Attachment B - LandIS CDRL and DID-Rev A.pdf

PDF 1 MB Posted

Attached to
Landsat Next Instrument Suite (LandIS) Request for Proposal Federal contract opportunity
Solicitation number
80GSFC22R0038
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This draft request for proposal from NASA's Goddard Space Flight Center solicits responses from interested parties to provide the Landsat Next Instrument Suite (LandIS). Respondents are advised to monitor www.Sam.gov for the potential release of a formal solicitation. The requirement includes providing instrument hardware and software, engineering test and development units, and associated support equipment. Responses are due based on dates specified in any formal solicitation. NASA intends to publicize a listing of respondents to facilitate teaming arrangements, but respondents may opt out of inclusion in this listing by clearly indicating this preference in their response.

View the file

Other files for this federal contract opportunity

Other files attached to Landsat Next Instrument Suite (LandIS) Request for Proposal, newest first.
File Type Posted
SF30-Amendment 2.pdf PDF
SF30-Amendment 1.pdf PDF
Enclosure 1 - SF1447-22-Amendment 1.pdf PDF
LandIS -Final RFP-Amendment 1 Section B-M.pdf PDF
LandIS Final RFP QA Set 1.pdf PDF
Attachment I - LNext Space Envrioments Requirements Document-Rev -.pdf PDF
Attachment K -Landsat Next Radiation Environment-Rev A.pdf PDF
Attachment N -LNext Analytical Math Models Document -Rev -.pdf PDF
Attachment T -IT Security Applicable Documents List.pdf PDF
Enclosure 6-IIT Security Management Plan Template.pdf PDF
Enclosure 7 - LNext SMASP Rev-.pdf PDF
RFP Cover Letter.pdf PDF
Attachment A - LandIS SOW-Rev A.pdf PDF
Attachment G - LNext IMAR-Rev A.pdf PDF
Attachment L - Top of Atmosphere Rad Spectra Rev -.1.pdf PDF
Enclosure 2-LandIS Cost Exhibits 1-12C.pdf PDF
Enclosure 3- LandIS-PastPerfQuestionnaires.pdf PDF
Enclosure 4 - LNext WBS and Dictionary-Rev-A.pdf PDF
Enclosure 8 -LandIS Draft PEP.pdf PDF
LandIS -Final RFP-Section B -M.pdf PDF
Enclosure 1 - SF1447-22.pdf PDF
Attachment D - LANDIS LaRD-Rev A.pdf PDF
Attachment F - LANDIS-Interface Requiremens Document-Rev A.pdf PDF
Attachment M - LNext WRS-3 Rev A.pdf PDF
Attachment O -LNext Design Reference Case (DRC) - 18 -v1.0 2022.pdf PDF
Attachment P - SCTR SOW Appendix A- Rev A.pdf PDF
LandIS Draft RFP_QA_Set 5.pdf PDF
LandIS Draft RFP_QA-Set 3.pdf PDF
LandIS Draft RFP_QA-Set 2.pdf PDF
LandIS Draft RFP_QA-Set 1.pdf PDF
Attachment H - LandIS GOLD Rules Compliance Matrix.pdf PDF
Attachment I - LNext Space Envrioments Requirements Document (LSERD).pdf PDF
Enclosure 8 -Saftey Mission Assurance Surveillance Plan (SMASP) Rev- .pdf PDF
Attachment G - LNext IMAR Rev -.pdf PDF
Attachment L - Top of Atmosphere Rad Spectra Rev -.pdf PDF
Attachment M - LNEXT - WRS-3 Rev -.pdf PDF
Attachment T -IT Security Applicable Documents List.pdf PDF
Enclosure 9 - Draft LandIS PEP.pdf PDF
80GSFC22R0038_LandIS DRFP.pdf PDF
LandIS_DRFP-Cover-Letter.pdf PDF
Attachment A-LANDIS-SOW- Rev -.pdf PDF
Attachment J-LNEXT- LNERD Rev-.pdf PDF
Attachment K - Landsat Next Radiation Environment Rev A .pdf PDF
Enclosure 2-LandIS Cost Exhibits 1-12B.pdf PDF
Enclosure 4 -LNext WBS and Dictionary.pdf PDF
Enclosure 5 - LNext LandIS Applicable and Reference Documents.pdf PDF
Enclosure 7-IIT Security Management Plan Template.pdf PDF
Attachment B-LANDIS-CDRL-Rev-.pdf PDF
SF33-22.pdf PDF
Attachment C-LANDIS-DIL- Rev -.pdf PDF
Show all 50

Landsat Next Instrument Suite (LandIS) Request for Proposal has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LandIS CDRL & DID LNEXT-LANDIS-PLAN-0052 Revision A ii

Landsat Next Landsat Instrument Suite (LandIS) Contract Data Requirements List (CDRL) and Data Item Descriptions (DID)

Signature/Approval Page

Prepared by:

Electronic Signature in TDMS Approval Date in TDMS Joy Henegar-Leon Date Landsat Next Payload Technical Manager Org./Code 426

Approved by:

Electronic Signature in TDMS Approval Date in TDMS Wen-Ting Hsieh Date Landsat Next Payload Manager Org./Code 426

Approved by:

Electronic Signature in TDMS Approval Date in TDMS James Pontius Date Landsat Next Project Manager Org./Code 426

Approved by:

Electronic Signature in TDMS Approval Date in TDMS Evan Webb Date Landsat Next Mission System Manager Org./Code 599 iii

CM Foreword This document is a Landsat Next Project Configuration Management (CM)-controlled document.

Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the Landsat Next CM Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.

Questions or comments concerning this document should be addressed to:

NASA/Goddard Space Flight Center Landsat Next Project Office, Code 426 Attention: Configuration Management Office Greenbelt, Maryland 20771 iv

Change History Log v

List of TBDs/TBRs Hyperlink to TBx Location Summary Ind.

Name/Org. Due Date

TBx-1 Section 4.1

LandIS-PM-1 Due Date and Maturity:

LandIS-PM-1:Monthly (nominally the last Tuesday(TBR) of each month)

PSM

Instrument Contract Award + 60 days vi

Table of Contents SIGNATURE/APPROVAL PAGE ................................................................................................ II

CM FOREWORD ..........................................................................................................................III

CHANGE HISTORY LOG .......................................................................................................... IV

LIST OF TBDS/TBRS .................................................................................................................... V

TABLE OF CONTENTS .............................................................................................................. VI

LIST OF FIGURES ..................................................................................................................... VII

LIST OF TABLES ....................................................................................................................... VII

1.0 INTRODUCTION

2.0 DEFINITION OF DUE DATES/MATRUITY, DEFINITION OF CATEGORIES, AND

MAILING DISTRIBUTION INSTRUCTIONS

2.1 Due Dates - Related Definitions

2.1.1 Due Date

2.2 Maturity

2.3 Category

2.4 Media

3.0 LANDIS CONTRACT DATA REQUIREMENTS LIST

3.1 CDRL Table

3.1.1 Program Management Data

3.1.2 Review Data

3.1.3 Software Data

3.1.4 Integration and Test Data

3.1.5 Calibration and Validation Data

3.1.6 Systems Engineering Data

3.1.7 On Orbit Data

3.1.8 System Assurance Data

4.0 DESCRIPTION OF REQUIRED DATA

4.1 Program Management Data

4.2 Review Data

4.3 Software Data

4.4 Integration and Test Data

4.5 Calibration and Validation Data

4.6 Systems Engineering Data

4.7 On Orbit Data

4.8 System Assurance Data

APPENDIX A ABBREVIATIONS AND ACRONYMS

APPENDIX B DEFINITIONS

vii

List of Figures No table of contents entries found.

List of Tables No table of contents entries found.

1.0 INTRODUCTION

This Contract Data Requirements List (CDRL) document defines the requirements for deliverable documentation to be provided by the Landsat Next Instrument Suite (LandIS) Contractor. Section 2.0 includes definitions and instructions for mailing and/or distribution. The table in sections 3.1.1 through 3.1.8 present the CDRL item by item, with due dates, and media format. Section 4.0 provides the Description of Required Data (DRD) or Data Item Descriptions (DIDs), a description of each item, which provides the use for the deliverable and the required preparation information. Except where specifically indicated to the contrary, the formats and drawing standards used shall be those normally used by the LandIS Contractor and by its subcontractors.

2.0 DEFINITION OF DUE DATES/MATRUITY, DEFINITION OF

CATEGORIES, AND MAILING DISTRIBUTION INSTRUCTIONS

2.1 DUE DATES - RELATED DEFINITIONS

The following definitions apply to the DUE DATE column in the tables in section 3.1.1 through

3.1.8. Unless otherwise specified, deadlines are in calendar days. Submissions can be made before the due date if the Contractor believes that no changes will be made between the submittal date and the due date.

2.1.1 Due Date

DUE DATE: The contract baseline schedule for delivery of SOW CDRL items is shown in the CDRL tables in sections 3.1.1 through 3.1.8 associated with acronyms for the various program reviews that form the contract baseline. Items designated for delivery "As Generated", or "Update As Required (UAR)" shall be provided to the Government within the timeframe specified in the table or as agreed to by the Government.

Monthly: Submitted on monthly basis L: Launch Date DACA: (Calendar) Days After Contract Award NLT: No later than Other entries in the "DUE DATE" column are self-explanatory.

2.2 MATURITY

The following definitions apply to the MATURITY column in the tables in sections 3.1.1 through 3.1.8.

(1) Initial: The first submission of an item, which will be revised and resubmitted at a later date.

(2) Preliminary: An early submission of an item. To be completed as is practicable at the time of preparation. Preliminary submittals are written with the best available current information and are resubmitted when further information becomes available.

(3) Final: The complete, thorough submission of an item for approval, review, or information that, to the best of the contractor’s knowledge and intention, will not require further revision or updates. However, this does not preclude updating if later found to be necessary. Any updates shall require the same "approval/review" process as was required for the original final submissions.

(4) Baseline, Current: The delivery is written with the best up-to-date information available at the time.

(5) Update: The delivery is revised with the best up-to-date information available at the time.

Other entries in the "MATURITY" column are self-explanatory.

2.3 CATEGORY

The following definitions apply to the CATEGORY column in the tables in sections 3.1.1 through 3.1.8. If separate approval instructions are not specified for separate submission due date/maturity items, then the listed approval instruction applies to all submissions.

A Approval. CDRL items in this category require approval by the GSFC Contracting Officer’s

Representative (COR) or Contracting Officer prior to use by the contractor. Receipt by the Government shall occur within the time specified in the "Due Date" column in the tables in sections 3.1.1 through 3.1.8 of this document.

Requirements for re-submission shall be as specified by the Contracting Officer or Contracting Officer's Representative. For most cases the contractor will be required to resubmit the document within 14 calendar days of receiving comments from the Government. If the contractor has not received a response from GSFC within 45 calendar days of delivery of a CDRL item, the contractor may proceed as if the document has been approved.

R Review. Documents in this category require delivery to the Government prior to use and within the time period specified in the "Due Date" column in the tables in sections 3.1.1 through 3.1.8 of this document. They are subject to evaluation by the Government or its designated representatives to determine Contractor effectiveness in meeting contract objectives. Upon submission, the Contractor may proceed with associated work while the Government reviews the submission.

I Information. Data in this category shall be delivered to the Government within the time period specified in the “Due Date” column in the tables in sections 3.1.1 through 3.1.8 for the purpose of determining current program status, progress, and future planning requirements.

The Government may request changes on deliverables where errors or omissions are noted.

2.4 MEDIA

All data items shall be delivered in electronic format to a mutually defined web portal that allows external Government and Contractor access unless otherwise noted in the tables in sections 3.1.1 through 3.1.8.

The CO shall be notified of electronic submission of the deliverable via email.

LNIS-CDRL-

Electronic deliverables shall be delivered in the following formats unless otherwise approved by the government:

Text Documents: Portable Document Format (PDF) (searchable) or Microsoft (MS) Word Presentations: PDF (searchable) or MS PowerPoint Spreadsheets: Microsoft Excel Database: Delimited American Standard Code for Information Interchange (ASCII) files accompanied with database schema document defining tables and entries.

Schedules: PDF and MS Project

Schematics and Drawings: High Resolution PDF to be readable

Photographs: Joint Photographic Experts Group (JPEG) or current industry standard.

Video: Any readily available open standard (e.g., Audio Video Interleave (AVI), Movie Picture Experts Group (MPEG))

3.0 LANDIS CONTRACT DATA REQUIREMENTS LIST

3.1 CDRL TABLE

The tables in sections 3.1.1 through 3.1.8 comprise the LandIS Contract Data Requirements List.

The tables contain the following CDRLs:

Program Management (PM) Reviews (RE) Flight Software (SW) Integration and Test (IT) Calibration/Validation (CV) System Engineering (SE) Systems Assurance (SA) On-Orbit Operations (OO)

3.1.1 Program Management Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-PM-1 Monthly Project Status Reviews LandIS-PM-1: I LandIS-PM-1:Monthly, Monthly (nominally the last

Tuesday(TBR) of each month)

SOW 3.1.1

SOW 3.1.4.3.3

SOW 3.1.12

SOW 3.2

LandIS-PM-2 Integrated Master Schedule (IMS) LandIS-PM-2-1: I LandIS-PM-2-2: I LandIS-PM-2-3: I LandIS-PM-2-4: I

LandIS-PM-2-1:DACA +45 days, Initial LandIS-PM-2-2:DACA +60 days, Baselined LandIS-PM-2-3:Monthly, 10 working days following accounting month end, Monthly, 10 working days following accounting month end LandIS-PM-2-4:Weekly, Weekly, Friday's with a 2 week look ahead during I&T phase

SOW 3.1.11

SOW 3.1.4.3.3

LandIS-PM-3 CADRE Data LandIS-PM-3-1: R LandIS-PM-3-2: R LandIS-PM-3-3: R LandIS-PM-3-4: R LandIS-PM-3-5: R

LandIS-PM-3-1:DACA +60 days, Preliminary LandIS-PM-3-2:IPDR -45 days, Update LandIS-PM-3-3:ICDR +15 days, Update LandIS-PM-3-4:Launch +30 days, Update LandIS-PM-3-5:Launch +90 days, Final

SOW 3.1.11

LandIS-PM-4 Final Report LandIS-PM-4-1: I LandIS-PM-4-2: I LandIS-PM-4-3: I LandIS-PM-4-4: I

LandIS-PM-4-1:ICDR, Initial LandIS-PM-4-2:IPER, Preliminary LandIS-PM-4-3:IPSR, Update LandIS-PM-4-4:Acceptance +30 days, Final

SOW 3.1

SOW 3.1.16

LandIS-PM-5 Engineering Peer Review Plan LandIS-PM-5: A LandIS-PM-5:DACA +60 days, Final SOW 3.1.4.2 LandIS-PM-6 Earned Value System Management

Plan LandIS-PM-6-1: I LandIS-PM-6-2: R LandIS-PM-6-3: R

LandIS-PM-6-1:After notification of selection, but prior to contract award, Preliminary LandIS-PM-6-2:DACA +60 days, Initial LandIS-PM-6-3:As required, Update

SOW 3.1.11

LandIS-PM-7 Financial Reports LandIS-PM-7-1: R LandIS-PM-7-2: R

LandIS-PM-7-1:Quarterly, no later than the 15th day of the month preceding the quarter being reported, Quarterly LandIS-PM-7-2:Monthly, No more than 10 working days after close of contractors monthly accounting period, Monthly, No more than 10 days after closing period

SOW 3.1.11

LandIS-PM-8 Integrated Program Management Report (IPMR)

LandIS-PM-8: I LandIS-PM-8:10th business day after the contractor accounting month end, Monthly

SOW 3.1.11

LandIS-PM-9 Engineering Development Unit Plan

LandIS-PM-9: A LandIS-PM-9:ISRR, Final SOW 3.4.17

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-PM-10 Hardware and Software

Configuration Management Plan LandIS-PM-10: R LandIS-PM-10:DACA +45 days, Final SOW 3.1.12

LandIS-PM-11 Project Management Plan LandIS-PM-11: R LandIS-PM-11:DACA +30 days, Final SOW 3.1 LandIS-PM-12 Risk Management Plan LandIS-PM-12: R LandIS-PM-12:DACA +45 days, Final SOW 3.1.9 LandIS-PM-13 Work Breakdown Structure (WBS)

Dictionary LandIS-PM-13: A LandIS-PM-13:IBR, Final SOW 3.1

LandIS-PM-14 Program Security Plan LandIS-PM-14: A LandIS-PM-14:DACA +30 days, Final SOW 3.1.19 LandIS-PM-15 Organization Conflict of Interest

Avoidance Plan LandIS-PM-15-1:

A LandIS-PM-15-2:

A

LandIS-PM-15-1:With Proposal, Final LandIS-PM-15-2:As required, Update

SOW 3.1

LandIS-PM-16 IT System Security Plan LandIS-PM-16: A LandIS-PM-16:DACA +30 days, Final SOW 3.1.18 LandIS-PM-17 Diversity, Equity, Inclusion, and

Accessibility Plan LandIS-PM-17: A LandIS-PM-17:DACA +30 days, Final SOW 3.1

3.1.2 Review Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-RE-1 Instrument System Requirements

Review Data Package LandIS-RE-1-1: I LandIS-RE-1-2: I

LandIS-RE-1-1:ISRR dry run -1 day, Preliminary LandIS-RE-1-2:ISRR -5 days, Final

SOW 3.1.4.1.1

LandIS-RE-2 Instrument Preliminary Design Review Data Package

LandIS-RE-2-1: I LandIS-RE-2-2: I

LandIS-RE-2-1:IPDR dry run -1 day, Preliminary LandIS-RE-2-2:IPDR -5 days, Final

SOW 3.1.4.1.1

LandIS-RE-3 Instrument Critical Design Review Data Package

LandIS-RE-3-1: I LandIS-RE-3-2: I

LandIS-RE-3-1:ICDR dry run -1 day, Preliminary LandIS-RE-3-2:ICDR -5 days, Final

SOW 3.1.4.1.1

LandIS-RE-4 Instrument Pre-Environmental Review Data Package

LandIS-RE-4-1: I LandIS-RE-4-2: I

LandIS-RE-4-1:IPER dry run -1 day, Preliminary LandIS-RE-4-2:IPER -5 days, Final

SOW 3.1.4.1.1

LandIS-RE-5 Instrument Pre-Ship Review Data Package

LandIS-RE-5-1: I LandIS-RE-5-2: I

LandIS-RE-5-1:IPSR dry run -1 day, Preliminary LandIS-RE-5-2:IPSR -5 days, Final

SOW 3.1.4.1.1

SOW 3.7

LandIS-RE-6 Inputs to Mission Level Reviews LandIS-RE-6-1-1: I LandIS-RE-6-1-2: I LandIS-RE-6-1-3: I LandIS-RE-6-1-4: I LandIS-RE-6-1-5: I

LandIS-RE-6-1-1:Mission Level SRR/MDR -10 days, Final LandIS-RE-6-1-2:Mission Level PDR -10 days, Final LandIS-RE-6-1-3:Mission Level CDR -10 days, Final LandIS-RE-6-1-4:Mission LevelPER -10 days, Final LandIS-RE-6-1-5:Mission Level PSR -10 days, Final

SOW 3.1.4.1.4

LandIS-RE-7 Engineering Peer Review Data

Packages LandIS-RE-7-1: I LandIS-RE-7-1:EPR -10 days, Final SOW 3.1.4.2

MAR 7.3

LandIS-RE-8 Instrument Integrated Baseline

Review Package LandIS-RE-8-1: I LandIS-RE-8-2: A LandIS-RE-8-3: A

LandIS-RE-8-1:DACA +120 days, IBR Data Package LandIS-RE-8-2:DACA +180 days, IBR Review LandIS-RE-8-3:As required, Update

SOW 3.1.11

SOW 3.1.4.1.1

LandIS-RE-9 Inputs to On-Orbit Acceptance Review

LandIS-RE-9: I LandIS-RE-9:Review -10 days, Final SOW 3.1.4.1.4

LandIS-RE-10 Instrument Integration Readiness Review

LandIS-RE-10: I LandIS-RE-10:Review -10 days, Final SOW 3.1.4.1.4

3.1.3 Software Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-SW-1 Software Management and

Development Plan (SMDP) LandIS-SW-1-1: R LandIS-SW-1-2: A LandIS-SW-1-3: R LandIS-SW-1-4: R LandIS-SW-1-5: R

LandIS-SW-1-1:DACA +30 days, Initial LandIS-SW-1-2:SwRR -30 days, Baseline LandIS-SW-1-3:SwPDR +30 days, Update LandIS-SW-1-4:SwCDR +30 days, Update LandIS-SW-1-5:ATRR (or as directed) +30 days, Update

SOW 3.4.10.2

LandIS-SW-2 Software Configuration Management Plan (SCMP)

LandIS-SW-2-1: R LandIS-SW-2-2: A LandIS-SW-2-3: R LandIS-SW-2-4: R

LandIS-SW-2-1:SwRR -15 days, Initial LandIS-SW-2-2:SwPDR -30 days, Baseline LandIS-SW-2-3:SwCDR, Update LandIS-SW-2-4:ATRR (or as Directed), Update

SOW 3.5.8.1

LandIS-SW-3 Software Test Plan (STP) LandIS-SW-3-1: R LandIS-SW-3-2: A LandIS-SW-3-3: R

LandIS-SW-3-1:SwPDR -15 days, Initial LandIS-SW-3-2:SwCDR -30 days, Baseline LandIS-SW-3-3:ATRR (or as Directed), Update

SOW 3.5.8.1.4

LandIS-SW-4 Software Maintenance Plan (SMP) LandIS-SW-4-1: R LandIS-SW-4-2: A

LandIS-SW-4-1:ATRR, Initial LandIS-SW-4-2:SwAR -30 days, Baseline

SOW 3.5.8.2

LandIS-SW-5 RESERVED LandIS-SW-6 RESERVED LandIS-SW-7 Software Requirements

Specification (SRS) LandIS-SW-7-1: R LandIS-SW-7-2: R LandIS-SW-7-3: R LandIS-SW-7-4: R

LandIS-SW-7-1:Software Requirement Review, Initial LandIS-SW-7-2:SwPDR -30 days, Baseline LandIS-SW-7-3:SwCDR, Update LandIS-SW-7-4:SwTRR, Update

SOW 3.4.10.3.1

LandIS-SW-8 Software Architectural and Detailed Design Document (SDD)

LandIS-SW-8-1: R LandIS-SW-8-2: R

LandIS-SW-8-1:SwPDR -30 days, Initial LandIS-SW-8-2:SwCDR -30 days, Baseline

SOW 3.4.10.4

LandIS-SW-8-3: R LandIS-SW-8-3:SwTRR -30 days, Update

LandIS-SW-9 Software Test Procedures (STP) LandIS-SW-9-1: R LandIS-SW-9-2: R LandIS-SW-9-3: R

LandIS-SW-9-1:SwCDR -30 days, Initial LandIS-SW-9-2:SwTRR -30 days, Baseline LandIS-SW-9-3:After test excution, Update

SOW 3.5.8.1.4

LandIS-SW-10 Software Peer Reviews and Inspection for Plans, Requirements, Design, Code and Test Procedures Report (Inspect)

LandIS-SW-10: I LandIS-SW-10:Inspection or review +7 days, Final SOW 3.4.10.5

LandIS-SW-11 Software Test Reports (STR) LandIS-SW-11: R LandIS-SW-11:Test +7 days, Final SOW 3.5.8.1.4 LandIS-SW-12 Software User's Manual (SUM) LandIS-SW-12-1:

R LandIS-SW-12-2:

R

LandIS-SW-12-1:AI&T -30 days, Initial LandIS-SW-12-2:PER -30 days, Baseline

SOW 3.5.8.2

LandIS-SW-13 Software Version Description Document (VDD)

LandIS-SW-13-1:

R

LandIS-SW-13-1:With each Software/patch release, Final

SOW 3.5.8

SOW 3.5.8.2

3.1.4 Integration and Test Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-IT-1 Instrument Integration and Test

Plan LandIS-IT-1-1: R LandIS-IT-1-2: A

LandIS-IT-1-1:IPDR, Preliminary LandIS-IT-1-2:ICDR, Final

SOW 3.4.15

SOW 3.12.10

LandIS-IT-2 Test Reports LandIS-IT-2: A LandIS-IT-2:Test +10 days, Final SOW 3.5.13.2 LandIS-IT-3 Detailed Integration and Test

Procedures LandIS-IT-3: A LandIS-IT-3:Test -10 days, Final SOW 3.5.13.1

SOW 3.5.13.2

LandIS-IT-4 Launch Site Test Procedures Inputs LandIS-IT-4-1: A

LandIS-IT-4-2: A LandIS-IT-4-1:SC PSR -120 days, Draft LandIS-IT-4-2:SC PSR, Final

SOW 3.12.10

LandIS-IT-5 Packaging, Handling, Storage, and Transportation Plan and Procedures

LandIS-IT-5-1: R LandIS-IT-5-2: A

LandIS-IT-5-1:ICDR +30 days, Plan, Final LandIS-IT-5-2:IPER -21 days, Procedures, Final

SOW 3.7

LandIS-IT-6 As Run Test Procedures LandIS-IT-6: R LandIS-IT-6:Test Conclusion, Final SOW 3.5.13.2 LandIS-IT-7 Environmental Verification Plan and Matrix LandIS-IT-7-1: R LandIS-IT-7-2: R LandIS-IT-7-3: A LandIS-IT-7-4: A

LandIS-IT-7-1:IPDR -10 days, Initial LandIS-IT-7-2:ICDR -10 days, Draft LandIS-IT-7-3:IPER -15 days, Baseline LandIS-IT-7-4:As required, Updates

SOW 3.4.15

3.1.5 Calibration and Validation Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-CV-1 Calibration/Validation Plan LandIS-CV-1-1:

R LandIS-CV-1-1:IPDR, Draft LandIS-CV-1-2:ICDR, Final

SOW 3.2.3

SOW 3.5.13.3

LandIS-CV-1-2:

A LandIS-CV-1-3:

A

LandIS-CV-1-3:As required, Updates SOW Appendix A

LandIS-CV-2 Calibration/Validation Procedures LandIS-CV-2-1:

R LandIS-CV-2-2:

A LandIS-CV-2-3:

A

LandIS-CV-2-1:Prior to Use -60 days, Draft LandIS-CV-2-2:Prior to Use -10 days, Final LandIS-CV-2-3:Launch -90 days, On-orbit Procedures

SOW 3.5.13.3

LandIS-CV-3 Calibration/Validation Reports and Summaries

LandIS-CV-3-1: I LandIS-CV-3-2:

R LandIS-CV-3-3:

R LandIS-CV-3-4:

R LandIS-CV-3-5:

R

LandIS-CV-3-1:Test +3 days, Final LandIS-CV-3-2:Test +10 days, Final LandIS-CV-3-3:Analysis completion, NLT IPSR +10 days, Final LandIS-CV-3-4:IPSR, Final LandIS-CV-3-5:IOC +90 days, Final

SOW 3.5.13.3

LandIS-CV-4 Radiometric Math Model LandIS-CV-4-1:

R LandIS-CV-4-2:

R

LandIS-CV-4-1:ICDR -15 days, Final LandIS-CV-4-2:As required, Updates

SOW 3.4.9.2

LandIS-CV-5 Optical Analytical Model LandIS-CV-5-1: I LandIS-CV-5-2: I LandIS-CV-5-3: I

LandIS-CV-5-1:IPDR, Preliminary LandIS-CV-5-2:ICDR -15 days, Final LandIS-CV-5-3:As required, Updates

SOW 3.4.3.1

LandIS-CV-6 Calibration Parameters LandIS-CV-6-1:

R LandIS-CV-6-2:

R LandIS-CV-6-3:

A LandIS-CV-6-4:

A LandIS-CV-6-5:

A

LandIS-CV-6-1:IPDR, Initial LandIS-CV-6-2:ICDR, Preliminary LandIS-CV-6-3:I&T Start, Update LandIS-CV-6-4:IPSR, Update LandIS-CV-6-5:IOC, Update

SOW 3.4.9.1

SOW 3.5.16.1

LandIS-CV-7 Calibration and Data Processing Algorithms

LandIS-CV-7-1:

R

LandIS-CV-7-1:IPDR, Draft LandIS-CV-7-2:ICDR, Preliminary

SOW 3.4.9.1

SOW 3.5.16

LandIS-CV-7-2:

R LandIS-CV-7-3:

R LandIS-CV-7-4:

A LandIS-CV-7-5:

A LandIS-CV-7-6:

A LandIS-CV-7-7:

A

LandIS-CV-7-3:I&T Start, Update LandIS-CV-7-4:IPSR, Final LandIS-CV-7-5:IOC, Update LandIS-CV-7-6:IPER, Compression/Decompression Algorithms Updates LandIS-CV-7-7:Environmental Test Completion +14 days, Compression/Decompression Algorithms Updates

SOW 3.5.16.2

SOW 3.5.16.3

LandIS-CV-8 Relative Spectral Response (RSR) Component Measurements and System RSR Analysis

LandIS-CV-8-1: I LandIS-CV-8-2: I

LandIS-CV-8-1:As generated, Final LandIS-CV-8-2:IPER -30 days, Final

SOW 3.5.13.3

LandIS-CV-9 Instrument and Simulator Data Sets LandIS-CV-9: I LandIS-CV-9: As generated 3.5.13.2 Appendix A

3.1.6 Systems Engineering Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-SE-1 Engineering Change Requests, Deviations and Waivers LandIS-SE-1-1: A LandIS-SE-1-2: I

LandIS-SE-1-1:As generated LandIS-SE-1-2:As generated

SOW 3.1.12

LandIS-SE-2 CAD Models LandIS-SE-2-1: I LandIS-SE-2-2: I LandIS-SE-2-3: I LandIS-SE-2-4: I LandIS-SE-2-5: I LandIS-SE-2-6: I LandIS-SE-2-7: I

LandIS-SE-2-1:ISRR -5 days, Concept (Solid Model only) LandIS-SE-2-2:IPDR -15 days, Detailed Concept (Solid Model only) LandIS-SE-2-3:ICDR -15 days, Baseline (Solid and Reduced Models) LandIS-SE-2-4:IIRR -15 days, Updated / As Built LandIS-SE-2-5:IPER -15 days, Updated / As Built LandIS-SE-2-6:IPSR -15 days, Updated / As Built LandIS-SE-2-7:Launch -30 days, Final

SOW 3.1.12

SOW 3.4.1

LandIS-SE-3 Trend Analysis and Operations Log

LandIS-SE-3-1: R LandIS-SE-3-2: R LandIS-SE-3-3: I LandIS-SE-3-4: I LandIS-SE-3-5: I

LandIS-SE-3-1:ICDR, Initial List LandIS-SE-3-2:IPER, Final List LandIS-SE-3-3:Monthly, Reports LandIS-SE-3-4:IPSR, Log LandIS-SE-3-5:PSR, Updated Log

SOW 3.2.5

LandIS-SE-4 Thermal Math Models LandIS-SE-4-1: R

LandIS-SE-4-2: R LandIS-SE-4-3: R LandIS-SE-4-4: R LandIS-SE-4-5: R

LandIS-SE-4-1:ICDR -30 days, Version 1 - Instrument Detailed Thermal Math Model (Temperature and Geometry) (DTMM) LandIS-SE-4-2:Instrument TB/TV -30 days, Version 2 - Instrument DTMM (Test Model) LandIS-SE-4-3:Instrument TB/TV +60 days, DTMM TV Report and Correlation LandIS-SE-4-4:ICDR -15 days, Version 1 - Instrument Reduced Thermal Math Model (Temperature and Geometry) (RTMM) LandIS-SE-4-5:Instrument TB/TV +60 days, RTMM TV Report and Correlation

SOW 3.4.13

SOW 3.1.3

LandIS-SE-5 Engineering Drawings LandIS-SE-5-1: I LandIS-SE-5-2: I LandIS-SE-5-3: I

LandIS-SE-5-1:ICDR +5 days, Baseline LandIS-SE-5-2:IPSR +5 days, Updated As Built LandIS-SE-5-3:Launch -30 days, Final

SOW 3.1.12

SOW 3.4.1

SOW 3.1.3

LandIS-SE-6 System Performance Verification Plan and Matrix

LandIS-SE-6-1: I LandIS-SE-6-2: A LandIS-SE-6-3: A

LandIS-SE-6-1:IPDR -10 days, Preliminary LandIS-SE-6-2:ICDR -10 days, Final LandIS-SE-6-3:IPER -15 days, Update

SOW 3.2.2

SOW 3.2.3

LandIS-SE-7 Verification Reports LandIS-SE-7: A LandIS-SE-7:Verification Event +30 days, Final SOW 3.5.13.2 SOW Appendix A

LandIS-SE-8 Configuration Item Identification List and Computer Software Configuration Items

LandIS-SE-8-1: I LandIS-SE-8-2: I

LandIS-SE-8-1:IPDR, Preliminary LandIS-SE-8-2:ICDR, Final

SOW 3.1.12

LandIS-SE-9 LandIS Design Specification LandIS-SE-9-1: R LandIS-SE-9-2: R LandIS-SE-9-3: A LandIS-SE-9-4: A

LandIS-SE-9-1:ISRR, Preliminary LandIS-SE-9-2:IPDR -30 days, Revised LandIS-SE-9-3:ICDR -30 days, Final LandIS-SE-9-4:As required, Updates

SOW 3.4.1

LandIS-SE-10 Focal Plane Array Documentation LandIS-SE-10-1:

R LandIS-SE-10-2:

R LandIS-SE-10-3: I LandIS-SE-10-4: I

LandIS-SE-10-1:IIBR, Items 1-4 LandIS-SE-10-2:1st detector lot completion -30 days, Items 5-6 LandIS-SE-10-3:As generated, Item 7 LandIS-SE-10-4:As generated, NLT IPDR +10 days, Item 8

SOW 3.5.1

LandIS-SE-11 Instrument Interface Description Document

LandIS-SE-11: A LandIS-SE-11:DACA +7 days SOW 3.2.2

LandIS-SE-12 Specification Tree LandIS-SE-12: I LandIS-SE-12:ISRR, Final SOW 3.2.3

LandIS-SE-13 Inputs to the LNext Spacecraft to

LandIS Interface Control Document

LandIS-SE-13-1: I LandIS-SE-13-2: I LandIS-SE-13-3:

A

LandIS-SE-13-1:IPDR -60 days, Preliminary LandIS-SE-13-2:ICDR -60 days, Update LandIS-SE-13-3:IPSR -60 days, Final

SOW 3.2.2

LandIS-SE-14 Instrument Operations Concept Document

LandIS-SE-14-1:

R LandIS-SE-14-2:

R

LandIS-SE-14-1:ISRR, Preliminary LandIS-SE-14-2:IPDR, Final

SOW 3.6.2

SOW 3.2.1

LandIS-SE-15 Structural and Dynamic Models and Model Verification Plan

LandIS-SE-15-1:

R LandIS-SE-15-2:

R LandIS-SE-15-3:

R LandIS-SE-15-4:

A

LandIS-SE-15-1:ISRR -7 days, Plan LandIS-SE-15-2:IPDR, Model and Matrix LandIS-SE-15-3:ICDR, Model and Matrix Update LandIS-SE-15-4:IPSR -30 days, Correlated model

SOW 3.1.3

SOW 3.4.5

LandIS-SE-16a Thermal Analysis Report LandIS-SE-16a-1:

R LandIS-SE-16a-2:

A LandIS-SE-16a-3:

A

LandIS-SE-16a-1:IPDR, Initial LandIS-SE-16a-2:ICDR, Update LandIS-SE-16a-3:ICDR through end of contract, Updates summarized twice per year

SOW 3.2.4

SOW 3.4.5

SOW 3.4.13

SOW 3.1.3

LandIS-SE-16b Structural and Mechanical Subsystem Performance and Analysis Report

LandIS-SE-16b-1:

R LandIS-SE-16b-2:

R LandIS-SE-16b-3:

R

LandIS-SE-16b-1:IPDR, Initial LandIS-SE-16b-2:ICDR, Update LandIS-SE-16b-3:ICDR through end of contract, Updates summarized twice per year

SOW 3.4.5

SOW 3.1.3

LandIS-SE-16c Stress Analysis Report LandIS-SE-16c-1:

R LandIS-SE-16c-2:

A LandIS-SE-16c-3:

A

LandIS-SE-16c-1:IPDR, Initial LandIS-SE-16c-2:ICDR, Update LandIS-SE-16c-3:ICDR through end of contract, Updates summarized twice per year

SOW 3.4.5

SOW 3.1.3

LandIS-SE-16d Jitter Analysis Report LandIS-SE-16d-1:

R LandIS-SE-16d-2:

R

LandIS-SE-16d-1:IPDR, Initial LandIS-SE-16d-2:ICDR, Update LandIS-SE-16d-3:ICDR through end of contract, Updates summarized twice per year

SOW 3.2.4

SOW 3.1.3

LandIS-SE-16d-3:

R

LandIS-SE-16e Radiometric Analysis Report LandIS-SE-16e-1:

R LandIS-SE-16e-2:

A LandIS-SE-16e-3:

A

LandIS-SE-16e-1:IPDR, Initial LandIS-SE-16e-2:ICDR, Update LandIS-SE-16e-3:ICDR through end of contract, Updates summarized twice per year

SOW 3.2.4

SOW 3.1.3

LandIS-SE-17474 Electrical Systems Requirements Document

LandIS-SE-17474 : A

LandIS-SE-17474 :ISRR, Final

SOW 3.4.12

LandIS-SE-18 Spare Parts Plan and List LandIS-SE-18: A LandIS-SE-18:ISRR, Final SOW 3.10 LandIS-SE-19 Acceptance Data Package LandIS-SE-19-1:

A LandIS-SE-19-2:

A LandIS-SE-19-3:

A

LandIS-SE-19-1:OAR, LandIS LandIS-SE-19-2:MOC Acceptance Test -15 days, LandIS Operations Simulator LandIS-SE-19-3:Acceptance Test -15 days, LandIS Interface Simulator

SOW 3.5.14

SOW 3.12.9.1

SOW 3.12.9.2

SOW 3.8

LandIS-SE-20 LandIS Operations Simulator Specification

LandIS-SE-20-1:

A LandIS-SE-20-2:

A

LandIS-SE-20-1:ISRR, Final LandIS-SE-20-2:As required, Update

SOW 3.5.14

LandIS-SE-21 LandIS Operations Simulator User's Guide

LandIS-SE-21-1:

R LandIS-SE-21-2:

R

LandIS-SE-21-1:Simulator Delivery -30 days, Final LandIS-SE-21-2:As Required, Update

SOW 3.5.14

LandIS-SE-22 LandIS Operations Simulator Verification Report

LandIS-SE-22-1:

R LandIS-SE-22-2:

A LandIS-SE-22-3:

A

LandIS-SE-22-1:ICDR, Initial LandIS-SE-22-2:IPER, Final LandIS-SE-22-3:As required, Update

SOW 3.5.14

LandIS-SE-23 LandIS Operations Simulator Test Plan

LandIS-SE-23: A LandIS-SE-23:Test -20 days SOW 3.5.14

LandIS-SE-24 LandIS Operations Simulator Test Reports

LandIS-SE-24: R LandIS-SE-24:Test +10 days, Final SOW 3.5.14

LandIS-SE-25 LandIS Interface Simulator Specification

LandIS-SE-25-1:

A

LandIS-SE-25-1:ISRR, Final LandIS-SE-25-2:As required, Update

SOW 3.5.14

LandIS-SE-25-2:

A

LandIS-SE-26 LandIS Interface Simulator User's Guide

LandIS-SE-26-1:

R LandIS-SE-26-2:

R

LandIS-SE-26-1:Simulator Delivery -30 days, Final LandIS-SE-26-2:As required, Update

SOW 3.5.14

LandIS-SE-27 LandIS Interface Simulator Verification Report

LandIS-SE-27-1:

R LandIS-SE-27-2:

A LandIS-SE-27-3:

A

LandIS-SE-27-1:ICDR, Initial LandIS-SE-27-2:IPER, Final LandIS-SE-27-3:As required, Update

SOW 3.5.14

LandIS-SE-28 LandIS Interface Simulator Test Plan

LandIS-SE-28-1:

R LandIS-SE-28-2:

A

LandIS-SE-28-1:IPDR, Initial LandIS-SE-28-2:ICDR, Final

SOW 3.5.14

LandIS-SE-29 LandIS Interface Simulator Test Reports

LandIS-SE-29: R LandIS-SE-29:Test +10 days, Final SOW 3.5.14

LandIS-SE-30 LandIS Performance Margin Analysis

LandIS-SE-30-1:

R LandIS-SE-30-2:

R LandIS-SE-30-3:

A

LandIS-SE-30-1:ISRR, Preliminary LandIS-SE-30-2:IPDR -30 days, Revised LandIS-SE-30-3:ICDR -30 days, Final

SOW 3.2.1

LandIS-SE-31 LandIS Mass Properties Report LandIS-SE-31-1:

R LandIS-SE-31-2:

R LandIS-SE-31-3:

R

LandIS-SE-31-1:Quartely LandIS-SE-31-2:Launch -378 days LandIS-SE-31-3:Launch -140 days

SOW 3.2.1

LandIS-SE-32 LandIS Systems Engineering Management Plan

LandIS-SE-32-1:

A LandIS-SE-32-2:

A

LandIS-SE-32-1:DACA +30 days, Preliminary LandIS-SE-32-2:ISRR -10 days, Final

SOW 3.2

LandIS-SE-33 DOORS Database LandIS-SE-33: R LandIS-SE-33:ISRR -60 days, Monthly SOW 3.2

SOW 3.2.1.1

LandIS-SE-34 Meteoroid and Orbital Debris Assessment

LandIS-SE-34-1:

R

LandIS-SE-34-1:MPDR -45 days, Preliminary ODAR LandIS-SE-34-2:MCDR -45 days, Preliminary ODAR

SOW 3.3, 3.4.1,

IMAR 2.6

LandIS-SE-34-2:

R LandIS-SE-34-3:

R LandIS-SE-34-4:

A LandIS-SE-34-5:

A

LandIS-SE-34-3:MSIRR, ORSAT Model, Preliminary LandIS-SE-34-4:MPER, ORSAT Model, Final LandIS-SE-34-5:SMSR -60 days, ODAR/EOMP

LandsIS-SE-35 Pointing and Alignment Budgets LandsIS-SE-35-1:

R LandsIS-SE-35-2:

A

LandsIS-SE-35-1:PDR -15 days, Preliminary LandsIS-SE-35-2:CDR -15 days, Final

SOW 3.2.4

LandsIS-SE-36 Venting Analysis LandsIS-SE-36-1:

R LandsIS-SE-36-2:

A

LandsIS-SE-36-1:Launch -660 days, Preliminary LandsIS-SE-36-2:Launch -420 days, Final

SOW 3.4.1

LandsIS-SE-37 Charging Analysis Model LandsIS-SE-37-1:

R LandsIS-SE-37-2:

A

LandsIS-SE-37-1:PDR -30 days, Preliminary LandsIS-SE-37-2:CDR -30 days, Final

SOW 3.4.1

LandsIS-SE-38 Fault Management Plan and Description Document

LandsIS-SE-38-1:

A LandsIS-SE-38-2:

A

LandsIS-SE-38-1:ICDR +30 days, Preliminary LandsIS-SE-38-2:FOR, Final

SOW 3.2.6

LandIS-SE-39 Single Event Effect Criticality Analysis (SEECA)

LandIS-SE-39-1:

R LandIS-SE-39-2:

R LandIS-SE-39-3:

A LandIS-SE-39-4:

A

LandIS-SE-39-1:DACA +90 days, List of Known Susceptible Parts LandIS-SE-39-2:PDR -30 days, Preliminary LandIS-SE-39-3:CDR -30 days LandIS-SE-39-4:At Parts Control Board, Updates at parts control board

SOW 3.4.1

LandIS-SE-40 LandIS Instrument Data Format Document

LandIS-SE-40-1:

R LandIS-SE-40-2:

R LandIS-SE-40-3:

A

LandIS-SE-40-1:IPDR -30 days, IPDR LandIS-SE-40-2:ICDR -30 days, ICDR LandIS-SE-40-3:IPSR -30 days, Instrument Pre-Ship Review

SOW 3.2.2

LandIS-SE-41 Contamination Control

Implementation Plan LandIS-SE-41-1:

R LandIS-SE-41-2:

A LandIS-SE-41-3:

R

LandIS-SE-41-1:PDR -30 days, Preliminary LandIS-SE-41-2:CDR -30 days, Final LandIS-SE-41-3:As required, Updates as necessary

SOW 3.5.12

SOW 3.4.14

LandIS-SE-42 TID/DDD Testing and Analysis for Parts Control Board Approval

LandIS-SE-42-1:

R LandIS-SE-42-2:

R LandIS-SE-42-3:

A

LandIS-SE-42-1:DACA +90 days, List of Known Susceptible Parts/Board/Box/Subsystem LandIS-SE-42-2:PDR -30 days, Preliminary parts list of radiation susceptible parts along with available analysis LandIS-SE-42-3:CDR or procurement -30 days, Required test data

SOW 3.4.1

LandIS-SE-43 Non-Destructive SEE Testing and Analysis for Parts Control Board Approval

LandIS-SE-43-1:

R LandIS-SE-43-2:

R LandIS-SE-43-3:

A

LandIS-SE-43-1:DACA +90 days, List of Known Susceptible Parts/Board/Box/Subsystem LandIS-SE-43-2:PDR -30 days, Preliminary parts list of radiation susceptible parts along with available analysis LandIS-SE-43-3:CDR or procurement -30 days, Required test data

SOW 3.4.1

LandIS-SE-44 Destructive SEE Testing and Analysis for Parts Control Board Approval

LandIS-SE-44-1:

R LandIS-SE-44-2:

R LandIS-SE-44-3:

A

LandIS-SE-44-1:DACA +90 days, List of Known Susceptible Parts/Board/Box/Subsystem LandIS-SE-44-2:PDR -30 days, Preliminary parts list of radiation susceptible parts along with available analysis LandIS-SE-44-3:CDR or procurement -30 days, Required test data

SOW 3.4.1

LandIS-SE-45 FPGA Development Plan LandIS-SE-45: A LandIS-SE-45:PDR -30 days, Final SOW 3.1.4.2 LandIS-SE-46 FPGA Design Data Package LandIS-SE-46-1:

R LandIS-SE-46-2:

A LandIS-SE-46-3:

A

LandIS-SE-46-1:IPDR -30 days, Initial LandIS-SE-46-2:ICDR -30 days, Final LandIS-SE-46-3:As Required, Updates as required

SOW 3.1.4.2

3.1.7 On Orbit Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-OO-1 LandIS On-Orbit Commissioning Plan LandIS-OO-1: A LandIS-OO-1:IPSR -90 days, Final SOW 3.12.7

SOW 3.12.11.1

LandIS-OO-2 Instrument User's Manual LandIS-OO-2-1: R

LandIS-OO-2-2: R LandIS-OO-2-1:IPDR, Initial LandIS-OO-2-2:ICDR, Updated

SOW 3.2.3

SOW 3.6.4

LandIS-OO-2-3: R LandIS-OO-2-3:IPSR, Final

LandIS-OO-3 On-Orbit Test Reports LandIS-OO-3: R LandIS-OO-3:Test +10 days, Final SOW3.12.11.1 LandIS-OO-4 On-Orbit Anomaly Resolution Support

Plan LandIS-OO-4-1: R LandIS-OO-4-2: R

LandIS-OO-4-1:MOR, Preliminary LandIS-OO-4-2:FOR, Final

SOW3.12.11.1

LandIS-OO-5 LandIS Launch Commit Criteria LandIS-OO-5-1: R LandIS-OO-5-2: R

LandIS-OO-5-1:Mission Sim 3 -90 days, Preliminary LandIS-OO-5-2:Launch -112 days, Final

SOW 3.6.2

LandIS-OO-6 Telemetry and Command Handbook LandIS-OO-6-1: R LandIS-OO-6-2: R LandIS-OO-6-3: R LandIS-OO-6-4: R LandIS-OO-6-5: R LandIS-OO-6-6: R LandIS-OO-6-7: R

LandIS-OO-6-1:ICDR -90 days, Preliminary handbook describing command and telemetry structure LandIS-OO-6-2:Start of Instrument I&T, Update document database information at start of I&T LandIS-OO-6-3:IPER, Update document database information at start of PER, CPT baseline LandIS-OO-6-4:IPSR, Update documenting data information at delivery LandIS-OO-6-5:As required, Updates based on observatory testing LandIS-OO-6-6:IPDR +90 days, Ancillary Data Definition LandIS-OO-6-7:ICDR +90 days, Ancillary Data Definition

SOW3.6.3

LandIS-OO-7 LandIS Launch and Early Orbit Procedures

LandIS-OO-7: R LandIS-OO-7:MRT5 -180 days SOW 3.6.2

LandIS-OO-8 LandIS On-Orbit Operations and Contingency Procedures

LandIS-OO-8-1: A LandIS-OO-8-1:MRT2 -180 days SOW 3.6.2

LandIS-OO-9 LandIS Training Materials LandIS-OO-9-1: R LandIS-OO-9-2: R

LandIS-OO-9-1:Training -56 days, Draft LandIS-OO-9-2:Training -28 days, Final

SOW 3.6.4

LandIS-OO-10 LandIS Constraints, Restrictions, and Warnings Document

LandIS-OO-10-1:

I LandIS-OO-10-2:

I LandIS-OO-10-3:

I

LandIS-OO-10-1:IIRR, Preliminary LandIS-OO-10-2:ORR, Update LandIS-OO-10-3:OAR, Final

SOW 3.6.2

LandIS-OO-11 LandIS Telemetry and Command Database

LandIS-OO-11-1:

R

LandIS-OO-11-1:ICDR -90 days, Initial to support LIS testing

SOW 3.6.3

LandIS-OO-11-2:

R LandIS-OO-11-3:

R LandIS-OO-11-4:

R LandIS-OO-11-5:

R

LandIS-OO-11-2:Start of Instrument I&T, Update LandIS-OO-11-3:IPER, Update for DB being used to qualify instrument LandIS-OO-11-4:IPSR, Update after instrument qualification LandIS-OO-11-5:Approx. Every 3 months until final On-Orbit acceptance of LandIS. To be negotiated based on Project and Testing Milestones, Update

LandIS-OO-12 LandIS On-Orbit Test and Calibration/Validation Procedures

LandIS-OO-12-1:

A

LandIS-OO-12-1:MRT5 -180 days SOW 3.12.11.1

3.1.8 System Assurance Data

CDRL Number CDRL Title Category Due Date and Maturity SOW Reference LandIS-SA-1 RESERVED LandIS-SA-2 Supplier List LandIS-SA-2-1: I

LandIS-SA-2-2: I LandIS-SA-2-1:Contract Award +60 days, Final LandIS-SA-2-2:Contract Award, Update

SOW 3.3, IMAR

1.8

LandIS-SA-3 RESERVED LandIS-SA-4 RESERVED LandIS-SA-5 RESERVED LandIS-SA-6 RESERVED LandIS-SA-7 System Safety Program Plan LandIS-SA-7-1: R

LandIS-SA-7-2: A LandIS-SA-7-3: R

LandIS-SA-7-1:ISRR, Preliminary LandIS-SA-7-2:MPDR -45 days, Final LandIS-SA-7-3:Implementation -30 days, Updates

SOW 3.3, IMAR

3.3.1

LandIS-SA-8 Safety Requirements Compliance Checklist

LandIS-SA-8-1: A LandIS-SA-8-2: A LandIS-SA-8-3: A

LandIS-SA-8-1:ISRR -45 days, Preliminary LandIS-SA-8-2:IPDR -45 days, Final LandIS-SA-8-3:ICDR -45 days, Update

SOW 3.3, IMAR

3.3.2

LandIS-SA-9 Operations Hazard Analysis and Hazard Verification Tracking Log

LandIS-SA-9: A LandIS-SA-9:SIR -45 days, Final SOW 3.3, IMAR 3.3.3.2

LandIS-SA-10 Instrument Safety Assessment Report

LandIS-SA-10-1:

R LandIS-SA-10-2:

R LandIS-SA-10-3:

A

LandIS-SA-10-1:IPDR -30 days, Preliminary LandIS-SA-10-2:ICDR -30 days, Intermediate LandIS-SA-10-3:IPSR -30 days, Final

SOW 3.3, IMAR

3.3.3.1

LandIS-SA-11 Hazardous Procedures for Payload

I&T and Pre-Launch Processing LandIS-SA-11-1:

R LandIS-SA-11-2:

R

LandIS-SA-11-1:First use -7 days, I&T Hazardous Procedure LandIS-SA-11-2:First use -65 days, Launch Range Hazardous Procedures

SOW 3.3, IMAR

3.3.6

LandIS-SA-12 Reliability Program Plan LandIS-SA-12-1:

R LandIS-SA-12-2:

A

LandIS-SA-12-1:ISRR -30 days, Draft LandIS-SA-12-2:ISRR +30 days, Final

SOW 3.3, IMAR

4.1

LandIS-SA-13 FMECA and Critical Items List LandIS-SA-13-1:

R LandIS-SA-13-2:

A

LandIS-SA-13-1:IPDR -30 days, Preliminary LandIS-SA-13-2:ICDR and each milestone Review upto LRR -30 days, Update

SOW 3.3, IMAR

4.2

LandIS-SA-14 Fault Tree Analysis LandIS-SA-14-1:

R LandIS-SA-14-2:

A

LandIS-SA-14-1:IPDR -30 days, Initial LandIS-SA-14-2:ICDR and each milestone Review upto LRR -30 days, Final

SOW 3.3, IMAR

4.3

LandIS-SA-15 Reliability Predictions Analysis LandIS-SA-15-1:

R LandIS-SA-15-2:

R LandIS-SA-15-3:

A LandIS-SA-15-4:

A

LandIS-SA-15-1:ISRR -30 days, Methodology LandIS-SA-15-2:IPDR -30 days, Initial LandIS-SA-15-3:ICDR and each milestone Review upto LRR -30 days, Final LandIS-SA-15-4:Changes +30 days, Update

SOW 3.3, IMAR

4.4

LandIS-SA-16 Limited-Life Items List LandIS-SA-16-1:

A LandIS-SA-16-2:

A

LandIS-SA-16-1:IPDR -30 days, Final LandIS-SA-16-2:Changes +30 days, Update

SOW 3.3, IMAR

4.5

LandIS-SA-17 Parts Stress Analysis LandIS-SA-17-1:

A LandIS-SA-17-2:

A

LandIS-SA-17-1:ICDR -30 days, Final LandIS-SA-17-2:Changes +30 days, Final

SOW 3.3, IMAR

4.6

LandIS-SA-18 Worst Case Analysis LandIS-SA-18-1:

A LandIS-SA-18-2:

A

LandIS-SA-18-1:ICDR -30 days, Final LandIS-SA-18-2:Changes +30 days, Update

SOW 3.3, IMAR

4.7

LandIS-SA-19 Software Assurance Plan LandIS-SA-19-1:

R

LandIS-SA-19-1:ISRR -30 days, Preliminary LandIS-SA-19-2:IPDR -15 days, Final

5.2

LandIS-SA-19-2:

A LandIS-SA-19-2:

A

LandIS-SA-19-2:ICDR -30 days, Update

LandIS-SA-20 RESERVED LandIS-SA-21 ESD control program LandIS-SA-21: I LandIS-SA-21:IPDR -30 days, Final SOW 3.3, IMAR

6.2 LandIS-SA-22 Printed Circuit Board (PCB)

Procurement Plan LandIS-SA-22-1:

A LandIS-SA-22-2:

A

LandIS-SA-22-1:ICDR -30 days, Preliminary LandIS-SA-22-2:Manufacturing -14 days, Update

SOW 3.3, IMAR

6.3

LandIS-SA-23 Lead-Free Control Plan LandIS-SA-23: I LandIS-SA-23:Contract Award +60 days, Final SOW 3.3, IMAR 6.4

LandIS-SA-24 EEE Parts Control Plan LandIS-SA-24: I LandIS-SA-24:Contract Award +30 days, Final SOW 3.3, IMAR 7.1

LandIS-SA-25 Master EEE Parts List LandIS-SA-25-1:

A LandIS-SA-25-2:

A

LandIS-SA-25-1:Initial LandIS-SA-25-2:Updates

SOW 3.3, IMAR

7.4

LandIS-SA-26 Materials & Processes Selection, Control, and Implementation Plan

LandIS-SA-26-1: I LandIS-SA-26-2:

A LandIS-SA-26-3:

A

LandIS-SA-26-1:ISRR -14 days, Initial LandIS-SA-26-2:IPDR -30 days, Draft LandIS-SA-26-3:ICDR -30 days, Final

SOW 3.3, IMAR

8.1

LandIS-SA-27 Materials Usage Agreement LandIS-SA-27-1:

A LandIS-SA-27-2:

A

LandIS-SA-27-1:ICDR -30 days, Final LandIS-SA-27-2:Identification +30 days, Update

SOW 3.3, IMAR

8.2

LandIS-SA-28 Materials Identification and Usage List

LandIS-SA-28-1:

R LandIS-SA-28-2:

A LandIS-SA-28-3:

A LandIS-SA-28-4:

A

LandIS-SA-28-1:IPDR -30 days, Preliminary LandIS-SA-28-2:ICDR -30 days, Final LandIS-SA-28-3:Identification +30 days, Updates LandIS-SA-28-4:IPSR +30 days, As Built

SOW 3.3, IMAR

8.3

LandIS-SA-29 Contamination Control Plan LandIS-SA-29-1:

R

LandIS-SA-29-1:IPDR -30 days, Preliminary LandIS-SA-29-2:ICDR -30 days, Final

9.1

LandIS-SA-29-2:

A LandIS-SA-29-3:

R LandIS-SA-29-4:

R

LandIS-SA-29-3:Thermal Vac Completion +30 days, Final Thermal Vac Result LandIS-SA-29-4:With End Item Data Package, Contamination Certificate

LandIS-SA-30 Foreign Object Debris Prevention and Control Plan

LandIS-SA-30: R LandIS-SA-30:IPDR -30 days, Final SOW 3.3, IMAR 9.3

LandIS-SA-31 End Item Data Package LandIS-SA-31-1:

A LandIS-SA-31-2:

A LandIS-SA-31-3:

A

LandIS-SA-31-1:IPSR -30 days, Preliminary LandIS-SA-31-2:Delivery -30 days, Final LandIS-SA-31-3:Identification +30 days, Updates

SOW 3.3, IMAR

LandIS-SA-32 RESERVED LandIS-SA-33 RESERVED LandIS-SA-34 Additive Manufacturing Control

Plan (AMCP) LandIS-SA-34-1: I LandIS-SA-34-2:

A LandIS-SA-34-3:

A

LandIS-SA-34-1:ISRR -14 days, AMCP LandIS-SA-34-2:IPDR -30 days, Updated AMCP LandIS-SA-34-3:ICDR -30 days, Final PPP

SOW 3.3, IMAR

8.4

LandIS-SA-35 AM Part Production Plan LandIS-SA-35-1: I LandIS-SA-35-2:

A

LandIS-SA-35-1:ICDR -30 days, Draft LandIS-SA-35-2:Manufacturing Readiness Reviews -30 days, Final

SOW 3.3, IMAR

8.5

LandIS-SA-36 Pre-Mishap Plan LandIS-SA-36-1:

R LandIS-SA-36-2:

A LandIS-SA-36-3:

A

LandIS-SA-36-1:ISRR -45 days, Preliminary LandIS-SA-36-2:IPDR -45 days, Final LandIS-SA-36-3:ICDR -45 days, Updates

3.3.7

4.0 DESCRIPTION OF REQUIRED DATA

4.1 PROGRAM MANAGEMENT DATA

CDRL No.: LandIS-PM-1 Title: Monthly Project Status Reviews Reference:

SOW 3.1.1

SOW 3.1.4.3.3

SOW 3.1.12

SOW 3.2

Related Documents:

Use:

To evaluate contract status. These reports will be used to provide an opportunity for face-to-face discussions between the contractor and the Government regarding project status, plans and issues.

Preparation Information:

Scope: The MPSR shall include all aspects of the contract effort.

The Monthly Project Status Review (MPSR) will be presented at a face-to-face meeting with the Government.

These meetings will occur at the contractor’s facility, unless modified by mutual consent.

The Monthly Project Status Review shall include the following:

A. Report of Key Technical Parameters; including mass and power budgets, peak and average power budgets, pointing knowledge and control error budgets, their current best estimated, calculated, and/or measured values for all parameters, and trends for each KTP. The list of reported Key Technical Parameters shall be agreed upon with the Government and may be revised by the Government as the situation dictates. The values to be presented shall be at least to the major component level of the subsystems, e.g. Mechanisms, Power supplies, heaters, cabling, etc. The accuracy of the values and units shall be identified. The status of margins and contingency based on maturity shall be presented.

B. Technical status for system and subsystem design and development activities, including subcontract technical performance , requirement TBx status and interface status.

C. Focal Plane Array Status; covering the FPA activities for the previous month, including: schedule and technical status of FPA development, manufacturing status, qualification and test status, issues and concerns D. Class I and Class II proposed and approved Configuration Control Board Changes E. Summary of Integrated Master Schedule Status, including a brief description of the current status of each subsystem or subassembly along with descriptions of any existing or potential problems areas. The critical path and near critical paths shall be explained along with possible work-arounds being considered to maintain the schedule. The third MPSR shall include a schedule baseline review. The basis of the review shall be the Integrated Master Schedule.

F. A detailed 12-month “rolling-wave” schedule (3 months of actual, plus 9 months of forecast) G. A summary and comparison of planned versus actual accomplishments for the period of time since the prior report.

H. Metrics summarizing all milestones depicting planned versus actual accomplishments and explanations for variances, e.g., graphic display of planned versus actual cumulative milestone status, xx of 1000 milestones are behind plan and why, etc.

I. Summary and explanation of key EVM parameter performance and trends. This shall include:

Cost/schedule trends, significant cost/schedule/technical variances, projected impacts, quantified risk assessments, and corrective action plans.

J. Problems encountered during the reporting period, and anticipated approaches for resolution (including, as appropriate, technical issues, manpower and staffing, supplier and subcontractor issues, etc.)

K. Status of open issues and problems from prior reporting periods L. Risk Status for top 10 risks M. Status of action items N. Identification and status of long-lead purchases/acquisitions planned or made prior to PDR and prior to

CDR.

O. Significant plans and activities for the following month, including upcoming milestone events depicting critical items of project status.

P. CDRL Status Report that includes the following information for each document delivered in accordance with the CDRL or overdue from previous reporting periods:

a. Document Number.

b. Document Title.

c. Scheduled Due Date.

d. Actual Submittal Date.

e. Current Status

f. a list of documents planned for delivery during the next reporting period, listed by document number, title, and scheduled submittal date.

Q. Summary graphical presentation of project workforce staffing depicting planned versus actuals (3 months actual, 9 months of forecast), explanation of variances, and discussion of key vacancies and staffing issues R. Summary of financial status S. Business issues, including personnel changes T. GOLD Rule Compliance Matrix and current status The contractor shall place MPSR material on the Government-access electronic database by the day of the MPSR. Presentation material may be in contractor format.

CDRL No.: LandIS-PM-2 Title: Integrated Master Schedule (IMS) Reference:

SOW 3.1.11

SOW 3.1.4.3.3

Related Documents:

NPR 7120.5F, NASA Space Flight Program and Project Management Requirements

• NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements

• NPR 7120.8, NASA Research and Technology Program and Project Management Requirements

• SP-2010-403, NASA Schedule Management Handbook

• 400-PG-7120.0.2B, NASA Goddard Flight Projects Directorate Schedule Management Procedures and Guidelines

• DI-MGMT-81861, Integrated Program Management Report, Format 6 IMS (Reference Only) Use:

To provide the contractor’s time-phased plan or “point estimate”, for performing the projects approved total scope of work and achieving the projects goals and objectives within a determined timeframe and with acceptable risks, in the form of a Critical Path Method-based integrated master schedule (IMS). The IMS also conveys the contractor’s current status, including actual work accomplishment, forecast to complete for work remaining, key milestones, task interdependencies, and development phases necessary to accomplish the approved total scope of work. This IMS will be used to provide and facilitate management insight into contractor baseline establishment, critical path identification, project status, schedule forecasting, schedule risk, and change management to support the evaluation of contractor performance within an integrated cost and schedule environment. Utilize any process and reporting synergies with finance and earned value management (EVM). Descriptions of scheduling terminology used in this DRD can be found in NASA’s Schedule Management Handbook.

Preparation Information:

The contract IMS shall include the tasks necessary to accomplish the approved total scope of work as identified in the contract statement of work (SOW) and defined in the Contract Work Breakdown Structure (CWBS). The IMS shall also include all logical relationships (interdependencies) between tasks. The IMS shall contain the approved baseline schedule as well as current forecast schedule. All key milestones shall be clearly identified and logically linked to related tasks including: contract milestones, design reviews, readiness reviews, and “givers/receivers” among subsystems/organizations (including subcontractor effort). The IMS shall be created and maintained in a project management software system that supports automated time phasing of tasks; a logic driven critical path; schedule assessments; trend analysis capabilities; and schedule baseline control. The IMS shall relate actual progress to the baseline and contain the current forecast for the remaining work/effort.

The IMS shall contain the following attributes:

1. CWBS Reference: All IMS tasks must be traceable to the CWBS to support integration with the cost/budget plan or performance measurement baseline (PMB) with a coding/flagging scheme referencing the appropriate CWBS number.

2. Contract SOW Reference: All IMS tasks must be traceable to the contract SOW to support integration with the cost/budget plan or PMB with a coding/flagging scheme referencing the appropriate CWBS number.

3. Task Designations: Includes WBSs for planning packages, control accounts, and work packages (WP) and activities must be identified in the IMS on contracts with an EVM requirement.

4. Earned Value Technique Designations: If the IMS is used to directly status the EVM tool, the contractor must identify at the task level the EVM technique used for determining the Budget Cost for Work Performed. Schedule status date must match the financial calendar end date.

5. Subcontractor Effort: At a minimum, subcontractor effort must be incorporated into the IMS at an intermediate level with key milestones and be distinguishable from the contractor’s in-house and interdivisional effort.

6. Schedule Baseline: The schedule baseline must be set and maintained at the task level of the IMS. If the schedule baseline is set for dates other than task early start and early finish dates, the contractor must provide a notification and justification to the Government.

7. Task Duration Rationale: The rationale for task durations exceeding 42 workdays must be explained in each task’s notes or other text field.

8. Predecessors and Successors Rationale: With the exception of the contract start and finish milestones, the rationale for any task without a predecessor or successor task must be described in the task’s notes or other text field.

9. Givers/Receivers: Deliverable and receivable products from one organizational element to another organization element must be identified with zero duration milestone tasks in the IMS and finish-to-start dependencies (for example, the deliverable of a subsystem, the “giver,” to system integration and test [I&T], the “receiver,” must each be a milestone task with zero-day…