Attachment 3_Q-3.pdf

PDF 27 KB Posted

Attached to
Gulfstream III Aircraft NASA 808 72-Month Inspections
Solicitation number
80AFRC26Q0003
Issued by

About this file

This document outlines the Procurement Quality Requirements established by NASA Armstrong Flight Research Center (AFRC) for contractors, effective November 19, 2018. The requirements mandate that all articles and materials ordered under NASA AFRC contracts are subject to source inspection and/or testing by a NASA Quality Assurance Representative (QAR) at the contractor's facility prior to delivery. Contractors must contact their NASA Buyer to identify their assigned QAR and obtain a list of mandatory inspection points (MIP) or test requirements before commencing work. The contractor is responsible for notifying the NASA QAR at least two days in advance of work completion requiring NASA inspection, or seven work days if the facility is located outside the NASA AFRC commuting area. Each shipment must include objective evidence demonstrating that the NASA QAR has completed source inspection or testing prior to release from the contractor's facility.

The quality assurance terms and conditions require prime suppliers to ensure that competent and qualified personnel handle aircraft parts and flow down all NASA AFRC quality requirements to any sub-tier suppliers. Prime suppliers must maintain or ensure their sub-tier suppliers maintain a quality management system such as AS9100, AS9120, ISO 9001, AS5553, or AS6081. NASA AFRC will monitor external provider performance through multiple systems including the Supplier Assessment System (SAS), Government-Industry Data Exchange Program (GIDEP), ERAI, non-conformance reports, and the Procurement Quality Assurance Database. Contractors are required to retain records in accordance with Federal Acquisitions Regulation (FAR) subpart 4.7.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Armstrong Flight Research Center

PROCUREMENT QUALITY REQUIREMENTS

Approved 19 Nov 2018

Q-3

A. SOURCE INSPECTION AND/OR TEST IS REQUIRED BY NASA

QUALITY REPRESENTATIVE

1. Articles and materials ordered by this contract are subject to NASA Quality inspection or test at the Contractor facility prior to delivery. Contact your NASA Buyer for the name and phone number of your NASA Quality Assurance Representative (QAR). The NASA QAR will provide a list of the mandatory inspection points (MIP) or test requirements for this contract. Do not start work on this order until the mandatory inspection points are established and understood. Verification of material or properties may be the first MIP.

The Contractor shall notify NASA QAR at least 2 days prior to completion of work requiring NASA inspection or test. A seven work day notification is required prior to the completion on the work requiring NASA QA inspection when the facility is out of the commuting area of NASA AFRC. The NASA mandatory inspection points were established at contract award. The advance notice is to permit the NASA QAR adequate scheduling of required contractual inspection and/or testing at the Contractor facility or other site as applicable.

At the time of such source inspection and/or test by NASA QAR, the Contractor shall provide the NASA representative with verifiable quality evidence to assure that the items meet the requirements of the contract.

2. The source inspection and/or test provided herein shall not constitute final acceptance of the items unless it is specifically stated in contract documents that final acceptance by NASA QAR will be performed at the Contractor facility.

3. Each shipment against this contract shall include objective evidence that NASA QAR has completed source inspection or test prior to shipment from the contractor’s facility or site as applicable.

4. Please contact one of these individuals to schedule a visit of a NASA Quality Assurance Representative.

PROCUREMENT QUALITY ASSURANCE TERMS AND CONDITIONS

• The Prime Supplier must ensure that the release of all products and services have competent and qualified persons handling aircraft parts.

• NASA Armstrong Flight Research Center (AFRC) will maintain interaction with Prime Supplier regarding the control and monitoring of the Prime Supplier’s performance as well as any verification or validation activities that the Prime Supplier or its customer, intends to perform at an external provider’s premises.

NASA Armstrong Flight Research Center

PROCUREMENT QUALITY ASSURANCE TERMS AND

CONDITIONS

• If the Prime Supplier is using a Sub-Tier Supplier the Prime Supplier must ensure that NASA AFRC quality requirements are flowed down to external providers.

• The Prime Supplier must have, or ensure that their Sub-Tier Supplier has, a quality management system (e.g. AS9100, AS9120, ISO 9001, AS5553, AS6081).

• NASA AFRC will monitor external provider performance via Supplier Assessment System (SAS), Government-Industry Data Exchange Program (GIDEP), ERAI, documentation of incoming Non-Conformance Reports, and Procurement Quality Assurance Database as applicable.

• Contractor shall retain records in accordance with Federal Acquisitions Regulation (FAR) subpart 4.7.

File details come from the government source that posted it. Updated .