This pre-solicitation notice updates a previous draft request for proposal for the Safety and Mission Assurance Engineering Contract II. The National Aeronautics and Space Administration Johnson Space Center plans to issue a request for proposal on or about January 17, 2018, with proposals due on or about February 22, 2018. The contract will provide engineering and analytical services to support risk identification, assessment, communication and mitigation for human spaceflight programs and projects. Services will include program reviews, analyses, assessments, quality assurance, independent evaluations, and institutional support. The contract has both cost-reimbursable core requirements and indefinite-delivery indefinite-quantity task order elements.

SMAEC II RFP Amendment 2

View the file

Other files

File Type Posted
SMAEC_II_RFP-Amendment_4.pdf PDF
SMAEC_II_RFP-Amendment_3.pdf PDF
SMAEC_II-RFP-Amendment_2-conformed.pdf PDF
SMAEC_II_Cost_Price_Template.xlsx XLSX spreadsheet
SMAEC_II-RFP-Amendment_1.pdf PDF
SMAEC_II_Amd_1_Cost_Price_Templates.xlsx XLSX spreadsheet
SMAEC_II_FINAL-RFP-80JSC018R0006.pdf PDF
SMAEC_II_Cost_Price_Template.xlsx XLSX spreadsheet
SMAEC_II_Past_Performance_Matrix.xlsx XLSX spreadsheet
80JSC018R0006_Final_RFP_Cover_Letter_with_enclosure.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE OF PAGES

3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.

7. ADMINISTERED BY (If other than Item 6) CODE

FACILITY CODECODE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

1. CONTRACT ID CODE

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

BY

(Signature of Contracting Officer)(Signature of person authorized to sign)

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is not

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation

E. IMPORTANT: Contractor is not, is required to sign this document and return

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.

4. REQUISITION/PURCHASE REQ. NO.

1 496

NASA

Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696

NASA

Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696

X

80JSC018R0006

01/18/2018

X

See Continuation Sheet If Applicable date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

CHECK ONE

(X) extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

X

The purpose of Amendment 2 is to post Question and Answers (Part 2 of 2) to the Safety and Mission Assurance Engineering Contract II (SMAEC II) posting on the Federal Business Opportunities website and revise the Request for Proposal issued on January 18, 2018.

In addition to the Questions and Answers, a list of changes and change pages are included in this Amendment.

See block 16C

02/07/2018 sjgillia Typewritten Text Stacy G. Houston

No. RFP Reference RFP Issue Description/Question/Recommendation Response

DRD014-TotalCompensationPlan
RFPPage191and1852.231-71(d)
Pg.358
OnPage358,paragraph(d)ofNFS1852.231-71
clausestatesthataTotalCompensationPlan(TCP)
wouldberequiredfromsubcontractorshavinga
CostReimbursementornon-competitivefixed-price
typesubcontractandexpectedtoexceedthe
thresholdforrequiringcertifiedcostorpricingdata

(>$750K).

PleaseconfirmthatonlySubcontractorsanticipated
receivingoneofthesubcontracttypeslistedabove
(andnotsubcontractorswithT&Mcontracttypes)
willberequiredtosubmitaTCPwiththePrime

Proposal.

TotalCompensationPlans(TCPs)arerequiredonlyfrom
subcontractorsthatareperformingunderacost-reimbursableor
non-competitivefixedpricetypesubcontractthatareexpected
toexceedthethresholdinNFS1852.231-71(d).ATCPisnot
requiredfromsubcontractorsthatareperformingunderaTime
&Materialssubcontract.

SMAEC II - RFP Questions and Answers - Amendment 2

69 Pre-Proposal Bidder’s Conference

IntheCost/PriceProposalOverviewsessionofthe
Pre-ProposalConference,itwasmentionedthatin
theeventtheincumbentcontractorproposesa
“ContractorIncumbentRate”thatisdifferentfrom
theRFP-provided“HistoricalIncumbentRate”,that
thecost/priceanalystwouldthenusethat
proposed“ContractorIncumbentRate”inlieuof
“Historical”forallotherofferors.
SincetheHistoricalIncumbentrateisacomposite
ratethatmayincludeDirectLaborthatdoesnot
belongtotheincumbent,itislogicallyinconsistent
toapplythecontractorincumbentratetothe
historicalincumbentrate.
Additionally,werecognizethegovernmentisfree
tomakeprobablecostadjustments,butour
understandingisthatthoseadjustmentswouldbe
madeagainsttherequirements,notbycomparing
proposals.Pleaseconfirmthatoneproposal’s
probablecostwouldnotbeadjustedbasedon
anotherproposal’scostsolution.
Werequestthatthatintheeventtheincumbent
usesthe“ContractorIncumbentRate”option,that
theratenotbeappliedtootherofferors’proposals,
consistentwiththewayitisdescribedinRFPCost
TemplateInstructions(p393).

Refer to response provided for Question #63 from Amendment 1.

Pre-Proposal Conference Chart 43;

SMAEC_II_Cost_Price_Template.xls

x;L.5(b)costmodelinstructionson
page384.
Theproposalchartsstatethatallsubcontractors
submittingaTCPneedtosubmitthecostmodels
spreadsheetsIRAP,TC(a),andTC(b).Howeverthe
spreadsheetsandinstructionsstatethatTC(a)and
TC(b)arejustformajorsubcontractorsandthe
prime.Andcostmodelinstructionsonpage384
implythatallthreespreadsheetsonlyneedtobe
submittedbymajorsubcontractorsandtheprime.
PleaseclarifywhethertheCostPriceTemplatetabs
IRAP,TC(a),andTC(b)needtobesubmittedbyonly
majorsubcontractorsandtheprimeasstatedon
thespreadsheetorbyallcontractorsthatsubmita

TCP.

Refer to response provided for Question #5 from Amendment 1.

71 L.2.c and L.2.f

L.2.cdirectsofferorstoidentifythe"versionof
MicrosoftOfficeapplicationused"whileL.2.fdirects
that"Electroniccopies...bepreparedandsubmitted
inMicrosoftOffice2016applications."Isitthe
government'sintentthatfilesbesubmittedonly
MicrosoftOffice2016?

Refer to response provided for Question #25 from Amendment 1.

72 Att L-1-2 and L.3.1

Theattachmentisentitled"L-1-22-S2TO-QAQE,
QualityAssuranceandQualityEngineering?JSC,
WSTF,GRC."PleaseconfirmthatWSTFhasbeen
removedfromthisSampleTaskasdepictedinTable
L-4whichstates"QualityAssuranceandQuality
Engineering-JSCandGRC."

Refer to response provided for Question #62 from Amendment 1.

73 L.5(c), L-3

Thegovernmentstatesthatofferorsareonlyto
proposeWYEsforCY1forthesampletaskTRTs.
HowevertheEPMallowsforofferorstopropose
WYEsforbothCY1andCY2.Willthegovernment
pleaseclarifyandupdatethesolicitationorEPM?

Refer to response provided for Question #30 from Amendment 1.

74 L.3.2

MA.2(1)appearstoreferencesubmittingtheTCPas
partofbothVolumeIandVolumeIII.Willthe
governmentclarifywhethertheTCPisonly
submittedaspartofVolumeI?
TheTotalCompensationPlan(TCP)shallbesubmittedaspartof
MA.2inVolumeI.TheTCPCompensationtemplatesshallbe
providedaspartoftheCostandPriceVolumeoftheproposal,
andwillbeevaluatedaspartofbothVolumeIandVolumeIII.

75 Table B-1, L-3

TableB-1andtheEPMonlyallowforasingleFBR
fortheprimeofferorforeachSLC,howevertheRFP
specifiesbothonandoff-siteworkaswellaswork
acrossmultiplegeographiclocations(andmultiple
wagedeterminations).Suggestforevaluation
purposesonlythegovernmentdictateofferors
assumeoff-site(contractorfacility)ratesin
Houston,TX.Ifnotwillthegovernmentplease
updatetheEPMandTableB-1toallowformultiple
localitiesandbothonandoff-site.

Refer to response provided for Question #55 from Amendment 1.

76 L-3

Thegovernmentstatedduringthepre-proposal
conferencethatiftheincumbentproposesupdated
incumbentdirectlaborrates(eitherhigheror
lower)withtheirproposalthatthoserateswillbe
usedinamostprobablecostanalysisforALL
offerorsproposingincumbentretention.Willthe
governmentpleaseconfirmthatisstilltheirintent?

Refer to response provided for Question #38 from Amendment 1.

77 L.2(c)

TheRFPstates"Textindiagrams,charts,tables,
artwork,andphotographsshallbenosmallerthan
12-pointtextsize."Wouldthegovernmentconsider
allowingaminimumof8-pointtextsizeforgraphics
thatareinsectionswhicharepagelimited?

Refer to response provided for Question #22 from Amendment 1.

78 Preproposal_charts_01-24-18_pdf

DRD-S2-002WorkBreakdownStructureand
DictionaryandDRD-S2-013ITSecurityPlanand
Reportsarereflectedas"DRDssubmittedwith
proposal."NeitheroftheseDRDsarelistedin
SectionLorMoftheFinalRFP.Pleaseclarifythe
government'srequest.

Refer to response provided for Question #26 from Amendment 1.

79 Section C, L1

TheMissionSuitabilitySampleTask2infinalRFP
deletedWSTFPressureVesselscertificationthough
theSOWstillincludesthisfunctionalrequirement.
PleaseclarifyiftheWSTFPVSystemsareincluded
andiftheyareincorerequirementsorshallbe
addressedunderIDIQpartthecontract.
RefertoresponseprovidedforQuestion#62fromAmendment1.
PressureVesselworkisacorerequirement;seeSOWsection

3.3C).

FRFPSectionJ,page210,C
CONTENT,2)JSCData
RequirementsDescription(DRD)
022–StaffingandCriticalSkills
Plan,(DRD-S2-022)“Staffingofthe
proposedorganizationalstructure
includingproposedteaming
partnersandsubcontractor
personnel,includingthenumbers
andSLCsforallcontractyears”.
Thestaffingtablesrequiredtoaddressthis
requirementconsumeasignificantnumberof
pages.WilltheGovernmentconsiderexcluding
thesestaffingtablesfromtheMissionSuitability
PageLimit?

Refer to response provided for Question #9 from Amendment 1.

FRFPSectionL,TableL-2,page365
–MissionSuitabilityPageLimitof
175pages.
TheMissionSuitabilityVolumerequires7approach
artifacts(CoreManagementSOWapproach,Core
TechnicalSOWapproach,3SampleTaskOrder
approaches,and2Scenarioresponses)and6or7(It
hasnotbeenclarifiedifWBSandDictionaryis
includedinthepagelimit)DRD-based
plans/artifactsallunderthe175pagelimitfor
MissionSuitability.
Toallowformoremeaningfulproposalresponses
andaidthebestvalueevaluationofMission
Suitability,werespectfullyrequestthatthe
GovernmentincreasetheMissionSuitabilitypage
limitto225pages.
ThisassumesthattheWBSandDictionary(WBS-S2-
002)isnotdeterminedtobepartoftheMission
Suitabilitypagelimit.IfWBSandDictionaryis
includedinthepagelimitthenwerespectfully
requestanadditional25pagesduetothelarge
diagram,tables,anddictionarycontentthisDRD

requires.

Refer to response provided for Question #9 from Amendment 1.

AttachmentL-4,(page447ofRFP)
&SMAEC_II_Cost_Price_Template
(ISCT-CRTab)
AttachmentL-4indicatesthattheSpecified
ResourcesNLRforCY1is$750,000butinthepricing
templatetheyhavedifferentfigures:
CY1:768,193
CY2:790,471
CY3:813,394
CY4:836,983
CY5:861,255
Pleaseclarifywhatvalues(Forallyears)shouldbe
usedforSpecifiedResourcesNLR.
TheISCT-CRworksheetiscorrect.AttachmentL-4iscorrectedin
Amendment2toreflecttheNLRlistedintheISCT-SRTemplate.

83 L.5(c), L-3

TheinstructionsfortheTRSTIDIQtabintheEPM
reference"IncumbentRetention%","Proposed
WYEconvertedtoStraightTimeHours",and"NLR
Costs"rowandcolumns,howeverthosedon'texist
ontheTRSTIDIQtab.Willthegovernmentplease
clarifyandupdatethesolicitationorEPM?
TheproposedWYEconversionoccursontheTOPT.The
instructionshavebeenmodifiedtoreflectthisinAmendment2.

84 L.5(c), L-3

Theinstructionsstateofferorsshall"discreetlybid"
NLRcosts,howevertheEPMdoesn'tprovideany
tabtoprovidedetailedbreakoutsforNLRs.Are
offerorsexpectedtosummarizeNLRsintheEPMas
currentlyprovided,andprovidedetailsaspartof
thewrittennarrative?Ormayofferorsinclude
additionalsupportingdocumentationasadditional
tabswithintheEPM?
TheEPMprovidesrowsforCorerequirementsforOfferorsto
estimateNLRcosts.OfferorsshallprovidetheirtotalNLRsas
indicatedontheEPMandprovideanarrativesummary,basisof
estimate,andadetailedtableintheircostnarrative.ForSample
TaskOrdersandSpecifiedResources,NLRsareprovidedforCY1-
CY5asatotalandshallnotbemodifiedbytheOfferor.

85 L-3

Rows62-64appeartobemandatingmajor
subcontractorstobeawardfeetotheprime
contractors.Areprimecontractorsallowedtoenter
intoothercontract/feearrangementswithmajor
subcontractors(T&M,LH,CPFF,etc.)?
TheMSCSTrows62-64shallbemodifedtoaccommodateprime
andsubcontractorscontract/feearrangements.

86 L-3

AreofferorsexpectedtoreplicatetheOHTtabfor
eachadditionalOHratetheymightpropose,or
shouldthetemplatewithintheOHTtabsimplybe
replicatedverticallywithintheexistingtab?
Ifadditionaloverheadratesareproposed,thenadditionaltabs
shouldbereplicatedtoeasilyidentifydifferenttypesofoverhead

rates.

87 L.5(c), L-3

TheinstructionsindicatedColumnGoftheIRAPtab
theofferoristoenter"ProposedWYEsbySLC",
howeveritisnotspecifiedwhatmakesup
"proposedWYEsbySLC".Willthegovernment
pleaseclarifywhetheritisforthecoretask,3
sampletasks,andspecifiedresourcescombined?
TheWYEsproposedincolumnGarefortheentireSOWwhich
includescorework,sampletaskordersandthespecified
resourcescombined.Amendment2correctsthecolumntabto
read"TotalProposedWYEbySLC(TotalCore,TOs,andSpecified
ResourcesCombined".
88 L.5(c),L-3
WillthegovernmentconfirmthatifanSLChasno
WYEs,theofferorisnotrequiredtoprovidearate
withintheIRAPandsubsequentlytheFBRtab?
OfferorsmustprovideratesintheIRAPandtheFBRevenifthe
Offeror'sproposedtechnicalormanagementapproachdoesn't
includeWYEsforthoseSLCsintheirproposal.

89 B, L-3

TheRFPstatesthatNLRsfortheIDIQwillbe
negotiatedatthetaskorderlevel,howevertheTRT
tabsappeartoincludeasectiontoestimateNLRs.
Willthegovernmentpleaseclarifyandupdatethe
solicitationorEPM?
Forproposalpurposesonly,NLRshavebeenprovidedforthe
SampleTaskOrders.Duringcontractadministration,NLRsfor
SMAECIIIDIQrequirementswillbenegotiatedonataskorder

level.

90 L.5(c), L-3

Theinstructionsstateofferorsmustindicate
whethereachSLCisexemptofnon-exempt,
howevertheOPTtabdoesn'thaveaplacetoenter
this.Willthegovernmentpleaseclarifyandupdate
thesolicitationorEPM?
TheOPTdoesnotrequireidentificationofeitherclassification.
However,theinstructionsfortheIRAPdoesprovideacolumnto
identifyeachSLCasexemptornon-exempt.Non-exempt
categoriesareprovidedinAttachmentJ-7,StandardLabor
Categories(SLCs).

91 L.5(c), L-3

Theinstructionsmentionareferencecolumn
providedwithinthetemplatetoidentifywhere
supportingcostelementdataisreferencedwithin
thecostproposal.Thatcolumndoesn'tcurrently
existintheEPM.Willthegovernmentpleaseclarify
andupdatedthesolicitationorEPM?
ThePCSTandtheMSCSTtabwillbecorrectedtoaincludecost
datareferencecolumn.

92 L-3

TheTRTtabsallowforofferorstoproposedifferent
WYEsforCY1andCY2,howeverISCT-TOappearsto
linkCY2WYEstoCY1WYEs.Willthegovernment
pleaseclarifyandupdatethesolicitationorEPM?
TheISCT-TOprovidestheOfferortoidentifyeachspecificyear's
totalofproposedWYEs.IntheexampleprovidedintheISCT-TO,
totalhoursoftheTOPTYear1islinked.TheOfferorwillbe
responsibletolinkthesucceedingyearsasappropriatebased
upontheTOPT.

93 L-3

TherearenoentrycellsforNLRsontheGrandTotal
tab,howeverthistabpullsfromothertabsthatare
tohaveNLRsperthesolicitation'sinstructions.Will
thegovernmentpleaseclarifyandupdatedthe
solicitationorEPM?
TheOfferorwillberesponsibletolinkallNLRcostsfromall
applicabletabs.(Core,TaskOrdersandSpecifiedResources)

94 L-3

TheinstructionsreferenceaBOEforPhase-In,yet
it'sunclearwhetherthisBOEshouldbepartofthe
costproposaloraspartofVolumeIwiththeBOEs
forthecoreandsampletasks.Willthegovernment
pleaseclarifywhichVolumetheyintendforthe
phase-inBOEtobeapartof?
BOEsforContractPhase-InisonlyprovidedwithVolumeIIIofthe
CostProposal.TheContractPhase-InPlan,includingBOEs,willbe
evaluatedaspartofVolumesIandIII.

95 L.5(b), L.5(c), L-3

ThegovernmentreferencesFPRAsassufficient
detailinlieuofnarrativeexplanationsfordirect
labor,indirects,andescalationinthecostproposal,
andinlieuofsubmittingtheOHTandGATtabsof
theEPM.WillthegovernmentacceptFPRPsinlieu
ofsuchdetail,astheydofortheCAOTtab?
IfForwardPricingRateAgreements(FPRAs)arenotavailable,the
OverheadTemplate(OHT)andG&ATemplate(GAT)tabsmustbe
populatedbytheOfferor.

96 L-3

Collectivebargainingagreementsarereferenced
withintheEPM.AretheirexistingCBAagreements
inplace,andifsocanthegovernmentplease
providecopiesofthem?
TherearenoCollectiveBargainingAgreements(CBAs)applicable
toSMAECII.TheEPMisdesignedtocapturethatscenario,if

applicable.

97 L-3

ThetabcombinesCoreTechnicalandCore
Management,howeverBOEsarerequested
separatelyforeachwithinVolumeI,androws5-7of
thetabappeartoindicatemultipleTRSTtemplates
arerequiredforCore.Willthegovernmentplease
clarifyandupdatethesolicitationorEPM?
Offerorsaretoduplicateandstackthetemplateverticallyinthe
sametab,denoting'Technical','Management',and'Technical
andManagementCombined.'

98 L.5(c), L-3

Theinstructionsstatethattheofferorsaretoapply
theteamcompositeFBRratestotheCoreand
Technicaltasks,howeverthePCSTtabdoesnot
allowfortheapplicationofoftheteamcomposite
FBRrates.Willthegovernmentpleaseclarifyand
updatedthesolicitationorEPM?
FullyBurdenedRatesshouldonlybeappliedtotheIDIQTask
OrdersandtheSpecifiedResources.FullyBurdenedRatesshould
notbeappliedtoCoreManagementandTechnicalrequirements.
ThecostinstructionswillbecorrectedinAmendment2.

Attachment L-3, The Cost Price Template (SMAEC_II_Cost_Price_Template)

worksheettabislabeledTC(a),
howevertheworksheettableis
labeledTC(c),thisalsoappliesto
worksheettabTC(b)theworksheet
tableislabeledTC(d).
Isitacceptabletoedit,changingthereferenceto
tabTC(a)&TC(b)tomatchtheworksheetnamein
theEPMfile?
TheRFPTemplateshavebeencorrectedtoreflectthecorrect
TC(a)andTC(b)inAmendment1.

Attachment L-3, The Cost Price Template (SMAEC_II_Cost_Price_Template),

LPTtabinstructions(page395RFP)
statethehoursshownshould
reconciletothehoursproposedin
the“ProposedHourswith
Efficiencies”fromtheyearlytotals
oftheTRSTcolumnsontheTRST
forCoreTechnicalandCore
Managementrequirements,
reducedbyanyhoursproposedon
theOvertimePricingtemplate
(OPT)discussednext.
GiventheTRSTforCoreTechnicalandCore
ManagementisthetotalhoursforboththePrime,
MajorandMinorSubs,isitacceptabletoremove
thelinkofthehourssectiontotheTRSTforCore
TechnicalandCoreManagementandaddan
additionalLPTworksheetfortheSubcontractHours,
RatesandCostsandtheoriginalLPTwillbeforthe
PrimeOnly?
AddinganadditionalLPTworksheetisacceptableforSubcontract
Hours.Iftabsareadded,Offerorsaretoensurethatthenew
tabsarelinkedcorrectly.Linksshouldnotberemoved,nor
shouldrowsorcolumnsbedeleted.
Section4.3.2,Page414,states“For
systemsidentifiedin4.3.1above,
theContractorVSEshallprovide

risk…………..”

WouldtheGovernmentpleaseclarifythatthe
“systemsidentified”,arethoseactuallyreferenced
inSection4.3Sub-Task2:OrionVSESupportand
not4.3.1?

The RFP will be revised in Amendment 2 to reflect "...4.3 above."

102 DRD 014, L-3

DRD014mentionsTCPtemplatesA-D,howeverthe
EPMonlyhastwotabslabeledTC(a)andTC(b).
Additionally,thosetemplatesthemselvesare
labeledTC(c)andCompensationTemplate(d).Will
thegovernmentpleaseclarifyandupdatetheDRD
orEPM?
DRD-S2-014wasupdatedinAmendment1toreflectTC(a)and
TC(b)only.

103 L-3

ColumnJaskstoinputtheTRSTIDIQGREamount
fromattachmentL-4,howeverL-4onlyprovidesa
GREfortheCoretaskandthespecifiedresources
IDIQ.Willthegovernmentpleaseclarifyandupdate
thesolicitationorEPM?
AttachmentL-4providesaGREfortheCorerequirementsanda
TotalContractValueGRE.TheGREfortheIDIQtaskscanbe
derivedfromthedifferencebetweentheTotalContractValue
GREandtheCoreGRE.
TableL-2mentions'SubcontractorArrangement'
underIV,ResponsibilityConsiderations.However,
thereisn'tasectiontitledSubcontractor
ArrangementunderResponsibilityinstructions.
WhatdoestheGovernmentexpectasaresponse?
TheTableL-2referencetoSubcontractorArrangementwas
deletedinRFPAmendment1.

105 Section C

Therearenoworkloadindicators(i.e.,volumetrics
thatprovidethecontractortasktype,size,
complexityandfrequencydataregardinghow
requiredtasksmightbemeasured)providedforany
ofthecoreSOWrequirements.DoesJSChaveany
suchindicatorsandwilltheypleaseprovidethese

data?

Table4.0CoreDeliverablesandTable5.0CoreAssumptionsare
providedforCorework.Inaddition,GovernmentResource
Estimates(GREs)areprovidedtodepicttheestimateddirect
laborstaffingthattheGovernmentanticipatesfortheentire
SOWinCY1forCoreTechnicalandManagementwork,Total
ContractValue,andSampleTaskOrderwork.JSCdoesnothave
otherworkloadindicators.

106 L.2(b), Tbl L-2; L.6(d)

TableL-2listsDRD-S2-007GovernmentProperty
ManagementPlanasarequirementforsubmittal
withVolumeIVResponsibilityConsiderations.
However,L.6(d)states"TheContractingOfficerwill
requestaGovernmentPropertyManagementPlan
(DRDS2-007)fromallOfferorsinthecompetitive
range,onlyfromtheapparentsuccessfulOfferor,or
fromOfferorsasdeemednecessarytosupportan
efficientresponsibilitydecision."Pleaseclarify
whetherDRDS2-007istobesubmittedaspartof
VolIV.
DRD-S2-007,GovernmentPropertyManagementPlan,isa
submittalunderVolumeIV,ResponsibilityConsiderations.
However,inaccordancewithL.6paragraph(d),DRD-S2-007will
berequestedbytheContractingOfficeratalaterdateandisnot
requiredwiththeproposalsubmission..

Section C SOW and table L-2, page 365.

WilltheGovernmentconsiderincreasingthePast
Performancepageallocationto65-70pagesto
addressthe14pagesofnewSOWrequirementsin
eachofthecontractdescriptions?
PastPerformancewillremainat55pages.Newworkwasnot
addedtotheFinalRFP,butratherworkwasmovedfromIDIQto
Core.ThereforemoredetailswereprovidedtoaidOfferorsin
developingtheirproposals.
FRFPSectionC,SOWparagraph4.0
CoreDeliverables,tableitem2,
WeeklyActivityReports(WARs),
referencesallSOWsections.Table
item27,WeeklyActivityReports,
referencesSOW3.3(C).
IstheWARreferencedintableitem27forSOW
3.3(C)inadditiontoorinsteadoftheWARrequired
bytablelineitem2forAllSOWs?
WeeklyActivityReports(WARs)arenecessarytocommunicate
workperformedeachweektoNASA.SOWSection4.0Tableline
27arespecificitemsthatneedtobestatusedweeklyfor
PressureVesselSystemsandcanbeincludedwithotherWAR
workstatus(line2).
FRFPSectionC,SOWparagraph4.0
CoreDeliverablesandparagraph
5.0CoreAssumptions.Item4inthe
CoreDeliverablestablerequires8-
20QuickReferenceRapid
InformationPagesperyear.Item3
intheCoreAssumptionstable
identifies8-20SMAquickreference
productsannually.SOW2.1.2(C)
provideslimitedinformationonthe
workrequirements,identifyingonly
“SMAquickreferenceproducts”,
andnoactivitiesrelatedto“Quick
ReferenceRapidInformation

Pages”.

Arebothitem4inthe4.0CoreDeliverabletable
anditem3inthe5.0CoreAssumptionspage
requiredtobedeliveredunderSOW2.1.2(C)?
Item4inthe4.0CoreDeliverabletableanditem3inthe5.0Core
Assumptionsarethesameitems.TheGovernmentwilldelete
thisitem3from5.0CoreAssumptions.
SectionC,SOWparagraph4.0Core
Deliverablesandparagraph5.0
CoreAssumptions.Thereisan
inconsistencybetweenitems21
and22in4.0CoreDeliverables
table,whichdiffersinquantity(64
total)withitem10in5.0Core
Assumptions(50–75total).
CouldtheGovernmentclarifythisinconsistency?
Items21and22inthe4.0CoreDeliverabletableanditem10in
the5.0CoreAssumptionsarethesameitems.TheGovernment
willdeleteitem10from5.0CoreAssumptions.
SectionC,SOWparagraph5.0Core
Assumptions.Lineitem27Weekly
ActivityReportsappearstobea

deliverable.

Should this entry be moved to paragraph 4.0 Core Deliverables?

CouldnotfindreferencetoLineItem27forWeeklyActivity
Reports(WARs)inSOW5.0CoreAssumptions.WARsarea
deliverableandareaddressedinSOWSection4.0Core

Deliverables.

112 I, 52.222-41

Clause52.222-41isincorporated,however52.222-
43isabsent.Willthegovernmentpleaseconfirm
thatofferorsareexpectedtoescalateWDratesas
partoftheirproposal?Ifnot,pleaseincludeFAR
clause52.222-43intothesolicitation.
FAR52.222-43willnotbeincorporatedintotheSMAECII
contractbecausethisclauseisnotapplicabletocost-
reimbursablecontracts.Inacost-reimbursablecontract,the
contractorwillinvoiceusingtheactuallaborratespaidtothe
employees.Withregardtoescalatingnon-exemptlaborrates,
Offerorsshouldproposeratesconsistentwiththeiroverall
approachandincompliancewithlaborlaws/regulations.Any
proposedescalationshallbesupportedwithrationaleand/orthe
company’sescalationratehistoryforthepastfive(5)yearsas
statedinSectionL.5(b)2.

113 G, 1852.245-83

Doesthegovernmentintendtohavethecontractor
manageRealPropertyatAwardorduringcontract
performanceperclause1852.245-83?Ifsocanthis
propertybeidentified?
Thecontractorwillberesponsbileformanagingandoperating
theReceivingInspectionandTestFacility(RITF).Thecontractoris
notresponsibleformaintainingfacilityinfrastructure,butis
responsbileforidentifyinganddisclosinganynormalandroutine
maintenanceandrepair.Seepart3.4(I)oftheStatementofWork
andSectionGclause1852.245-83forfurtherdetails.
TableL-2,OverviewofProposal
Volumes,PageLimitations,Copies
andFormat
TheModelContracthasbeenprovidedasa.pdf.
TableL-2requiresacompletedModelContractto
besubmittedinMicrosoftWord.Werequestthat
theGovernmentprovideaMicrosoftWordversion
oftheModelcontract.
TheGovernmentwillnotprovideaMicrosoftWordversionofthe
RFP.ItistheOfferor'sresponsibilitytoprovidetheModel
ContractwithOfferorFill-Ins(OFIs)completed.
AttachmentL-4Government
ResourceEstimateTable1:Core

GRE

PertheSOW,Corerequirementsassigndeliverables
andtaskingthatistypicallyperformedbyIT
personnel.TheGREisnotconsistentwiththeSOW
requirementsasnoITWYEarenotedintheGRE.
PleaseclarifyiftheGREiscorrectoradjustit.
OfferorsmayproposeanySLCorskillmixtheydeemappropriate
tomeetSMAECIIrequirements.IfnewSLCsarebeingproposed,
narrativedescriptionsshallbeprovided.SeeDRD-S2-022,Staffing
andCriticalSkillsPlan.

116 Att L-8

ThePPQtemplatereferences"theMissionSystems
OperationsContract(MSOC)."Pleaseconfirmthat
offerorsshouldchangethisreferencetothe"Safety
andMissionAssuranceEngineeringContractII
(SMAECII)."

This was corrected with Amendment 1.

117 L.2(a), L-4(d), Att L-8

L.2(a)requestsdeliveryofVolumeII,Past
Performance,byFebruary15,2018.InstructionsinL-
4(d)andthereferencedAttachmentL-8aresilent
ontherequestedreceiptdateforPastPerformance
Questionnaires.AretheydueonFebruary15with
VolumeIIorontheproposalduedateofFebruary

22?

PastPerformanceQuestionnairesarepreferredbyFebruary15,
2018andarerequestednolaterthanMarch1,2018.
118 D,1852.245-74(e)
IntheeventofagovernmentshutdownwillJSC
CentralReceiving,Bldg.420remainopen?Ifnot,is
thereanalternatesubmissionplan?
Intheeventofashutdown,itisanticipatedthattheJohnson
SpaceCenterwillbeshutdownandspecificdetailswillbe
providedontheSMAECIIwebsite

119 I, 52.252-2

Clause52.252-2incorporatesseveralwebsitesin
full.Doesthegovernmentintendtolistwhich
clausesapplytoeachwebsite?Website
http://farsite.hill.af.mil/referencescontracting
supplementsforseveraldifferentagencies.
Theintentoftheselinksistoprovideaccesstothefulltextofall
clausesincorporatedbyreferenceinSMAECII.OnlyNASAFAR
SupplementclausesareapplicabletotheSMAECIIprocurement.
120 B-1 MayofferorsamendtableB-1toaccountfor
multipleindirectratesthatmayapplytoNLRs?
Yes,OfferorsmayaddrowstoTableB-1,asneeded,fortheir
proposals.Rowsmaynotbedeleted.

121 L-3

TheEPMstillreferstoSOW1.0Contract
ManagementfromthedraftRFPonmultipletabs.Is
itcorrecttoassumethesereferencesshouldbe
"CoreTechnicalandManagement"?

This was corrected with RFP Amendment 1.

122 Table L-2; L.3.1(b)

TableL-2,Note1,indicates"TSRTsshallonlybe
providedinVolumeIII.However,L.3.1(b)states
"TRSTtemplatesarealsosubmittedaspartof
VolumeIII."TheTRSTandTRTtemplatesare
referencedaspartoftheMissionSuitabilityvolume,
butareincludedwithintheEPM.Areofferors
supposedtoincludetheTRSTandTRTtemplates
withinbothVolumeIandVolumeIII,orjustwithin
theVolumeIIIEPM?
RefertoresponsesprovidedforQuestions#16and31from
Amendment1.

123 L-1

Allthreesampletasksstateperiodofperformance
ofoneyear.TheEPMshowsafullfiveyearperiod
ofperformanceforeachsampletask.Willthe
governmentpleaseclarifyandupdatethe
solicitationorEPM?
RefertoresponseprovidedforQuestion#30fromAmendment1.
Forevaluationpurposes,CY2proposedresourceswillbestraight-
linedthroughCY5.

124 L-4, L-3

L-4appearstoprovideassumptionsforofferorsto
useasplugvaluesforNLRsforthecoreandsample
tasks,aswellasthetotalIDIQ.Thesetotalsdonot
matchwithwhat'sprovidedintheEPM,and
contradictinstructionselsewhereinL.3requesting
offerorsprovidetheirownNLRestimates.Willthe
governmentpleaseclarifyandupdatethe
solicitationorEPM?

The Government clarified NLRs in Amendment 2.

125 L.8

TheemailinthePastPerformanceQuestionnaire
appearstobeincorrect(missingtheword"mail"in
thedomain).Canthegovernmentpleaseclarifythat
theemailshouldbeJSC-SMAEC-II@mail.nasa.gov
andnotJSC-SMAEC-II@nasa.gov?
ThecorrectemailaddressisstatedintheRFP.Itis:
JSC-SMAEC-II@mail.nasa.gov.Amendment2oftheRFPcorrects
theaddressinthePastPerformanceQuestionaire.Pleasenotify
yourPastPerformanceevaluatorstoresubmittothecorrect

address.

FRFPSectionL,L.2,page364–
ProposalDueDateofFebruary22
andPastPerformancerequested
earlydeliverydateofFebruary15.
NumerouschangeswereintroducedintheFinalRFP
(modificationoftheSOW,incorporationofanew
TA1CoreSOWapproachrequirement,SampleTask
Orderchanges,andothers)andthereisstill
pendinginformationnotreleasedrelatedtothe
numberofonsiteseatsavailableforSMAECII
contractoranddetailsrelatedtotheWBSand
Dictionarypagelimitandlocationintheproposal.
TheseitemsaffecttheMissionSuitabilityVolume,
PastPerformanceVolume,Cost/PriceVolumeand
ElectronicPricingModel.
Inconsiderationoftheseitemswerespectfully
requestthattheGovernmentextendtheproposal
duedatetoatleastMarch1,2018andtheearly
deliveryofPastPerformanceVolumetoFebruary
22,2018.
ThiswereaddressedwithAmendment1.TheProposalduedate
wasextendedtoMarch1,2018.EarlydeliveryofthePast
PerformanceVolumeremainsFebruary15,2018.

Section Page # From To

SMAEC II Amendment 2 Change Log

80JSC018R0006

C 49

DELETE Line 3 from Table 5.0 Core Assumptions:

SMA quick reference products related to human spaceflight programs. A quick reference product is generated for each flight.

C 49

DELETE Line 10 from Table 5.0 Core Assumptions:

Inspection Due Notifications and Delinquency Reports (JSC). 3.3(C)b

Renumbered rows

L 367 Table L-2:

Government Property Management Plan (DRD-S2-007)

Table L-2:

Government Property Management Plan (DRD-S2-007) (see Provision L.6, paragraph (d))

L 387

Offerors are required to develop a contractor team composite Fully Burdened Rate (FBR) per contract year, per SLC, and apply those rates to the hours proposed on Core Technical Requirements, Core Management Requirements, IDIQ Sample Task Orders, and RFP Specified Resources.

Offerors are required to develop a contractor team composite Fully Burdened Rate (FBR) per contract year, per SLC, and apply those rates to the hours proposed on IDIQ Sample Task Orders, and RFP Specified Resources.

L 388

All other resources, including indirect rates, labor escalation and NLR escalation shall be discretely bid by Offerors for all contract years (CY1 –

CY5).

All other resources, including indirect rates and labor escalation shall be discretely bid by Offerors for all contract years (CY1 – CY5).

L 388 For proposal purposes, assume no NLRs ($0) for the Sample Task Orders.

For Sample TOs and evaluation purposes, NLRs are provided for CY1- CY5 as a total and shall not be modified by the Offeror.

L 392

DELETED from paragraph (b), Technical Resources Summary Template (TRST IDIQ):

The “Proposed WYEs converted to Straight Time Hours” column is provided in order to provide the Offeror a means of converting the WYEs proposed into productive hours based upon the Offeror’s conversion factor of 1 WYE to productive labor hours. This column must not include non-productive hours such as vacation leave, sick leave, etc.

Renumbered

L 393

At the bottom of the template, Offerors are required to fill in their proposed Non-Labor Resources (NLR) costs for each Task/Delivery for CY1. This corresponds to the BOE narrative response to Section L.

For Sample TOs and evaluation purposes, NLRs are provided for CY1- CY5 as a total and shall not be modified by the Offeror.

L 401

ADDED to L.5, Cost and Price Instructions, paragraph (c) Task Order Pricing Template (TOPT):

The Proposed WYEs converted to Straight Time Hours columns are provided for the Offeror as a means of converting the WYEs proposed into productive hours based upon the Offeror’s conversion factor of 1 WYE to productive labor hours. This column must not include non-productive hours such as vacation leave, sick leave, etc.

L 402

The fourth section of the template provides for the Offeror’s estimate of the NLRs necessary to perform the Task Order.

For Sample TOs and evaluation purposes, NLRs are provided for CY1- CY5 as a total and shall not be modified by the Offeror.

L 417 For systems identified in 4.3.1 above… For systems identified in 4.3 above…

L-4 450

Assumptions for Sample TOs and Specified Resources for CY1:

• Assume a cumulative NLR total of $150,000 for all Sample TOs

• For Specified Resources, assume total NLRs of $750,000

Assumptions for Sample TOs and Specified Resources for CY1:

• For Sample TOs and evaluation purposes, NLRs are provided in the Excel Pricing Model (EPM) ISCT-TO tab for CY1-CY5 as a total and shall not be modified by the Offeror.

• For Specified Resources and evaluation purposes, WYEs and NLRs are provided in the EPM ISCT-SR for CY1-CY5 and shall not be modified by the Offeror.

L 456 Past Performance Questionnaire:

JSC-SMAEC-II@nasa.gov

Past Performance Questionnaire:

JSC-SMAEC-II@mail.nasa.gov

L

Attachm ent L-3

IRAP

Tab

Column G:

Proposed FTEs by SLC

Column G:

Total Proposed WYEs by SLC (Total Core, TOs and Specified Resources combined)

L

Attachm ent L-3

MSCST

Tab

Removed "Award Fee" Fee or Profit if Applicable

L Attachm ent L-3

Added Reference columns per cost instructions.

mailto:JSC-SMAEC-II@nasa.gov mailto:JSC-SMAEC-II@mail.nasa.gov

MSCST

Tab and

PCST

Tab

L

TRST

IDIQ

Templat e

Added "Non-Labor Resources" row in the TRST IDIQ tab

TABLE OF CONTENTS

Table of Content

SECTION A - SOLICITATION/CONTRACT FORM

Table of Content

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

CONTRACT TYPE

SCOPE OF WORK

ESTIMATED COST AND FEE*

1852.232-81 CONTRACT FUNDING (JUN 1990)

JSC 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (AUG 2013)

REQUIRED LEVEL-OF-EFFORT FOR TASK ORDERS

FULLY BURDENED RATE TABLE FOR PRICING COST-REIMBURSEMENT, IDIQ

AND LOE TASK ORDERS, AND CORE REQUIREMENTS

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION D - PACKAGING AND MARKING

1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT

(JAN 2011)

SECTION E - INSPECTION AND ACCEPTANCE

52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) ALTERNATE I (APR 1984)

52.247-34 F.O.B. DESTINATION (NOV 1991)

JSC 52.247-95 FLIGHT ITEM (AUG 2005)

COMPLETION OF WORK AND PERIOD OF PERFORMANCE

PLACE OF PERFORMANCE-SERVICES

OPTIONS TO EXTEND PERIOD OF PERFORMANCE

SECTION G - CONTRACT ADMINISTRATION DATA

1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR

NONPROFIT ORGANIZATION (APR 2015)

1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND

PATENT REPRESENTATIVE (APR 2015)

1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)

1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)

1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING (NOV

2004)

1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED

PROPERTY (AUG 2015)

1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY (AUG

2015)

1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (APR 2012)

1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (SEP 2016)

1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY (JAN

2011) ALTERNATE I (JAN 2011)

1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF

CONTRACTORS (JAN 2017)

1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR

52.245-1 (JAN 2011)

1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS (JAN 2011)

NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES

JSC HAZARDOUS MATERIALS USE

IDENTIFICATION OF EMPLOYEES

SECTION H - SPECIAL CONTRACT REQUIREMENTS

1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)

1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC

2015)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)

1852.225-70 EXPORT LICENSES (FEB 2000) ALTERNATE I (FEB 2000)

ENVIRONMENTAL AND ENERGY CONSERVATION REQUIREMENTS

1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989)

JSC 52.219-90 SMALL BUSINESS SUBCONTRACTING GOALS (OCT 2006)

JSC 52.242-94 ADMINISTRATIVE LEAVE (SEP 2008)

OPTION TO TRANSITION FROM AWARD-FEE TO FIXED-FEE

OPTION TO TRANSITION FROM FIXED-FEE TO AWARD-FEE

ASSOCIATE CONTRACTOR AGREEMENT (ACA)

EXTERNAL CUSTOMER EFFORT

CONTRACT ADJUSTMENT

SECTION I - CONTRACT CLAUSES

52.202-1 DEFINITIONS (NOV 2013)

52.203-3 GRATUITIES (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT

(SEP 2006)

52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR

ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY

(MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (OCT 2010)

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT

2015)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

52.204-2 SECURITY REQUIREMENTS (AUG 1996)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER

CONTENT PAPER (MAY 2011)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL

(JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2016)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-

DELIVERY CONTRACTS (OCT 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL

2016)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR

PROPOSED FOR DEBARMENT (OCT 2015)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (NOV 2015)

52.215-2 AUDIT AND RECORDS—NEGOTIATION (OCT 2010)

52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)

52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING

DATA—MODIFICATIONS (AUG 2011)

52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—

MODIFICATIONS (OCT 2010)

52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT

BENEFITS (PRB) OTHER THAN PENSIONS (JUL 2005)

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009) ALTERNATE I

(OCT 2009)

52.216-8 FIXED FEE (JUN 2011)

52.216-26 PAYMENTS OF ALLOWABLE COSTS BEFORE DEFINITIZATION (DEC

2002)

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL

BUSINESS CONCERNS (OCT 2014)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2017)

52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (JAN 1999)

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

52.222-3 CONVICT LABOR (JUN 2003)

52.222-26 EQUAL OPPORTUNITY (SEP 2016)

52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA

(JAN 1997) ALTERNATE I (JUL 1995)

52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY

2011)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)

52.223-16 ACQUISITION OF EPEAT®-REGISTERED PERSONAL COMPUTER

PRODUCTS (OCT 2015)

52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN

SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING

WHILE DRIVING (AUG 2011)

52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY

2011)

52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

52.224-2 PRIVACY ACT (APR 1984)

52.224-3 PRIVACY TRAINING (JAN 2017)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

52.227-11 PATENT RIGHTS - OWNERSHIP BY THE CONTRACTOR (MAY 2014)

[(MODIFIED BY NFS 1852.227-11 (APR 2015)]

52.227-16 ADDITIONAL DATA REQUIREMENTS (JUN 1987)

52.228-7 INSURANCE-LIABILITY TO THIRD PERSONS (MAR 1996)

52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

52.232-17 INTEREST (MAY 2014)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

52.232-22 LIMITATION OF FUNDS (APR 1984)

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

52.232-25 PROMPT PAYMENT (JAN 2017) ALTERNATE I (FEB 2002)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD

MANAGEMENT (JUL 2013)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

CONTRACTORS (DEC 2013)

52.233-1 DISPUTES (MAY 2014)

52.233-3 PROTEST AFTER AWARD (AUG 1996) ALTERNATE I (JUN 1985)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION (APR 1984)

52.237-3 CONTINUITY OF SERVICES (JAN 1991)

52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)

52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)

52.242-13 BANKRUPTCY (JUL 1995)

52.243-2 CHANGES - COST-REIMBURSEMENT (AUG 1987) ALTERNATE II (APR

1984)

52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (NOV 2017)

52.245-1 GOVERNMENT PROPERTY (JAN 2017)

52.245-9 USE AND CHARGES (APR 2012)

52.246-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)

52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JUN 2003)

52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)

52.249-14 EXCUSABLE DELAYS (APR 1984)

52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)

52.204-1 APPROVAL OF CONTRACT (DEC 1989)

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (JUN 2016)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

[DO-C9]

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA

OTHER THAN CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)

ALTERNATE III (OCT 1997)

52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)

52.216-18 ORDERING (OCT 1995)

52.216-19 ORDER LIMITATIONS (OCT 1995)

52.216-22 INDEFINITE QUANTITY (OCT 1995)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(JUL 2013)

52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS (MAY 2014)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)

52.229-10 STATE OF NEW MEXICO GROSS RECEIPTS AND COMPENSATING TAX

(APR 2003)

52.244-2 SUBCONTRACTS (OCT 2010)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

1852.203-70 DISPLAY OF INSPECTOR GENERAL HOTLINE POSTERS (JUN 2001)

1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (AUG 2014)

1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION

TECHNOLOGY RESOURCES (JAN 2011)

1852.215-84 OMBUDSMAN (NOV 2011) ALTERNATE I (JUN 2000)

1852.216-75 PAYMENT OF FIXED FEE (DEC 1988)

1852.219-75 INDIVIDUAL SUBCONTRACTING REPORTS (APR 2015)

1852.219-77 NASA MENTOR-PROTÉGÉ PROGRAM (APR 2015)

52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE V (DEC 2007)

[(MODIFIED BY NFS 1852.227-14 (APR 2015)]

1852.228-75 MINIMUM INSURANCE COVERAGE (OCT 1988)

1852.235-70 CENTER FOR AEROSPACE INFORMATION (DEC 2006)

1852.237-70 EMERGENCY EVACUATION PROCEDURES (DEC 1988)

1852.237-72 ACCESS TO SENSITIVE INFORMATION (JUN 2005)

1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)

1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION (APR 2001)

1852.216-80 TASK ORDERING PROCEDURE (OCT 1996)

SECTION J - LIST OF ATTACHMENTS

Attachment J-0, Table of Contents

Attachment J-1, Acronym List

Attachment J-2, Data Requirements List and Data Requirements Description

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 001 - Contract Management Plan

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 002 - Work Breakdown Structure Plan and Dictionary

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 003 - Integrated Technical Management Report

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 004 - Planning, Programming, Budgeting, and Execution (PPBE) Inputs

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 005 - External Customer Plan

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 006 - Contractor Financial Management Report (NF533)

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 007 - Government Property Management Plan (PMP)

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 008 - Safety and Health Plan

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 009 - Continual Improvement Plan

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 010 - SMAEC II Software and Database List

JSC DATA REQUIREMENTS DESCRIPTION (DRD) 011 -…