This is a notice for a solicitation for a Human Space Flight Technical Integration Contract. NASA/JSC plans to issue a Request for Proposal for technical integration services to support human space flight programs. The solicitation is anticipated to be released on November 1st, 2019 with proposals due by December 11th, 2019. The procurement is set aside for small businesses with a NAICS code of 541715 and size standard of 1,250 employees. All responsible sources may submit a proposal which will be considered by the agency. The Center Ombudsman and additional solicitation documents can be found on the listed websites. Prospective offerors shall notify the agency of their intent to submit a proposal and are responsible for monitoring the listed websites for solicitation amendments and releases. All contractual technical questions must be submitted in writing.
SSP-50264
View the file
Other files for this federal contract opportunity
Show all 50
Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION AND HISTORY PAGE
| REV. |
| DESCRIPTION |
| PUB. DATE |
| - |
| Initial Release (Reference per SSCD 009611, EFF. 01-11-06) |
| Early Release |
| 01-26-06 |
| Program Release |
| 03-01-06 |
PREFACE
This Bilateral Hardware and Software Exchange Agreement identifies the hardware and software that will be exchanged between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). In addition, this agreement identifies the technical support that will be provided for the hardware and software.
Both NASA and JAXA herein mutually agree that the execution of this hardware and software exchange agreement is necessary for the effective and safe integration of the International Space Station (ISS).
NASA/JAXA
BILATERAL HARDWARE AND SOFTWARE EXCHANGE AGREEMENTS, LISTS,
AND SCHEDULES
November 2005
CONCURRENCE
NASA/JAXA
APPROVAL
INTERNATIONAL SPACE STATION PROGRAM
BILATERAL HARDWARE AND SOFTWARE EXCHANGE AGREEMENTS, LISTS, AND SCHEDULES
November 2005 For NASA:
For JAXA:
/s/ Kirk Shirman
/s/ Kuniaki Shiraki Michael Suffredini
Kuniaki Shiraki
ISS Program Manager
ISS Program Manager
NASA/JAXA
SSP 50264 BILATERAL HARDWARE AND SOFTWARE EXCHANGE AGREEMENTS, LISTS, AND SCHEDULES
LIST OF CHANGES
November 2005 All changes to paragraphs, tables, and figures in this document are shown below:
SSCBD
ENTRY DATE
CHANGE
TABLE OF CONTENTS
iiREVISION AND HISTORY PAGE iiiPREFACE ivCONCURRENCE vAPPROVAL viLIST OF CHANGES viiTABLE OF CONTENTS
81.0
INTRODUCTION
81.1
BACKGROUND
91.2
PURPOSE
101.3
SCOPE
101.4
DEFINITIONS
101.5
DOCUMENT CONTROL
111.6
APPLICABLE DOCUMENTS
122.0
DEVELOPMENT AND CONTROL OF BHSEALS DATABASE
122.1
PROCESS FOR ADDITIONS, DELETIONS, OR CHANGES TO THE BHSEALS DATABASE
122.2
PERIODIC RECONCILIATION OF THE BHSEALS DOCUMENT AND DATABASE
153.0
REQUIREMENTS AND RESPONSIBILITIES
153.1
ASSIGNMENT OF RESPONSIBILITIES
153.2
RESPONSIBILITIES OF THE HARDWARE/SOFTWARE PROVIDER AND RECIPIENT
194.0
SPECIAL CONDITIONS
194.1
COPYRIGHTS
194.2
USE OF EXCHANGED HARDWARE/SOFTWARE
194.3
CONFIDENTIALITY
21APPENDIX A: TECHNICAL PROTOCOL
22APPENDIX B: JAXA NOTICE OF DOCUMENT CHANGE FORM
23APPENDIX C: PROFORMA INVOICE (JSC Form 1735)
24APPENDIX D : EXPORT CONTROL WORKSHEET (JSC Form 1724)
25APPENDIX E : SHIPPING DOCUMENT (JSC Form 290)
26APPENDIX E: SHIPPING DOCUMENT (JSC Form 290) CONTINUED
27APPENDIX F: APPROVED DATABASE CHANGES
28APPENDIX G : ABBREVIATIONS AND ACRONYMS
32APPENDIX H : DIAGRAM OF BHSEALS PROCESS
33APPENDIX I: PREVIOUS EXCHANGE TABLES
1.0 INTRODUCTION
This bilateral agreement documents arrangements between NASA and JAXA regarding hardware and software to be exchanged between NASA and JAXA in carrying out their respective International Partner (IP) roles in the development and operation of the Japanese Experiment Module (JEM). This agreement covers JEM related hardware and software exchanges such as:
· development developed hardware and software to be used in interface simulations and verification testing;
· support equipment used in simulations, verification testing, training, and operations;
· Japanese flight hardware and software that will be integrated into the United States Orbital Segment (USOS) flight elements; and
· American flight hardware and software that will be integrated into the JEM flight elements.
This agreement is not intended to include:
· flight hardware and software that will be delivered to Kennedy Space Center (KSC) for launch; and
· ground support hardware and software for launch processing
· flight hardware and software that will be exchanged on orbit.
hardware and software that was exchanged and have been already returned to providing organization.
1.1 BACKGROUND
This document is one of a series of bilateral agreements to be accomplished in implementation of the joint NASA/JAXA development of the ISS. The exchange of appropriate hardware and software provides mutual benefits in this Program, including:
a. Improves feasibility and performance of the Space Station by allowing use of the best available technology in each country’s segment.
b. Assures compatibility of the NASA and JAXA flight systems by making authentic hardware and software available for interface development and verification by the other side.
PURPOSE
1. Identify and describe hardware and software to be exchanged between JAXA and NASA, including their respective contractors in development of the ISS.
2. Define the schedule for hardware and software exchanges between JAXA and NASA
3. Identify the organizations responsible for providing and receiving this hardware and software.
4. Define the requirements and responsibilities for the use and support of this hardware and software, including technical support, acceptance data packages, configuration management, logistics, and maintenance. Define the processes for negotiating and documenting final details of these requirements. These processes will be tailored to the criticality of the intended application, and will utilize existing documentation where appropriate.
5. Define the management process for maintaining and tracking this exchange activity, including the shipping process as reference.
SCOPE
The terms of this agreement apply whether custody of the exchanged item is retained by the Providing Organization or transferred to the Receiving Organization. Specific responsibilities for these two cases are identified in paragraph 3.0.
1.2 DEFINITIONS
BHSEALS - the approved abbreviation for the Bilateral Hardware and Software Exchange Agreements, Lists and Schedules.
EXCHANGE as defined in the BHSEALS process – any hardware or software item delivered under the provisions of this agreement to be used for ground support, training, testing, certification testing or other purpose. This definition excludes any hardware or software delivered for launch on the receiving organizations space vehicle.
NOTICE OF DATABASE CHANGE FORM (J-NDC) – a form to authorize a change, addition, or deletion to the BHSEALS Database, per paragraph 2.0.
(See Appendix B)
BHSEALS DATABASE – the tool that is used to record and track all exchange items defined on the Notice of Database Change Form (J-NDC), per paragraph 2.0.
TECHNICAL PROTOCOL – An agreement between NASA and JAXA stating the exact reason as to why a particular hardware or software delivery needs to take place.
(See Appendix A)
1.3 DOCUMENT CONTROL
All changes to this document require the approval of the NASA Space Station Program Manager and the JAXA Space Station Program Manager.
This BHSEALS implements the NASA/NASDA Joint Management Plan (SSP 50030), Ad Referendum, Paragraph 3.11, Hardware and Software Exchange Process.
APPLICABLE DOCUMENTS
| Document Number |
| Title |
No Number
Intergovernmental Agreement (IGA)
| No Number |
| Memorandum of Understanding between the United States National Aeronautics and Space Administration and Space Administration and the Government of Japan (GOJ) |
| SSP 50030 |
| NASA/NASDA Joint Management Plan, Ad Referendum |
| SSP 50035 |
| NASA/NASDA Bilateral Integration and Verification Plan |
| SSP 50075-1J |
| Assembly and Operations Support Plan Flight 1J |
| SSP 50075-1JA |
| Assembly and Operations Support Plan Flight 1JA |
| SSP 50075-2JA |
| Assembly and Operations Support Plan Flight 2JA |
DEVELOPMENT AND CONTROL OF BHSEALS DATABASE
The BHSEALS Database is the tool that is used to record and track all exchange items defined in this document. Development of the BHSEALS Database will be controlled and maintained by the NASA BHSEALS Book Manager, but made available for JAXA to view at any time.
1.4 PROCESS FOR ADDITIONS, DELETIONS, OR CHANGES TO THE BHSEALS DATABASE
The NASA technical team will produce a Notice of Database Change Form (J-NDC) (see APPENDIX B) for all items to be exchanged, per the technical protocol (see APPENDIX A).
The NASA technical team will produce a Proforma Invoice (See APPENDIX C) to accompany the J-NDC.
The NASA technical team will then submit the J-NDC and Proforma Invoice electronically to the NASA BHSEALS Book Manager. The NASA BHSEALS Book Manager will then assign a tracking number to the J-NDC.
The NASA BHSEALS Book Manager will review these two documents (Notice of Document Change (J-NDC) and the Proforma Invoice and inform the NASA technical team of any discrepancies. After correction by the NASA technical team, the NASA and JAXA technical teams will work closely together, via meetings, telecons, faxes, etc. to obtain all team level signatures on the J-NDC.
The signed J-NDC will then be returned to the NASA BHSEALS Book Manager for approval by the management of the providing and receiving organizations. Upon approval of the J-NDC, the NASA BHSEALS Book Manager will update the BHSEALS database with the confirmation of the JAXA BHSEALS Book Manager. The approved J-NDC and Proforma will then be handed off to the ISS Shipping Coordinator.
Shipments cannot take place before approval of the J-NDC.
1.5 PERIODIC RECONCILIATION OF THE BHSEALS DOCUMENT AND DATABASE
The NASA Book Manager will provide a copy of the BHSEALS database to JAXA biannually. The NASA Book Manager and the JAXA Book Manager will review the database to ensure its accuracy
Biannually, Appendix C of this document will be updated with a printout of the database as concurred upon by the NASA BHSEALS Book Manager and the JAXA Book Manager.
This database printout will include, at a minimum, the following columns:
a. J-NDC number
b. Item Description
c. Shipped/Received Date
d. Status (Open or Closed)
The illustration of BHSEALS database updated process with document revision is shown in Figure 2.2-1.
In the figure below, J-NDC means BHSEALS Notice of Document Change Form and TP means Technical Protocol.
| Contents of Technical Protocol |
| Contents of J-NDC |
| Special conditions to Roles/Responsibilities |
| Unique Identifiers |
| Detailed information for exchange items |
| Contact names and addresses |
| Details of conditions of technical support |
| Shipping addresses |
| Possibility of changes in shipping/return dates |
| Acceptance Data Package (if applicable) |
| Maintenance and Logistics Support |
| Specific Item Information (name, quantity, Part Number, Serial Number) |
| Configuration Control |
| Need Date |
Information on Shipping POC
Figure 2.2-1: Document Revision and Database Update Process for BHSEALS
2.0 REQUIREMENTS AND RESPONSIBILITIES
2.1 ASSIGNMENT OF RESPONSIBILITIES
NASA and JAXA will each be responsible for issuing direction to their respective contractors or subordinate agencies as necessary to meet the requirements of this agreement.
2.2 RESPONSIBILITIES OF THE HARDWARE/SOFTWARE PROVIDER AND RECIPIENT
Definition:
Provider: Entity that has actual, physical custody of the property Recipient: Entity that is receiving the above mentioned property Table 3.2-1: Hardware/Software Provider’s and Recipient’s Responsibilities in Each Phase
| Phase |
| H/S Location |
| H/S Provider’s |
Responsibilities H/S Recipient's
Responsibilities
| In-Advanced |
| In provider’s country |
| · Provide periodic schedule status on development and production of the item to be exchanged. |
| Pre-shipping |
| In provider’s country |
| · Coordinate and approve Technical Protocol(TP) |
· Coordinate and get J-NDC approval
· Coordinate and approve Technical Protocol(TP)
· Coordinate and get J-NDC approval
| In provider’s country |
| · Arrange Round-Trip Shipment with agreements in Technical Protocol (TP) |
-unusual circumstances sometimes dictate a one-way trip, which will be defined in the Technical Protocol.
| In provider’s country |
| · Arrange for appropriate export control authorizations for export from provider’s country. |
| In provider’s country |
| · Provide proper and sufficient information to freight forwarder to support the completion of import and export Customs paperwork. |
In provider’s country
· Provide the commercial invoice to the shipping company or freight forwarder NLT 2 weeks (4 weeks for larger shipments) prior to shipment. Provide the airway bill number and routing information as soon as this information is available.
| Shipping |
| Export from the customs of the provider’s country |
| · Arrange for prompt execution of export custom procedure and ensure exemption from any other taxes and duties collected by the customs of their hardware and software at provider’s country. |
· Arrange for prompt execution of transportation payment.
| In - Transit |
| · Ship the hardware and software in accordance with the need date. |
| Post-Shipping |
| In - Transit |
| · Notify the H/S recipient that the exchanged items have been sent. |
| · Notify the H/S provider of receipt of the exchanged items. |
Import at the custom of the recipient’s Country
· Execute import custom procedures and ensure exemption from any taxes and duties collected by customs.
| In recipient’s country |
| · Provide technical support for the exchanged items which includes: sustaining engineering support except COTS products, integration support, logistics support, spares parts support (if required), updates and/or revision to software, and site contact teams (if required). Such support may be accomplished on-site or at a site agreed to by both hardware/software provider and recipient. This responsibility will be identified in the Technical Protocol. |
| · Provide appropriate environment for the exchanged items. |
· Conduct sustaining engineering for COTS products after the H/S handover from provider.
· The responsibilities for control and configuration management of hardware and software items exchanged will be controlled within the Acceptance Data Package.
Note: These responsibilities will be identified in the Technical Protocol.
| In recipient’s country |
| · Operate the exchanged items in accordance with agreements in Technical Protocol. |
| · Operate the exchanged items in accordance with agreements in Technical Protocol. |
| In recipient’s country |
| · Specific technical support may be negotiated and documented in accordance with Technical Protocol. This responsibility will be identified in the Technical Protocol. |
· Specific technical support may be negotiated and documented in accordance with Technical Protocol. This responsibility will be identified in the Technical Protocol.
| In recipient’s country |
| · Maintain complete records on the operation of exchanged items with agreements in Technical Protocol. |
| · Maintain complete records on the operation of exchanged items with agreements in Technical Protocol. |
| Return |
| In recipient’s country |
| · Provide the shipping information such as commercial invoice, airway bill number, routing information, freight forwarder and export agent NLT 2 weeks (4 weeks for a large shipment) to recipient. |
Receive the shipping information such as commercial invoice, airway bill number, routing information, freight forwarder and export agent NLT 2 weeks (4 weeks for a large shipment).
| Export from the custom of the recipient’s Country |
| · Arrange for prompt execution of any transportation cost, if required. |
· Produce the necessary technical documentation to clear customs.
· Recipient signs as a shipper to support export provider’s hardware and software from recipient’s country.
| In - Transit |
| · Ship the exchanged items as scheduled. |
· Support to ship the exchanged items as schedule.
| Import into the provider’s country |
| · Arrange for prompt execution of import custom procedure of hardware and software. |
Arrange for prompt execution of any import fee, if required.
| In provider’s country |
| · Notify the hardware/software recipient that items have arrived. |
3.0 SPECIAL CONDITIONS
Fidelity of the hardware and software exchanged under this agreement will be shown on the appropriate Technical Protocol and also on the J-NDC for each item.
3.1 COPYRIGHTS
The Providing Organization keeps all property rights and copyrights in relation to the exchange items. Nothing in this agreement can be interpreted as a basis for reassignment of the property right and copyrights for these items or for issuing licenses related to these items.
3.2 USE OF EXCHANGED HARDWARE/SOFTWARE
The exchange items may be used only by the Receiving Organization (JAXA or NASA), space agencies of the ISS IP, and their contractors which are companies of the U.S., the I P, or the Commonwealth of Independent States (CIS). These exchanges will be used only for performing work in the framework of the ISS Program. Without prior written approval by the Providing Organization, the Receiving Organization will not transfer exchange hardware or software to any party outside the above-mentioned organizations, will not introduce any changes to the items, and will not duplicate the item or use it for any goals other than mentioned above.
Upon request of the Providing Organization, the Receiving Organization will provide a written statement confirming its obligation to adhere to these requirements. This will be submitted in the form of an appropriate certificate.
3.3 CONFIDENTIALITY
It is understood, that in the course of the ISS Program implementation process, the exchange of confidential hardware and software items which are the property of JAXA, NASA, or their contractors, may become necessary.
The hardware and software provided in accordance with this agreement are intended for the use exclusively within the ISS Program implementation activities. Consequently, only the personnel of the receiving party directly dealing with the ISS Program activities may have access to such hardware and software. Any other use, commercial or non-commercial, of such hardware and software will require written approval by the providing party.
The party providing confidential hardware and software will attach the appropriate notification on the use rights restrictions. The party receiving such hardware and software is obligated to use them strictly in compliance with the requirements indicated in the notification on the use rights restrictions, as well as to take the appropriate measures ensuring confidentiality, which includes the appropriate instructing of the user personnel who have access to such hardware and software.
In cases when a deliverable, accompanied by the notification on the use rights restrictions, will be handed over to contractors or third parties, the requirements indicated herein shall be applicable to such contractors and third parties, and shall be documented in writing in the respective agreements or included in the terms of the respective contract.
Providing of hardware and software is not, and may not be interpreted as ownership rights transfer, yielding of copyrights, or granting of license to use.
APPENDIX A: TECHNICAL PROTOCOL
APPENDIX B: JAXA NOTICE OF DOCUMENT CHANGE FORM
APPENDIX C: PROFORMA INVOICE (JSC Form 1735)
APPENDIX D : EXPORT CONTROL WORKSHEET (JSC Form 1724)
APPENDIX E : SHIPPING DOCUMENT (JSC Form 290)
APPENDIX E: SHIPPING DOCUMENT (JSC Form 290) CONTINUED
APPENDIX F: APPROVED DATABASE CHANGES
APPENDIX G : ABBREVIATIONS AND ACRONYMS
| Acc. |
| Acceptance |
| ACU |
| Assembly Complete Unit |
| AIT |
| Analysis and Integration Team |
| A/R |
| As Required |
| AVU |
| Artificial Vision Unit |
| BHSEALS |
| Bilateral Hardware and Software Exchange Agreements, Lists, and Schedules |
| CAS |
| Common Attach System |
| CE |
| Cargo Element |
| CEU |
| Control Electronics Unit |
| CIL |
| Critical Items List |
| CIS |
| Commonwealth of Independent Status |
| CLA |
| Configuration Launch Assembly |
| CM |
| Configuration Management |
| C/O |
| Check Out |
| Config. |
| Configuration |
| CPS |
| Consolidated Planning System |
| CSCI |
| Computer Software/System Configuration Item |
| DARS |
| Data and Analysis Retrieval System |
| DC |
| Direct Current |
| DDCU |
| DC-to-CD Converter Unit |
| Dest |
| Destination |
| Dev |
| Development |
| DQA |
| Data Quality Assurance |
| EESII |
| Element to Element System Interface Integrity |
| EM |
| Engineering Model |
| EVA |
| Extravehicular Activity |
| FEU |
| Functional Equivalent Unit |
| FLT |
| Flight Unit |
| FM |
| Flight Model |
| FMEA |
| Failure Modes and Effects Analysis |
| Env |
| Environment |
| FQT |
| Flight Qualification Test |
| FSE |
| Flight Support Equipment |
| FSEGF |
| Flight Support Equipment Grapple Fixture |
| GOJ |
| Government of Japan |
| GSE |
| Ground Support Equipment |
| HRMS |
| High Rate Multiplex System |
| H/S |
| Hardware/Software |
| ICD |
| Interface Control Document |
| I/F |
| Interface |
| Ident |
| Identification |
| IDL |
| Intersite Delivery List |
| IGA |
| Intergovernment Agreement |
| IMCA |
| Integrated Motor/Control Assembly |
| Intg |
| Integration |
| IP |
| International Partner |
| IPT |
| Integrated Product Team |
| IPS |
| Integrated Planning System |
| ISS |
| International Space Station |
| JAXA |
| Japan Aerospace Exploration Agency |
| JEM |
| Japanese Experimant Module |
| JMP |
| Joint Management Plan |
| JSC |
| Johnson Space Center |
| KSC |
| Kennedy Space Center |
| Lab |
| Laboratory |
| LDP |
| Launch Deployment Package |
| LEE |
| Latching End Effector |
| LP |
| Launch Package |
| Maint |
| Maintenance |
| Mass |
| Mass Model |
| MBS |
| Mobile Base System |
| MBF |
| Mission Build Facility |
| MDA-HB |
| McDonnell Douglas Aerospace-Huntington Beach |
| MDM |
| Multiplexer-DeMultiplexer |
| MPD |
| Maintenance Data Processor |
| Mfg |
| Manufacturing |
| Mfr |
| Manufacture |
| MOU |
| Memorandum of Understanding |
| MRB |
| Material Review Board |
| MRS |
| Mobile Remote Servicer |
| MSFC |
| Marshall Space Flight Center |
| MSS |
| Mobile servicing System |
| MT |
| Mobile Transporter |
| MTCL |
| Mobile Transporter Capture Latch |
| NASA |
| National Aeronautics and Space Administration |
| NDC |
| Notice of Database Change |
| OCS |
| Operational Control Segment |
| OPR |
| Office of Primary Responsibility |
| Opr |
| Operating |
| Orgn |
| Organization |
| ORU |
| Orbital Replaceable Unit |
| PDGF |
| Power Data Grapple Fixture |
| PDH |
| Payload Data Handler |
| PM |
| Prototype Model |
| P/N |
| Part Number |
| POA |
| Portable ORU Accomidation |
| PTU |
| Pan Tilt Unit |
| Qual |
| Qualification |
| Resp |
| Responsible |
| RMS |
| Remote Manipulator System |
| RPCM |
| Remote Power Control Mechanism |
| RWS |
| Robotic Work Station |
| Sim |
| Simulation |
| SMDS |
| SSRMS/MBS Data Simulator |
| Spec |
| Specification |
| SRU |
| Shop Replaceable Unit |
| SSCBD |
| Space Station Control Board Directive |
| SSMB |
| Space Station Manned Base |
| SSP |
| Space Station Program |
| SSRMS |
| Space Station Remote Manipulator System |
| STA |
| Star Tracker Assembly |
Structural Test Article
| STC |
| Software Test Center |
| STE |
| Special test Equipment |
| SVF |
| Software Verification Facility |
| SVS |
| Space Vision System |
| S/W |
| Software |
| TBC |
| To Be Confirmed |
| TBD |
| To Be Determined |
| TP |
| Technical Protocol |
| TSE |
| Test Support Equipment |
| TSU |
| Test Support Unit |
| UF2 |
| Utilization Flight # 2 |
| UID |
| Unique Identification Number |
| USOS |
| United States Orbital Segment |
| Ver |
| Verification |
| VSC |
| Video Signal Converter |
| WETF |
| Weightless Environment Training Facility |
APPENDIX H : DIAGRAM OF BHSEALS PROCESS
APPENDIX I: PREVIOUS EXCHANGE TABLES
This information shows hardware and software that was previously exchanged between NASA and JAXA. For current, real-time viewing of any hardware and/or software exchanges between NASA and JAXA, please see the BHSEALS Database.
| ID |
| TABLE NO |
| ITEM NO |
| BDC NO |
| ITEM DESCRIPTION |
| DESCRIPTION EXTENSION |
| QTY |
| CATEGORY |
| ORIGINATING AGENCY |
| NEED DATE |
| RETURN DATE |
| FIDELITY |
| FID COMMENTS |
| STATUS |
| COMMENTS |
| 1 |
| 5.1 |
| 5.1.6A |
| N/A |
| Pressurized Module Trainer |
| Part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 6/16/2001 |
| TBD |
Domestic PMT, w/ outfitting enhancements for SSTF
For SST
| 2 |
| 5.1 |
| 5-1-6B |
| N/A |
| JCP Simulator |
| Part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 1/31/2004 |
| TBD |
Domestic CST
For SST
| 3 |
| 5.1 |
| 5-1-6C |
| N/A |
| System Laptop Terminal Simulator |
| Part of JEM Segment Trainer |
| 2 |
| H/W |
| JAXA/JEM |
| 1/31/2004 |
| TBD |
Domestic CST
For SST
| 4 |
| 5.1 |
| 5-1-6D |
| N/A |
| Instructor Station |
| Part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 1/31/2004 |
| TBD |
Domestic CST, w/enhancements for SSTF
For SST
| 5 |
| 5.1 |
| 5-1-6E |
| N/A |
| JEM System Simulation N/W |
| Part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 1/31/2004 |
| TBD |
| FEU |
| 6 |
| 5.1 |
| 5-1-7A |
| N/A |
| JCP Simulator |
| Part of JEM C&DH Simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 2/28/2003 |
| TBD |
Domestic CST, w/enhancements for SDIL
| 7 |
| 5.1 |
| 5-1-7C |
| N/A |
| DIU-III |
| Part of JEM C&DH Simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 2/28/2003 |
| TBD |
| FEU |
| 8 |
| 5.1 |
| 5-1-7D |
| N/A |
| DIU-III kit simulator |
| Part of JEM C&DH Simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 2/28/2003 |
| TBD |
| 9 |
| 5.1 |
| 5-1-7E |
| N/A |
| MDP |
| Part of JEM C&DH Simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 2/28/2003 |
| TBD |
| FEU |
| 10 |
| 5.1 |
| 5-1-7F |
| N/A |
| MDP kit simulator |
| Part of JEM C&DH Simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 2/28/2003 |
| TBD |
Domestic RST with enhancements for SDIL
| 11 |
| 5.1 |
| 5-1-8B |
| N/A |
| Payload Interface Unit (PIU) Fluid Quick Disconnect (FQD) |
| Female Side |
| 8 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
Test Equipment
| 12 |
| 5.2 |
| 5-2-3A |
| N/A |
| JCP Flight S/W |
| Part of JEM Segment Trainer |
| 1 |
| S/W |
| JAXA/JEM |
| 6/16/2001 |
| TBD |
Domestic CST
For SST
| 13 |
| 5.2 |
| 5-2-3B |
| N/A |
| JEM System Simulations SW |
| Part of JEM Segment Trainer |
| 1 |
| S/W |
| JAXA/JEM |
| 6/16/2001 |
| TBD |
Domestic CST, w/enhancements for SSTF
For SST
| 14 |
| 5.2 |
| 5-2-3C |
| N/A |
| System Laptop Terminal Simulator Flight S/W |
| Part of JEM Segment Trainer |
| 2 |
| S/W |
| JAXA/JEM |
| 6/16/2001 |
| TBD |
Domestic CST
For SST
| 15 |
| 5.2 |
| 5-2-3D |
| N/A |
| Instructor Station S/W |
| Part of JEM Segment Trainer |
| 1 |
| S/W |
| JAXA/JEM |
| 6/16/2001 |
| TBD |
Domestic CST, w/enhancements for SSTF
For SST
| 16 |
| 5.2 |
| 5-2-4A |
| N/A |
| JCP Flight S/W |
| 1 |
| S/W |
| JAXA/JEM |
| 2/28/03 |
| TBD |
| Flight Version |
For SDII
| 17 |
| 5.2 |
| 5-2-4B |
| N/A |
| RMS MDP Flight S/W |
| 1 |
| S/W |
| JAXA/JEM |
| 2/28/03 |
| TBD |
| Flight Version |
For SDII
| 18 |
| 5.2 |
| 5-2-4C |
| N/A |
| JCP kit S/W |
| Part of JEM C&DH Simulator |
| 1 |
| S/W |
| JAXA/JEM |
| 2/28/03 |
| TBD |
Domestic CST, w/enhancements for SDIL
For SDII
| 19 |
| 5.2 |
| 5-2-4D |
| N/A |
| MDP kit S/W |
| Part of JEM C&DH Simulator |
| 1 |
| S/W |
| JAXA/JEM |
| 2/28/03 |
| TBD |
Domestic RST with enhancements for SDIL
For SDII
| 20 |
| 5.2 |
| 5-2-4E |
| N/A |
| DIU kit S/W |
| Part of JEM C&DH Simulator |
| 1 |
| S/W |
| JAXA/JEM |
| 2/28/03 |
| TBD |
Dor SDII
| 21 |
| 5.2 |
| 5-3-5A |
| N/A |
| Audio Terminal Units (ATUs) |
| 1 |
| H/W |
| NASA |
| 6/1/99 |
| TBD |
SSMTF
| 22 |
| 5.2 |
| 5-3-5B |
| N/A |
| Audio Terminal Units (ATUs) |
| 3 |
| H/W |
| NASA |
| 7/1/99 |
| TBD |
SSMTF
| 23 |
| 5.2 |
| 5-3-5C |
| N/A |
| Caution & Warning Panels |
| 4 |
| H/W |
| NASA |
| 6/1/99 |
| TBD |
SSMTF
| 24 |
| 5.2 |
| 5-3-5D |
| N/A |
| Caution & Warning Panels |
| 1 |
| H/W |
| NASA |
| 5/1/99 |
| 6/16/01 |
SSMTF
| 25 |
| 5.2 |
| 5-3-5E |
| N/A |
| Caution & Warning Panels |
| 1 |
| H/W |
| NASA |
| 6/1/99 |
| 6/16/01 |
SSMTF
| 26 |
| 5.2 |
| 5-3-5F |
| N/A |
| Portable Fire Extinguisher |
| 1 |
| H/W |
| NASA |
| 7/1/99 |
| TBD |
SSMTF
| 27 |
| 5.2 |
| 5-3-5G |
| N/A |
| Portable Breathing Apparatus |
| 1 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF
| 28 |
| 5.2 |
| 5-3-5H |
| N/A |
| Foot Restraints |
| 1 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF short duration
| 29 |
| 5.2 |
| 5-3-5I |
| N/A |
| Foot Restraints |
| 1 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF long duration
| 30 |
| 5.2 |
| 5-3-5J |
| N/A |
| Tether Assembly |
| 1 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF fixed length
| 31 |
| 5.2 |
| 5-3-5K |
| N/A |
| Tether Assembly |
| 1 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF fixed length
| 32 |
| 5.2 |
| 5-3-5L |
| N/A |
| Equipment Bag Assembly |
| 1 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF
| 33 |
| 5.2 |
| 5-3-5M |
| N/A |
| Handrail Assembly |
| 4 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF 41.5 inches
| 34 |
| 5.2 |
| 5-3-5N |
| N/A |
| Handrail Assembly |
| 4 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF 21.5 inches
| 35 |
| 5.2 |
| 5-3-5O |
| N/A |
| Handrail Assembly |
| 4 |
| H/W |
| NASA |
| 8/1/99 |
| TBD |
SSMTF 8.5 inches
| 36 |
| 5.2 |
| 5-3-5P |
| N/A |
| Handrail Equipment Anchor |
| 4 |
| H/W |
| NASA |
| 10/1/99 |
| TBD |
SSMTF
| 37 |
| 5.2 |
| 5-3-5Q |
| N/A |
| Seat Track Equipment Anchor |
| 2 |
| H/W |
| NASA |
| 9/1/99 |
| TBD |
SSMTF
| 38 |
| 5.2 |
| 5-3-5R |
| N/A |
| Articulating Post Assembly |
| 2 |
| H/W |
| NASA |
| 9/1/99 |
| TBD |
SSMTF
| 39 |
| 5.2 |
| 5-3-5S |
| N/A |
| Portable Utility Light Assembly |
| 2 |
| H/W |
| NASA |
| 10/1/99 |
| TBD |
SSMTF
| 40 |
| 5.2 |
| 5-3-5T |
| N/A |
| Emergency Egress Light |
| pair |
| 1 |
| H/W |
| NASA |
| 5/1/99 |
| TBD |
SSMT 36 inches
| 41 |
| 5.2 |
| 5-3-5U |
| N/A |
| Emergency Egress Light |
| pair |
| 1 |
| H/W |
| NASA |
| 5/1/99 |
| TBD |
SSMT 57 inches
| 42 |
| 5.2 |
| 5-3-6A |
| N/A |
| 2 CPU PC; Xeon processor |
| Simulation computer for Am. Seg. Trainer |
| 1 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 43 |
| 5.2 |
| 5-3-6B |
| N/A |
| 1 CPU PC; Pentium 4 processor |
| Workstation computer for AST |
| 3 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 44 |
| 5.2 |
| 5-3-6C |
| N/A |
| IBM A31P |
| US PCS laptop for AST |
| 2 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 45 |
| 5.2 |
| 5-3-6D |
| N/A |
| Printer |
| 1 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 46 |
| 5.2 |
| 5-3-6E |
| N/A |
| Ethernet Hub |
| 1 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
| 47 |
| 5.2 |
| 5-3-6F |
| N/A |
| Cable and connectors |
| set |
| 1 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 48 |
| 5.2 |
| 5-3-6G |
| N/A |
| PCS and SSC support brackets |
| 2 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
| 49 |
| 5.2 |
| 5-3-6H |
| N/A |
| SSC |
| 2 |
| H/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 50 |
| 5.2 |
| 5-3-7A |
| N/A |
| Hatch Window Cover |
| 1 |
| H/W |
| NASA |
| TBD |
| TBD |
| 51 |
| 5.2 |
| 5-3-8A |
| N/A |
| IVA Seal Kit |
| quantity TBD |
| H/W |
| NASA |
| TBD |
| TBD |
| 52 |
| 5.2 |
| 5-3-9A |
| N/A |
| LTA EVA Cable |
| 5 |
| H/W |
| NASA |
| 4/21/04 |
| After assembly |
| 53 |
| 5.2 |
| 5-3-10A |
| N/A |
| Power and Data Grapple Fixture (PDGF) |
| 1 |
| H/W |
| NASA |
| 3/5/01 |
| N/A |
| 54 |
| 5.2 |
| 5-3-11A |
| N/A |
| Payload Disconnect Assembly (PDA) |
| 1 |
| H/W |
| NASA |
| 3/15/99 |
| TBD |
| 55 |
| 5.2 |
| 5-3-11B |
| N/A |
| PDA Cover |
| 1 |
| H/W |
| NASA |
| TBD |
| TBD |
| 56 |
| 5.2 |
| 5-4-3A |
| N/A |
| Consolidated Planning System (CPS) and Integrated Planning System (IPS) |
| 1 |
| S/W |
| NASA |
| 1/31/98 |
| TBD |
cycle 9
| 57 |
| 5.2 |
| 5-4-4A |
| N/A |
| AST s/w Linus OS/SAMMI s/w for AST |
| 4 |
| S/W |
| NASA |
| 8/16/04 |
| TBD |
COTS
| 58 |
| 5.2 |
| 5-4-6A |
| N/A |
| MOLFLUX |
| Outside contamination analysis tool |
| 1 |
| S/W |
| NASA |
| N/A |
| TBD |
Contamination analysis s/w
| 59 |
| 5.1 |
| 5-1-2A |
| N/A |
| Power Distribution Unit |
| including cable and connectors |
| 1 |
| H/W |
| JAXA/JEM |
| 4/1/97 |
| 8/27/97 |
| PM |
SPEL Step 1 test
| 60 |
| 5.1 |
| 5-1-2B |
| N/A |
| Power Distribution Box |
| including cable and connectors |
| 1 |
| H/W |
| JAXA/JEM |
| 4/1/97 |
| 8/27/97 |
| PM |
SPEL Step 1 Test
| 61 |
| 5.1 |
| 5-1-2C |
| N/A |
| DC/DC Converter |
| load simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 4/1/97 |
| 8/27/97 |
| PM |
SPEL Step 1 Test
| 62 |
| 5.1 |
| 5-1-3A |
| N/A |
| High Rate Multiplex System |
| HRMS |
| 1 |
| H/W |
| JAXA/JEM |
| 7/14/97 |
| 7/31/97 |
| EM |
For HRDL Integrated testing
| 63 |
| 5.1 |
| 5-1-3B |
| N/A |
| HRMS KIT |
| 1 |
| H/W |
| JAXA/JEM |
| 7/14/97 |
| 7/31/97 |
For HRDL Integrated testing
| 64 |
| 5.1 |
| 5-1-3C |
| N/A |
| Payload Data Handler |
| PDH |
| 1 |
| H/W |
| JAXA/JEM |
| 7/14/97 |
| 7/31/97 |
| Simulator |
For HRDL Integrated testing
| 65 |
| 5.1 |
| 5-1-3D |
| N/A |
| PDH KIT |
| 1 |
| H/W |
| JAXA/JEM |
| 7/14/97 |
| 7/31/97 |
For HRDL Integrated testing
| 66 |
| 5.1 |
| 5-1-4A |
| N/A |
| J1 Power Cable |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 67 |
| 5.1 |
| 5-1-4B |
| N/A |
| DIU III |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
| PM |
C&DH Test 1
| 68 |
| 5.1 |
| 5-1-4C |
| N/A |
| J2 Cable |
| 1553 and RS-422 Cable |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 69 |
| 5.1 |
| 5-1-4D |
| N/A |
| RT Address Switch Box |
| 2 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 70 |
| 5.1 |
| 5-1-4E |
| N/A |
| RS-422 Monitor Box |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 71 |
| 5.1 |
| 5-1-4F |
| N/A |
| RS-422 Simulator |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 72 |
| 5.1 |
| 5-1-4G |
| N/A |
| GP-IB Cable |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 73 |
| 5.1 |
| 5-1-4H |
| N/A |
| Computer and Printer |
| 1 |
| H/W |
| JAXA/JEM |
| 04/20/99 |
| 05/03/99 |
C&DH Test 1
| 74 |
| 5.1 |
| 5-1-5A |
| N/A |
| Main Processing Controller Interface Contollor-BIC |
| Part of JCP |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 76 |
| 5.1 |
| 5-1-5B |
| N/A |
| External Data Storage Unit (EDSU) |
| Part of JCP |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
| BBM |
C&DH Test 1 / 1A
| 77 |
| 5.1 |
| 5-1-5C |
| N/A |
| Cable between MPC/BIC and EDS |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 78 |
| 5.1 |
| 5-1-5D |
| N/A |
| Personal Computer (GSE) |
| 3-4 |
| 4 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 79 |
| 5.1 |
| 5-1-5E |
| N/A |
| Engineering Workstation (EWS)(GSE) |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 80 |
| 5.1 |
| 5-1-5F |
| N/A |
| MV 4000 (EDSU Host Computer) (GSE) |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 81 |
| 5.1 |
| 5-1-5G |
| N/A |
| Interface Unit(GSE) |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 82 |
| 5.1 |
| 5-1-5H |
| N/A |
| Power Supply DC120V |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 83 |
| 5.1 |
| 5-1-5I |
| N/A |
| Cooling Water Circulation Unit |
| 1 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 84 |
| 5.1 |
| 5-1-5L |
| N/A |
| RMS MDP Test Support Eqmt |
| 0 |
| H/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1 / 1A
| 85 |
| 5.1 |
| 5-1-6A |
| N/A |
| Pressurized Module Trainer |
| part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 6/30/00-6/16/01 |
| N/A |
| Domestic PMT,w/outfitting enhancements for SSTF |
For SSTF at JSC
| 86 |
| 5.1 |
| 5-1-6B |
| N/A |
| JCP Simulator |
| part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 6/30/00-6/16/01 |
| N/A |
| Domistic CST |
For SSTF at JSC
| 88 |
| 5.1 |
| 5-1-6D |
| N/A |
| Instructor Station |
| part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 6/30/00-6/16/01 |
| N/A |
| Domestic CST, w/enhancements for SSTF |
For SSTF at JSC
| 89 |
| 5.1 |
| 5-1-6E |
| N/A |
| JEM System Simulation H/W |
| part of JEM Segment Trainer |
| 1 |
| H/W |
| JAXA/JEM |
| 6/30/00-6/16/01 |
| N/A |
| Domestic CST, w/enhancements for SSTF |
For SSTF at JSC
| 90 |
| 5.1 |
| 5-1-7B |
| N/A |
| Have no info for this item |
| 91 |
| 5.2 |
| 5-2-2A |
| N/A |
| DIU III Firmware |
| 1 |
| S/W |
| JAXA/JEM |
| 4/20/99 |
| 5/3/99 |
| Flight Version |
C&DH Test 1
| 92 |
| 5.2 |
| 5-2-2B |
| N/A |
| JCP Flight S/W |
| 0 |
| S/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
C&DH Test 1A
| 93 |
| 5.2 |
| 5-2-2C |
| N/A |
| RMS Flight S/W |
| 1 |
| S/W |
| JAXA/JEM |
| 10/11/99 |
| 11/29/99 |
| Flight Version |
C&DH Test 1A
| 99 |
| 5.2 |
| 5-3-5V |
| N/A |
| Manual Pre Emergency Egress Light ssure Equalization Valve |
| 1 |
| S/W |
| JAXA/JEM |
| 5/1/99 |
| 6/16/01 |
| SSMT |
For intergration w/JST.
| 100 |
| 5.4 |
| 5-4-3A |
| N/A |
| Consolidated Planning System (CPS) & Integrated Planning system (IPS) |
| 1 |
| S/W |
| NASA |
| 1/31/98 |
| N/A |
| cycle 9 |
For execute planning in Tsukuba
| 101 |
| 5.4 |
| 5-4-4A |
| N/A |
| AST S/W Linux OS/SAMMI S/W for American Segment Trainer |
| 4 |
| S/W |
| NASA |
| 8/16/04 |
| N/A |
| COTS |
For JAXA Trainer at Tsukuba
| 102 |
| 5.4 |
| 5-4-5A |
| N/A |
| There is no info on this item |
| 103 |
| 1.1 |
| 1.1 |
| N/A |
| JEM Control Processor (JCP) (TBD) |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
| FEU |
NASA date 9/1/99 - NASDA date TBD
| 104 |
| 1.1 |
| 1.2 |
| N/A |
| JEM System Local Bus 1 Simulator (provides nescessary human control interface, simulation environmen |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
NASA date 9/1/99 - NASDA date TBD
| 105 |
| 1.1 |
| 1.3 |
| N/A |
| JEM System Local Bus 2 Simulator (provides necessary human control interface, simulation enviroment |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
NASA date 9/1/99 - NASDA date TBD
| 106 |
| 1.1 |
| 1.4 |
| N/A |
| JCP KIT (contents described in the JEM to SDIL ICD SSP 50149) |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
NASA date 9/1/99 - NASDA date TBD
| 107 |
| 1.1 |
| 1.5 |
| N/A |
| DIU III (TBD) |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
| PM |
NASA date 9/1/99 - NASDA date TBD
| 108 |
| 1.1 |
| 1.6 |
| N/A |
| JEM Simulator for DIU III (TBD) |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
NASA date 9/1/99 - NASDA date TBD
| 109 |
| 1.1 |
| 1.7 |
| N/A |
| There is no info for this item |
| 110 |
| 1.1 |
| 1.8 |
| N/A |
| RMS Maintenance Data Processor (MDP) (TBD) |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
| FEU |
NASA date 9/1/99 - NASDA date TBD
| 111 |
| 1.1 |
| 1.9 |
| N/A |
| JEM Simulator for RMS MDP (TBD) |
| For SVF (Qty TBD) |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
| 112 |
| 1.1 |
| 1.10 |
| N/A |
| RMS KIT (contents described in the JEM to SDIL ICD SSP 50149) TBD |
| For SVF |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
NASA date 9/1/99 - NASDA date TBD
| 113 |
| 1.1 |
| 1.11 |
| N/A |
| JEM RMS Trainer (TBD) |
| For SSTF (Qty TBD) |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
| 114 |
| 1.1 |
| 1.12 |
| N/A |
| JEM Payload Trainers TBD |
| For SSTF (Qty TBD) |
| H/W |
| JAXA/JEM |
| TBD |
| N/A |
| 115 |
| 1.1 |
| 1.13 |
| N/A |
| JEM Control Processor (JCP) |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
| Prototype Model |
C&DH Verification Test 3&4
| 116 |
| 1.1 |
| 1.14 |
| N/A |
| JRM System Local Bus 1 Simulator |
| Provides necessary human control interface, simulation environment etc |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 117 |
| 1.1 |
| 1.15 |
| N/A |
| JEM System Local Bus 2 simulator |
| Provides necessary human control interface, simulation environment etc. |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 118 |
| 1.1 |
| 1.16 |
| N/A |
| JCP KIT |
| contents described in the JEM to SDIL ICD SSP 50149 |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 119 |
| 1.1 |
| 1.17 |
| N/A |
| DIU III |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
| PM |
C&DH Verification Test 3&4
| 120 |
| 1.1 |
| 1.18 |
| N/A |
| JEM Simulator for DIU III |
| contents described in the JEM to SDIL ICD SSP 50149 |
| 1 |
| H/W |
| NASA |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 121 |
| 1.1 |
| 1.19 |
| N/A |
| There is no info for this item |
| 122 |
| 1.1 |
| 1.20 |
| N/A |
| RMS Maintenance Data Processor |
| MDP |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
| Bread Board Model (BBM) |
C&DH Verification Test 3&4
| 123 |
| 1.1 |
| 1.21 |
| N/A |
| JEM Simulator for RMS MDP |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 124 |
| 1.1 |
| 1.22 |
| N/A |
| RMS KIT |
| Contents descrided in the JEM to SDIL ICD SSP 50149 |
| 1 |
| H/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 125 |
| 2.2 |
| 2.1 |
| N/A |
| There is no info for this item |
| 126 |
| 2.2 |
| 2.2 |
| N/A |
| There is no info for this item |
| 127 |
| 2.2 |
| 2.3 |
| N/A |
| There is no info for this item |
| 128 |
| 2.2 |
| 2.4 |
| N/A |
| JEM RMS Trainer S/W |
| Part of JEM system trainer (TBD) (Qty TBD) |
| S/W |
| JAXA/JEM |
| TBD |
| N/A |
| 129 |
| 2.2 |
| 2.5 |
| N/A |
| JEM Payload Trainers S/W |
| Part of JEM system trainer (TBD) (Qty TBD) |
| S/W |
| JAXA/JEM |
| TBD |
| N/A |
FOR SSTF
| 130 |
| 2.2 |
| 2.6 |
| N/A |
| There is no info for this item |
| 0 |
| S/W |
| 131 |
| 2.2 |
| 2.7 |
| N/A |
| JCP FLT S/W |
| 1 |
| S/W |
| JAXA/JEM |
| TBD |
| TBD |
| Formal Qualification test (FQT) |
C&DH Verification Test 3&4
| 132 |
| 2.2 |
| 2.8 |
| N/A |
| System Local Bus 1Simulation S/W |
| 1 |
| S/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 133 |
| 2.2 |
| 2.9 |
| N/A |
| System Local Bus 2 Simulation S/W |
| 1 |
| S/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 134 |
| 2.2 |
| 2.10 |
| N/A |
| DUI -III Firmware |
| 1 |
| S/W |
| JAXA/JEM |
| TBD |
| TBD |
| FQT |
C&DH Verification Test 3&4
| 135 |
| 2.2 |
| 2.11 |
| N/A |
| There is no info for this item |
| 136 |
| 2.2 |
| 2.12 |
| N/A |
| RMS Flight S/W |
| 1 |
| S/W |
| JAXA/JEM |
| TBD |
| TBD |
| FQT |
C&DH Verification Test 3&4
| 137 |
| 2.2 |
| 2.13 |
| N/A |
| RMS Simulation S/W |
| 1 |
| S/W |
| JAXA/JEM |
| TBD |
| TBD |
C&DH Verification Test 3&4
| 138 |
| 3.3 |
| 3.1 |
| N/A |
| Node 2 Emulator |
| including cables |
| 1 |
| H/W |
| NASA |
| TBD |
| TBD |
| Emulator |
| EPS STEP 2 TEST |
NASA Date TBD - NASDA date TBD
| 139 |
| 3.3 |
| 3.2 |
| N/A |
| Portable Breathing Apparatus Brackets |
| PBA |
| 2 |
| H/W |
| NASA |
| TBD |
| TBD |
| Prototype |
| Fit test |
| 140 |
| 3.3 |
| 3.3 |
| N/A |
| Portable Breathing Apparatus |
| 2 |
| H/W |
| NASA |
| TBD |
| TBD |
| Prototype |
| fit test |
| 141 |
| 3.3 |
| 3.4 |
| N/A |
| Portable Breathing Apparatus Brackets |
| 2 |
| H/W |
| NASA |
| TBD |
| N/A |
| Prototype |
| for installation in the JEM |
| 142 |
| 3.3 |
| 3.5 |
| N/A |
| Portable Breathing Apparatus |
| 2 |
| H/W |
| NASA |
| TBD |
| N/A |
| Prototype |
| for installation in the JEM |
| 143 |
| 3.3 |
| 3.9 |
| N/A |
| ESS C&C MDM |
| including cables and connectors |
| 1 |
| H/W |
| NASA |
| TBD |
| TBD |
| FEU |
| C&DH test 2 |
| 144 |
| 3.3 |
| 3.10 |
| N/A |
| MDM Application Test Environment 3 |
| MATE including cables |
| 1 |
| H/W |
| NASA |
| TBD |
| TBD |
C&DH test 2
| 145 |
| 3.3 |
| 3.11 |
| N/A |
| SSC spare |
| 1 |
| H/W |
| NASA |
| TBD |
| N/A |
| COTS |
| JAXA Trainer at Tsukuba |
| 146 |
| 4.4 |
| 4.4 |
| N/A |
| C&C MDM flight S/W |
| 1 |
| S/W |
| NASA |
| TBD |
| TBD |
| CCS R3 PDR version |
| C&DH test 2 |
| 147 |
| 4.4 |
| 4.5 |
| N/A |
| C&C MDM Simulation S/W |
| 1 |
| S/W |
| NASA |
| TBD |
| TBD |
| CES R3 PDR Version |
| C&DH test 2 |
| 148 |
| 4.4 |
| 4.6 |
| N/A |
| SSC Software |
| Qty TBD |
| S/W |
| NASA |
| TBD |
| N/A |
| COTS |
| for JAXA trainer at Tskuba |
J-NDC Forms with NASA and JAXA approval
Revised
JEM BHSEALS
NASA will update the database
Start CM Process
Updated BHESALS
Database
NASA and JAXA confirmation
Technical Protocols and J-NDCs are maintained on file by NASA BHSEALS Book Manager
Biannual Reconciliation by NASA and JAXA Book Managers, if necessary.
J-NDC
"A"
"B"
"D"
"C"
TP
AA"
D"
C"
BB"
Note: at this point shipments A, B, C, and D can take place (after all licenses and shipping issues have been resolved) v
_1193139713.doc
International Space Station
Program
SSP 50264
August 8, 2004November 2005
NASA/JAXA Bilateral Hardware and Software Exchange Agreements, Lists, and Schedules for the Japanese Experiment Module (JEM)
Japan Aerospace Exploration
Agency
National Aeronautics and Space Administration
International Space Station Program
Johnson Space Center
Houston, Texas
National Aeronautics and Space Administration
International Space Station Program
Johnson Space Center
Houston, Texas
_1193556970.doc
BHSEALS NDC FORM No.:
JEM-XXX (assigned by BHSEALS Book Manager)
Document Number:
SSP 50264
Date J-NDC Originated:
date
Page 1 of
Name of Document:
NASA/JAXA Bilateral Hardware and Software Exchange Agreement, Lists, and Schedules
Reason for Change:
Add item to J-NDC BHSEALS Database
Content of Change:
NDC Title: Create a short title that gives a top-level description of the purpose, module, segment, etc. of this hardware/software exchange. Use as few words as possible.
1. Add a row to BHSEALS Database, to include the following information:
Nomenclature: (name/description of hardware or software to be exchanged – part number if available)
Quantity:
Baseline Ship Date: (month/day/year)
Providing Organization: (example: NASA (JSC)
Receiving Organization: (example: JAXA)
Item to be Returned?: Yes or No / Return date:
Comments: (optional additional comments if necessary)
Authority:(Protocol, TIM, or agreement source that authorizes this exchange.)
2. Add a row to BHSEALS Database, to include the following information:
Nomenclature: (name/description of hardware or software to be exchanged - part number if available)
Receiving Organization: (example: JAXA)
Authority:(Protocol, TIM, or agreement source that authorizes this exchange )
3. Add a row to BHSEALS Database, to include the following information:
Nomenclature: (name/description of hardware or software to be exchanged - part number if available)
Receiving Organization: (example: JAXA)
Authority:(Protocol, TIM, or agreement source that authorizes this exchange )
Signatures:
NASA / Date
JAXA / Date
TBD / Date
Technical Team
Technical Team
Bilateral Document
Manager
Eva Fuller
Kazuhiro Mitsumatsu
Technical Mgt.
Jeff Theall
KEYWORDS \* MERGEFORMAT
_1193133501.doc
Protocol
Of the Engineering Meeting
Between NASA/JAXA Representatives
Month DD, YYYY
NASA/JAXA came to an agreement regarding deliveries of NASA equipment to Japan (JAXA) that are needed to support development and maintenance of ISS Simulation Software for NASA. The items listed in the attachment are to be delivered to upgrade the functionality of the Ground Support Equipment (GSE) facility at JAXA. The first delivery is in progress in accordance with the previous protocol dated Month DD, YYYY. The second delivery is in process in accordance with the previous protocol dated Month DD, YYYY. This is the third such delivery of equipment – there will be other deliveries with separate protocols as the specifics of the GSE equipment are defined.
Bilateral Document SSP 50615 is the basis for these deliveries. Appropriate SSP 50615 changes will be made by Notice of Document Change (NDC) as agreed to and signed by NASA and JAXA.
The planned delivery date for the equipment in the attachment is DD Month YYYY.
Prepared by:
NASA Technical Lead
Concurred by:
NASA JEM Project MGR
JAXA JEM Project Team
Approved by:
NASA/JAXA Integrations MGR
JAXA JEM Project MGR
_1175619263.xls Sheet1
Approved Database Changes to SSP- TBD
Period covering: to:
BDC # BDC Date BDC Title Date Shipped Status Comments