SMAEC_II-RFP-Amendment_2.pdf
PDF 4 MB Posted
- Attached to
- Safety and Mission Assurance Engineering Contract II (SMAEC II) - Pre-Solicitation Notice - 80JSC018R0006
- Solicitation number
- 80JSC018R0006
About this file
This pre-solicitation notice updates a previous draft request for proposal for the Safety and Mission Assurance Engineering Contract II. The National Aeronautics and Space Administration Johnson Space Center plans to issue a request for proposal on or about January 17, 2018, with proposals due on or about February 22, 2018. The contract will provide engineering and analytical services to support risk identification, assessment, communication and mitigation for human spaceflight programs and projects. Services will include program reviews, analyses, assessments, quality assurance, independent evaluations, and institutional support. The contract has both cost-reimbursable core requirements and indefinite-delivery indefinite-quantity task order elements.
SMAEC II RFP Amendment 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMAEC_II_RFP-Amendment_4.pdf | ||
| SMAEC_II_RFP-Amendment_3.pdf | ||
| SMAEC_II-RFP-Amendment_2-conformed.pdf | ||
| SMAEC_II_Cost_Price_Template.xlsx | XLSX spreadsheet | |
| SMAEC_II-RFP-Amendment_1.pdf | ||
| SMAEC_II_Amd_1_Cost_Price_Templates.xlsx | XLSX spreadsheet | |
| SMAEC_II_FINAL-RFP-80JSC018R0006.pdf | ||
| SMAEC_II_Cost_Price_Template.xlsx | XLSX spreadsheet | |
| SMAEC_II_Past_Performance_Matrix.xlsx | XLSX spreadsheet | |
| 80JSC018R0006_Final_RFP_Cover_Letter_with_enclosure.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
PAGE OF PAGES
3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.
7. ADMINISTERED BY (If other than Item 6) CODE
FACILITY CODECODE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
1. CONTRACT ID CODE
16B. UNITED STATES OF AMERICA 16C. DATE
SIGNED
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED
BY
(Signature of Contracting Officer)(Signature of person authorized to sign)
15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is not
12. ACCOUNTING AND APPROPRIATION DATA (If required)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation
E. IMPORTANT: Contractor is not, is required to sign this document and return
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.
4. REQUISITION/PURCHASE REQ. NO.
1 496
NASA
Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696
NASA
Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696
X
80JSC018R0006
01/18/2018
X
See Continuation Sheet If Applicable date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
CHECK ONE
(X) extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
X
The purpose of Amendment 2 is to post Question and Answers (Part 2 of 2) to the Safety and Mission Assurance Engineering Contract II (SMAEC II) posting on the Federal Business Opportunities website and revise the Request for Proposal issued on January 18, 2018.
In addition to the Questions and Answers, a list of changes and change pages are included in this Amendment.
See block 16C
02/07/2018 sjgillia Typewritten Text Stacy G. Houston
No. RFP Reference RFP Issue Description/Question/Recommendation Response
| DRD | 014 | - | Total | Compensation | Plan |
| RFP | Page | 191 | and | 1852.231-71(d) | |
| Pg. | 358 |
| On | Page | 358, | paragraph | (d) | of | NFS | 1852.231-71 |
| clause | states | that | a | Total | Compensation | Plan | (TCP) |
| would | be | required | from | subcontractors | having | a | |
| Cost | Reimbursement | or | non-competitive | fixed-price | |||
| type | subcontract | and | expected | to | exceed | the | |
| threshold | for | requiring | certified | cost | or | pricing | data |
(>$750K).
| Please | confirm | that | only | Subcontractors | anticipated | ||||
| receiving | one | of | the | subcontract | types | listed | above | ||
| (and | not | subcontractors | with | T&M | contract | types) | |||
| will | be | required | to | submit | a | TCP | with | the | Prime |
Proposal.
| Total | Compensation | Plans | (TCPs) | are | required | only | from | ||||
| subcontractors | that | are | performing | under | a | cost-reimbursable | or | ||||
| non-competitive | fixed | price | type | subcontract | that | are | expected | ||||
| to | exceed | the | threshold | in | NFS | 1852.231-71(d). | A | TCP | is | not | |
| required | from | subcontractors | that | are | performing | under | a | Time | |||
| & | Materials | subcontract. |
SMAEC II - RFP Questions and Answers - Amendment 2
69 Pre-Proposal Bidder’s Conference
| In | the | Cost/Price | Proposal | Overview | session | of | the | ||
| Pre-Proposal | Conference, | it | was | mentioned | that | in | |||
| the | event | the | incumbent | contractor | proposes | a | |||
| “Contractor | Incumbent | Rate” | that | is | different | from | |||
| the | RFP-provided | “Historical | Incumbent | Rate”, | that | ||||
| the | cost/price | analyst | would | then | use | that | |||
| proposed | “Contractor | Incumbent | Rate” | in | lieu | of | |||
| “Historical” | for | all | other | offerors. | |||||
| Since | the | Historical | Incumbent | rate | is | a | composite | ||
| rate | that | may | include | Direct | Labor | that | does | not | |
| belong | to | the | incumbent, | it | is | logically | inconsistent | ||
| to | apply | the | contractor | incumbent | rate | to | the | ||
| historical | incumbent | rate. | |||||||
| Additionally, | we | recognize | the | government | is | free | |||
| to | make | probable | cost | adjustments, | but | our | |||
| understanding | is | that | those | adjustments | would | be | |||
| made | against | the | requirements, | not | by | comparing | |||
| proposals. | Please | confirm | that | one | proposal’s | ||||
| probable | cost | would | not | be | adjusted | based | on | ||
| another | proposal’s | cost | solution. | ||||||
| We | request | that | that | in | the | event | the | incumbent | |
| uses | the | “Contractor | Incumbent | Rate” | option, | that | |||
| the | rate | not | be | applied | to | other | offerors’ | proposals, | |
| consistent | with | the | way | it | is | described | in | RFP | Cost |
| Template | Instructions | (p | 393). |
Refer to response provided for Question #63 from Amendment 1.
Pre-Proposal Conference Chart 43;
SMAEC_II_Cost_Price_Template.xls
| x; | L.5(b) | cost | model | instructions | on |
| page | 384. |
| The | proposal | charts | state | that | all | subcontractors | |||
| submitting | a | TCP | need | to | submit | the | cost | models | |
| spreadsheets | IRAP, | TC(a), | and | TC(b). | However | the | |||
| spreadsheets | and | instructions | state | that | TC(a) | and | |||
| TC(b) | are | just | for | major | subcontractors | and | the | ||
| prime. | And | cost | model | instructions | on | page | 384 | ||
| imply | that | all | three | spreadsheets | only | need | to | be | |
| submitted | by | major | subcontractors | and | the | prime. | |||
| Please | clarify | whether | the | Cost | Price | Template | tabs | ||
| IRAP, | TC(a), | and | TC(b) | need | to | be | submitted | by | only |
| major | subcontractors | and | the | prime | as | stated | on | ||
| the | spreadsheet | or | by | all | contractors | that | submit | a |
TCP.
Refer to response provided for Question #5 from Amendment 1.
71 L.2.c and L.2.f
| L.2.c | directs | offerors | to | identify | the | "version | of |
| Microsoft | Office | application | used" | while | L.2.f | directs | |
| that | "Electronic | copies...be | prepared | and | submitted | ||
| in | Microsoft | Office | 2016 | applications." | Is | it | the |
| government's | intent | that | files | be | submitted | only | |
| Microsoft | Office | 2016? |
Refer to response provided for Question #25 from Amendment 1.
72 Att L-1-2 and L.3.1
| The | attachment | is | entitled | "L-1-2 | 2-S2TO-QAQE, | |||
| Quality | Assurance | and | Quality | Engineering | ? | JSC, | ||
| WSTF, | GRC." | Please | confirm | that | WSTF | has | been | |
| removed | from | this | Sample | Task | as | depicted | in | Table |
| L-4 | which | states | "Quality | Assurance | and | Quality | ||
| Engineering | - | JSC | and | GRC." |
Refer to response provided for Question #62 from Amendment 1.
73 L.5(c), L-3
| The | government | states | that | offerors | are | only | to | |
| propose | WYEs | for | CY1 | for | the | sample | task | TRTs. |
| However | the | EPM | allows | for | offerors | to | propose | |
| WYEs | for | both | CY1 | and | CY2. | Will | the | government |
| please | clarify | and | update | the | solicitation | or | EPM? |
Refer to response provided for Question #30 from Amendment 1.
74 L.3.2
| MA.2(1) | appears | to | reference | submitting | the | TCP | as | ||
| part | of | both | Volume | I | and | Volume | III. | Will | the |
| government | clarify | whether | the | TCP | is | only | |||
| submitted | as | part | of | Volume | I? |
| The | Total | Compensation | Plan | (TCP) | shall | be | submitted | as | part | of | ||
| MA.2 | in | Volume | I. | The | TCP | Compensation | templates | shall | be | |||
| provided | as | part | of | the | Cost | and | Price | Volume | of | the | proposal, | |
| and | will | be | evaluated | as | part | of | both | Volume | I | and | Volume | III. |
75 Table B-1, L-3
| Table | B-1 | and | the | EPM | only | allow | for | a | single | FBR |
| for | the | prime | offeror | for | each | SLC, | however | the | RFP | |
| specifies | both | on | and | off-site | work | as | well | as | work | |
| across | multiple | geographic | locations | (and | multiple | |||||
| wage | determinations). | Suggest | for | evaluation | ||||||
| purposes | only | the | government | dictate | offerors | |||||
| assume | off-site | (contractor | facility) | rates | in | |||||
| Houston, | TX. | If | not | will | the | government | please | |||
| update | the | EPM | and | Table | B-1 | to | allow | for | multiple | |
| localities | and | both | on | and | off-site. |
Refer to response provided for Question #55 from Amendment 1.
76 L-3
| The | government | stated | during | the | pre-proposal | |||
| conference | that | if | the | incumbent | proposes | updated | ||
| incumbent | direct | labor | rates | (either | higher | or | ||
| lower) | with | their | proposal | that | those | rates | will | be |
| used | in | a | most | probable | cost | analysis | for | ALL |
| offerors | proposing | incumbent | retention. | Will | the | |||
| government | please | confirm | that | is | still | their | intent? |
Refer to response provided for Question #38 from Amendment 1.
77 L.2(c)
| The | RFP | states | "Text | in | diagrams, | charts, | tables, | |
| artwork, | and | photographs | shall | be | no | smaller | than | |
| 12-point | text | size." | Would | the | government | consider | ||
| allowing | a | minimum | of | 8-point | text | size | for | graphics |
| that | are | in | sections | which | are | page | limited? |
Refer to response provided for Question #22 from Amendment 1.
78 Preproposal_charts_01-24-18_pdf
| DRD-S2-002 | Work | Breakdown | Structure | and | ||||||
| Dictionary | and | DRD-S2-013 | IT | Security | Plan | and | ||||
| Reports | are | reflected | as | "DRDs | submitted | with | ||||
| proposal." | Neither | of | these | DRDs | are | listed | in | |||
| Section | L | or | M | of | the | Final | RFP. | Please | clarify | the |
| government's | request. |
Refer to response provided for Question #26 from Amendment 1.
79 Section C, L1
| The | Mission | Suitability | Sample | Task | 2 | in | final | RFP | |
| deleted | WSTF | Pressure | Vessels | certification | though | ||||
| the | SOW | still | includes | this | functional | requirement. | |||
| Please | clarify | if | the | WSTF | PV | Systems | are | included | |
| and | if | they | are | in | core | requirements | or | shall | be |
| addressed | under | IDIQ | part | the | contract. |
| Refer | to | response | provided | for | Question | #62 | from | Amendment | 1. |
| Pressure | Vessel | work | is | a | core | requirement; | see | SOW | section |
3.3C).
| FRFP | Section | J, | page | 210, | C |
| CONTENT, | 2) | JSC | Data | ||
| Requirements | Description | (DRD) | |||
| 022 | – | Staffing | and | Critical | Skills |
| Plan, | (DRD-S2-022) | “Staffing | of | the | |
| proposed | organizational | structure | |||
| including | proposed | teaming | |||
| partners | and | subcontractor | |||
| personnel, | including | the | numbers | ||
| and | SLCs | for | all | contract | years”. |
| The | staffing | tables | required | to | address | this |
| requirement | consume | a | significant | number | of | |
| pages. | Will | the | Government | consider | excluding | |
| these | staffing | tables | from | the | Mission | Suitability |
| Page | Limit? |
Refer to response provided for Question #9 from Amendment 1.
| FRFP | Section | L, | Table | L-2, | page | 365 |
| – | Mission | Suitability | Page | Limit | of | |
| 175 | pages. |
| The | Mission | Suitability | Volume | requires | 7 | approach | |||
| artifacts | (Core | Management | SOW | approach, | Core | ||||
| Technical | SOW | approach, | 3 | Sample | Task | Order | |||
| approaches, | and | 2 | Scenario | responses) | and | 6 | or | 7 | (It |
| has | not | been | clarified | if | WBS | and | Dictionary | is | |
| included | in | the | page | limit) | DRD-based | ||||
| plans/artifacts | all | under | the | 175 | page | limit | for | ||
| Mission | Suitability. |
| To | allow | for | more | meaningful | proposal | responses | |
| and | aid | the | best | value | evaluation | of | Mission |
| Suitability, | we | respectfully | request | that | the | ||
| Government | increase | the | Mission | Suitability | page | ||
| limit | to | 225 | pages. |
| This | assumes | that | the | WBS | and | Dictionary | (WBS-S2- | ||
| 002) | is | not | determined | to | be | part | of | the | Mission |
| Suitability | page | limit. | If | WBS | and | Dictionary | is | ||
| included | in | the | page | limit | then | we | respectfully | ||
| request | an | additional | 25 | pages | due | to | the | large | |
| diagram, | tables, | and | dictionary | content | this | DRD |
requires.
Refer to response provided for Question #9 from Amendment 1.
| Attachment | L-4, | (page | 447 | of | RFP) |
| & | SMAEC_II_Cost_Price_Template | ||||
| (ISCT-CR | Tab) |
| Attachment | L-4 | indicates | that | the | Specified | ||||
| Resources | NLR | for | CY1 | is | $750,000 | but | in | the | pricing |
| template | they | have | different | figures: | |||||
| CY1: | 768,193 | ||||||||
| CY2: | 790,471 | ||||||||
| CY3: | 813,394 | ||||||||
| CY4: | 836,983 | ||||||||
| CY5: | 861,255 | ||||||||
| Please | clarify | what | values | (For | all | years) | should | be | |
| used | for | Specified | Resources | NLR. |
| The | ISCT-CR | worksheet | is | correct. | Attachment | L-4 | is | corrected | in | |
| Amendment | 2 | to | reflect | the | NLR | listed | in | the | ISCT-SR | Template. |
83 L.5(c), L-3
| The | instructions | for | the | TRST | IDIQ | tab | in | the | EPM |
| reference | "Incumbent | Retention | %", | "Proposed | |||||
| WYE | converted | to | Straight | Time | Hours", | and | "NLR | ||
| Costs" | row | and | columns, | however | those | don't | exist | ||
| on | the | TRST | IDIQ | tab. | Will | the | government | please | |
| clarify | and | update | the | solicitation | or | EPM? |
| The | proposed | WYE | conversion | occurs | on | the | TOPT. | The | |
| instructions | have | been | modified | to | reflect | this | in | Amendment | 2. |
84 L.5(c), L-3
| The | instructions | state | offerors | shall | "discreetly | bid" | ||
| NLR | costs, | however | the | EPM | doesn't | provide | any | |
| tab | to | provide | detailed | breakouts | for | NLRs. | Are | |
| offerors | expected | to | summarize | NLRs | in | the | EPM | as |
| currently | provided, | and | provide | details | as | part | of | |
| the | written | narrative? | Or | may | offerors | include | ||
| additional | supporting | documentation | as | additional | ||||
| tabs | within | the | EPM? |
| The | EPM | provides | rows | for | Core | requirements | for | Offerors | to | ||
| estimate | NLR | costs. | Offerors | shall | provide | their | total | NLRs | as | ||
| indicated | on | the | EPM | and | provide | a | narrative | summary, | basis | of | |
| estimate, | and | a | detailed | table | in | their | cost | narrative. | For | Sample | |
| Task | Orders | and | Specified | Resources, | NLRs | are | provided | for | CY1- | ||
| CY5 | as | a | total | and | shall | not | be | modified | by | the | Offeror. |
85 L-3
| Rows | 62-64 | appear | to | be | mandating | major | |
| subcontractors | to | be | award | fee | to | the | prime |
| contractors. | Are | prime | contractors | allowed | to | enter | |
| into | other | contract/fee | arrangements | with | major | ||
| subcontractors | (T&M, | LH, | CPFF, | etc.)? |
| The | MSCST | rows | 62-64 | shall | be | modifed | to | accommodate | prime |
| and | subcontractors | contract/fee | arrangements. |
86 L-3
| Are | offerors | expected | to | replicate | the | OHT | tab | for |
| each | additional | OH | rate | they | might | propose, | or | |
| should | the | template | within | the | OHT | tab | simply | be |
| replicated | vertically | within | the | existing | tab? |
| If | additional | overhead | rates | are | proposed, | then | additional | tabs | |
| should | be | replicated | to | easily | identify | different | types | of | overhead |
rates.
87 L.5(c), L-3
| The | instructions | indicated | Column | G | of | the | IRAP | tab | |
| the | offeror | is | to | enter | "Proposed | WYEs | by | SLC", | |
| however | it | is | not | specified | what | makes | up | ||
| "proposed | WYEs | by | SLC". | Will | the | government | |||
| please | clarify | whether | it | is | for | the | core | task, | 3 |
| sample | tasks, | and | specified | resources | combined? |
| The | WYEs | proposed | in | column | G | are | for | the | entire | SOW | which |
| includes | core | work, | sample | task | orders | and | the | specified | |||
| resources | combined. | Amendment | 2 | corrects | the | column | tab | to | |||
| read | "Total | Proposed | WYE | by | SLC | (Total | Core, | TOs, | and | Specified | |
| Resources | Combined | ". |
| 88 L.5(c), | L-3 | ||||||||
| Will | the | government | confirm | that | if | an | SLC | has | no |
| WYEs, | the | offeror | is | not | required | to | provide | a | rate |
| within | the | IRAP | and | subsequently | the | FBR | tab? |
| Offerors | must | provide | rates | in | the | IRAP | and | the | FBR | even | if | the |
| Offeror's | proposed | technical | or | management | approach | doesn't | ||||||
| include | WYEs | for | those | SLCs | in | their | proposal. |
89 B, L-3
| The | RFP | states | that | NLRs | for | the | IDIQ | will | be |
| negotiated | at | the | task | order | level, | however | the | TRT | |
| tabs | appear | to | include | a | section | to | estimate | NLRs. | |
| Will | the | government | please | clarify | and | update | the | ||
| solicitation | or | EPM? |
| For | proposal | purposes | only, | NLRs | have | been | provided | for | the | |
| Sample | Task | Orders. | During | contract | administration, | NLRs | for | |||
| SMAEC | II | IDIQ | requirements | will | be | negotiated | on | a | task | order |
level.
90 L.5(c), L-3
| The | instructions | state | offerors | must | indicate | ||||
| whether | each | SLC | is | exempt | of | non-exempt, | |||
| however | the | OPT | tab | doesn't | have | a | place | to | enter |
| this. | Will | the | government | please | clarify | and | update | ||
| the | solicitation | or | EPM? |
| The | OPT | does | not | require | identification | of | either | classification. | ||
| However, | the | instructions | for | the | IRAP | does | provide | a | column | to |
| identify | each | SLC | as | exempt | or | non-exempt. | Non-exempt | |||
| categories | are | provided | in | Attachment | J-7, | Standard | Labor | |||
| Categories | (SLCs). |
91 L.5(c), L-3
| The | instructions | mention | a | reference | column | |||
| provided | within | the | template | to | identify | where | ||
| supporting | cost | element | data | is | referenced | within | ||
| the | cost | proposal. | That | column | doesn't | currently | ||
| exist | in | the | EPM. | Will | the | government | please | clarify |
| and | updated | the | solicitation | or | EPM? |
| The | PCST | and | the | MSCST | tab | will | be | corrected | to | a | include | cost |
| data | reference | column. |
92 L-3
| The | TRT | tabs | allow | for | offerors | to | propose | different |
| WYEs | for | CY1 | and | CY2, | however | ISCT-TO | appears | to |
| link | CY2 | WYEs | to | CY1 | WYEs. | Will | the | government |
| please | clarify | and | update | the | solicitation | or | EPM? |
| The | ISCT-TO | provides | the | Offeror | to | identify | each | specific | year's | ||||
| total | of | proposed | WYEs. | In | the | example | provided | in | the | ISCT-TO, | |||
| total | hours | of | the | TOPT | Year | 1 | is | linked. | The | Offeror | will | be | |
| responsible | to | link | the | succeeding | years | as | appropriate | based | |||||
| upon | the | TOPT. |
93 L-3
| There | are | no | entry | cells | for | NLRs | on | the | Grand | Total |
| tab, | however | this | tab | pulls | from | other | tabs | that | are | |
| to | have | NLRs | per | the | solicitation's | instructions. | Will | |||
| the | government | please | clarify | and | updated | the | ||||
| solicitation | or | EPM? |
| The | Offeror | will | be | responsible | to | link | all | NLR | costs | from | all |
| applicable | tabs. | (Core, | Task | Orders | and | Specified | Resources) |
94 L-3
| The | instructions | reference | a | BOE | for | Phase-In, | yet | |||
| it's | unclear | whether | this | BOE | should | be | part | of | the | |
| cost | proposal | or | as | part | of | Volume | I | with | the | BOEs |
| for | the | core | and | sample | tasks. | Will | the | government | ||
| please | clarify | which | Volume | they | intend | for | the | |||
| phase-in | BOE | to | be | a | part | of? |
| BOEs | for | Contract | Phase-In | is | only | provided | with | Volume | III | of | the |
| Cost | Proposal. | The | Contract | Phase-In | Plan, | including | BOEs, | will | be | ||
| evaluated | as | part | of | Volumes | I | and | III. |
95 L.5(b), L.5(c), L-3
| The | government | references | FPRAs | as | sufficient | |||||
| detail | in | lieu | of | narrative | explanations | for | direct | |||
| labor, | indirects, | and | escalation | in | the | cost | proposal, | |||
| and | in | lieu | of | submitting | the | OHT | and | GAT | tabs | of |
| the | EPM. | Will | the | government | accept | FPRPs | in | lieu | ||
| of | such | detail, | as | they | do | for | the | CAOT | tab? |
| If | Forward | Pricing | Rate | Agreements | (FPRAs) | are | not | available, | the |
| Overhead | Template | (OHT) | and | G&A | Template | (GAT) | tabs | must | be |
| populated | by | the | Offeror. |
96 L-3
| Collective | bargaining | agreements | are | referenced | ||||
| within | the | EPM. | Are | their | existing | CBA | agreements | |
| in | place, | and | if | so | can | the | government | please |
| provide | copies | of | them? |
| There | are | no | Collective | Bargaining | Agreements | (CBAs) | applicable | |||||
| to | SMAEC | II. | The | EPM | is | designed | to | capture | that | scenario, | if |
applicable.
97 L-3
| The | tab | combines | Core | Technical | and | Core | |||
| Management, | however | BOEs | are | requested | |||||
| separately | for | each | within | Volume | I, | and | rows | 5-7 | of |
| the | tab | appear | to | indicate | multiple | TRST | templates | ||
| are | required | for | Core. | Will | the | government | please | ||
| clarify | and | update | the | solicitation | or | EPM? |
| Offerors | are | to | duplicate | and | stack | the | template | vertically | in | the |
| same | tab, | denoting | 'Technical', | 'Management', | and | 'Technical | ||||
| and | Management | Combined.' |
98 L.5(c), L-3
| The | instructions | state | that | the | offerors | are | to | apply |
| the | team | composite | FBR | rates | to | the | Core | and |
| Technical | tasks, | however | the | PCST | tab | does | not | |
| allow | for | the | application | of | of | the | team | composite |
| FBR | rates. | Will | the | government | please | clarify | and | |
| updated | the | solicitation | or | EPM? |
| Fully | Burdened | Rates | should | only | be | applied | to | the | IDIQ | Task |
| Orders | and | the | Specified | Resources. | Fully | Burdened | Rates | should | ||
| not | be | applied | to | Core | Management | and | Technical | requirements. | ||
| The | cost | instructions | will | be | corrected | in | Amendment | 2. |
Attachment L-3, The Cost Price Template (SMAEC_II_Cost_Price_Template)
| worksheet | tab | is | labeled | TC | (a), | |
| however | the | worksheet | table | is | ||
| labeled | TC | (c), | this | also | applies | to |
| worksheet | tab | TC(b) | the | worksheet | ||
| table | is | labeled | TC(d). |
| Is | it | acceptable | to | edit, | changing | the | reference | to | |||
| tab | TC | (a) | & | TC | (b) | to | match | the | worksheet | name | in |
| the | EPM | file? |
| The | RFP | Templates | have | been | corrected | to | reflect | the | correct |
| TC(a) | and | TC(b) | in | Amendment | 1. |
Attachment L-3, The Cost Price Template (SMAEC_II_Cost_Price_Template),
| LPT | tab | instructions | (page | 395 | RFP) | |
| state | the | hours | shown | should | ||
| reconcile | to | the | hours | proposed | in | |
| the | “Proposed | Hours | with | |||
| Efficiencies” | from | the | yearly | totals | ||
| of | the | TRST | columns | on | the | TRST |
| for | Core | Technical | and | Core | ||
| Management | requirements, | |||||
| reduced | by | any | hours | proposed | on | |
| the | Overtime | Pricing | template | |||
| (OPT) | discussed | next. |
| Given | the | TRST | for | Core | Technical | and | Core | |||
| Management | is | the | total | hours | for | both | the | Prime, | ||
| Major | and | Minor | Subs, | is | it | acceptable | to | remove | ||
| the | link | of | the | hours | section | to | the | TRST | for | Core |
| Technical | and | Core | Management | and | add | an | ||||
| additional | LPT | worksheet | for | the | Subcontract | Hours, | ||||
| Rates | and | Costs | and | the | original | LPT | will | be | for | the |
| Prime | Only? |
| Adding | an | additional | LPT | worksheet | is | acceptable | for | Subcontract | ||||
| Hours. | If | tabs | are | added, | Offerors | are | to | ensure | that | the | new | |
| tabs | are | linked | correctly. | Links | should | not | be | removed, | nor | |||
| should | rows | or | columns | be | deleted. |
| Section | 4.3.2, | Page | 414, | states | “For |
| systems | identified | in | 4.3.1 | above, | |
| the | Contractor | VSE | shall | provide |
risk…………..”
| Would | the | Government | please | clarify | that | the | ||
| “systems | identified”, | are | those | actually | referenced | |||
| in | Section | 4.3 | Sub-Task | 2: | Orion | VSE | Support | and |
| not | 4.3.1? |
The RFP will be revised in Amendment 2 to reflect "...4.3 above."
102 DRD 014, L-3
| DRD | 014 | mentions | TCP | templates | A-D, | however | the | |
| EPM | only | has | two | tabs | labeled | TC(a) | and | TC(b). |
| Additionally, | those | templates | themselves | are | ||||
| labeled | TC(c) | and | Compensation | Template | (d). | Will | ||
| the | government | please | clarify | and | update | the | DRD | |
| or | EPM? |
| DRD-S2-014 | was | updated | in | Amendment | 1 | to | reflect | TC(a) | and |
| TC(b) | only. |
103 L-3
| Column | J | asks | to | input | the | TRST | IDIQ | GRE | amount |
| from | attachment | L-4, | however | L-4 | only | provides | a | ||
| GRE | for | the | Core | task | and | the | specified | resources | |
| IDIQ. | Will | the | government | please | clarify | and | update | ||
| the | solicitation | or | EPM? |
| Attachment | L-4 | provides | a | GRE | for | the | Core | requirements | and | a | ||
| Total | Contract | Value | GRE. | The | GRE | for | the | IDIQ | tasks | can | be | |
| derived | from | the | difference | between | the | Total | Contract | Value | ||||
| GRE | and | the | Core | GRE. |
| Table | L-2 | mentions | 'Subcontractor | Arrangement' | |||
| under | IV, | Responsibility | Considerations. | However, | |||
| there | isn't | a | section | titled | Subcontractor | ||
| Arrangement | under | Responsibility | instructions. | ||||
| What | does | the | Government | expect | as | a | response? |
| The | Table | L-2 | reference | to | Subcontractor | Arrangement | was |
| deleted | in | RFP | Amendment | 1. |
105 Section C
| There | are | no | workload | indicators | (i.e., | volumetrics | |||
| that | provide | the | contractor | task | type, | size, | |||
| complexity | and | frequency | data | regarding | how | ||||
| required | tasks | might | be | measured) | provided | for | any | ||
| of | the | core | SOW | requirements. | Does | JSC | have | any | |
| such | indicators | and | will | they | please | provide | these |
data?
| Table | 4.0 | Core | Deliverables | and | Table | 5.0 | Core | Assumptions | are | ||
| provided | for | Core | work. | In | addition, | Government | Resource | ||||
| Estimates | (GREs) | are | provided | to | depict | the | estimated | direct | |||
| labor | staffing | that | the | Government | anticipates | for | the | entire | |||
| SOW | in | CY1 | for | Core | Technical | and | Management | work, | Total | ||
| Contract | Value, | and | Sample | Task | Order | work. | JSC | does | not | have | |
| other | workload | indicators. |
106 L.2(b), Tbl L-2; L.6(d)
| Table | L-2 | lists | DRD-S2-007 | Government | Property | ||||
| Management | Plan | as | a | requirement | for | submittal | |||
| with | Volume | IV | Responsibility | Considerations. | |||||
| However, | L.6(d) | states | "The | Contracting | Officer | will | |||
| request | a | Government | Property | Management | Plan | ||||
| (DRD | S2-007) | from | all | Offerors | in | the | competitive | ||
| range, | only | from | the | apparent | successful | Offeror, | or | ||
| from | Offerors | as | deemed | necessary | to | support | an | ||
| efficient | responsibility | decision." | Please | clarify | |||||
| whether | DRD | S2-007 | is | to | be | submitted | as | part | of |
| Vol | IV. |
| DRD-S2-007, | Government | Property | Management | Plan, | is | a | ||||||
| submittal | under | Volume | IV, | Responsibility | Considerations. | |||||||
| However, | in | accordance | with | L.6 | paragraph | (d), | DRD-S2-007 | will | ||||
| be | requested | by | the | Contracting | Officer | at | a | later | date | and | is | not |
| required | with | the | proposal | submission.. |
Section C SOW and table L-2, page 365.
| Will | the | Government | consider | increasing | the | Past | ||
| Performance | page | allocation | to | 65-70 | pages | to | ||
| address | the | 14 | pages | of | new | SOW | requirements | in |
| each | of | the | contract | descriptions? |
| Past | Performance | will | remain | at | 55 | pages. | New | work | was | not | ||
| added | to | the | Final | RFP, | but | rather | work | was | moved | from | IDIQ | to |
| Core. | Therefore | more | details | were | provided | to | aid | Offerors | in | |||
| developing | their | proposals. |
| FRFP | Section | C, | SOW | paragraph | 4.0 |
| Core | Deliverables, | table | item | 2, | |
| Weekly | Activity | Reports | (WARs), | ||
| references | all | SOW | sections. | Table | |
| item | 27, | Weekly | Activity | Reports, | |
| references | SOW | 3.3 | (C). |
| Is | the | WAR | referenced | in | table | item | 27 | for | SOW |
| 3.3(C) | in | addition | to | or | instead | of | the | WAR | required |
| by | table | line | item | 2 | for | All | SOWs? |
| Weekly | Activity | Reports | (WARs) | are | necessary | to | communicate | ||||
| work | performed | each | week | to | NASA. | SOW | Section | 4.0 | Table | line | |
| 27 | are | specific | items | that | need | to | be | statused | weekly | for | |
| Pressure | Vessel | Systems | and | can | be | included | with | other | WAR | ||
| work | status | (line | 2). |
| FRFP | Section | C, | SOW | paragraph | 4.0 | |
| Core | Deliverables | and | paragraph | |||
| 5.0 | Core | Assumptions. | Item | 4 | in | the |
| Core | Deliverables | table | requires | 8- | ||
| 20 | Quick | Reference | Rapid | |||
| Information | Pages | per | year. | Item | 3 | |
| in | the | Core | Assumptions | table | ||
| identifies | 8-20 | SMA | quick | reference | ||
| products | annually. | SOW | 2.1.2 | (C) | ||
| provides | limited | information | on | the | ||
| work | requirements, | identifying | only | |||
| “SMA | quick | reference | products”, | |||
| and | no | activities | related | to | “Quick | |
| Reference | Rapid | Information |
Pages”.
| Are | both | item | 4 | in | the | 4.0 | Core | Deliverable | table |
| and | item | 3 | in | the | 5.0 | Core | Assumptions | page | |
| required | to | be | delivered | under | SOW | 2.1.2 | (C)? |
| Item | 4 | in | the | 4.0 | Core | Deliverable | table | and | item | 3 | in | the | 5.0 | Core |
| Assumptions | are | the | same | items. | The | Government | will | delete | ||||||
| this | item | 3 | from | 5.0 | Core | Assumptions. |
| Section | C, | SOW | paragraph | 4.0 | Core | |
| Deliverables | and | paragraph | 5.0 | |||
| Core | Assumptions. | There | is | an | ||
| inconsistency | between | items | 21 | |||
| and | 22 | in | 4.0 | Core | Deliverables | |
| table, | which | differs | in | quantity | (64 | |
| total) | with | item | 10 | in | 5.0 | Core |
| Assumptions | (50 | – | 75 | total). |
| Could | the | Government | clarify | this | inconsistency? | ||||||||
| Items | 21 | and | 22 | in | the | 4.0 | Core | Deliverable | table | and | item | 10 | in |
| the | 5.0 | Core | Assumptions | are | the | same | items. | The | Government | ||||
| will | delete | item | 10 | from | 5.0 | Core | Assumptions. |
| Section | C, | SOW | paragraph | 5.0 | Core |
| Assumptions. | Line | item | 27 | Weekly | |
| Activity | Reports | appears | to | be | a |
deliverable.
Should this entry be moved to paragraph 4.0 Core Deliverables?
| Could | not | find | reference | to | Line | Item | 27 | for | Weekly | Activity |
| Reports | (WARs) | in | SOW | 5.0 | Core | Assumptions. | WARs | are | a | |
| deliverable | and | are | addressed | in | SOW | Section | 4.0 | Core |
Deliverables.
112 I, 52.222-41
| Clause | 52.222-41 | is | incorporated, | however | 52.222- | |||
| 43 | is | absent. | Will | the | government | please | confirm | |
| that | offerors | are | expected | to | escalate | WD | rates | as |
| part | of | their | proposal? | If | not, | please | include | FAR |
| clause | 52.222-43 | into | the | solicitation. |
| FAR | 52.222-43 | will | not | be | incorporated | into | the | SMAEC | II | |
| contract | because | this | clause | is | not | applicable | to | cost- | ||
| reimbursable | contracts. | In | a | cost-reimbursable | contract, | the | ||||
| contractor | will | invoice | using | the | actual | labor | rates | paid | to | the |
| employees. | With | regard | to | escalating | non-exempt | labor | rates, | |||
| Offerors | should | propose | rates | consistent | with | their | overall | |||
| approach | and | in | compliance | with | labor | laws/regulations. | Any | |||
| proposed | escalation | shall | be | supported | with | rationale | and/or | the | ||
| company’s | escalation | rate | history | for | the | past | five | (5) | years | as |
| stated | in | Section | L.5 | (b) | 2 | . |
113 G, 1852.245-83
| Does | the | government | intend | to | have | the | contractor |
| manage | Real | Property | at | Award | or | during | contract |
| performance | per | clause | 1852.245-83? | If | so | can | this |
| property | be | identified? |
| The | contractor | will | be | responsbile | for | managing | and | operating | ||
| the | Receiving | Inspection | and | Test | Facility | (RITF). | The | contractor | is | |
| not | responsible | for | maintaining | facility | infrastructure, | but | is | |||
| responsbile | for | identifying | and | disclosing | any | normal | and | routine | ||
| maintenance | and | repair. | See | part | 3.4(I) | of | the | Statement | of | Work |
| and | Section | G | clause | 1852.245-83 | for | further | details. |
| Table | L-2, | Overview | of | Proposal |
| Volumes, | Page | Limitations, | Copies | |
| and | Format |
| The | Model | Contract | has | been | provided | as | a | .pdf. | |
| Table | L-2 | requires | a | completed | Model | Contract | to | ||
| be | submitted | in | Microsoft | Word. | We | request | that | ||
| the | Government | provide | a | Microsoft | Word | version | |||
| of | the | Model | contract. |
| The | Government | will | not | provide | a | Microsoft | Word | version | of | the |
| RFP. | It | is | the | Offeror's | responsibility | to | provide | the | Model | |
| Contract | with | Offeror | Fill-Ins | (OFIs) | completed. |
| Attachment | L-4 | Government | ||
| Resource | Estimate | Table | 1: | Core |
GRE
| Per | the | SOW, | Core | requirements | assign | deliverables | |||
| and | tasking | that | is | typically | performed | by | IT | ||
| personnel. | The | GRE | is | not | consistent | with | the | SOW | |
| requirements | as | no | IT | WYE | are | noted | in | the | GRE. |
| Please | clarify | if | the | GRE | is | correct | or | adjust | it. |
| Offerors | may | propose | any | SLC | or | skill | mix | they | deem | appropriate | ||
| to | meet | SMAEC | II | requirements. | If | new | SLCs | are | being | proposed, | ||
| narrative | descriptions | shall | be | provided. | See | DRD-S2-022, | Staffing | |||||
| and | Critical | Skills | Plan. |
116 Att L-8
| The | PPQ | template | references | "the | Mission | Systems | |
| Operations | Contract | (MSOC)." | Please | confirm | that | ||
| offerors | should | change | this | reference | to | the | "Safety |
| and | Mission | Assurance | Engineering | Contract | II | ||
| (SMAEC | II)." |
This was corrected with Amendment 1.
117 L.2(a), L-4(d), Att L-8
| L.2(a) | requests | delivery | of | Volume | II, | Past | |||
| Performance, | by | February | 15, | 2018. | Instructions | in | L- | ||
| 4(d) | and | the | referenced | Attachment | L-8 | are | silent | ||
| on | the | requested | receipt | date | for | Past | Performance | ||
| Questionnaires. | Are | they | due | on | February | 15 | with | ||
| Volume | II | or | on | the | proposal | due | date | of | February |
22?
| Past | Performance | Questionnaires | are | preferred | by | February | 15, | ||
| 2018 | and | are | requested | no | later | than | March | 1, | 2018. |
| 118 D, | 1852.245-74 | (e) | |||||||
| In | the | event | of | a | government | shutdown | will | JSC | |
| Central | Receiving, | Bldg. | 420 | remain | open | ? | If | not, | is |
| there | an | alternate | submission | plan? |
| In | the | event | of | a | shutdown, | it | is | anticipated | that | the | Johnson |
| Space | Center | will | be | shut | down | and | specific | details | will | be | |
| provided | on | the | SMAEC | II | website |
119 I, 52.252-2
| Clause | 52.252-2 | incorporates | several | websites | in | ||
| full. | Does | the | government | intend | to | list | which |
| clauses | apply | to | each | website? | Website | ||
| http://farsite.hill.af.mil/ | references | contracting | |||||
| supplements | for | several | different | agencies. |
| The | intent | of | these | links | is | to | provide | access | to | the | full | text | of | all |
| clauses | incorporated | by | reference | in | SMAEC | II. | Only | NASA | FAR | |||||
| Supplement | clauses | are | applicable | to | the | SMAEC | II | procurement. |
| 120 B-1 May | offerors | amend | table | B-1 | to | account | for |
| multiple | indirect | rates | that | may | apply | to | NLRs? |
| Yes, | Offerors | may | add | rows | to | Table | B-1, | as | needed, | for | their |
| proposals. | Rows | may | not | be | deleted. |
121 L-3
| The | EPM | still | refers | to | SOW | 1.0 | Contract | |
| Management | from | the | draft | RFP | on | multiple | tabs. | Is |
| it | correct | to | assume | these | references | should | be | |
| "Core | Technical | and | Management"? |
This was corrected with RFP Amendment 1.
122 Table L-2; L.3.1(b)
| Table | L-2, | Note | 1, | indicates | "TSRTs | shall | only | be | |
| provided | in | Volume | III. | However, | L.3.1(b) | states | |||
| "TRST | templates | are | also | submitted | as | part | of | ||
| Volume | III." | The | TRST | and | TRT | templates | are | ||
| referenced | as | part | of | the | Mission | Suitability | volume, | ||
| but | are | included | within | the | EPM. | Are | offerors | ||
| supposed | to | include | the | TRST | and | TRT | templates | ||
| within | both | Volume | I | and | Volume | III, | or | just | within |
| the | Volume | III | EPM? |
| Refer | to | responses | provided | for | Questions | #16 | and | 31 | from |
| Amendment | 1. |
123 L-1
| All | three | sample | tasks | state | period | of | performance | |||
| of | one | year. | The | EPM | shows | a | full | five | year | period |
| of | performance | for | each | sample | task. | Will | the | |||
| government | please | clarify | and | update | the | |||||
| solicitation | or | EPM? |
| Refer | to | response | provided | for | Question | #30 | from | Amendment | 1. |
| For | evaluation | purposes, | CY2 | proposed | resources | will | be | straight- | |
| lined | through | CY5. |
124 L-4, L-3
| L-4 | appears | to | provide | assumptions | for | offerors | to | |||
| use | as | plug | values | for | NLRs | for | the | core | and | sample |
| tasks, | as | well | as | the | total | IDIQ. | These | totals | do | not |
| match | with | what's | provided | in | the | EPM, | and | |||
| contradict | instructions | elsewhere | in | L.3 | requesting | |||||
| offerors | provide | their | own | NLR | estimates. | Will | the | |||
| government | please | clarify | and | update | the | |||||
| solicitation | or | EPM? |
The Government clarified NLRs in Amendment 2.
125 L.8
| The | in | the | Past | Performance | Questionnaire | |||
| appears | to | be | incorrect | (missing | the | word | "mail" | in |
| the | domain). | Can | the | government | please | clarify | that | |
| the | should | be | JSC-SMAEC-II@mail.nasa.gov | |||||
| and | not | JSC-SMAEC-II@nasa.gov? |
| The | correct | address | is | stated | in | the | RFP. | It | is: | |
| JSC-SMAEC-II@mail.nasa.gov. | Amendment | 2 | of | the | RFP | corrects | ||||
| the | address | in | the | Past | Performance | Questionaire. | Please | notify | ||
| your | Past | Performance | evaluators | to | resubmit | to | the | correct |
address.
| FRFP | Section | L, | L.2, | page | 364 | – |
| Proposal | Due | Date | of | February | 22 | |
| and | Past | Performance | requested | |||
| early | delivery | date | of | February | 15. |
| Numerous | changes | were | introduced | in | the | Final | RFP |
| (modification | of | the | SOW, | incorporation | of | a | new |
| TA1 | Core | SOW | approach | requirement, | Sample | Task | |
| Order | changes, | and | others) | and | there | is | still |
| pending | information | not | released | related | to | the | |
| number | of | onsite | seats | available | for | SMAEC | II |
| contractor | and | details | related | to | the | WBS | and |
| Dictionary | page | limit | and | location | in | the | proposal. |
| These | items | affect | the | Mission | Suitability | Volume, | |
| Past | Performance | Volume, | Cost/Price | Volume | and | ||
| Electronic | Pricing | Model. |
| In | consideration | of | these | items | we | respectfully | ||||
| request | that | the | Government | extend | the | proposal | ||||
| due | date | to | at | least | March | 1, | 2018 | and | the | early |
| delivery | of | Past | Performance | Volume | to | February | ||||
| 22, | 2018. |
| This | were | addressed | with | Amendment | 1. | The | Proposal | due | date | ||
| was | extended | to | March | 1, | 2018. | Early | delivery | of | the | Past | |
| Performance | Volume | remains | February | 15, | 2018. |
Section Page # From To
SMAEC II Amendment 2 Change Log
80JSC018R0006
C 49
DELETE Line 3 from Table 5.0 Core Assumptions:
SMA quick reference products related to human spaceflight programs. A quick reference product is generated for each flight.
C 49
DELETE Line 10 from Table 5.0 Core Assumptions:
Inspection Due Notifications and Delinquency Reports (JSC). 3.3(C)b
Renumbered rows
L 367 Table L-2:
Government Property Management Plan (DRD-S2-007)
Table L-2:
Government Property Management Plan (DRD-S2-007) (see Provision L.6, paragraph (d))
L 387
Offerors are required to develop a contractor team composite Fully Burdened Rate (FBR) per contract year, per SLC, and apply those rates to the hours proposed on Core Technical Requirements, Core Management Requirements, IDIQ Sample Task Orders, and RFP Specified Resources.
Offerors are required to develop a contractor team composite Fully Burdened Rate (FBR) per contract year, per SLC, and apply those rates to the hours proposed on IDIQ Sample Task Orders, and RFP Specified Resources.
L 388
All other resources, including indirect rates, labor escalation and NLR escalation shall be discretely bid by Offerors for all contract years (CY1 –
CY5).
All other resources, including indirect rates and labor escalation shall be discretely bid by Offerors for all contract years (CY1 – CY5).
L 388 For proposal purposes, assume no NLRs ($0) for the Sample Task Orders.
For Sample TOs and evaluation purposes, NLRs are provided for CY1- CY5 as a total and shall not be modified by the Offeror.
L 392
DELETED from paragraph (b), Technical Resources Summary Template (TRST IDIQ):
The “Proposed WYEs converted to Straight Time Hours” column is provided in order to provide the Offeror a means of converting the WYEs proposed into productive hours based upon the Offeror’s conversion factor of 1 WYE to productive labor hours. This column must not include non-productive hours such as vacation leave, sick leave, etc.
Renumbered
L 393
At the bottom of the template, Offerors are required to fill in their proposed Non-Labor Resources (NLR) costs for each Task/Delivery for CY1. This corresponds to the BOE narrative response to Section L.
For Sample TOs and evaluation purposes, NLRs are provided for CY1- CY5 as a total and shall not be modified by the Offeror.
L 401
ADDED to L.5, Cost and Price Instructions, paragraph (c) Task Order Pricing Template (TOPT):
The Proposed WYEs converted to Straight Time Hours columns are provided for the Offeror as a means of converting the WYEs proposed into productive hours based upon the Offeror’s conversion factor of 1 WYE to productive labor hours. This column must not include non-productive hours such as vacation leave, sick leave, etc.
L 402
The fourth section of the template provides for the Offeror’s estimate of the NLRs necessary to perform the Task Order.
For Sample TOs and evaluation purposes, NLRs are provided for CY1- CY5 as a total and shall not be modified by the Offeror.
L 417 For systems identified in 4.3.1 above… For systems identified in 4.3 above…
L-4 450
Assumptions for Sample TOs and Specified Resources for CY1:
• Assume a cumulative NLR total of $150,000 for all Sample TOs
• For Specified Resources, assume total NLRs of $750,000
Assumptions for Sample TOs and Specified Resources for CY1:
• For Sample TOs and evaluation purposes, NLRs are provided in the Excel Pricing Model (EPM) ISCT-TO tab for CY1-CY5 as a total and shall not be modified by the Offeror.
• For Specified Resources and evaluation purposes, WYEs and NLRs are provided in the EPM ISCT-SR for CY1-CY5 and shall not be modified by the Offeror.
L 456 Past Performance Questionnaire:
JSC-SMAEC-II@nasa.gov
Past Performance Questionnaire:
JSC-SMAEC-II@mail.nasa.gov
L
Attachm ent L-3
IRAP
Tab
Column G:
Proposed FTEs by SLC
Column G:
Total Proposed WYEs by SLC (Total Core, TOs and Specified Resources combined)
L
Attachm ent L-3
MSCST
Tab
Removed "Award Fee" Fee or Profit if Applicable
L Attachm ent L-3
Added Reference columns per cost instructions.
mailto:JSC-SMAEC-II@nasa.gov mailto:JSC-SMAEC-II@mail.nasa.gov
MSCST
Tab and
PCST
Tab
L
TRST
IDIQ
Templat e
Added "Non-Labor Resources" row in the TRST IDIQ tab
TABLE OF CONTENTS
Table of Content
SECTION A - SOLICITATION/CONTRACT FORM
Table of Content
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
CONTRACT TYPE
SCOPE OF WORK
ESTIMATED COST AND FEE*
1852.232-81 CONTRACT FUNDING (JUN 1990)
JSC 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (AUG 2013)
REQUIRED LEVEL-OF-EFFORT FOR TASK ORDERS
FULLY BURDENED RATE TABLE FOR PRICING COST-REIMBURSEMENT, IDIQ
AND LOE TASK ORDERS, AND CORE REQUIREMENTS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D - PACKAGING AND MARKING
1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT
(JAN 2011)
SECTION E - INSPECTION AND ACCEPTANCE
52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)
SECTION F - DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG 1989) ALTERNATE I (APR 1984)
52.247-34 F.O.B. DESTINATION (NOV 1991)
JSC 52.247-95 FLIGHT ITEM (AUG 2005)
COMPLETION OF WORK AND PERIOD OF PERFORMANCE
PLACE OF PERFORMANCE-SERVICES
OPTIONS TO EXTEND PERIOD OF PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR
NONPROFIT ORGANIZATION (APR 2015)
1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND
PATENT REPRESENTATIVE (APR 2015)
1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)
1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING (NOV
2004)
1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED
PROPERTY (AUG 2015)
1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY (AUG
2015)
1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (APR 2012)
1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (SEP 2016)
1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY (JAN
2011) ALTERNATE I (JAN 2011)
1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS (JAN 2017)
1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR
52.245-1 (JAN 2011)
1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)
1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS (JAN 2011)
NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES
JSC HAZARDOUS MATERIALS USE
IDENTIFICATION OF EMPLOYEES
SECTION H - SPECIAL CONTRACT REQUIREMENTS
1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)
1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC
2015)
1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)
1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)
1852.225-70 EXPORT LICENSES (FEB 2000) ALTERNATE I (FEB 2000)
ENVIRONMENTAL AND ENERGY CONSERVATION REQUIREMENTS
1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989)
JSC 52.219-90 SMALL BUSINESS SUBCONTRACTING GOALS (OCT 2006)
JSC 52.242-94 ADMINISTRATIVE LEAVE (SEP 2008)
OPTION TO TRANSITION FROM AWARD-FEE TO FIXED-FEE
OPTION TO TRANSITION FROM FIXED-FEE TO AWARD-FEE
ASSOCIATE CONTRACTOR AGREEMENT (ACA)
EXTERNAL CUSTOMER EFFORT
CONTRACT ADJUSTMENT
SECTION I - CONTRACT CLAUSES
52.202-1 DEFINITIONS (NOV 2013)
52.203-3 GRATUITIES (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT
(SEP 2006)
52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY
(MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2010)
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT
2015)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
52.204-2 SECURITY REQUIREMENTS (AUG 1996)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
(JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (OCT 2016)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-
DELIVERY CONTRACTS (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL
2016)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (OCT 2015)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
52.215-2 AUDIT AND RECORDS—NEGOTIATION (OCT 2010)
52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)
52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING
DATA—MODIFICATIONS (AUG 2011)
52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—
MODIFICATIONS (OCT 2010)
52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT
BENEFITS (PRB) OTHER THAN PENSIONS (JUL 2005)
52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009) ALTERNATE I
(OCT 2009)
52.216-8 FIXED FEE (JUN 2011)
52.216-26 PAYMENTS OF ALLOWABLE COSTS BEFORE DEFINITIZATION (DEC
2002)
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL
BUSINESS CONCERNS (OCT 2014)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (NOV 2016)
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2017)
52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (JAN 1999)
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222-3 CONVICT LABOR (JUN 2003)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014)
52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
(JAN 1997) ALTERNATE I (JUL 1995)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY
2011)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)
52.223-16 ACQUISITION OF EPEAT®-REGISTERED PERSONAL COMPUTER
PRODUCTS (OCT 2015)
52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN
SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING (AUG 2011)
52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (MAY
2011)
52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
52.224-2 PRIVACY ACT (APR 1984)
52.224-3 PRIVACY TRAINING (JAN 2017)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
52.227-11 PATENT RIGHTS - OWNERSHIP BY THE CONTRACTOR (MAY 2014)
[(MODIFIED BY NFS 1852.227-11 (APR 2015)]
52.227-16 ADDITIONAL DATA REQUIREMENTS (JUN 1987)
52.228-7 INSURANCE-LIABILITY TO THIRD PERSONS (MAR 1996)
52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)
52.232-17 INTEREST (MAY 2014)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
52.232-22 LIMITATION OF FUNDS (APR 1984)
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-25 PROMPT PAYMENT (JAN 2017) ALTERNATE I (FEB 2002)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT (JUL 2013)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
CONTRACTORS (DEC 2013)
52.233-1 DISPUTES (MAY 2014)
52.233-3 PROTEST AFTER AWARD (AUG 1996) ALTERNATE I (JUN 1985)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND
VEGETATION (APR 1984)
52.237-3 CONTINUITY OF SERVICES (JAN 1991)
52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)
52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)
52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)
52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
52.242-13 BANKRUPTCY (JUL 1995)
52.243-2 CHANGES - COST-REIMBURSEMENT (AUG 1987) ALTERNATE II (APR
1984)
52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (NOV 2017)
52.245-1 GOVERNMENT PROPERTY (JAN 2017)
52.245-9 USE AND CHARGES (APR 2012)
52.246-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)
52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS (JUN 2003)
52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)
52.249-14 EXCUSABLE DELAYS (APR 1984)
52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
52.204-1 APPROVAL OF CONTRACT (DEC 1989)
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS (JUN 2016)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
[DO-C9]
52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)
ALTERNATE III (OCT 1997)
52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)
52.216-18 ORDERING (OCT 1995)
52.216-19 ORDER LIMITATIONS (OCT 1995)
52.216-22 INDEFINITE QUANTITY (OCT 1995)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JUL 2013)
52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)
52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)
52.229-10 STATE OF NEW MEXICO GROSS RECEIPTS AND COMPENSATING TAX
(APR 2003)
52.244-2 SUBCONTRACTS (OCT 2010)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
1852.203-70 DISPLAY OF INSPECTOR GENERAL HOTLINE POSTERS (JUN 2001)
1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (AUG 2014)
1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION
TECHNOLOGY RESOURCES (JAN 2011)
1852.215-84 OMBUDSMAN (NOV 2011) ALTERNATE I (JUN 2000)
1852.216-75 PAYMENT OF FIXED FEE (DEC 1988)
1852.219-75 INDIVIDUAL SUBCONTRACTING REPORTS (APR 2015)
1852.219-77 NASA MENTOR-PROTÉGÉ PROGRAM (APR 2015)
52.227-14 RIGHTS IN DATA—GENERAL (MAY 2014) ALTERNATE V (DEC 2007)
[(MODIFIED BY NFS 1852.227-14 (APR 2015)]
1852.228-75 MINIMUM INSURANCE COVERAGE (OCT 1988)
1852.235-70 CENTER FOR AEROSPACE INFORMATION (DEC 2006)
1852.237-70 EMERGENCY EVACUATION PROCEDURES (DEC 1988)
1852.237-72 ACCESS TO SENSITIVE INFORMATION (JUN 2005)
1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION (APR 2001)
1852.216-80 TASK ORDERING PROCEDURE (OCT 1996)
SECTION J - LIST OF ATTACHMENTS
Attachment J-0, Table of Contents
Attachment J-1, Acronym List
Attachment J-2, Data Requirements List and Data Requirements Description
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 001 - Contract Management Plan
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 002 - Work Breakdown Structure Plan and Dictionary
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 003 - Integrated Technical Management Report
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 004 - Planning, Programming, Budgeting, and Execution (PPBE) Inputs
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 005 - External Customer Plan
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 006 - Contractor Financial Management Report (NF533)
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 007 - Government Property Management Plan (PMP)
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 008 - Safety and Health Plan
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 009 - Continual Improvement Plan
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 010 - SMAEC II Software and Database List
JSC DATA REQUIREMENTS DESCRIPTION (DRD) 011 -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .