s s i o n swww.nasa.gov 1
Welcome to the Johnson Space Center Mission Technical Integration Contract (MTIC) Industry Update
September 6, 2024 9:00am – 11:00am (CST)
Agenda
Speaker Subject
Portia Keyes, Acting Procurement Deputy Manager Intro and Disclaimers
Bradley J. Niese, JSC Office of Procurement, Director Welcome – Office of Procurement
Robert E. Watts, Senior Small Business Specialist Office of Small Business Programs
Requirements of Individual Programs
Dana Weigel, International Space Station, Program Manager
Kay Bond, Gateway Program, PP&C Deputy for Business Operations
Amanda Gaspard, Orion Program, PP&C Deputy
Eric Davis, Commercial Low Earth Orbit Development Program, PP&C Deputy
Additional Updates
Stephen Gawenis, MTIC Board Chair Contract Utilization, Statement of Work (SOW) Format, Additional Topics
Eric S. Festa, Contract Specialist Procurement Updates
Disclaimer
• These slides are for information and planning purposes only. No solicitation exists at this time.
• This presentation shall not be construed as a commitment by the Government or as a comprehensive description of any future requirements.
• If a solicitation is released, it will be synopsized on the Governmentwide point of entry (GPE), as defined by
FAR 2.101.
Goals of this Industry Update
• Promote competition on the proposed acquisition
• Develop Industry’s understanding of the Government’s current vision and objectives
• Provide Industry additional information based on questions and comments received from June 18 Industry Day and updates regarding planned future requirements
• A copy of this presentation will be posted on the Mission Technical Integration Contract (MTIC) website at: https://www.nasa.gov/johnson/jsc-procurement/mtic/ https://www.nasa.gov/johnson/jsc-procurement/mtic/ https://www.nasa.gov/johnson/jsc-procurement/mtic/
Responses to Questions
• If you have questions during this briefing, submit by email to address below and they will be answered after the 15-minute break.
• Email – jsc-mtic@mail.nasa.gov
• Responses to questions during Industry Update will not be considered official.
• Questions submitted electronically and in writing will be answered and posted to GPE and will be considered official responses.
• If a difference exists between verbal and written responses to questions, the written responses shall govern.
• Feedback: Please submit any feedback about today's presentations to the Contracting Officer at jsc-mtic@mail.nasa.gov mailto:jsc-mtic@mail.nasa.gov mailto:jsc-mtic@mail.nasa.gov
Welcome
Bradley J. Niese Director, JSC Office of Procurement
Robert Watts Small Business Specialist
Johnson Space Center Office of Small Business
Programs
Main phone number: (281) 483-4512
Robert Watts, Small Business Specialist
Monica Craft, Small Business Specialist
Tumarrow Romain, Small Business Specialist
All emails should be sent to: jsc-smallbusiness@mail.nasa.gov Location: Building 1, Suite 453 Address:
NASA Johnson Space Center, Industry Assistance Office Mail Code: BA 2101 NASA Parkway Houston, TX 77058-3696
Contact Information mailto:jsc-smallbusiness@mail.nasa.gov
Dana Weigel Program Manager
International Space Station
International Space Station
Aug. 17, 2024: International Space Station Configuration. Six spaceships are parked at the space station including Boeing’s Starliner spacecraft, the SpaceX Dragon Endeavour spacecraft, the Northrop Grumman resupply ship, the Soyuz MS-25 crew ship, and the Progress 88 and 89 resupply ships.
NASA
ISS Requirements on MTIC
• Certification of Flight Readiness Administration
• Strategic Collaboration and Research Tracking
• Program specific IT integration and Management
• Configuration Management, Data and Records Management, Meeting Services
• Mission Integration and Planning
• Risk Management process maintenance and implementation
• Conference Facility
• Visiting Vehicle and Cargo Integration
• External data requests from commercial entities
• Export Control
• Technical Writing support
• Business system maintenance, administration and analysis
• System Integration
• Vehicle Configuration
• Program Application Sustaining
• MER IT support and NASA-Russia IT
Services
• Systems Engineering and Integration
• External Configuration Analysis
• Test and Verification Integration
• Visiting Vehicle, IP Element and Robotic
Systems Integration
• Flight and Increment Planning
• Increment Management Center staffing
• Probabilistic Risk Assessment
• Research Portfolio Integration
ISS requirements include the breadth of the MTIC SOW including but not limited to:
Kay Bond PP&C Deputy for Business Operations
Gateway
Gateway Program Overview
Artemis Schedule
For reference only
Gateway Requirements on MTIC
• Program Leadership
• Certification of Flight Readiness (CoFR) Process and Execution
• Milestone and Lifecycle Reviews, engagement with Standing Review Board
• Export Control
• Meeting Services
• Configuration and Data Management
• Program-Specific IT Systems and Implementation
• Property Management/Ground Logistics
• Audit Management
• Strategic Collaboration
• Critical Support to CAMs/Project Offices
• Internal CoFR Process and Execution
• Project Coordination/Office Management
• Risk Management
• Subsystem technical, specification, verification management
• System Performance Analysis and Integration
• Mission Analysis and Integration
• Visiting Vehicle Integration
• Requirements Management and Integration
• Digital Architecture
• Vehicle/Common Equipment
• Assembly, Integration, and Test
• Test and Verification
Amanda Gaspard PP&C Deputy
Orion
Orion Spacecraft Overview
Orion Program
• Current contract provides both engineering and program planning and control (PP&C) functions across the Orion Program
• Export Control
• Meeting Services
• Configuration Management/Data Management (CM/DM)
• Information Technology (IT)
• Systems Engineering and Integration (SE&I)
• Cross Program Integration
• Strategic Collaboration
• Facility Management
• Contract Expectations
• Continue similar functions
• Emphasis on innovation
• Focus on cross program efficiencies
Eric Davis PP&C Deputy
Commercial Low Earth Orbit Development
Commercial LEO Development Program Overview
• The Program currently utilizes the HSFTIC contract for a variety of services:
• Configuration Management (CM)
• Data Management (DM)
• Program Specific Information Technology (IT) Support
• Program Meeting Services Support
• Certification of Flight Readiness Support (CoFR)
• Project Coordination Services
• Risk Management Support
• Systems Engineering and Integration Support (SE&I)
• The CLDP Program plans to continue existing contract support level, and anticipates needs will grow as the Program expands
CLDP MTIC Overview
Stephen Gawenis HSFTIC Contract Utilization, SOW
Format, Additional Topics MTIC Board Chair
HSFTIC Contract Utilization
SOW Format
• The SOW will be re-organized to scar for additional tasks for each human spaceflight programs in addition to a general over head section and an IDIQ section for discreet requirements.
1.0 Contract Overhead
2.0 International Space Station
3.0 Gateway Program
4.0 Orion Program
5.0 EVA and Human Surface Mobility (EHP)
6.0 Commercial LEO
7.0 Commercial Crew
8.0 Exploration
9.0 Moon to Mars
10.0 Human Landing System (HLS)
11.0 IDIQ
• Note: Senior level SLCs will be available for higher skilled tasks as needed
SOW Expansion and WLIs
• Detailed SOW paragraphs for work currently performed for each program will be included in the RFP.
• Placeholders for work not currently performed will be included to allow for expansion as each program matures.
X.1 Program Management and Administration X.2 Business Management X.3 Configuration Management X.4 Information Technology (IT) X.5 Systems Engineering and Integration (SE&I) X.6 Mission Integration X.7 Operations X.8 Safety and Mission Assurance (S&MA) X.9 Program Research and Communication
• Work Load Indicators (WLIs) will be provided for SOW sections as applicable.
• WLIs for tasks not currently ordered will be zeroed out for purposes of this procurement.
• SOW requirements will be written to a level of detail that any offeror will be able to interpret. Feedback on the updated SOW, once released, is highly encouraged
Additional Topics o Technical Library o The first batch of documents are planned for posting the week of 9/9 o Will include NPR, SSP and other documents o Additional documents will be posted once processed through export control reviews o Program POCs o Program technical points of contact are available to talk to you on MTIC program specific requirements. For POC contact information, please send an email to jsc-mtic@mail.nasa.gov requesting this list
Eric S. Festa Contract Specialist
International Space Station Procurement Office
Proposed MTIC Contract
• Solicitation Number: 80JSC024MTIC
• NAICS Code and Size Standard
• The NAICS Code is 541715
• The size standard is 1,300
• Anticipated Period of Performance contemplated is October 01, 2025 – September 30, 2031:
• Base: October 01, 2025 – September 30, 2027
• Option 1: October 01, 2027 – September 30, 2028
• Option 2: October 01, 2028 – September 30, 2029
• Option 3: October 01, 2029 – September 30, 2030
• Option 4: October 01, 2030 – September 30, 2031
Preliminary Acquisition Schedule Planned Date Industry Update Briefing 09/06/24 Draft Request for Proposal 10/10/24 Final Request for Proposal 11/12/24 Pre-Proposal Conference 11/19/24 Proposals Due 12/19/24 Contract Award 07/01/25 Contract Start 10/01/25
Proposed Contract (Continued)
• Contract Types: Cost Plus Award Fee & Incentive Fee (CPAF&IF), Indefinite Delivery Indefinite Quantity (IDIQ)
• Based on Industry feedback from the Sources Sought Synopsis (SSS) and one-on-one meetings, the government anticipates including the option to convert the Award Fee to Cost Plus Fixed Fee.
• Anticipated to be a Competitive Small-Business Set-Aside
• Anticipated Special Clauses:
• NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)
• NFS 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989)
• PROGRAM MANAGER AND DEPUTY PROGRAM MANAGER
REPLACEMENT(S)
• RUSSIA SUBCONTRACTING WITH RUSSIA ENTITIES FOR GOODS OR
SERVICES
15- Minute Break
Question and Answer Period
• Submit questions via email during break.
• Email – jsc-mtic@mail.nasa.gov
How to Get Connected
• https://www.nasa.gov/johnson/jsc-procurement/mtic/
• NASA/JSC Contract Opportunities https://sam.gov/content/home
• JSC Procurement Website https://www.nasa.gov/jsc/procurement
• Industry Assistance Office, JSC Bldg. 1 jsc-industry-assistance@mail.nasa.gov https://www.nasa.gov/johnson/jsc-procurement/mtic/ https://sam.gov/content/home https://www.nasa.gov/jsc/procurement mailto:jsc-industry-assistance@mail.nasa.gov
Special Consideration
NOTE TO PROSPECTIVE OFFERORS
Prospective offerors are reminded not to contact incumbent personnel (either directly or through electronic means) during duty hours or at their place of employment, as such contacts are disruptive to the performance of the current contract.
Thank you for attending!
Visit:
https://www.nasa.gov/johnson/jsc-procurement/mtic/ https://www.nasa.gov/johnson/jsc-procurement/mtic/ https://www.nasa.gov/johnson/jsc-procurement/mtic/
| Welcome to the �Johnson Space Center �Mission Technical Integration Contract (MTIC)�Industry Update� |
| Agenda |
| Disclaimer |
| Goals of this Industry Update |
| Responses to Questions |
| Welcome��Bradley J. Niese�Director, JSC Office of Procurement� |
| Robert Watts�Small Business Specialist�Johnson Space Center Office of Small Business Programs |
Contact Information
| Dana Weigel�Program Manager�International Space Station �� |
| International Space Station |
| ISS Requirements on MTIC |
| Kay Bond�PP&C Deputy for Business Operations�Gateway |
| Gateway Program Overview |
| Artemis Schedule |
| Gateway Requirements on MTIC |
| Amanda Gaspard�PP&C Deputy�Orion |
| Orion Spacecraft Overview |
| Orion Program |
| Eric Davis�PP&C Deputy �Commercial Low Earth Orbit Development � |
| Commercial LEO Development Program Overview |
| CLDP MTIC Overview |
| Stephen Gawenis�HSFTIC Contract Utilization, SOW Format, Additional Topics� MTIC Board Chair� |
| HSFTIC Contract Utilization |
| SOW Format |
| SOW Expansion and WLIs |
| Additional Topics |
| Eric S. Festa� Contract Specialist�International Space Station Procurement Office |
| Proposed MTIC Contract |
| Proposed Contract (Continued) |
| 15- Minute Break ��Question and Answer Period |
| How to Get Connected |
| Special Consideration |
| Thank you for attending!��Visit:�https://www.nasa.gov/johnson/jsc-procurement/mtic/ |
File details come from the government source that posted it. Updated .