This notice announces a forthcoming request for proposal for the Human Space Flight Technical Integration Contract. NASA/JSC plans to issue an RFP on or around November 1st, 2019, with proposals due December 11th, 2019. The contract is a total small business set-aside under NAICS code 541715 with a size standard of 1,250 employees. The contractor will provide technical integration services for human space flight programs. The solicitation and amendments will be available online at the listed websites. Prospective offerors must monitor the sites and are responsible for downloading documents. All technical questions must be submitted in writing.
SSP 50182
Text of this file
SSP 50182
NASA/ASI Bilateral Safety and Product Assurance Requirements V International Space Station Program
May 2, 1996 file_0.wmf file_1.doc thumbnail_0.wmf
National Aeronautics and Space Administration International Space Station Program Johnson Space Center Houston, Texas
Agenzia Spaziale Italiana (Italian Space Agency) Rome, Italy
REVISION AND HISTORY PAGE
Revision Letter Description Publication Date
Initial Release
09-13-99 ii i
PREFACE
The NASA/ASI Bilateral Safety and Product Assurance Requirements document is a joint National Aeronautics and Space Administration (NASA) and Agenzia Spaziale Italiana (ASI) document which describes all safety and product assurance requirements applicable to the ASI.
Both NASA and ASI herein mutually agree that the execution of this document is necessary for the effective and safe integration of the Mini-Pressurized Logistics Module (MPLM) in to the International Space Station.
| /s/ T. W. Holloway 8/23/99____ | /s/ Silvana Rabbia 7/20/99 | |
| Thomas W. Holloway | Silvana Rabbia | |
| Manager, Space Station Program | Program Manager, | |
| ASI MPLM Program |
INTERNATIONAL SPACE STATION PROGRAM
NASA/ASI BILATERAL SAFETY AND PRODUCT ASSURANCE REQUIREMENTS DOCUMENT
CONCURRENCE
May, 1996
| Prepared By: | Dale Cegielski | _NASA | ||
| (NASA) | PRINT NAME | ORGN | ||
| /s/ John K. Trainor for | 7/20 /99 | |||
| SIGNATURE | DATE |
Concurred By: Gregg Baumer NASA (NASA Mgr S&MA for
| International Partners) | PRINT NAME | ORGN | |
| /s/ Gladys M. Henderson for | 7/20 /99 | ||
| SIGNATURE | DATE |
| Concurred By: | Francesco P. Cantelli | ASI PA | ||
| (ASI) | PRINT NAME | ORGN | ||
| /s/ Francesco P. Cantelli | 7/20/99 | |||
| SIGNATURE | DATE |
| DQA | Richard Delgado | NASA | ||
| PRINT NAME | ORGN | |||
| /s/ Richard Delgado | 8/2/99 | |||
| SIGNATURE | DATE |
INTERNATIONAL SPACE STATION PROGRAM
NASA/ASI BILATERAL SAFETY AND PRODUCT ASSURANCE
REQUIREMENTS DOCUMENT
LIST OF CHANGES
August 25, 1995
All changes to paragraphs, tables, and figures in this document are shown below:
SSCBD
Entry Date Change Paragraph(s)
TABLE OF CONTENTS
PARAGRAPH PAGE
| 1.0 | INTRODUCTION | . | 1-1 |
| 1.1 | PURPOSE | 1-1 | |
| 1.2 | SCOPE | 1-1 | |
| 1.3 | MANAGEMENT APPROACH | 1-1 | |
| 1.4 | RELATION TO OTHER REQUIREMENTS | 1-1 | |
| 1.4.1 | PROGRAM REQUIREMENTS | 1-1 | |
| 1.4.2 | GSE HARDWARE AND SOFTWARE | 1-2 | |
| 1.5 | MOTIVATION | . | 1-2 |
| 1.6 | INDEPENDENT EVALUATIONS FOR NASA OR THE | ||
| INTERNATIONAL PARTNERS | 1-2 | ||
| 1.7 | DATA REQUIREMENT DESCRIPTIONS | 1-2 | |
| 1.8 | SAFETY AND PRODUCT ASSURANCE DATABASE | 1-2 | |
| 1.9 | MILESTONE REVIEWS | 1-2 | |
| 1.10 | CERTIFICATION | 1-3 | |
| 1.11 | DELEGATION OF AUTHORITY | . | 1-3 |
| 2.0 | APPLICABLE DOCUMENTS | 2-1 | |
| 3.0 | RELIABILITY AND MAINTAINABILITY | 3-1 | |
| 3.1 | MANAGEMENT | 3-1 | |
| 3.1.1 | ORGANIZATION | 3-1 | |
| 3.1.1.1 | THE PROGRAM OFFICE OVERSIGHT RESPONSIBILITY | 3-1 | |
| 3.1.1.2 | PROGRAM OFFICE AVAILABILITY ASSESSMENT | 3-1 | |
| 3.1.2 | RELIABILITY AND MAINTAINABILITY PLAN | 3-1 | |
| 3.1.3 | AUDITS AND SURVEYS | 3-1 | |
| 3.1.4 | SUPPLIER RELIABILITY AND MAINTAINABILITY CONTROL | 3-2 | |
| 3.1.5 | NASA OR INTERNATIONAL PARTNER FURNISHED EQUIPMENT | ||
| (GFE/IGFE) RELIABILITY AND MAINTAINABILITY | 3-2 | ||
| 3.2 | RELIABILITY AND MAINTAINABILITY ENGINEERING | 3-2 | |
| 3.2.1 | RELIABILITY AND MAINTAINABILITY DESIGN CRITERIA | 3-2 | |
| 3.2.2 | RELIABILITY AND MAINTAINABILITY ANALYSES/TRADE STUDIES | . | 3-2 |
| 3.2.2.1 | RELIABILITY ANALYSES/TRADE STUDIES | 3-2 | |
| 3.2.2.2 | MAINTAINABILITY ANALYSES/TRADE STUDIES | 3-2 | |
| 3.2.2.3 | PROGRAM OFFICE SUPPORTABILITY/AVAILABILITY | ||
| ANALYSES/TRADE STUDIES | 3-3 | ||
| 3.2.3 | HARDWARE FAILURE MODES AND EFFECTS ANALYSES | 3-3 | |
| 3.2.3.1 | FLIGHT HARDWARE FMEAS | 3-3 | |
| 3.2.3.2 | GROUND SUPPORT EQUIPMENT FMEAS | 3-3 | |
| 3.2.3.3 | PAYLOAD FMEAS | 3-3 | |
| 3.2.4 | CRITICALITY CATEGORIES | 3-3 | |
| 3.2.5 | CRITICAL ITEM CONTROL | 3-3 | |
| 3.2.5.1 | CRITICAL ITEMS LIST PREPARATION | 3-3 | |
| 3.2.5.2 | RESERVED | 3-4 | |
| 3.2.5.3 | RESERVED | 3-4 | |
| 3.2.5.4 | CRITICAL ITEMS LIST PRIORITIZATION | 3-4 | |
| 3.2.6 | RELIABILITY AND MAINTAINABILITY DATA | 3-4 | |
| 3.2.6.1 | FLIGHT AVIONICS HARDWARE OPERATING TIME | 3-4 | |
| 3.2.7 | LIMITED-LIFE ITEMS | 3-4 | |
| 3.2.8 | MILESTONE REVIEWS | 3-4 | |
| 3.2.9 | CONFIGURATION CONTROL BOARDS AND PANELS | 3-4 | |
| 3.2.10 | PROBLEM REPORTING SYSTEM | 3-4 | |
| 3.2.11 | VERIFICATION ASSURANCE | 3-4 | |
| 3.3 | ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL AND | ||
| MECHANICAL PARTS CONTROL | 3-5 | ||
| 3.3.1 | ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS | 3-5 | |
| 3.3.1.1 | GENERAL | 3-5 | |
| 3.3.1.2 | ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS | ||
| SELECTION | 3-5 | ||
| 3.4 | Materials and Processes | 3-5 | |
| 3.5 | REPORTING PARTS AND MATERIALS PROBLEMS AND | ||
| ASSESSING ALERTS | 3-5 | ||
| 3.5.1 | NASA ALERTS | 3-5 | |
| 3.5.2 | INTERNATIONAL PARTNERS ALERTS | 3-6 | |
| 4.0 | QUALITY ASSURANCE | 4-1 | |
| 4.1 | MANAGEMENT AND PLANNING | 4-1 | |
| 4.1.1 | PLANNING | 4-1 | |
| 4.1.2 | ORGANIZATION | 4-1 | |
| 4.1.2.1 | THE SPACE STATION PROGRAM OVERSIGHT RESPONSIBILITY | 4-1 | |
| 4.1.3 | QUALITY PROGRAM PLAN | 4-1 | |
| 4.1.4 | RESERVED | 4-2 | |
| 4.1.5 | MANAGEMENT ASSESSMENT DATA | 4-2 | |
| 4.1.6 | TRAINING | 4-2 | |
| 4.1.7 | INTERNAL QUALITY PROGRAM AUDITS AND SURVEYS | 4-2 | |
| 4.1.8 | MILESTONE REVIEWS | 4-2 | |
| 4.2 | DESIGN AND DEVELOPMENT CONTROLS | 4-3 | |
| 4.2.1 | TECHNICAL DOCUMENTS | 4-3 | |
| 4.2.2 | QUALITY SUPPORT TO DESIGN REVIEWS | 4-3 | |
| 4.2.3 | CHANGE CONTROL VERIFICATION | 4-3 | |
| 4.2.4 | PRODUCT/PROCESS DEVELOPMENT AND VALIDATION | 4-4 | |
| 4.3 | IDENTIFICATION AND DATA RETRIEVAL | 4-4 | |
| 4.3.1 | GENERAL | 4-4 | |
| 4.3.2 | RETENTION OF RECORDS | 4-5 | |
| 4.3.3 | RECORD RETRIEVAL | 4-5 | |
| 4.4 | PROCUREMENT | 4-5 | |
| 4.4.1 | PROCUREMENT CONTROLS | 4-5 | |
| 4.4.2 | SELECTION OF CONTRACTOR PROCUREMENT SOURCES | 4-5 | |
| 4.4.3 | PROCUREMENT DOCUMENTS | 4-5 | |
| 4.4.3.1 | PRIOR TO RELEASE | 4-6 | |
| 4.4.3.2 | PROCUREMENT REQUIREMENT DOCUMENTS | 4-6 | |
| 4.4.3.3 | PROCUREMENT DOCUMENT CONTENTS | 4-6 | |
| 4.4.3.3.1 | CHANGES | 4-6 | |
| 4.4.3.3.2 | TEST RESULTS | 4-6 | |
| 4.4.6 | RECEIVING INSPECTION | 4-6 | |
| 4.4.7 | PROCUREMENT SOURCE DATA | 4-7 | |
| 4.4.8 | AUDITS AND SURVEYS OF PROCUREMENT SOURCE OPERATIONS | 4-7 | |
| 4.5 | FABRICATION CONTROLS. | 4-7 | |
| 4.5.1 | FABRICATION OPERATIONS | 4-7 | |
| 4.5.2 | ARTICLE AND MATERIAL CONTROLS | 4-8 | |
| 4.5.3 | CLEANLINESS/CONTAMINATION CONTROL | 4-9 | |
| 4.5.4 | PROCESS CONTROLS | 4-9 | |
| 4.5.5 | NONDESTRUCTIVE EVALUATION | 4-9 | |
| 4.5.6 | WORKMANSHIP STANDARDS | 4-9 | |
| 4.5.7 | CONTROL OF TEMPORARY INSTALLATIONS AND REMOVALS | 4-10 | |
| 4.5.8 | QUALITY ASSURANCE DESIGNEES | 4-10 | |
| 4.5.9 | INSPECTION PROCEDURES | 4-10 | |
| 4.6 | TEST CONTROLS | 4-10 | |
| 4.6.1 | VERIFICATION | 4-10 | |
| 4.6.2 | TEST PROCEDURES | 4-10 | |
| 4.6.3 | TEST PERFORMANCE | 4-11 | |
| 4.6.4 | INSPECTION AND TEST RECORDS AND DATA | 4-12 | |
| 4.6.4.1 | RECORDS | 4-12 | |
| 4.6.4.2 | ACCEPTANCE DATA PACKAGE | 4-12 | |
| 4.6.4.3 | END-ITEM ACCEPTANCE REVIEW | 4-12 | |
| 4.7 | NONCONFORMING ARTICLES AND MATERIALS | 4-13 | |
| 4.7.1 | NONCONFORMANCE CONTROL SYSTEM | 4-13 | |
| 4.7.2 | IDENTIFICATION OF NONCONFORMANCES | 4-13 | |
| 4.7.3 | NONCONFORMANCE EVALUATION | 4-13 | |
| 4.7.4 | NONCONFORMANCE DISPOSITIONS | 4-13 | |
| 4.7.4.1 | RETURN TO SUPPLIER | 4-13 | |
| 4.7.4.2 | RETURN FOR REWORK OR COMPLETION OF OPERATIONS | 4-13 | |
| 4.7.4.3 | SCRAP | 4-13 | |
| 4.7.4.4 | MATERIAL REVIEW BOARD | 4-13 | |
| 4.7.5 | MATERIAL REVIEW BOARD ACTION | 4-14 | |
| 4.7.5.1 | MEMBERSHIP | 4-14 | |
| 4.7.5.2 | MATERIAL REVIEW BOARD DISPOSITIONS | 4-14 | |
| 4.7.5.2.1 | REPAIR | 4-14 | |
| 4.7.5.2.2 | USE AS IS | 4-14 | |
| 4.7.5.2.3 | SCRAP | 4-14 | |
| 4.7.5.2.4 | WAIVERS | 4-14 | |
| 4.7.5.2.5 | ARTICLES OR MATERIALS RETURNED TO SOURCE | 4-15 | |
| 4.7.5.3 | MATERIAL REVIEW BOARD HOLDING AREA | 4-15 | |
| 4.7.5.4 | SUPPLIER MATERIAL REVIEW BOARD | 4-15 | |
| 4.7.5.5 | RECURRENCE CONTROL | 4-15 | |
| 4.7.6 | PROBLEM REPORTING | 4-15 | |
| 4.8 | METROLOGY | 4-15 | |
| 4.8.1 | METROLOGY CONTROLS | 4-15 | |
| 4.8.2 | CALIBRATION RECORDS | 4-16 | |
| 4.8.3 | MEASUREMENT ACCURACY | 4-16 | |
| 4.8.4 | CALIBRATION CONTROLS | 4-16 | |
| 4.8.4.1 | FACILITY | 4-16 | |
| 4.8.4.2 | TRACEABILITY | 4-16 | |
| 4.8.4.3 | HANDLING, STORAGE, AND TRANSPORTATION | 4-16 | |
| 4.8.4.4 | IDENTIFICATION AND LABELING | 4-17 | |
| 4.8.4.5 | CALIBRATION INTERVALS | 4-17 | |
| 4.8.4.6 | RECALL SYSTEM | 4-17 | |
| 4.8.4.7 | ENVIRONMENTAL REQUIREMENTS | 4-17 | |
| 4.8.5 | REMEDIAL ACTION AND RECURRENCE CONTROL | 4-17 | |
| 4.9 | STAMP CONTROLS | 4-17 | |
| 4.9.1 | STAMP AND MARKING MATERIALS | 4-17 | |
| 4.9.2 | STAMP TRACEABILITY | 4-17 | |
| 4.9.3 | STAMP APPLICATION | 4-18 | |
| 4.9.4 | ELECTRONIC DATA CONTROL | 4-18 | |
| 4.9.5 | STAMPING/MARKING APPLICATION | 4-18 | |
| 4.9.6 | STATUS STAMPING | 4-18 | |
| 4.9.7 | STAMPING METHODS | 4-18 | |
| 4.9.8 | STAMP SIGNIFICANCE | 4-18 | |
| 4.9.9 | CONTRACTOR STAMP DESIGNS | 4-18 | |
| 4.10 | HANDLING, STORAGE, PRESERVATION, MARKING, LABELING, | ||
| PACKAGING, PACKING, AND SHIPPING | 4-18 | ||
| 4.10.1 | PROCEDURES AND INSTRUCTIONS CONTROL | 4-18 | |
| 4.10.2 | HANDLING | 4-19 | |
| 4.10.3 | STORAGE | 4-19 | |
| 4.10.4 | PRESERVATION | 4-19 | |
| 4.10.5 | PACKAGING AND PACKING | 4-19 | |
| 4.10.6 | MARKING AND LABELING | 4-19 | |
| 4.10.7 | SHIPPING | 4-19 | |
| 4.10.7.1 | CONTROL | 4-19 | |
| 4.10.7.2 | UNSCHEDULED REMOVAL | 4-20 | |
| 4.11 | SAMPLING PLANS, STATISTICAL PLANNING, AND ANALYSES | 4-20 | |
| 4.11.1 | SAMPLING PLANS | 4-20 | |
| 4.11.2 | STATISTICAL ANALYSES | 4-20 | |
| 4.12 | CONTROL OF NASA AND INTERNATIONAL PARTNER PROPERTY | 4-20 | |
| 4.12.1 | CONTRACTOR RESPONSIBILITY | 4-20 | |
| 4.12.2 | UNSUITABLE NASA OR INTERNATIONAL PARTNER PROPERTY | 4-21 | |
| 5.0 | SOFTWARE PRODUCT ASSURANCE | 5-1 | |
| 5.1 | MANAGEMENT | 5-1 | |
| 5.1.1 | ORGANIZATION | 5-1 | |
| 5.1.2 | SOFTWARE PRODUCT ASSURANCE PLANNING | 5-2 | |
| 5.1.3 | FORMAL AND INTERNAL REVIEWS | 5-2 | |
| 5.1.4 | SUBTIER REQUIREMENTS | 5-2 | |
| 5.1.5 | NONDEVELOPMENTAL SOFTWARE | 5-2 | |
| 5.1.6 | NASA OR INTERNATIONAL PARTNER FURNISHED EQUIPMENT | 5-2 | |
| 5.1.7 | PROGRESS REPORTING | 5-2 | |
| 5.1.8 | CONTROL BOARDS | 5-3 | |
| 5.1.9 | OPERATIONS AND MAINTENANCE | 5-3 | |
| 5.1.10 | TRAINING | 5-3 | |
| 5.1.11 | SOFTWARE TOOLS | 5-3 | |
| 5.1.12 | SOFTWARE PRODUCT ASSURANCE RECORDS | 5-3 | |
| 5.2 | SOFTWARE QUALITY ASSURANCE | 5-3 | |
| 5.2.1 | AUDITS | 5-3 | |
| 5.2.2 | TOOLS, TECHNIQUES, AND METHODOLOGIES | 5-3 | |
| 5.2.3 | SOFTWARE DOCUMENTATION | 5-4 | |
| 5.2.4 | SOFTWARE CODE INSPECTION | 5-4 | |
| 5.2.5 | SOFTWARE TESTING | 5-4 | |
| 5.3 | CONFIGURATION MANAGEMENT | 5-5 | |
| 5.3.1 | CONFIGURATION IDENTIFICATION, STATUS ACCOUNTING AND | ||
| VERIFICATION | 5-5 | ||
| 5.3.2 | CONFIGURATION CHANGE CONTROL | 5-5 | |
| 5.3.3 | SOFTWARE DELIVERY | 5-5 | |
| 5.3.4 | SOFTWARE LIBRARIES | 5-5 | |
| 5.3.5 | DEVIATIONS AND WAIVERS | 5-5 | |
| 5.4 | NONCONFORMANCE REPORTING AND CORRECTIVE ACTION | 5-5 | |
| 5.4.1 | NONCONFORMANCE REPORTING | 5-6 | |
| 5.4.2 | PROBLEM REPORTING AND CORRECTIVE ACTION | 5-6 | |
| 5.5 | RESERVED | 5-6 | |
| 5.6 | SOFTWARE SAFETY | 5-6 | |
| 5.7 | STANDARDS | 5-6 | |
| 5.8 | TRADE STUDIES | 5-6 | |
| 5.9 | INTEGRATION ASSURANCE | 5-6 | |
| 5.10 | VERIFICATION AND VALIDATION | 5-6 | |
| 5.11 | INDEPENDENT VERIFICATION AND VALIDATION | 5-7 | |
| 5.12 | CERTIFICATION | 5-7 | |
| 5.13 | SECURITY AND PRIVACY ASSURANCE | 5-7 | |
| 6.0 | SAFETY | 6-1 | |
| 6.1 | SAFETY MANAGEMENT | 6-1 | |
| 6.1.1 | SAFETY APPROACH | 6-1 | |
| 6.1.2 | ORGANIZATION | 6-1 | |
| 6.1.3 | SAFETY PLAN | 6-1 | |
| 6.1.4 | SAFETY REVIEW REQUIREMENTS | 6-1 | |
| 6.1.4.1 | SPACE STATION REVIEW AND CERTIFICATION | 6-1 | |
| 6.1.4.2 | SPACE STATION USER PAYLOAD SAFETY REVIEWS | 6-1 | |
| 6.1.5 | SAFETY AUDIT TEAMS AND SURVEY | 6-2 | |
| 6.1.6 | OPERATIONAL READINESS INSPECTIONS | 6-2 | |
| 6.1.7 | FACILITY SAFETY REVIEWS | 6-2 | |
| 6.1.8 | MISHAP REPORTING AND INVESTIGATION | 6-2 | |
| 6.1.9 | SAFETY TRAINING AND CERTIFICATION | 6-3 | |
| 6.1.10 | WAIVERS AND DEVIATIONS | 6-3 | |
| 6.2 | SYSTEM SAFETY | 6-3 | |
| 6.2.1 | SYSTEM SAFETY OBJECTIVES | 6-3 | |
| 6.2.2 | SYSTEM SAFETY TECHNICAL REQUIREMENTS | 6-3 | |
| 6.2.3 | SAFETY ANALYSES | 6-4 | |
| 6.2.4 | HAZARD ELIMINATION AND CONTROL | 6-4 | |
| 6.2.4. | HAZARD ELIMINATION | 6-4 | |
| 6.2.4.2 | DESIGN FOR MINIMUM HAZARD | 6-4 | |
| 6.2.4.2.1 | SAFETY DEVICES | 6-4 | |
| 6.2.4.2.2 | CAUTION AND WARNING DEVICES | 6-4 | |
| 6.2.4.2.3 | SPECIAL PROCEDURES AND TRAINING | 6-5 | |
| 6.2.5 | HAZARD REPORT CLOSURE CRITERIA | 6-5 | |
| 6.2.6 | HUMAN ENGINEERING | 6-5 | |
| 6.2.7 | SPECIFICATIONS AND PROCEDURES REVIEW | 6-5 | |
| 6.2.8 | NASA OR INTERNATIONAL PARTNER FURNISHED EQUIPMENT | ||
| SAFETY | 6-5 | ||
| 6.2.9 | GROUND SUPPORT EQUIPMENT SAFETY | 6-5 | |
| 6.2.10 | REVIEW OF CHANGES | 6-6 | |
| 6.2.11 | REVIEW OF FLIGHT AND GROUND HARDWARE FAILURES | 6-6 | |
| 6.2.12 | EVALUATION OF GROUND AND FLIGHT TEST RESULTS | 6-6 | |
| 6.2.13 | EVALUATION OF MISSION OPERATIONAL ACTIVITY | 6-6 | |
| 6.3 | INDUSTRIAL SAFETY | 6-6 | |
| 6.3.1 | GROUND OPERATIONS SAFETY | 6-6 | |
| 6.4 | TEST OPERATIONS SAFETY | 6-6 | |
| 6.4.1 | EVALUATION OF SAFETY MARGINS | 6-6 | |
| 6.4.2 | TESTING OF SAFETY CRITICAL EQUIPMENT | 6-6 | |
| 6.4.2.1 | SAFETY CRITICAL SYSTEMS | 6-6 | |
| 6.4.2.2 | SAFETY CRITICAL EQUIPMENT | 6-7 | |
| 6.4.3 | TEST OPERATION REVIEWS | 6-7 | |
| 6.4.4 | SAFETY MONITORING | 6-7 |
| A | ABBREVIATIONS AND ACRONYMS | A-1 |
| B | GLOSSARY OF TERMS | B-1 |
Table 1 NASA/ ASI Exchange Data (S&PA) C-1
1 - 3
1.0 INTRODUCTION
1.1 PURPOSE
This document establishes programmatic hardware and software safety and product assurance (reliability, maintainability, and quality assurance) requirements and related implementation processes, agreed between NASA and Agenzia Spaziale Italiana (ASI) for the design, development, production, test, and operation of International Space Station (ISS).
1.2 SCOPE
These safety and product assurance requirements are applicable to all flight equipment, and certain Ground Support Equipment (GSE) (as specified herein) and related software supplied for ISS by ASI. The programmatic application of the requirements of this document shall be tailored, as appropriate, by ASI consistent with overall program objectives.
1.3 MANAGEMENT APPROACH
Management of safety and product assurance shall include the following:
| A. | Defining the major hardware and software safety and product assurance tasks and assuring that they are performed as integral parts of all phases of the program |
| B. | Evaluating the safety, reliability, maintainability, and quality of hardware, software, and operations through analyses, tests, reviews, and assessments |
| C. | Providing timely status reporting through periodic project reviews and as a part of overall project status reports |
| D. | Ensuring compatible safety and product assurance requirements among manufacturing, test, launch, and ground operations sites |
The ASI Safety and Product Assurance Office shall prepare, implement and maintain a Safety and Product Assurance (S&PA) Program Plan which defines the tasks and products of the Safety, Reliability, Maintainability and Quality Assurance (SRM&QA) activities and organizational responsibilities for task implementation. The plan will provide visibility of SRM&QA activities to be accomplished during the life of the ISS. Safety and product assurance management shall have direct unimpeded access to the management level having full project responsibility. The ASI S&PA Program Plan will be exchanged in accordance with SSP 50125, NASA/ASI Data Exchange Agreement, Lists and Schedules.
E. NASA Space Station Program shall assure that results of SRM&QA analyses are integrated into ISS assessment activities, so that the effects of Mini-Pressurized Logistics Module (MPLM) design options can be assessed.
1.4 RELATION TO OTHER REQUIREMENTS
1.4.1 PROGRAM REQUIREMENTS
The safety and product assurance requirements set forth in this document shall take precedence in cases of conflict with requirements contained in subtier documents. The safety and product assurance design requirements are contained in SSP 41164, Italian Mini-Pressurized Logistics Segment Specification.
1.4.2 GSE HARDWARE AND SOFTWARE
S&PA analyses for GSE hardware and software procured by ASI from existing programs need not be performed again if ASI has determined the use of the GSE is within the scope of the original analysis and meets current program requirements. All Critical Items and accepted risk hazards identified in these analyses must be baselined by the ISS.
1.5 MOTIVATION
A product-oriented motivational (awareness) activity shall be implemented by the NASA Centers (and their contractors) and, as appropriate, by ASI and its contractor as an integral part of and making maximum use of existing motivational activities. The objective of this activity shall be the prevention of human error by instilling in personnel an awareness of their personal responsibility for ISS success.
1.6 INDEPENDENT EVALUATIONS FOR NASA OR THE INTERNATIONAL PARTNERS
NASA and the International Partners reserve the right to appoint independent representatives to assist in safety and product assurance evaluation activities. These representatives will provide technical support to the applicable parent organization and determine effectiveness of and recommend improvements for safety and product assurance activities.
1.7 DATA REQUIREMENT DESCRIPTIONS
All S&PA exchange data between NASA and ASI shall be identified in this document (refer to Table 1), and details and submittal requirements of the exchange data will be specified in SSP 50125.
1.8 SAFETY AND PRODUCT ASSURANCE DATABASE
S&PA data bases shall be established. The data transfer format will be defined in SSP 50125.
1.9 MILESTONE REVIEWS
Safety and product assurance activities shall include supporting internal and supplier design reviews, and NASA and International Partner design and readiness reviews. Participation in milestone reviews shall assure that S&PA requirements are adequately considered.
ASI shall support the implementation of the ISS Safety Review Process as it is described in SSP 30599. The Safety Review Panel (SRP) assesses the MPLM element design for compliance with the safety requirements established in the SSP 50021.
Space Station Program major program milestone review safety assessment reports shall be prepared and submitted to the ISS Safety and Mission Assurance (S&MA) Program Office, within a defined period of time following the Space Station Program major program milestone reviews, as specified by the Director, International Space Station Alpha.
1.10 CERTIFICATION
S&PA shall ensure that products requiring certification meet the requirements contained in SSP 50108, Certificate of Flight Readiness Process Document.
1.11 DELEGATION OF AUTHORITY
This document is controlled, through approval signatures, by the NASA Space Station Program Manager and the ASI MPLM Program Manager. Either Program Manager can propose a change to this document by initiating a letter to the other Program Manager. Following a change proposal letter, both Program Managers will authorize the appropriate activity to discuss the proposed change. Changes to this document are approved by NASA and ASI Program Managers at either Space Station Control Boards (SSCBs) involving ASI participation or at NASA/ASI Joint Program Reviews. All changes to this document require the approval of both the NASA and ASI Program Managers. Following initial joint approval, NASA maintains this document, including the incorporation of approved changes.
2 - 2
2.0 APPLICABLE DOCUMENTS
The following documents include specifications, models, standards, guidelines, handbooks, and other special publications form a part of this document to the extent specified herein. The specific date and issue are shown in parentheses when the document is under Space Station Control Board (SSCB) control.
SSP 50102
NASA/ASI Bilateral Integration and Verification Plan
SSP 30233
Space Station Requirements for Materials and Processes
SSP 30234
Instructions for Preparation of Failure Modes and Effects Analysis (FMEA) and Critical Items List for Space Station
SSP 30309
Safety Analysis and Risk Assessment Requirements Document
SSP 30312
Electrical, Electronic, and Electromechanical (EEE) and Mechanical Parts Management and Implementation Plan for Space Station Program
SSP 30423
Space Station Approved Electrical, Electronic, and Electromechanical Parts List
SSP 30459
Space Station Interface Development Process Requirements
SSP 30599
Safety Review Process for International Space Station Alpha Program
SSP 41000
System Specification for the International Space Station Alpha
SSP 41164
Italian Mini-Pressurized Logistics Segment Specification
SSP 41170
Configuration Management Requirements
SSP 50004
Ground Support Equipment Design Requirements
SSP 50005
ISS Flight Crew Integration Standards
SSP 50021
ISS Safety Requirements
SSP 50108
Certificate of Flight Readiness Process Document
SSP 50125
July 22, 1997 NASA/ASI Data Exchange Agreement
NSTS 1700.7B
Safety Policy and Requirements for Payloads using the Space Transportation System
MIL-STD-105D
Sampling Procedures and Tables for Inspection by Attributes
SSP 50076
NASA/ASI Joint Management Plan
MIL-STD-414
Sampling Procedures and Tables for Inspection by Variables for Percent Defective
MIL-STD-975
NASA Standard Electrical, Electronic, and Electromechanical (EEE) Parts List
MSFC-HDBK-527
Materials Selection List for Space Hardware Systems, Revision D
NHB 1700.1 (V1-B)
NASA Safety Policy and Requirements Document
NSTS 13830 B
Implementation Procedure for NSTS Payloads System Safety Requirements
3 - 3 3 - 6
3.0 RELIABILITY AND MAINTAINABILITY
3.1 MANAGEMENT
Reliability and maintainability activities shall be planned and developed to be an integral part of the MPLM design, development, test and evaluation, and operational activities.
Scheduled status control will be used to provide visibility and assist in reporting, controlling and assessment of the reliability and maintainability effort. Objectives will be to plan and establish the reliability and maintainability effort; to define the major reliability and maintainability tasks and their place as an integral part of the design and development process; to assure the effective implementation of reliability and maintainability requirements; to evaluate system reliability and maintainability characteristics through a program of analysis, review, and test/demonstration; and to conduct trades between reliability, maintainability, and related disciplines to establish optimum availability.
3.1.1 ORGANIZATION
Organization of the reliability and maintainability efforts shall assure effective planning, management, implementation, and performance of reliability and maintainability activities. While the accomplishment of all reliability and maintainability tasks may not be the responsibility of the same organizational element, management of the reliability and maintainability efforts shall assure that all tasks are effectively accomplished. Reliability and maintainability management shall have direct access and shall report regularly to program/project management.
3.1.1.1 THE PROGRAM OFFICE OVERSIGHT RESPONSIBILITY
The Program Office S&MA Office shall have oversight responsibility for the reliability and maintainability efforts. This office shall monitor compliance with the reliability and maintainability requirements specified herein, and shall conduct independent assessments of the reliability process implementation, the maintainability process implementation, and reliability or maintainability analyses performed. The S&MA Office will participate in milestone and design reviews as stated in Paragraph 3.2.8.
3.1.1.2 PROGRAM OFFICE AVAILABILITY ASSESSMENT
Not Applicable.
3.1.2 RELIABILITY AND MAINTAINABILITY PLAN
The ASI Reliability and Maintainability (R&M) Program Plan will describe how its organizational activity will implement the R&M program requirements of this section and SSP 41164. The ASI R&M Program Plan will be submitted in accordance with SSP 50125.
3.1.3 AUDITS AND SURVEYS
The reliability and maintainability efforts shall include contractor internal audits and vendor/supplier surveys to evaluate the progress and effectiveness of reliability and maintainability activities and to determine the need for adjustments or changes. Audits and surveys shall be conducted, where needed, at intervals as defined by the reliability and maintainability plans.
3.1.4 SUPPLIER RELIABILITY AND MAINTAINABILITY CONTROL
The reliability and maintainability efforts shall assure that hardware/software obtained from any source, including Off-The-Shelf (OTS), meets the reliability and maintainability requirements of the overall system. Management controls shall be provided to assure the adequacy of the implementation of the requirements.
3.1.5 NASA OR INTERNATIONAL PARTNER FURNISHED EQUIPMENT (GFE/IGFE) RELIABILITY AND MAINTAINABILITY Reliability and maintainability data needed for GFE/Airborne Flight Equipment (AFE) shall be identified by the contractor or supplying agency and shall be supplied by the supplying agency. When examination of these data or testing indicates that the equipment is not consistent with the reliability and/or maintainability requirements of the MPLM, the supplying agency shall be formally and promptly notified.
3.2 RELIABILITY AND MAINTAINABILITY ENGINEERING
Reliability and maintainability engineering tasks shall be accomplished, to the extent specified, for all flight equipment, flight support equipment, orbital support equipment, ground support equipment, and NASA or ASI furnished equipment which could cause personnel injuries or damage to the facility or which interfaces with flight hardware. Maintainability engineering efforts shall support ground maintenance planning efforts as appropriate.
3.2.1 RELIABILITY AND MAINTAINABILITY DESIGN CRITERIA
The reliability and maintainability efforts shall include the establishment of reliability and maintainability design criteria and assure that the criteria are incorporated into each design. The reliability and maintainability efforts shall include a systematic approach for reviewing and concurring in design and procurement specifications and in design changes to assure that all design items reflect proper and complete reliability and maintainability design criteria and that the specifications contain applicable reliability and maintainability requirements.
3.2.2 RELIABILITY AND MAINTAINABILITY ANALYSES/TRADE STUDIES
3.2.2.1 RELIABILITY ANALYSES/TRADE STUDIES
The reliability effort shall include participation in design trades and assessments utilizing reliability modeling and numerical predictions as appropriate. Reliability criteria, such as failure modes and effects, frequency of failures, and operating life, shall be evaluated as part of engineering and operational trade studies.
3.2.2.2 MAINTAINABILITY ANALYSES/TRADE STUDIES
The maintainability effort shall include participation in design trades and assessments utilizing maintainability modeling and numerical predictions as appropriate. Maintainability criteria, such as mean-time-to-repair and restorability considerations shall be evaluated as part of engineering and operational trade studies.
3.2.2.3 PROGRAM OFFICE SUPPORTABILITY/AVAILABILITY ANALYSES/TRADE
STUDIES
Not applicable.
3.2.3 HARDWARE FAILURE MODES AND EFFECTS ANALYSES
A system for preparing, maintaining, and controlling Failure Modes and Effects Analyses (FMEAs) shall be established in accordance with SSP 50125, NASA/ASI Data Exchange Agreement.
3.2.3.1 FLIGHT HARDWARE FMEAs
Flight hardware FMEAs shall be developed for the MPLM in accordance with SSP 30234, Instructions for Preparation of FMEA and Critical Items List for Space Station. The FMEA shall be conducted for each mission phase for the MPLM. ASI will submit the MPLM FMEA/Critical Items List (CIL) report to the NASA Space Station Program in accordance with SSP 50125.
3.2.3.2 GSE FMEAs
GSE FMEAs shall be prepared in accordance with SSP 30234.
3.2.3.3 PAYLOAD FMEAs
Not applicable.
3.2.4 CRITICALITY CATEGORIES
Criticality categories for flight hardware and GSE are defined in SSP 30234.
3.2.5 CRITICAL ITEM CONTROL
3.2.5.1 CRITICAL ITEMS LIST PREPARATION
Based on results of the FMEAs, a CIL shall be prepared in accordance with SSP 30234. ASI will submit the MPLM CIL to the NASA Space Station Program as part of the FMEA/CIL Report in accordance with SSP 50125.
The CIL shall consist of Criticality 1, 1S, 1P and 2 failure points and redundant items in 1R and 1SR applications which do not meet the program failure tolerance requirements. In addition, the CIL will contain all items in which any of the following occur:
| A. | Item(s) which cannot be checked out during prelaunch or in orbit before being required to operate |
| B. | Item(s) whose loss cannot be detected by the flight or ground crew during any mission phase |
| C. | Not applicable |
3.2.5.2 RESERVED
Not applicable.
3.2.5.3 RESERVED
Not applicable.
3.2.5.4 CRITICAL ITEMS LIST PRIORITIZATION
Not applicable.
3.2.6 RELIABILITY AND MAINTAINABILITY DATA
Reliability data shall be compiled for all flight hardware in accordance with SSP 50125.
3.2.6.1 FLIGHT AVIONICS HARDWARE OPERATING TIME
Reserved.
3.2.7 LIMITED-LIFE ITEMS
The life-limiting criteria and characteristics for limited-life items shall be established, and limited-life items shall be identified. Accrued data (pre-delivery) of the limited-life items shall be recorded in order to enable refurbishment and replacement of these items and projection of their remaining life after delivery. Limited life hardware identification and reporting shall be in accordance with SSP 50125.
3.2.8 MILESTONE REVIEWS
Reliability and maintainability activities shall include support to major MPLM milestone reviews. Participation in milestone reviews shall assure that reliability and maintainability requirements are adequately considered.
3.2.9 CONFIGURATION CONTROL BOARDS AND PANELS
Reliability and maintainability assurance personnel shall support configuration control boards and panels through evaluation, tracking, and followup of engineering changes. Each engineering change package shall contain a reliability and maintainability assessment of the impact of the proposed change.
3.2.10 PROBLEM REPORTING SYSTEM
Reliability and maintainability activities shall support the MPLM problem reporting system. This support shall include the establishment and verification of corrective action/recurrence control for design related problems.
3.2.11 VERIFICATION ASSURANCE
Reliability and maintainability shall assure that an effective verification program is established and implemented. Reliability and maintainability assurance activities shall include participation in such verification processes as development, certification, acceptance, check-out, and maintainability verification. The reliability and maintainability verification shall be performed as required in accordance with SSP 41164 and SSP 50125.
3.3 ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL AND MECHANICAL
PARTS CONTROL
3.3.1 ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS
3.3.1.1 GENERAL
A system for controlling EEE and mechanical parts shall be developed and implemented in accordance with SSP 30312, Electrical, Electronic, and Electromechanical (EEE) and Mechanical Parts Management and Implementation Plan for Space Station Program, or the appropriate International Partner documents.
3.3.1.2 ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL PARTS SELECTION
EEE parts shall be selected in accordance with SSP 30312 or equivalent International Partner documents. The EEE parts used by NASA and the International Partners shall be listed in the SSP 30423, Space Station Approved EEE Parts List (SSAEPL), or International Partner’s Approved Parts List.
NASA and ASI shall develop and maintain their approved parts list. NASA and ASI shall develop and maintain their approved parts list respectively. NASA and ASI will exchange their approved parts list in accordance with SSP 50125.
3.4 Materials and Processes
The selection, usage and control of Materials and Processes (M&P) shall be in accordance with SSP 30233, Space Station Requirements for Materials and Processes or the equivalent International Partner document. NASA and ASI will exchange their M&P data which are Materials Usage Agreement (MUA) Summary, Spacecraft Maximum Allowance Concentration (SMAC) values, and other MAPTIS/MPLM MAPTIS data including data specified in Materials Selection List for Space Hardware Systems, Version D, (MSFC-HDBK-527). The ASI MIUL will be provided to NASA. These data elements and submittal requirements shall be in accordance with SSP 50125.
3.5 REPORTING PARTS AND MATERIALS PROBLEMS AND ASSESSING ALERTS
3.5.1 NASA ALERTS
Problems with parts, materials, equipment, or diminishing sources, which are of mutual concern to NASA and associated contractors, shall be reported through the Government-Industry Data Exchange Program (GIDEP) and NASA Acute Launch Emergency Restraint Tip (ALERT) systems. Previously published ALERTs will be reviewed to assure that generic problems and technical issues will be avoided. GIDEP and NASA distributed ALERTs shall be evaluated and responses shall be provided by a systematic closed-loop approach. NASA ALERTs with potential impact to ASI hardware and GIDEP data will be made available to ASI in accordance with SSP 50125.
3.5.2 INTERNATIONAL PARTNERS ALERTS
Problems with parts, materials, equipment, or diminishing sources, which are of mutual concern to the International Partners and their associated contractors, shall be reported through the International Partner’s ALERT system. The distributed ALERTs shall be evaluated and responses shall be provided by a systematic closed-loop approach. EEE Parts Problem Notification shall be provided to NASA Space Station Program in accordance with SSP 50125.
4 - 21
4.0 QUALITY ASSURANCE
These quality requirements are applicable to all ISS hardware and software designated as flight components, subsystems, systems and/or equipment including Flight Support Equipment (FSE) and Orbital Support Equipment (OSE). These quality requirements are also applicable to GSE that: 1) either physically or functionally interfaces with flight hardware/software; 2) could by its malfunction cause loss of life or loss/damage to flight, GSE, or facilities hardware/software; and/or 3) generated data used in determining flight worthiness/certification. These quality requirements may be tailored for other GSE as appropriate to the mission and intended useful life.
4.1 MANAGEMENT AND PLANNING
4.1.1 PLANNING
Quality Assurance activities shall be planned and developed to be an integral part of ISS design, development, test and evaluation production, and operational activities and refurbishment/ overhaul. Scheduled status reporting will be used to provide visibility and assist in controlling the quality assurance effort. Objectives will be to plan and establish the quality assurance effort; to define the major quality assurance tasks and their place as an integral part of the design and development process; and to assure the effective implementation of quality assurance requirements. Quality assurance program planning shall address all program phases and shall provide a comprehensive management approach to preventing, detecting, documenting, and resolving actual or potential nonconformances.
4.1.2 ORGANIZATION
Organizations and personnel responsible for implementing and performing quality assurance functions shall have well defined responsibilities, authority, and organizational freedom to develop and implement quality assurance disciplines and controls. One designated person shall have the responsibility and authority for directing and managing the quality assurance activity. That person shall have direct unimpeded access to the management level having full responsibility for the program/project work and shall report regularly on the status and effectiveness of quality activities.
4.1.2.1 THE SPACE STATION PROGRAM OVERSIGHT RESPONSIBILITY
The ISS S&MA/ASI S&PA Offices shall have independent assessment responsibility for the quality assurance efforts. Both offices shall monitor compliance with the quality assurance requirements specified herein. Both offices shall conduct independent assessments of the quality process implementation at their contractor/subcontractor level.
4.1.3 QUALITY PROGRAM PLAN
The quality organization shall prepare, implement, and maintain a quality plan which describes the compliance with requirements set forth herein. The plan content shall be readily identifiable with each cited requirement and shall cover all quality activities. Contractor quality procedures which define involvement by the applicable procuring agency shall be reviewed and approved by the procurement agency (i.e., NASA or ASI or their designated representatives). New or existing policies and procedures with no NASA or ASI involvement shall be available for review. The ASI Quality Assurance Program Plan shall be submitted in accordance with SSP 50125.
4.1.4 RESERVED
4.1.5 MANAGEMENT ASSESSMENT DATA
The quality organization shall provide a quality progress and status report to their respective program management office and/or applicable procurement agency as defined by the procurement documents.
4.1.6 TRAINING
Quality assurance shall determine the need for and the adequacy of training courses used in the various quality assurance disciplines for submittal to the government for inclusion in the flight crew training program.
Quality assurance shall also assure development, implementation, and maintenance of a documented training program for special processes. Personnel performing or inspecting special processes shall be trained and certified. Evidence of personnel certification shall be available in the area where duties are being performed. Personnel shall be recertified as a result of unsatisfactory performance, changes in techniques or required skills, and/or extensive interruption of work performance. Records of training, testing, and certification status of personnel shall be maintained and shall be available for review by the applicable procurement agency or its delegated representative.
4.1.7 INTERNAL QUALITY PROGRAM AUDITS AND SURVEYS
Quality assurance shall conduct audits or surveys of task performance, procedures, and operations which implement the quality program. Independent assessments shall be conducted periodically as appropriate with program maturity and shall be performed by personnel not having specific line responsibilities in those areas. Each audit or survey shall include an examination of operations and documentation, evaluation of actual operations as compared with each established requirement, documentation of discrepancies and deficiencies, and recommendations for corrective action, as appropriate. A corrective action plan which addresses measures to be taken to correct the discrepancies/deficiencies noted during the survey/audit shall be prepared and approved. Follow-up activities shall include reviews to ensure that measures required by the corrective action plan are being implemented properly.
The results of audits and surveys shall be documented in a report to management. Management action shall be taken to ensure that required corrections have been implemented. Records of the contractor's audits and surveys shall be available for review by the applicable procurement agency or its delegated representative.
4.1.8 MILESTONE REVIEWS
Quality assurance activities shall include supporting project milestones such as design, acceptance, and readiness reviews. Participation in reviews shall assure that quality requirements are adequately considered in decisions which affect hardware design, configuration controls, initiation of subsystem and integrated testing, shipment, and readiness for flight. Quality assurance data presented will contain sufficient detail to allow management to assess the acceptability to proceed with the next program phase activity.
4.2 DESIGN AND DEVELOPMENT CONTROLS
4.2.1 TECHNICAL DOCUMENTS
Quality assurance shall conduct timely reviews of technical documents and changes thereto prior to document release. Technical documents include, but are not limited to, specifications, engineering drawings, engineering change orders, program plans, implementing procedures, work instructions, deviations/waivers, and documentation. Designs produced by automated systems shall have an equivalent level of control.
4.2.1.1 Quality assurance shall verify that a documentation system that assures the inclusion of quality characteristics and design criteria in specifications, procedures, drawings, fabrication and inspection planning, and test documents is established and implemented.
4.2.1.2 Quality assurance shall assure that the drawing system and other specifications identify hardware characteristics requiring verification with particular emphasis on critical characteristics. This identification shall be used in developing quality inspection and test verification planning and procedures.
4.2.2 QUALITY SUPPORT TO DESIGN REVIEWS
Quality assurance shall participate in design reviews to ensure that designs permit and facilitate the quality considerations of producibility, repeatability, inspectability, and refurbishability/ maintainability and that other related quality considerations are defined. These reviews shall reflect the requirements and criteria as defined in the quality assurance checklist. Quality assurance shall define methods and plans for product inspection and test commensurate with the definition of design and fabrication requirements. This technical planning activity shall be integrated into the detailed fabrication and inspection planning.
Quality assurance shall review selected program documents prior to design reviews to ensure compliance with these requirements. Quality participation shall be documented to provide a historical record of quality concurrence in the design development.
4.2.3 CHANGE CONTROL VERIFICATION
Engineering changes shall be reviewed by quality assurance to determine the quality impact such as modified inspection/test requirements, identification of new or modified tooling, gaging, or test equipment needs, and identification of changes to critical inspection/test procedures. The procurement agency (NASA contractor/subcontractor or ASI) shall be notified of any proposed changes in fabrication, materials, methods, or processes which may affect the quality or intended end use of an item.
Change incorporation shall be verified in accordance with specified effectivity with special attention to changes involving interface relationships.
4.2.4 PRODUCT/PROCESS DEVELOPMENT AND VALIDATION
Quality assurance shall participate in product and process development activities to ensure that fabrication quality requirements are defined in concert with product requirements. Quality assurance shall assure criteria for material, and process controls are developed consistent with these requirements. Product and process activities include, but are not limited to, development of mockups, engineering models, qualification/protoflight units, development test units, and development of processes and fabrication methods. Commensurate with these activities, quality assurance shall develop methods and plans for verification of these requirements with particular emphasis on early identification of critical characteristics.
4.3 IDENTIFICATION AND DATA RETRIEVAL
4.3.1 GENERAL
A documented identification and data retrieval system shall be developed, implemented, and maintained. Each article and material shall be identified by a unique part or type number, and the method shall be specified on engineering drawings and specifications. All disciplines shall use identification numbers related to the engineering design. Criticality, design complexity, application, performance characteristics, manufacturing, processing or environmental conditions, and limited-life sensitivity shall be used to determine the level of control applied through identification and data retrieval requirements. An identification and data retrieval system shall be provided for parts and materials installed or consumed in ISS flight elements. This system shall provide visibility to the related manufacturer's lot or batch number and/or date code for parts and materials. An identification and retrieval system shall be developed for part and material locations as follows:
4.3.1.1 Each article and material shall be identified by a unique part or type number. One or more of the following detailed identification methods shall be used as applicable:
4.3.1.1.1 Date codes indicating date of manufacture to identify articles or materials made by a continuous and controlled process and those which are subject to variation of degradation with age.
4.3.1.1.2 Lot numbers to identify individual materials or articles produced in homogeneous groups.
4.3.1.1.3 Serial numbers to identify materials or articles for which unique data are to be maintained.
4.3.1.1.4 Standard usage hardware (e.g., non-high strength fasteners, shims, pins) which are not safety or functionally critical and fall outside the date code, lot number, and serial number screens shall require part or type number traceability only.
4.3.1.2 Other identification methods, such as paint dots, etc., must be approved by the procurement agency or a designated representative.
4.3.1.3 Methods of location of part or type numbers and detailed identification on articles shall be indicated in technical documents.
4.3.1.4 Controls shall be included to assure identification numbers are assigned in a consecutive manner.
4.3.1.5 Records shall indicate detailed identification and be organized so that records and the related article or material may be located and retrieved as necessary.
4.3.1.6 Requirements shall be established for EEE parts which will provide the capability of tracing backwards from fabricated hardware to the lot from which the part originated.
4.3.2 RETENTION OF RECORDS
Records shall be retained in a safe, accessible location for the period specified in the program requirements. Records shall not be destroyed unless authorized by the NASA contracting officer or the governing body of ASI.
4.3.3 RECORD RETRIEVAL
Record systems shall ensure that records are identified and related to the applicable articles and materials. The system shall be organized so that these records and the related articles and materials may be rapidly located and retrieved.
4.4 PROCUREMENT
4.4.1 PROCUREMENT CONTROLS
The procuring agency is responsible for assuring that purchased articles, materials, and services conform to the requirements specified in this document and other program requirements. Control of procurements shall include identification of contract quality requirements, selection of qualified suppliers, verification of product quality and compliance with contractual requirements, and provisions for reporting and correcting nonconformances.
4.4.2 SELECTION OF CONTRACTOR PROCUREMENT SOURCES
Quality personnel shall participate in the selection of procurement sources based on one of the following:
4.4.2.1 The procurement source shall have a previous and continuing record of supplying quality articles, materials, or services of the type being procured.
4.4.2.2 A preaward survey of the procurement source facility and quality system shall be conducted in accordance with documented procedures, developed by the procuring organization, to determine if the procurement source is capable of satisfying procurement quality requirements. The results of preaward surveys shall be documented and maintained on file.
4.4.2.3 When articles or materials were fabricated specifically for contracts issued under other NASA (or associated international participants government) contracts that have current acceptable surveys, a preaward survey is not required.
4.4.3 PROCUREMENT DOCUMENTS
Procurement documents shall be written and processed in accordance with the following:
4.4.3.1 PRIOR TO RELEASE
Applicable procurement documents shall be approved by quality personnel to ensure inclusion of appropriate quality requirements and associated documentation.
4.4.3.2 PROCUREMENT REQUIREMENT DOCUMENTS
Procurement documents shall require each procurement source and its subtier sources to comply with the applicable requirements of this document. The contractor, in complying with these requirements, may use its existing procurement requirements documents subject to approval by NASA (or by ASI) prior to implementation. The quality system of suppliers of OTS hardware shall be reviewed and evaluated to establish the adequacy of their imposed quality system. Items such as historical information, previous quality performance, and compliance with standardized quality systems shall be factors during the course of the review.
4.4.3.3 PROCUREMENT DOCUMENT CONTENTS
Procurement documents shall contain the following specific requirements:
4.4.3.3.1 CHANGES
The procurement source shall be required to notify the procuring organization of any proposed changes in fabrication, materials, methods, or processes previously approved and shall obtain written approval from the procuring authority before making the change. When a proprietary item is procured, the procurement source shall be required to notify the procuring organization of changes in materials, fabrication methods, processes, or product operating characteristics prior to delivery.
4.4.3.3.2 TEST RESULTS
Records of test results shall be maintained and must be traceable to the procured articles. Purchased raw materials shall be accompanied with chemical and/or physical test results. Procedures shall provide for periodic laboratory analysis and testing to verify the validity of test reports received from suppliers of raw materials.
4.4.6 RECEIVING INSPECTION
Quality assurance shall develop, implement, and maintain a documented receiving inspection activity to ensure that procured articles comply with procurement document requirements, inspection and test data are accurate and acceptable, evidence of contractor and procurement agency source inspection (NASA or ASI) has been provided as required, specified identification and data retrieval requirements have been met, time/cycle-sensitive articles are identified, expended and remaining time/cycle information is complete, chemical analyses and physical tests are performed, and receiving inspection results and status of articles are maintained. Procedures shall provide for periodic laboratory analysis and testing to verify the validity of test reports received from suppliers.
4.4.7 PROCUREMENT SOURCE DATA
Inspections and test results commencing with receiving inspection shall be recorded to reflect, on a continuous basis, the qualitative and quantitative performance of individual sources and the quality histories of the supplied articles and materials. Quality assurance shall maintain data to aid in the selection of procurement sources, establish trends of potential problems, and initiate action to resolve any negative trends.
4.4.8 AUDITS AND SURVEYS OF PROCUREMENT SOURCE OPERATIONS
The procuring organization shall schedule and conduct audits and surveys of procurement sources to ensure contract compliance based upon the following:
4.4.8.1 Type of items being procured; e.g., criticality or complexity of article or material or special processes involved
4.4.8.2 Procurement source quality history including known problems or difficulties
4.4.8.3 Remaining period of procurement source performance. For planning purposes, a schedule shall be prepared and shall include all planned audits and surveys for at least one year in advance and shall be amended to accommodate unanticipated problem areas.
The schedule shall be maintained throughout the duration of the procurement and shall be available for review.
The audits and surveys shall be to evaluate the quality system, including implementing policies and procedures, and shall be performed in accordance with documented procedures and checklists which are based on program requirements. This shall include assurance that all manufacturing, fabrication, assembly, test, and handling operations involving ISS hardware and software are conducted using procedures approved, released, and controlled within the documentation system.
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 50
Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .