This document package contains cost proposal exhibits required from offerors responding to NASA/GSFC Request for Proposal number 80GSFC22R0038 for the Landsat Next Instrument Suite (LandIS) program. Key details include:

  • Exhibits 1 through 5 require offerors to provide estimated costs, fees, direct labor hours and rates, overhead and G&A rates, and other direct costs for the base period and 11 option years. Exhibit 2A specifies monthly direct labor hours and costs by labor category. Exhibits 2B and 3 are for significant subcontractors.

  • Exhibit 8 specifies travel costs by destination and purpose. Exhibit 10 calculates the productive work year.

  • The draft RFP is a presolicitation for information purposes to verify requirements and promote competition. No commitment or payment is implied. Potential offerors should monitor SAM.gov for release and amendments and are responsible for downloading their own copy.

  • NASA intends to publicize respondent listings to facilitate teaming unless a firm requests otherwise. The anticipated award is for the Landsat Next Instrument Suite program managed by NASA's Goddard Space Flight Center.

View the file

Other files for this federal contract opportunity

Other files attached to Landsat Next Instrument Suite (LandIS) Request for Proposal, newest first.
File Type Posted
SF30-Amendment 1.pdf PDF
Enclosure 1 - SF1447-22-Amendment 1.pdf PDF
LandIS -Final RFP-Amendment 1 Section B-M.pdf PDF
LandIS Final RFP QA Set 1.pdf PDF
RFP Cover Letter.pdf PDF
Attachment A - LandIS SOW-Rev A.pdf PDF
Attachment B - LandIS CDRL and DID-Rev A.pdf PDF
Attachment G - LNext IMAR-Rev A.pdf PDF
Attachment L - Top of Atmosphere Rad Spectra Rev -.1.pdf PDF
Enclosure 3- LandIS-PastPerfQuestionnaires.pdf PDF
Enclosure 4 - LNext WBS and Dictionary-Rev-A.pdf PDF
Enclosure 8 -LandIS Draft PEP.pdf PDF
LandIS -Final RFP-Section B -M.pdf PDF
Enclosure 1 - SF1447-22.pdf PDF
Attachment D - LANDIS LaRD-Rev A.pdf PDF
Attachment F - LANDIS-Interface Requiremens Document-Rev A.pdf PDF
Attachment M - LNext WRS-3 Rev A.pdf PDF
Attachment O -LNext Design Reference Case (DRC) - 18 -v1.0 2022.pdf PDF
Attachment P - SCTR SOW Appendix A- Rev A.pdf PDF
Attachment C - LandIS DIL-Rev A.pdf PDF
LandIS Draft RFP_QA-Set 4.pdf PDF
LandIS Draft RFP_QA-Set 2b.pdf PDF
LandIS Draft RFP_QA-Set2a.pdf PDF
LandIS Draft RFP_QA-Set 2.pdf PDF
LandIS Draft RFP_QA-Set 1.pdf PDF
Attachment G - LNext IMAR Rev -.pdf PDF
Attachment L - Top of Atmosphere Rad Spectra Rev -.pdf PDF
Attachment M - LNEXT - WRS-3 Rev -.pdf PDF
Attachment T -IT Security Applicable Documents List.pdf PDF
Enclosure 9 - Draft LandIS PEP.pdf PDF
80GSFC22R0038_LandIS DRFP.pdf PDF
LandIS_DRFP-Cover-Letter.pdf PDF
Attachment A-LANDIS-SOW- Rev -.pdf PDF
Attachment J-LNEXT- LNERD Rev-.pdf PDF
Attachment K - Landsat Next Radiation Environment Rev A .pdf PDF
Enclosure 2-LandIS Cost Exhibits 1-12B.pdf PDF
Enclosure 4 -LNext WBS and Dictionary.pdf PDF
Enclosure 5 - LNext LandIS Applicable and Reference Documents.pdf PDF
Enclosure 7-IIT Security Management Plan Template.pdf PDF
Attachment B-LANDIS-CDRL-Rev-.pdf PDF
SF33-22.pdf PDF
Attachment C-LANDIS-DIL- Rev -.pdf PDF
Attachment D-LANDIS-LaRD Rev -.pdf PDF
Attachment E - LNext LandIS Sim RD Rev -.pdf PDF
Attachment F - LandIS IRD.pdf PDF
Attachment N - LNext Analytical Math Models Document Rev -.pdf PDF
Attachment O-LNEXT- Design Reference Case (DRC) Definition -v1.0 202.pdf PDF
Attachment P - SCTR SOW Appendix A Rev -.pdf PDF
Enclosure 3- LandIS-PastPerfQuestionnaires.pdf PDF
Enclosure 6 -OCI Avoidance Plan Outline template.pdf PDF
Show all 50

Landsat Next Instrument Suite (LandIS) Request for Proposal has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP# 80GSFC22R0038

Proposing Entity

EXHIBIT 1

PRIME OFFEROR

SUMMARY OF ESTIMATED COST PLUS AWARD FEE

CLIN 001 CLIN 001 CLIN 001 CLIN 001 CLIN 001 CLIN 001 CLIN 001 CLIN 001

Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 Contract Year 6 Contract Year 7 GRAND TOTAL

TOTAL PRIME PLUS SIGNIFICANT SUBCONTRACTORS

DIRECT LABOR HOURS

TOTAL ESTIMATED COST

MAXIMUM AVAILABLE AWARD FEE

TOTAL COST PLUS AWARD FEE

Option Period CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002

Element of Cost (Option Item) Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 Contract Year 6 Contract Year 7 Contract Year 8 Contract Year 9 Contract Year 10 Contract Year 11 GRAND TOTAL

TOTAL PRIME PLUS SIGNIFICANT SUBCONTRACTORS

DIRECT LABOR HOURS

TOTAL ESTIMATED COST

MAXIMUM AVAILABLE FIXED FEE

TOTAL COST PLUS FIXED FEE

TOTAL CPAF and TOTAL CPFF (CLIN 001 and CLIN 002)

This exhibit contains Source Selection Information. See FAR 3.104.

Proposing Entity:

EXHIBIT 2

PRIME OFFEROR

ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)

WBS Level 3

Grand Elements of Cost CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 Total

Direct Labor (DL) Hours:

Prime Onsite DL Hours (Derived from Exhibit 2A ) Prime Offsite DL Hours (Derived from Exhibit 2A ) Total Prime Direct Labor Hours

Significant Subcontractor Onsite DL Hours* (List total hours separately by company) Subtotal Significant Subcontractor Onsite Direct Labor Hours

Significant Subcontractor Offsite DL Hours* (List total hours separately by company) Subtotal Significant Subcontractor Offsite Direct Labor Hours

Total Significant Subcontractor Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS DIRECT

LABOR HOURS

Direct Labor Costs:

Prime Onsite DL Costs (Derived from Exhibit 2A ) Prime Offsite DL Costs (Derived from Exhibit 2A )

TOTAL PRIME DIRECT LABOR COSTS

Overhead:

Onsite Offsite

TOTAL OVERHEAD COSTS

Other Direct Costs (ODCs):

Significant Subcontracts (list separately by company)** Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

SUB TOTAL ESTIMATED COST

AWARD FEE PERCENTAGE

MAXIMUM AVAILABLE AWARD FEE AMOUNT

SUB TOTAL COST PLUS AWARD FEE

Special Studies Award Fee Sub Total Special Studies Plug Number $9,000,000

GRAND TOTAL COST (Core plus Special Studies)

GRAND TOTAL AWARD FEE (Core Plus Special Studies)

GRAND TOTAL CPAF

*Significant Subcontractor (>20% of proposed contract value ) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Costs and Fees/Profits Offerors may adjust elements of cost to be consistent with your current accounting system.

EXHIBIT 2 Option Period

PRIME OFFEROR

ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)

WBS Level 3

CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 Grand Elements of Cost Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Total

Direct Labor (DL) Hours:

Prime Onsite DL Hours (Derived from Exhibit 2A ) Prime Offsite DL Hours (Derived from Exhibit 2A ) Total Prime Direct Labor Hours

Significant Subcontractor Onsite DL Hours*:

(List total hours separately by company) Subtotal Significant Subcontractor Onsite Direct Labor Hours

Significant Subcontractor Offsite DL Hours*:

(List total hours separately by company) Subtotal Significant Subcontractor Offsite Direct Labor Hours

Total Significant Subcontractor Direct Labor Hours

TOTAL PRIME AND SIGNIFICANT SUBCONTRACTORS DIRECT

LABOR HOURS

Direct Labor Costs:

Prime Onsite DL Costs (Derived from Exhibit 2A ) Prime Offsite DL Costs (Derived from Exhibit 2A )

TOTAL PRIME DIRECT LABOR COSTS

Overhead:

Onsite Offsite

TOTAL OVERHEAD COSTS

Other Direct Costs (ODCs):

Significant Subcontracts (list separately by company)** Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COSTS

G&A COSTS

TOTAL ESTIMATED COST

FIXED FEE PERCENTAGE

MAXIMUM AVAILABLE FIXED FEE AMOUNT

TOTAL COST PLUS FIXED FEE

*Significant Subcontractor (>20% of proposed contract value ) - Insert Direct Labor Hours Only **List each significant subcontractor separately by company - Insert Total Costs and Fees/Profits

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

WBS Level 3

Labor Type Grand (E or NE) CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 Total

DIRECT LABOR (DL) HOURS:

Onsite DL Hours:

(List by Individual DL Category)

Subtotal Onsite DL Hours

Offsite DL Hours:

(List by Individual DL Category)

Subtotal Offsite DL Hours

TOTAL DIRECT LABOR HOURS

DIRECT LABOR HOURLY RATES:

(List by Individual DL Category)

DIRECT LABOR COSTS:

Onsite DL Costs:

(List by Individual DL Category)

Subtotal Onsite DLCosts

Offsite DL Costs:

(List by Individual DL Category)

Subtotal Offsite DL Costs

TOTAL DIRECT LABOR COSTS

Elements of Cost

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A Option Period

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

WBS Level 3

Labor Type CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 Grand (E or NE) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Total

DIRECT LABOR (DL) HOURS

Onsite DL Hours (List by Individual DL Category)

Subtotal Onsite DL Hours

Offsite DL Hours (List by Individual DL Category)

Subtotal Offsite DL Hours

TOTAL DIRECT LABOR HOURS

DIRECT LABOR HOURLY RATES

(List by Individual DL Category)

DIRECT LABOR COSTS

Onsite DL Costs (List by Individual DL Category)

Subtotal Onsite DLCosts

Offsite DL Costs (List by Individual DL Category)

Subtotal Offsite DL Costs

TOTAL DIRECT LABOR COSTS

Elements of Cost

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

Contract Year and WBS Level 3

Elements of Cost Labor Type (E or NE) Month Month Month Month Month Month Month Month Month Month Month Month TOTAL

DIRECT LABOR (DL) HOURS:

Onsite DL Hours:

(List by Individual DL Category)

Subtotal Onsite DL Hours

Offsite DL Hours:

(List by Individual DL Category)

Subtotal Offsite DL Hours

TOTAL DIRECT LABOR HOURS

DIRECT LABOR HOURLY RATES:

(List by Individual DL Category)

DIRECT LABOR COSTS:

Onsite DL Costs:

(List by Individual DL Category)

Subtotal Onsite DLCosts

Offsite DL Costs:

(List by Individual DL Category)

Subtotal Offsite DL Costs

TOTAL DIRECT LABOR COSTS

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A Option Period

DIRECT LABOR HOURS, DIRECT LABOR RATES AND DIRECT LABOR COSTS DETAIL

Contract Year and WBS Level 3

Elements of Cost Labor Type (E or NE) Month Month Month Month Month Month Month Month Month Month Month Month TOTAL

DIRECT LABOR (DL) HOURS:

Onsite DL Hours:

(List by Individual DL Category)

Subtotal Onsite DL Hours

Offsite DL Hours:

(List by Individual DL Category)

Subtotal Offsite DL Hours

TOTAL DIRECT LABOR HOURS

DIRECT LABOR HOURLY RATES:

(List by Individual DL Category)

DIRECT LABOR COSTS:

Onsite DL Costs:

(List by Individual DL Category)

Subtotal Onsite DLCosts

Offsite DL Costs:

(List by Individual DL Category)

Subtotal Offsite DL Costs

TOTAL DIRECT LABOR COSTS

EXHIBIT 2B

SIGNIFICANT SUBCONTRACTOR

ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)

WBS Level 3

Grand Elements of Cost CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 Total

Direct Labor (DL) Hours:

Onsite DL Hours (Derived from Exhibit 2A ) Offsite DL Hours (Derived from Exhibit 2A )

TOTAL DIRECT LABOR HOURS

Direct Labor Costs:

Onsite DL Costs (Derived from Exhibit 2A ) Offsite DL Costs (Derived from Exhibit 2A )

TOTAL DIRECT LABOR COSTS

Overhead:

Onsite Offsite

TOTAL OVERHEAD COSTS

Other Direct Costs (ODCs):

Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

[Sub Specify Type - FEE or PROFIT] PERCENTAGE

[Sub Specify Type - FEE or PROFIT] AMOUNT

TOTAL COST PLUS [Sub Specify Type - FEE or PROFIT]

EXHIBIT 2B Option Period

SIGNIFICANT SUBCONTRACTOR

ELEMENTS OF COST BY WORK BREAKDOWN STRUCTURE (WBS)

WBS Level 3

CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 CLIN 002 Grand Elements of Cost Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Total

Direct Labor (DL) Hours Onsite DL Hours (Derived from Exhibit 2A ) Offsite DL Hours (Derived from Exhibit 2A )

TOTAL DIRECT LABOR HOURS

Direct Labor Costs Onsite DL Costs (Derived from Exhibit 2A ) Offsite DL Costs (Derived from Exhibit 2A )

TOTAL DIRECT LABOR COSTS

Overhead Onsite Offsite

TOTAL OVERHEAD COSTS

Other Direct Costs (ODCs) Other Subcontracts Material Travel Other (Specify)

TOTAL ODCs

SUBTOTAL COST

G&A COSTS

TOTAL ESTIMATED COST

[Sub Specify Type - FEE or PROFIT] PERCENTAGE

[Sub Specify Type - FEE or PROFIT] AMOUNT

TOTAL COST PLUS [Sub Specify Type - FEE or PROFIT]

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 3

SUMMARY OF INDIRECT RATES

Overhead Onsite Overhead Offsite Manufacturing G&A Expense Other (Identify)** Rate Rate Overhead Rate Rate Rate

Contract Year 1 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From: to

Contract Year 2 Composite

Contract Year 3 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 3 Composite

Contract Year 4 *Portion of Contractor FY From: to *Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________ Contract Year 5 Composite

Contract Year 6 *Portion of Contractor FY From: to *Portion of Contractor FY From:________to________

Contract Year 6 Composite

Contract Year 7 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 7 Composite

Contract Year 8 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From: to

Contract Year 8 Composite

Contract Year 9 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 9 Composite

Contract Year 10 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 10 Composite

Contract Year 11 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From: to

Contract Year 11 Composite

Contract Year 12 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From: to

Contract Year 12 Composite

Contract Year 13 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 13 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED

AGAINST (Specific Base)***

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates **If Multiple "Other" Indirect Rates - Add additional columns and specify each individually ***Explanation of Base of Application

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 4

SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)

Specify ODC** Specify ODC** Specify ODC** Specify ODC** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount*** Percentage/Rate/Amount***

Contract Year 1 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 1 Composite

Contract Year 2 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 3 Composite

Contract Year 4 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 4 Composite

Contract Year 5 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 5 Composite

Contract Year 6 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 6 Composite

Contract Year 7 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 7 Composite

Contract Year 8 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 8 Composite

Contract Year 9 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 9 Composite

Contract Year 10 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 10 Composite

Contract Year 11 *Portion of Contractor FY From:________to________ *Portion of Contractor FY From:________to________

Contract Year 11 Composite

Contract Year 12 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 12 Composite

Contract Year 13 *Portion of Contractor FY From: to *Portion of Contractor FY From: to

Contract Year 13 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED

AGAINST (Specific Base)****

*Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates **Type/Name of Recurring ODCs or CERs (i.e. Computer Usage, Program Management, Administrative Support, Depreciation, etc.)

***Specify ODC as either a Percentage (%), Rate, and/or Dollar amount ($) ****Explanation of Base of Application

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 5A

OVERHEAD EXPENSE POOL (Composition of Burden Pool)

Overhead or Service Center Pool = (Specify Type of Overhead Burden, e.g. Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc. - See Section L - Cost Volume Instructions)

OFFEROR'S FISCAL YEAR BEGINS AND ENDS .

Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Cost Elements within Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year the Overhead Burden Pool Prior Yr 3** Prior Yr 2** Prior Yr 1&&

Total Overhead Pool Expenses Base of Distribution (identify) Dollars Existing Base Forecasted Base* Contractor FY Rate (%)

Conversion of Contractor FY Overhead Rate to Contract Year (CY) Rate CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 CY 8 CY 9 CY 10 CY 11 CY 12 CY 13 Proposed Overhead Bid Rate by CY

If more than one Overhead Pool is proposed, submit a separate Exhibit for each Pool.

*Provide details of the forecasted base.

**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 5B

GENERAL AND ADMINISTRATIVE (G&A) EXPENSE POOL (Composition of Burden Pool)

OFFEROR'S FISCAL YEAR BEGINS AND ENDS .

Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Prior Yr 3** Prior Yr 2** Prior Yr 1**

Labor:

Labor Related Cost:

B&P

IR&D

Corporate Allocations:

Other (Specify):

Total G&A Pool Expenses Base of Distribution (identify) Dollars Existing Base Forecasted Base* Contractor FY Rate (%)

Conversion of Contractor FY G&A Rate to Contract Year (CY) Rate CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 CY 8 CY 9 CY 10 CY 11 CY 12 CY 13 Proposed G&A Bid Rate by GFY

If more than one G&A Pool is proposed, submit a separate Exhibit for each Pool.

*Provide details of the forecasted base.

**If 8(a) Unpopulated Joint Venture (JV), provide actual expenses for both entities that comprise the JV.

Cost Elements Within the G&A Expense Pool

RFP# 8GSFC22R0038

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 8

TRAVEL COSTS

CONTRACT

YEAR WBS ORGIN/DESTINATION PURPOSE # OF TRIPS # OF PEOPLE # OF DAYS AIRFARE

RATE

AIRFARE

AMOUNT

PER DIEM

RATE

PER DIEM

AMOUNT

CAR

RENTAL

RATE

CAR

RENTAL

AMOUNT

TOTAL

TOTAL

RFP# 8GSFC22R0038

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 8 Option Period

TRAVEL COSTS

CONTRACT YEAR WBS ORGIN/DESTINATION PURPOSE # OF TRIPS # OF PEOPLE # OF DAYS AIRFARE

RATE

AIRFARE

AMOUNT

PER DIEM

RATE

PER DIEM

AMOUNT

CAR

RENTAL

RATE

CAR

RENTAL

AMOUNT

TOTAL

TOTAL

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 10

PRODUCTIVE WORK YEAR CALCULATION

CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 CY 8 CY 9 CY 10 CY 11 CY 12 CY 13

Total Possible Hours in Year Less:

Vacation in Hours

Holidays in Hours

Sick Leave in Hours

Miscellaneous in Hours (specifically identify)

This exhibit contains Source Selection Information. See FAR 3.104.

PRODUCTIVE WORK YEAR in Hours (Hours Actually Worked)