Attachment H - LandIS Gold Rules Applicability Matrix-Rev B.pdf

PDF 2 MB Posted

Attached to
Landsat Next Instrument Suite (LandIS) Request for Proposal Federal contract opportunity
Solicitation number
80GSFC22R0038
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This draft request for proposal (RFP) is for the Landsat Next Instrument Suite (LandIS) to be issued by the National Aeronautics and Space Administration Goddard Space Flight Center (NASA GSFC). The RFP will solicit responses for the Landsat Next payload, which includes sensors to continue the Landsat program's multi-spectral imaging of Earth's surface. Interested offerors should monitor www.Sam.gov for release of the solicitation, which may include an option for continued operations and maintenance of the instrument suite. NASA intends to publicize respondents to facilitate teaming arrangements, though firms may request to opt out of this listing. The pre-solicitation notice does not constitute a funding commitment and is meant for planning purposes only.

View the file

Other files for this federal contract opportunity

Other files attached to Landsat Next Instrument Suite (LandIS) Request for Proposal, newest first.
File Type Posted
SF30-Amendment 2.pdf PDF
LandIS -RFP-Final-Amendment 2 Section B-M.pdf PDF
SF30-Amendment 1.pdf PDF
Attachment I - LNext Space Envrioments Requirements Document-Rev -.pdf PDF
Attachment K -Landsat Next Radiation Environment-Rev A.pdf PDF
Attachment N -LNext Analytical Math Models Document -Rev -.pdf PDF
Attachment T -IT Security Applicable Documents List.pdf PDF
Enclosure 6-IIT Security Management Plan Template.pdf PDF
Enclosure 7 - LNext SMASP Rev-.pdf PDF
Attachment C - LandIS DIL-Rev A.pdf PDF
Attachment E - LandIS SIM RD- Rev A.pdf PDF
Attachment J - LNERD-Rev A.pdf PDF
Enclosure 5 - LandIS Applicable and Reference Documents-Rev-A.pdf PDF
RFP Cover Letter.pdf PDF
Attachment A - LandIS SOW-Rev A.pdf PDF
Attachment B - LandIS CDRL and DID-Rev A.pdf PDF
Attachment G - LNext IMAR-Rev A.pdf PDF
Attachment L - Top of Atmosphere Rad Spectra Rev -.1.pdf PDF
Enclosure 2-LandIS Cost Exhibits 1-12C.pdf PDF
Enclosure 3- LandIS-PastPerfQuestionnaires.pdf PDF
Enclosure 4 - LNext WBS and Dictionary-Rev-A.pdf PDF
Enclosure 8 -LandIS Draft PEP.pdf PDF
LandIS -Final RFP-Section B -M.pdf PDF
LandIS Draft RFP_QA_Set 5.pdf PDF
LandIS Draft RFP_QA-Set 4.pdf PDF
LandIS Draft RFP_QA-Set 2b.pdf PDF
LandIS Draft RFP_QA-Set 3.pdf PDF
LandIS Draft RFP_QA-Set2a.pdf PDF
LandIS Draft RFP_QA-Set 2.pdf PDF
LandIS Draft RFP_QA-Set 1.pdf PDF
Attachment H - LandIS GOLD Rules Compliance Matrix.pdf PDF
Attachment I - LNext Space Envrioments Requirements Document (LSERD).pdf PDF
Enclosure 8 -Saftey Mission Assurance Surveillance Plan (SMASP) Rev- .pdf PDF
SF33-22.pdf PDF
Attachment C-LANDIS-DIL- Rev -.pdf PDF
Attachment D-LANDIS-LaRD Rev -.pdf PDF
Attachment E - LNext LandIS Sim RD Rev -.pdf PDF
Attachment F - LandIS IRD.pdf PDF
Attachment N - LNext Analytical Math Models Document Rev -.pdf PDF
Attachment O-LNEXT- Design Reference Case (DRC) Definition -v1.0 202.pdf PDF
Attachment P - SCTR SOW Appendix A Rev -.pdf PDF
Enclosure 3- LandIS-PastPerfQuestionnaires.pdf PDF
Enclosure 6 -OCI Avoidance Plan Outline template.pdf PDF
Attachment G - LNext IMAR Rev -.pdf PDF
Attachment L - Top of Atmosphere Rad Spectra Rev -.pdf PDF
Attachment M - LNEXT - WRS-3 Rev -.pdf PDF
Attachment T -IT Security Applicable Documents List.pdf PDF
Enclosure 9 - Draft LandIS PEP.pdf PDF
80GSFC22R0038_LandIS DRFP.pdf PDF
LandIS_DRFP-Cover-Letter.pdf PDF
Show all 50

Landsat Next Instrument Suite (LandIS) Request for Proposal has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LandIS GOLD Rules Applicability Matrix LNEXT-LANDIS-REQ-0016 Revision B ii

Landsat Next Instrument Suite (LandIS) GSFC-STD-1000, Goddard Open Learning Design (GOLD) Rules, Applicability

Matrix

Signature/Approval Page

Prepared by:

Electronic Signature in TDMS Approval Date in TDMS Joy Henegar-Leon Date Landsat Next Payload Technical Manager Org./Code 426

Approved by:

Electronic Signature in TDMS Approval Date in TDMS Wen-Ting Hsieh Date Landsat Next Payload Manager Org./Code 426

Approved by:

Electronic Signature in TDMS Approval Date in TDMS James Pontius Date Landsat Next Project Manager Org./Code 426 iii

CM Foreword This document is a Landsat Next Project Configuration Management (CM)-controlled document.

Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the Landsat Next CM Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.

Questions or comments concerning this document should be addressed to:

NASA/Goddard Space Flight Center Landsat Next Project Office, Code 426 Attention: Configuration Management Office Greenbelt, Maryland 20771 iv

Change History Log v

Table of Contents SIGNATURE/APPROVAL PAGE ................................................................................................ II

CM FOREWORD ..........................................................................................................................III

CHANGE HISTORY LOG .......................................................................................................... IV

TABLE OF CONTENTS ................................................................................................................ V

LIST OF FIGURES ........................................................................................................................ V

LIST OF TABLES .......................................................................................................................... V

1.0 INTRODUCTION

1.1 Related Documentation

1.1.1 Reference Documents

1.1.2 Applicable Program Documents

2.0 LANDIS GOLD RULES MATRIX

List of Figures No table of contents entries found.

List of Tables No table of contents entries found.

1.0 INTRODUCTION

This document describes the Goddard Open Learning Design (GOLD) Rules from Goddard Space Flight Center (GSFC) Rules for Design, Development, Verification and Operation of Flight Systems, GSFC-STD-1000H, that are applicable to the Landsat Next Instrument Suite (LandIS).

1.1 RELATED DOCUMENTATION

1.1.1 Reference Documents

Document Number Title Revision GSFC-STD-7000 General Environmental Verification Standard (GEVS) for

GSFC Flight Programs and Projects B

NASA-STD-5017 DESIGN AND DEVELOPMENT REQUIREMENTS FOR

MECHANISMS

B

NPR 7150.2 NASA Software Engineering Requirements D In this document, citations are assumed to be the latest version unless otherwise noted.

This document table was generated from the Landsat Next Referenced Documents List Draft Rev B

1.1.2 Applicable Program Documents

Document Number Title Section Reference LNEXT-SYS-REQ-0005 Landsat Next Environmental Requirements

Document (LNERD)

SEMP: TBD

LaRD: 2.4.5.3 IGR:Sections 2.2.4, 2.2.5, 2.4.2.5, 2.4.1.4.1, 2.4.5.3, 2.6.3, and 2.6.4, and Table 2.2.2-1, Table 2.4-1, Table 2.4.5.3-1, and Table 2.6.1-1

In this document, citations are assumed to be the latest version unless otherwise noted.

This document table was generated from the Landsat Next Referenced Documents List Draft Rev B

2.0 LANDIS GOLD RULES MATRIX

Rule No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

1.05 Single Point

Failures

Single point failures that prevent the ability to fully meet Mission success requirements shall be identified, and the risk associated with each shall be characterized, managed, and tracked and the system trades necessary to determine the need and effectiveness of mitigation efforts (e.g., redundancy, selection of robust parts, etc.) commensurate with mission class shall be conducted and documented.

Robust design approaches make the elimination of single point failures desirable. From a risk management perspective, it is recognized that the acceptance of some single point failures may be prudent. In these cases, it is essential to understand the attendant risks and ensure that they are communicated to senior management.

Yes

1.06 Resource

Margins

Mission-level resource margins shall be met in accordance with Table 1.06-1.

Compliance with these margins improves performance on cost and schedule as well as overall mission performance.

NOTE: Flight software margin guidelines are covered in Rule 3.07.

Yes

Rule No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

1.06-1

1.07 End-to-End

Phasing/Polarity Checks

All hardware whose performance is affected by polarity, orientation or position (sensors, switches, mechanisms and actuators) shall be verified by test and inspection for the proper polarity, orientation and position of all components. This includes all GN&C sensors and actuators which shall also undergo full end-to-end (i.e., from sensor stimulus to actuator response) phasing/polarity testing after spacecraft integration in the final flight configuration (hardware and software). All hardware that cannot be fully verified end-to-end in flight

Inadequate verification of signal phasing or polarity can result in unexpected on-orbit performance and possible loss of mission. Component-level and end-to-end phasing tests and flight software mitigations can ensure correct operation.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments configuration shall have flight software mitigations to efficiently correct phasing/polarity errors. The test methodology and results for all polarity/phasing testing shall be independently reviewed.

1.08 System End-to-

End Testing

System end-to-end testing shall be performed in the final flight configuration, hardware and software.

End-to-end testing shall be from instrument(s) sensor input, through the spacecraft, to a command and telemetry ground system.

End-to-end testing is the best verification of the system's functionality

Yes

1.09 Test as You Fly All GSFC missions shall follow a "Test as You Fly (TAYF) - Fly as You Test" approach, throughout all applicable life cycle phases. Each deviation to this approach, along with the rationale for the deviation, shall be documented and a waiver submitted. A project may elect to hold an engineering peer review (EPR), chaired by the rule owner or their designate, in the CDR time frame to discuss the expected TAYF exceptions, rationale and associated risks.

This EPR can serve as an expedited method for achieving rule owner acceptance of the project’s TAYF waivers. The TAYF exceptions list, along with the EPR minutes shall be maintained by the project configuration management systems. Deltas to the list shall be discussed at subsequent milestone reviews. Note: A waiver or exception to this rule will be based only on the specific elements that appear and are approved in the request and is not a global approval to waive TAYF for all elements.

Testing of all critical mission-operation elements as they will be flown greatly reduces the risk of encountering negative impacts upon Mission success, from partial to full loss of mission capability.

Yes

1.11 Qualification of

Heritage Flight Hardware

All heritage flight hardware shall be fully qualified and verified for use in its new application. This qualification shall take into consideration necessary design modifications, changes to expected environments, and differences in operational use.

All hardware, whether heritage or not, must be qualified for its expected environment and operational uses.

Yes

1.14 Mission Critical

Telemetry and

During time-sensitive events where failure to execute could result in failure to meet mission objectives, event telemetry shall be monitored and

With continuous telemetry and command capability, operators can prevent anomalous events from

No

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

Command Capability downlinked in real-time and/or recorded for downlink later. Mission-critical events include separation from the launch vehicle; power-up of major components or subsystems; deployment of mechanisms and/or mission-critical appendages;

initial thruster firings and all planned propulsive maneuvers required to establish mission orbit and/or achieve safe attitude. Following launch vehicle separation, critical deployments, and initial orbit attitude acquisition, continuous command coverage shall be maintained during all subsequent mission-critical events.

propagating to mission loss. Also, flight data will be available for anomaly investigations.

1.17 Safe Hold Mode All spacecraft shall have a power-positive, thermally safe, control mode (Safe Hold) to be entered in spacecraft emergencies. Safe Hold Mode shall have the following characteristics: (1) its safety shall not be compromised by the same credible fault that led to Safe Hold activation and (2) it shall employ the minimum hardware set required to maintain a safe attitude.

Safe Hold Mode should behave very predictably while minimizing its demands on the rest of the spacecraft.

This facilitates the survival, diagnosis, and recovery of the larger system. Complexity typically reduces the robustness of Safe Hold, since it increases the risk of failure due to existing spacecraft faults or unpredictable controller behavior.

No

1.19 Initial Thruster

Firing Limitations

If alternate actuators (e.g., reaction wheels) are present, the momentum induced by initial thruster firings shall be within the alternate actuators' capability to execute safe recovery of the spacecraft.

For subsequent firings, the Attitude Control System and Failure Detection and Correction shall be designed to limit excessive momentum beyond the capacity of the RWAs.

Polarity issues and thruster underperformance typically occur early in the mission. Both conditions can result in a spacecraft emergency due to excessive spacecraft spin rates.

No

1.20 Wetted Joints of

Hazardous Propellants

All joints in the propellant lines between the propellant supply tank and the first isolation valve shall be NDE-verified welds.

Failure of wetted joint poses a catastrophic threat to personnel and/or facility.

No

1.21 Over

Pressurization Protection in Liquid

The propulsion system design and operations shall preclude damage due to pressure surges ("water hammer"). (Note: See also rule 1.28 "Unintended Propellant Vapor Ignition.")

Pressure surges could result in damage to components or manifolds, leading to failure of the propulsion system, damage to facilities, and/or safety risk to personnel.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

Propulsion Systems

1.22 Purging of

Residual Test Fluids

Propulsion system design and the assembly & test plans shall preclude entrapment of test fluids that are reactive with wetted material or propellant.

Residual test fluids can be reactive with the propellant or corrosive to materials in the system leading to critical or catastrophic failure.

No

1.23 Spacecraft

"OFF"

Command

No single command shall result in Spacecraft "OFF." This includes both the single string spacecraft case and the redundant spacecraft with one side failed case.

Requiring multiple actions to power off the spacecraft will mitigate the possibility of an unintentional spacecraft power off.

No

1.24 Propulsion

System Safety Electrical Disconnect

An electrical disconnect "plug" and/or set of restrictive commands shall be provided to preclude inadvertent operation of propulsion system components.

Unplanned operation of propulsion system components (e.g., "dry" cycling of valve; heating of catalyst bed in air; firing of thrusters after loading propellant) can result in injury to personnel or damage to components.

No

1.25 Redundant

Systems

When redundant systems or functions are implemented, the redundant components, or functional command paths, shall be independent, such that the failure of one component or command path does not affect the other component or command path. The design shall avoid routing of redundant power/signals through a single connector, relay, integrated circuit or other common interface.

For redundancy to have its desired effects to enhance system reliability, care must be taken to maintain independence between the redundant and primary systems.

Yes

1.27 Propulsion

System Overtemp Fuse

Flight fuses (or other over-current protection devices) for wetted propulsion system components shall be derated per Table 4 of Section F3 of EEE- INST-002 relative to the current at which overheating of propellant will occur. (Note: See also rule 2.06 "System Fusing Architecture.")

Propulsion components such as pressure transducers normally draw very low current, and therefore their fuses are usually oversized. In such cases it may be possible for a malfunctioning component to overheat significantly without exceeding the rating of the fuse.

Any wetted component (i.e., in addition to fuses) that could be continuously powered should also be considered. Exceeding the auto-ignition temperature of propellant can result in mission failure or critical/catastrophic hazard to personnel and facility.

No

1.28 Unintended

Propellant Vapor Ignition

Propulsion system design and operations shall preclude ignition of propellants in the feed system.

Ignition of propellant vapor can occur due to a variety of conditions including (1) mixing of fuel and oxidizer in pressurant manifolds via diffusion and condensation; (2) pyrotechnic valve initiator products entering propellant

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments manifolds; (3) adiabatic compression of gas due to pressure surges, i.e., "water hammer" effects. These conditions can cause hardware damage and/or mission failure.

1.30 Controller

Stability Margins

The Attitude Control System (ACS) shall have stability margins of at least 6db for rigid body stability with 30 degrees phase margin. The magnitude of the flexible modes transmission in the open-loop transfer function shall be less than minus 12dB.

Proper gain and phase margins are required to maintain stability for reasonable unforeseen changes and uncertainty in spacecraft configuration.

No

1.31 Actuator Sizing

Margins

The Attitude Control System (ACS) actuator sizing shall reflect specified allowances for mass properties growth.

Knowledge of spacecraft mass and inertia can be very uncertain at early design stages, so actuator sizing should be done with the appropriate amount of margin to ensure a viable design.

No

1.32 Thruster and

Venting Impingement

Thruster or external venting plume impingement shall be analyzed and demonstrated to meet mission requirements.

Impingement is likely to contaminate critical surfaces and degrade material properties and can also create adverse and unpredictable S/C torques and unacceptable localized heating.

No

1.37 Stowage

Configuration

When a spacecraft is in its stowed (launch) configuration, it shall not obscure visibility of any attitude sensors required for acquisition and shall not block any antenna required for command and telemetry.

Establishment of spacecraft communications and acquisition of safe attitude are the two highest-priority post-separation activities and should not be dependent on completion of deployments.

Yes

1.39 Propellant

Sampling in Liquid Propulsion Systems

Liquid propellant quality shall be verified by sampling at point of use prior to loading spacecraft propulsion system.

Contaminated propellant could result in damage to components or manifolds, leading to failure of the propulsion system with a potential impact on mission success. If detected after loading propellant into the flight system, purging and cleansing the propulsion system of contaminants would incur significant cost and result in launch delay.

No

1.40 Maintaining

Command Authority of a Passive Spacecraft

All spacecraft shall be designed to prevent loss of command authority and command integrity.

Mission control needs to be maintained. No

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

1.41 GSE Use At

Launch Site

All testing of flight systems at the launch site shall only use GSE and test configurations that have been previously demonstrated with the flight hardware.

Proper operation of the spacecraft with umbilical length equal to or with similar impedance and circuit characteristics to that expected at the launch site shall be demonstrated. Note: Does not apply to launch site resident GSE.

New test configurations introduce unknown variables that could possibly result in unexpected test results or damage flight hardware

Yes

1.42 Powering Off

RF Command Receiver

The spacecraft RF Command Receiver shall not be powered off during nominal flight operations.

Preserves spacecraft command receipt capability. No

1.43 Flight Software

Update Demonstration

There shall be a pre-flight, end-to-end demonstration of code change, using the MOC and flight observatory, for any software which can be changed in flight. (If the system contains FPGAs that can be reprogrammed in-flight, the ability to do so from the MOC shall also be demonstrated.)

Demonstration of this capability for software not hosted in the spacecraft primary computer is often overlooked prior to launch

Yes

1.44 Early Interface

Testing

Spacecraft-to-payload electrical interfaces, including protocol and software compatibility, shall be tested with breadboard or engineering unit hardware, as soon as the hardware is available, preferably before the instrument (or component) CDR.

On multiple missions, it has been demonstrated that the time and effort to execute early interface tests reduces the overall mission cost and schedule by finding and correcting incompatibilities before they impact system-level I&T. While having well-written ICDs and/or the use of industry-standard interfaces, can minimize interface incompatibilities, there are often nuances that can only be uncovered via test.

Yes

1.45 System

Alignments

System alignment verifications shall be performed before and after exposure to system environmental testing to demonstrate alignment stability.

Demonstrates stability of alignments through the environments which gives confidence that alignments will not shift due to launch vibro-acoustic environment or post-launch thermal environment

Yes

1.46 Use of Micro-

Switches

Micro-switches shall be used for information only and shall not be used as the single means to initiate on-board autonomous activity or as an on-board interlock.

Micro-switches have known reliability issues. Yes

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

1.47 Design

Deployables For Test

Whenever practical, appendages and other deployables shall be capable of deployment under 1G conditions without the use of g-negation ground support equipment. When it is not practical to design for unassisted 1G deployment, the design shall have provisions for interfacing to gravity off-load GSE.

Numerous occasions where instrument doors, etc. are not designed for 1G deployment and don't have provisions built in for g-negation.

Yes

1.48 Space Data

Systems Standards

Data systems standards (e.g., CCSDS, OMG, commercial, international) shall be utilized by missions and implemented in all space communication systems.

Standardization of space data system interfaces, formats, and protocols within the Agency reduces the cost of specification and implementation of data systems. It increases reliability through the use of proven interfaces and heritage software and tested vendor products. Space data systems standards enable easier and lower-cost data interoperability between systems within a local system, across a Center or Agency, and with external partners.

No

2.01 Flight

Electronic Hardware Operating Time

One thousand (1000) hours of operating/power-on time shall be accumulated on all flight electronic hardware (including all redundant hardware) prior to launch. The last 350 hours of operating/power-on time shall be failure-free, of which at least 200 hours shall be in vacuum. For Class D and below, only the failure-free and vacuum requirements shall apply. For hardware expected to operate for less than 100 hours in-flight, proposed pre-launch operating hours shall be discussed with the rule owner.

Accumulated power-on time that demonstrates trouble-free parts performance helps reduce the risk of failures after launch.

Yes

2.05 System

Grounding Architecture

For all missions, a system grounding design shall be developed and documented for flight and GSE test configurations. Except for coaxial interfaces, structure or shields shall not be used for the primary circuit current return path. A dedicated conductor shall be included to provide the current return path with the smallest loop area possible.

Poor system grounding design will lead to grounding incompatibility between different systems during the integration phase, with potential degradation of end-to-end functional performance. Failure to consider GSE grounding could result in damage to flight hardware.

Yes

2.06 System Fusing

Architecture

A system fusing architecture shall be developed and documented for all missions, including the payloads.

All circuit breakers that can't be reset by command

Lack of a system fusing design may lead to fuse incompatibilities between the power source and the payloads, which could lead to the power source fuse

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

(i.e., fuses) should be easily accessible for replacement and/or for integrity verification at any time prior to launch vehicle integration.

being blown prior to the payloads. The system fusing design should maximize the reliability of the system.

2.13 Electrical

Connector Mating

All flight connectors where mating cannot be verified via ground tests, shall be clearly labeled and keyed uniquely, and mating of these connectors shall be verified visually to prevent incorrect mating. The design shall not use connectors that require a blind mating in system-level integration, test and launch operations.

Error in mating of interchangeable connectors can result in mission degradation or failure.

Yes

2.14 Protection of

Avionics Enclosures External Connectors Against ESD

All avionics enclosures shall be protected from ESD. All external connectors must be fitted with shorting plugs or appropriate caps during transportation between locations. Additionally, all test points and plugs must be capped or protected from discharge for flight.

Capping open connectors provides protection from electrostatic discharge resulting from space charging.

Yes

2.22 Corona Region

Testing of High Voltage Equipment

Assemblies containing a High Voltage (>150V) supply that is not tested through the Corona region shall undergo venting / outgassing analysis to determine when it is safe to turn on and operate after launch.

Each High Voltage supply is different in its design and the voltage where coronal discharge may occur will vary by the construction and materials used. It will also be dependent on how clean the supply is and how well the outgassing products are vented to space.

Yes

2.23 RF Component

Testing for Multipaction and Corona

Multipactor and corona margins for component of spacecraft RF communications subsystems shall be maintained at the mission frequencies. All components shall be vented.

• If the RF transmitter is on during launch and ascent, all flight components in the transmit path shall be verified as corona free at all pressures from sea level to 1E-4 Torr.

• Resonant passive flight components shall be verified as multipactor free by test on all units.

• Non-resonant passive flight components shall be verified as multipactor free by test or analysis.

• The test setup shall be verified with a known breakdown device.

Unless significant design margin is demonstrated, small unit-to-unit variations make it impossible to predict whether an RF component is susceptible to Multipaction or Corona. Testing/Analysis will ensure immunity to multipactor/corona at the component level.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

• Multipactor analysis shall show a 10dB margin.

• Multipactor test level for the passive components shall be at least 6dB above the nominal power level in vacuum (<1E-5 Torr) during unit acceptance testing.

2.24 Solar Arrays a. Solar arrays shall incorporate solar cells that have been qualified per AIAA-S-111A-2014, “Qualification and Quality Requirements for Space Solar Cells.” If a later revision of AIAA-S-111 has been released by the time of contract award for the mission, the later revision shall govern.

b. Solar panels shall be qualified to the mission environment via qualification panels per AIAA-S-112A-2013 (or equivalent), “Qualification and Quality Requirements for Electrical Components on Space Solar Panels.” If a later revision of AIAA-S-112 has been released by the time of contract award for the mission, the later revision shall govern.

c. Qualification and flight solar panels shall be tested at ambient temperature and at their highest predicted operating temperature including calibrated I-V curves (where practical) before and after panel-level environmental testing.

d. Flight solar arrays shall be tested at wing level or array level at ambient temperature including calibrated I-V curves after all environmental testing (integrated to the spacecraft or not) is complete.

Should the flight solar array be stored for a period of more than two years after the post-environmental array testing is complete, the calibrated I-V curve measurements at ambient temperature shall be repeated prior to launch.

Space solar arrays must survive severe environments including particulate radiation, UV, and up to tens of thousands of very rapid temperature excursions between cold and hot. Incremental changes to parts and processes can have unexpectedly large consequences. Therefore, it is essential that the solar array for each mission be rigorously qualified and tested for that mission.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

2.25 Electrical

Interface Verification

Electrical Interface (i.e., copper-path) Verification Test (IVT) shall be performed on all flight connectors following final flight mating. This may be performed via powered testing and/or physical (e.g., resistance) measurements.

Final verification of flight interfaces is required to ensure proper electrical integrity and function, thereby minimizing the probability of system failure and maximizing probability of mission success.

Yes

2.26 Power-On Reset

Visibility

A power-on reset occurrence shall be unambiguously identifiable via telemetry. Note:

This does not imply real-time telemetry as the reset is occurring.

An unexpected power-on reset could be an indication of a serious issue and should be able to be distinguished from resets that are indicative of less serious conditions.

Yes

2.27 Spacecraft

Strip-Charting Capability

A minimal set of hard-line spacecraft parameters, sufficient to establish spacecraft health and safety, shall be monitored and captured (stored), independent of the spacecraft telemetry system, by the EGSE whenever the spacecraft is powered. This data should be sampled at a rate sufficiently high to aid in diagnosis of abnormal power events.

This capability is necessary to capture data for anomalous behavior on the spacecraft during I&T when spacecraft telemetry is not available.

No

3.01 Verification and

Validation Program for Mission Software Systems

A thorough verification and validation process shall be applied to all mission software systems. This process shall trace customer/mission operations concepts and science requirements to implementation requirements and system design and shall include requirements-based testing of all mission elements, and end-to-end system operations scenario testing.

Mission software, especially flight software, must be tested thoroughly to ensure a successful mission/project.

The activities described below provide guidance on recommended software verification and validation activities at each lifecycle phase to supplement the requirements found in NPR 7150.2.

Yes

3.02 Elimination of

Unreachable Software

An analysis of unreachable code, as defined per Table 3.02-1, shall be performed on the intended software that is associated with space flight operation. The analysis shall identify all instances (areas) of unreachable code, the general functionality associated with the code, the reason each is intended to be left within the software, and the justification (e.g., mitigating action) that explains why the included code does not provide a risk to the mission. The focus is on technical risk to the long-term mission, not cost.

There are significant benefits to re-using software from past missions, but each mission has different requirements and re-using heritage software often carries forward software not required by the current mission. Unreachable software can also occur within a mission's lifecycle as system and software requirements change during the software development process.

Unreachable software is typically not verified or validated as part of the current mission test programs, as a mission is only required to verify its mission requirements. This creates the potential for negative side-effects, costs, and risks during the current mission's

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments on-orbit life. Table 3.02-2 provides sample types of unreachable code.

Table 3.02-1

3.02-2

3.03 High Fidelity

Interface Simulation Capabilities

A high-fidelity software simulation capability for each external interface to FSW shall be provided in the FSW development/maintenance environments.

Both nominal and anomalous data inputs to FSW shall be configurable in real-time using the procedure language of the FSW test workstation.

The organization building the flight article being simulated shall also be responsible for the simulator.

If this is not feasible, then the developing organization shall provide inputs for and participate in the requirements, design and development of the simulator.

When adequate simulation capabilities aren't planned, there may be significant impact to FSW development/maintenance productivity and funds.

Yes

3.04 Independent

Software Testing

Software build testing, system testing, and acceptance testing shall be performed by qualified testers that are independent of the software designers

Ideally, an independent team should develop the software test plan and verification/validation test procedures and execute the tests. Frequently the

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments and developers. NOTE: Members of the same development team can perform independent testing as long as the assigned testers have not been involved in any part of the design and development of the software components being tested.

software development team will be used to perform these functions as a means to reduce cost and schedule.

Having authored the code, they already know how it should function and can quickly perform the testing activities. The independent test team approach is non-biased, with an end-user perspective, and specialized test teams frequently have greater expertise on various test tools and technologies; thus, providing a more thorough and comprehensive test program. An independent test team ensures adequate time for testing because there is a clear demarcation between development and testing. However, if utilizing an independent test team is not feasible, at a minimum, the use of independent testers who were not involved with the software design and development process allows alternate interpretations of requirements and multiple approaches to testing.

3.05 Ground

System/Operati ons Testing and Operations Team Readiness

Access to flight system interface and functional capabilities, provided either by the spacecraft or by spacecraft simulators, shall be negotiated with all stakeholders, including the ground system and operations teams. Schedules and agreements should address the spacecraft/spacecraft simulators/instrument(s)/instrument simulator(s) at all levels of fidelity.

The ground system must be compatible with the S/C it is being designed to support, and this must be proven prior to launch via tests. Similarly, the operations team must be able to develop and validate a variety of operations products, such as procedures, databases, display pages, and launch scripts. The operations team must also have opportunities to learn about operating the S/C and prove this knowledge has been acquired prior to launch.

Yes

3.06 Dedicated

Hardware Computing Platform Testbed for Flight Software and Reconfigurable FPGA Lifecycle Development

A data processing system testbed(s), representative of the flight hardware, shall be dedicated to FSW/FPGA product development teams specifically for development, integration and test. The quantity of f data system testbed units shall be sufficient to support the FSW/FPGA development schedule and the overall mission schedule.

Early investment in dedicated flight computing system testbeds with high fidelity hardware saves costs and avoids significant schedule risks associated with FSW/FPGA development and downstream flight integration and test. Anything less than a dedicated hardware unit that is representative of the flight processing system (e.g., ETU, EDU, flight spare) will add to mission risk and threaten cost/schedule.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

3.07 Flight Software

Margins

Flight software resource margins shall be maintained in accordance with Table 3.07-1 and presented at Key Decision Point (KDP) milestone reviews.

Early and repeated attention by flight software teams to resource utilization will improve resource margins for future phases of the mission.

Yes

Table 3.07-1 Intro

3.07-1

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

Table 3.07-1 Notes

3.07-1 Notes

3.10 Flight

Operations Preparations and Team Development

Experienced operations personnel shall participate as early as possible during mission development, preferably during the mission operations concept phase and the development of specifications for the spacecraft and/or instruments which impact operations. Ideally, the Flight Operations Team

Involving experienced operations personnel early in the mission helps ensure that the mission design will be considerate of operational requirements and practicalities. It will allow the operations team to become intimately familiar with the mission design, including design rationale, spacecraft limitations, and

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

(FOT) will supply Test Conductors to support Observatory I&T, which will serve to prepare and train the FOT. As a minimum, the FOT shall participate in flight operations readiness tests that are specified in Table 3.10. Note that these serve as guidelines and are not intended to be prescriptive.

operating constraints. Involving FOT members during mission operations readiness tests gives them a great deal of hands-on experience with the observatory prior to launch thereby enhancing their training; and the FOT will be able to assume their responsibility with a reasonable degree of skill and knowledge for conducting on-orbit spacecraft operations.

3.10

3.11 Long Duration

And Failure Free System Level Test of Flight and Ground System Software

Ground test of the fully integrated FSW and ground system shall include demonstration of error free operations-like scenarios over an extended time period. The minimum duration of uninterrupted FSW system-level test (on the highest fidelity FSW testbed) and ground system operations is 72 hours for Class A and B missions; 48 hours for Class C missions; and, 36 hours for Class D missions, respectively. Planetary missions should consider test durations longer than the above guidance commensurate with the planned ConOps.

Frequent restart of FSW and the ground system during ground tests may mask problems which will only occur following extended execution of these systems. Also, ground system stress testing is needed to ensure reliable operation. The number of hours specified is based on discussion with senior-level engineers, and reflect best practices accumulated over a period of 15 years.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

3.13 Maintaining

Adequate Resources for Mission Critical Components

The updating of mission critical components during the mission operations phase (including any combination of hardware platforms, hardware devices, and software code) shall not compromise the capability of the system to meet mission requirements. Missions shall provide sufficient quantities of flight and ground resources to allow development, test, and operations activities to be conducted without compromising mission availability requirements.

Missions should provide sufficient resources to allow updates to mission critical/high availability components, such as flight software and ground system components directly supporting space-ground communications, to be developed and tested without compromising operations.

Missions should also ensure against inadvertent updates or deliberate concurrent updates of mission critical/high availability components. For example, under no circumstances should prime and redundant components, such as prime and backup flight software code images, be modified/updated concurrently, before the operational performance of the change is properly verified in a single unit.

Yes

3.14 Command

Procedure Changes

Command procedures and/or scripts, and mission databases (onboard and ground) shall be controlled (treated with the same rigor as changes to flight critical software). This includes formal configuration management, peer review by knowledgeable technical personnel, and full verification with up-to-date simulations wherever possible. (Routine command loads to perform nominal operations may require less test rigor based on experience of senior engineers.)

Changes in command procedures and critical database areas that are not tracked, controlled, and fully tested can cause loss of science and/or the mission.

Yes

4.01 Contamination

Control, Planning, and Execution

Specific contamination control requirements and processes (such as analytical modeling, laboratory investigations, and contamination protection and avoidance plans) that support mission objectives shall be identified.

Contamination sensitive components are often critical elements that directly affect system performance. It is essential that critical component performance be preserved and not allowed to degrade due to contamination exposure & accumulations. Early attention to pinpointing susceptibilities to contamination degradation in the design as well as iterating allowable degradation due to contamination in the science performance requirements allows project management to identify risks and mitigations with the least impact to cost and schedule. Monitoring early on-orbit performance and documenting lessons learned benefits all future GSFC missions.

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

4.03 Factors of

Safety for Structural Analysis and Design, and Mechanical Test Factors & Durations

Structural analysis and design factors of safety shall apply to all systems in accordance with GEVS Section 2.2.5.The project shall employ the mechanical test factors and durations in accordance with GEVS Section 2.2.4.

This will provide confidence that the hardware will not experience failure or detrimental permanent deformation under test, ground handling, launch, or operational conditions.

Yes, per

LNERD

Sections 2.2.5 and 2.2.4

4.06 Validation of

Thermal Coatings Properties

All thermal coatings properties that drive thermally significant performance shall be determined, measured and validated to be accurate for materials and mission flight parameters over the lifecycle of the mission. All thermal analysis shall employ these properties. The GSFC Coatings Committee (chaired by Code 546) shall review and approve the coatings properties.

Thermal coatings properties directly affect Mission success through S/C or instrument thermal design. Early assessment of thermal coating ensures the mission objectives will be met.

Yes

4.10 Minimum

Workmanship

All electrical, electronic, and electro-mechanical components shall be subjected to minimum workmanship test levels as specified in GEVS Section 2.4.2.5.

The workmanship levels defined in GEVS Section

2.4.2.5 have been found to be the minimum input level necessary to adequately screen the hardware types above for workmanship flaws.

Yes, per

LNERD

Section 2.4.2.5

4.11 Testing in

Flight Configuration

Mechanical environmental testing (sine, random, & acoustic, shock, etc.) of flight hardware shall be performed with the test article in the flight like configuration. Mechanisms shall be configured for flight, and the flight (or flight like) blankets and harness shall be present for test. The flight optical system shall also be present for the test and configured for flight.

Testing in-flight configuration ensures that hardware which is difficult to analyze (i.e., blankets, harnesses, mechanisms) will be adequately screened by environmental testing for design or workmanship flaws.

The presence of the optical system in this testing enables verification that the performance stability of the as-built opto-mechanical configuration is compliant to requirements (e.g., wave-front error, alignment, etc.)

before and after testing.

Yes

4.12 Structural Proof

Testing

Primary and secondary structures fabricated from nonmetallic composites, beryllium, or containing bonded joints, bonded inserts, or critical welds shall be proof tested in accordance with GSFC-Std-7000 Section 2.4.1.4.1. The following definitions should be used to interpret this GOLD Rule:

The mechanical strength of the above items is dependent on workmanship and processing and can only be verified by proof testing.

Yes, per

LNERD

Section

2.4.1.4.1 and Table 2.2.2-1 Flight System Hardware

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments

Primary Structure – Structure in the primary load path that carries the operational or test loads of the system to the structural boundary and whose failure would result in loss of structural integrity.

Secondary Structure – Structure that is not in the primary load path and whose failure would not result in loss of structural integrity but would result in an unacceptable loss of capability for the system to meet functional requirements. Secondary structure includes structure whose failure could result in damage to other hardware critical to meeting the functional requirements of the system.

Tertiary Structure – Structure not in the primary load path whose failure would not affect structural integrity or the ability of the system to meet functional requirements.

Note: Classification of structures should be evaluated at each level of assembly as defined in GEVS (system, subsystem, component).

Levels of Assembly

4.14 Structural and

Mechanical Test Verification

Structural and Mechanical Test Verification program shall comply with GEVS-Table 2.4-1, Structural and Mechanical Verification Test Requirements.

Demonstration of structural requirements is a key risk reduction activity during mission development.

Yes, per LNERD Table 2.4.1-1 Structural and Mechanical Verification Test Requirements

4.15 Torque/Force

Margin

The Torque/Force Margin (TM) requirement defined in NASA-STD-5017, Section 4.3 shall apply to all mechanical functions, those driven by motors as well as springs, etc. at beginning of life (BOL). End of Life (EOL) mechanism performance shall be determined by life testing, and/or by analysis;

however, all torque increases due to life test results and/or analysis shall be included in the final TM calculation and verification. Margins shall include

The torque or force margin needs to be sufficiently large to guarantee system-performance under worst-case conditions throughout its life by fully accommodating the uncertainty in the resisting forces or torques and in the source of energy.

Yes, per

LNERD

Section 2.4.5.3 and Table 2.4.5.3-1 Torque/Force Margins By Project Phase

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments all flight drive electronics effects and limitations.

Note: use higher safety factors as appropriate for immature mechanism designs with no engineering test data to significantly substantiate resistive torque/force loads. See GEVS Section 2.4.5.3 for suggested factors to be considered by mission phase.

4.18 Deployment and

Articulation Verification

All flight deployables, movable appendages, and mechanisms shall demonstrate full range of motion and articulation under worst-case conditions, when being driven by the flight avionics (i.e., not EGSE) prior to flight.

Environmental factors such as temperature, gravity, acceleration fields, wire bundle stiffness, and others can adversely affect successful deployment. Additionally, initiation of mechanism release with EGSE could result in masking system-level design issues. Verification of these systems under worst-case conditions will improve on-orbit success.

Yes

4.20 Fastener

Locking

All threaded fasteners shall employ a minimum of one locking feature that does not depend on fastener preload to function.Exception: Swagelock compression fittings are not required to have a locking feature, but it is recommended. See Code 543 for best practices/approaches for adding a secondary locking feature.

If not locked in the torqued, preloaded position, threaded fasteners subjected to vibration and thermal cycling loads may experience a reduction in preload and fully back out potentially jeopardizing the mission.

Yes

4.21 Brush-type

Motor Use Avoidance

Designs shall avoid brush-type motors for critical applications with very low relative humidity or vacuum operations. Intentionally excluded from this rule are contacting sensory and signal power transfer devices such as potentiometers and electrical contact ring assemblies (slip rings, roll rings), etc.

The operating life of the brush-type motors can be significantly decreased in extremely dry or vacuum conditions. Critical components relying on brush-type motors could be rendered inoperable due to excessively worn brushes or brush particulate contamination.

Yes

4.22 Precision

Component Assembly

When precise location of a component is required, the design shall use a stable, positive location system (not relying on friction) as the primary means of attachment.

When in the domain of arc-sec to sub-arc-sec location requirements, the use of pinning or similar non-friction reliant method will help ensure alignment is maintained through all expected stresses.

Yes

4.23 Life Test Once requirements and design are stabilized to a high degree of certainty, a life test shall be conducted, within representative operational environments, to at least 2x expected life for all repetitive motion devices with a goal of completing 1x expected life by CDR. The differences between

Degradation in repetitive motion devices from wear, fatigue, lubrication degradation, etc., can have serious negative impacts on mission success. Continuing the life test post-launch, if required, provides valuable information of potential anomalous conditions that

No.

GSFC-STD-

1000H Rule Title

GSFC-STD-1000H Rule Text GSFC-STD-1000H Rule Rationale LandIS Applicability and Comments the life-test drive electronics and the flight drive electronics (e.g., voltage, current, duty cycle, etc.)

could affect mechanism operating life and should be considered in the life-test.

could be used to modify mechanism flight operations to meet minimum mission requirements.

4.24 Mechanical

Clearance Verification

Verification of mechanical clearances and margins (e.g., potential reduced clearances after blanket expansion) shall be performed on the final as-built hardware.

Proper mechanical clearances are often critical to successful on-orbit performance (e.g., free-movement area, thruster impingement, FOV, etc.). Verification through analysis and drawing checking alone is not sufficient to properly demonstrate adequate clearance.

Yes

4.25 Thermal Design

Margins

Thermal design shall provide adequate margin between stacked worst-case flight predictions and component allowable flight temperature limits per

GEVS 2.6

Note: This applies to normal operations and planned contingency modes. This does not apply to cryogenic systems.

Positive temperature margins are required to account for uncertainties in power dissipations, environments, and thermal system parameters.

Yes, however per GEVS Section 2.6.1 Definitions, thermal design margins are not specified, but instead should be set up to ensure that test verifications of required thermal margins are fully successful.

4.27 Test

Temperature Margins

Components and systems shall be tested beyond allowable flight temperature limits, to proto-flight or acceptance test levels as specified…