AFCS Pre-Proposal Conference Presentation and List of Attendees

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Flight Crew Support, newest first.
File Type Posted
Source_Selection_Statement_-_FBO.pdf PDF
80AFRC18R0001_Amendment_No._2.pdf PDF
Questions_and_Responses.pdf PDF
80AFRC18R0001_Amendment_No._1.pdf PDF
Attachment_2_-_AFRC_80AFRC18R001_PWS_2-12-18.pdf PDF
Attachment_2_-_AFRC_PWS.pdf PDF
Attachment_4_-_DD_254.pdf PDF
Attachment_9_-_Past_Performance_Questionnaire.pdf PDF
Attachment_1_-_Agencywide_PWS.pdf PDF
Solicitation_No._80AFRC18R0001.pdf PDF
Attachment_3_-_GFP.pdf PDF
Attachment_5_-_DRD_Monthly_Report.pdf PDF
Attachment_5_-_DRD_Monthly_Report.pdf PDF
Draft_Solicitation.pdf PDF
Attachment_4_-_DD_254.pdf PDF
Attachment_1_-_Agencywide_PWS.pdf PDF
Attachment_3_-_GFP.pdf PDF
Attachment_9_-_Past_Performance_Questionnaire.pdf PDF
Attachment_2_-_AFRC_PWS.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Armstrong Flight Research Center

• Aircraft Flight Crew Support (AFCS) Services

• Pre-Proposal Conference

– Solicitation No. 80AFRC18R0001

– February 5, 2018

– Solicitation Overview

• Angela Stinchfield – Contracting Officer

• James Williams – Contracting Officer

– Technical Overview

• Troy Asher – Deputy Director, Flight Operations

• David (Nils) Larson – Chief Pilot

1Armstrong Flight Research Center Aircraft Flight Crew Support (AFCS)

Introduction

• The purpose of this contract is to provide aircrew support operations for all aircraft assigned to Armstrong Flight Research Center (AFRC). Contractor shall manage its workforce to ensure that quality products and safe operations are provided to NASA and NASA customers.

2Armstrong Flight Research Center

AFCS

Scope

• AFRC aircraft are operated to meet both Center and Agency platform, research, and support aircraft requirements.

• AFRC aircraft are defined as those located at main campus (Edwards Air Force Base, California) and Building 703 located in Palmdale, California.

• During deployments, AFRC may conduct aircraft operations from other facilities, including Contiguous United States (CONUS) and Outside Contiguous United States (OCONUS).

• The Contractor shall support all aircraft aircrew operations (Pilots, Flight Engineers, Navigator/Mission Planner and Flight Instructors). This include non-flying duties (i.e.

mission planning, training plans, flight manual support).

3Armstrong Flight Research Center

Solicitation Overview Read the solicitation carefully:

• There are numerous clauses and provisions that have been incorporated via full text, by reference or per an addendum throughout the document.

• Clauses incorporated by reference have the same force and effect as if they were included in full text.

• The Request for Proposal (RFP) contains several blanks that require fill-in by the Offeror. If the information is not applicable, Offeror should insert “N/A”.

• Any information provided during the pre-proposal conference does not amend the solicitation. All changes made to the solicitation will be made by a formal amendment.

4Armstrong Flight Research Center

RFP Highlights

• Solicitation No.: 80AFRC18R0001

• Contract Type: Indefinite Delivery, Indefinite Quantity (IDIQ) requirement to a single contractor with the ability to issue Firm-Fixed Price task orders for the core requirement;

and a Time and Materials Contract Line Item Number (CLIN) for defined labor rates, materials, training, travel, or other direct costs.

• Method of Competition: Full and Open Competition

• NAICS Code and Size Standard

– NAICS Code 488190 – Other Support Activities for Air Transportation

– Size Standard - $32,000,000.00 5Armstrong Flight Research Center

RFP Highlights

• 30 Day Phase-In Period

• One (1) Year Base Period with Four (4) One-Year Options

– 30 day Phase In: 6/1/2018 – 6/30/2018

– Base Period: 7/1/2018 – 6/30/2019

– Option 1: 7/1/2019 – 6/30/2020

– Option 2: 7/1/2020 – 6/30/2021

– Option 3: 7/1/2021 – 6/30/2022

– Option 4: 7/1/2022 – 6/30/2023

6Armstrong Flight Research Center

Instructions to Offerors

• Technical Volume 1-A: Agency-Wide Performance Work

Statement (PWS) Requirements

– Technical Approach: Detailed description of plan to implement, accomplish and manage various task requirements.

– Management Approach: Approach to provide qualified staff to meet as needed Agency-wide requirements.

7Armstrong Flight Research Center

• Technical Volume 1-B: Armstrong Task Order

– Technical Approach: Detailed description of plan to implement, accomplish and manage various task requirements per the AFRC PWS.

– Phase-In Plan: Description of plan to meet the 30 day phase-in.

– Management Approach: Approach to provide qualified staff to meet the AFRC PWS requirements.

• A Total Compensation Plan must also be provided.

8Armstrong Flight Research Center

– Staffing Approach

9Armstrong Flight Research Center

Table 1

As of 10/23/2017 Sorties Sorties Sorties Sorties Flight hour Flight hour Flight hour Flight hour Avg. time of Deployment/Yr Aircraft 2014 2015 2016 2017 2014 2015 2016 2017

SOFIA ‐ NB747 46 64 89 102 423 596 823 925 9 weeks

(2) B200 Support ‐ N7, N801 166 162 136 116 170 395 228 238 5 weeks

DC‐8 ‐ N817 35 92 83 88 112 554 432 596 20 weeks

(2) ER‐2 ‐ N806, N809 114 106 100 103 408 391 306 335 8 weeks F‐15 Research ‐ N836 14 5 9 8 15 5 8 7 0

(2) F‐15 Support ‐ N897, N884 27 47 77 40 43 79 117 56 0

(3) F‐18 Support ‐ N843, N846, N850 124 102 130 155 126 167 124 171 7 weeks

C20/GIII ‐ N502 103 95 72 83 473 395 287 368 4 weeks

GIII ‐ N804 88 23 11 20 129 54 28 43 0

GIII Support ‐ N808 14 96 23 168 4 days MQ 9 (Ikhana) ‐ N870 9 30 26 19 59 131 104 77 0

(2) RQ 4 (Globalhawk) ‐ N872, N874 30 14 19 10 401 154 252 155 2 weeks T34 Support ‐ N865 103 161 117 118 127 227 161 132 2 days

TG‐14 ‐ N856 41 34 53 46 3 weeks X 56 ‐ UAS Buckeye 1 1 0

TOTALS 859 901 924 993 2486 3148 2946 3318

– Staffing Approach

Table 3

– Key Personnel: Program Manager/Aviator position designated as key personnel.

12Armstrong Flight Research Center

• Volume II: Past Performance

– Questionnaire (Attachment 9).

– Three (3) current or past contracts performing the same or similar task within the last three (3) years.

• One (1) of the three can be as a major subcontract and/or team member.

– Government may verify references.

– Government may use other sources of performance information.

13Armstrong Flight Research Center

• Volume III: Pricing Volume

– This section is to be strictly limited to cost and price information.

– Information that can be construed as belonging in one of the other sections of the proposal will be so construed and counted against that section’s page limitation.

– Provide fully burdened firm-fixed price monthly rate and the extended price for each period.

– Complete the price list table on page 28 of the solicitation.

14Armstrong Flight Research Center

Evaluation

• Basis of Award

– Best Value selection (Price Performance Trade-Off).

– Initial proposal review will be conducted in accordance with NFS 1815.305-70. Unacceptable proposals will be eliminated from further evaluation.

– Evaluation Factors

• Technically Acceptable

• Past Performance

• Price

– All evaluation factors other than price, when combined, are significantly more important than price.

15Armstrong Flight Research Center

• Volumes 1-A and 1-B: Technically Acceptable

– Proposals will be evaluated on a Pass/Fail basis, and will be assigned a rating of Acceptable or Unacceptable.

– All technically acceptable proposals shall be treated equally except for past performance records and price.

– Offerors rated technically unacceptable will not be further evaluated.

TECHNICAL ACCEPTABLE / UNACCEPTABLE RATINGS

RATING DESCRIPTION

Acceptable Proposal meets the minimum requirements of the solicitation.

Unacceptable Proposal does not meet the minimum requirements of the solicitation.

Armstrong Flight Research Center

• Volume II: Past Performance

– Two aspects to the past performance evaluation.

• Relevance of the Offeror’s current or past performance.

• Quality assessment ratings for evaluating past performance.

‒ Overall performance confidence assessment using Level of Confidence ratings.

17Armstrong Flight Research Center

• Volume III: Price

– Pricing shall be evaluated only on the FFP portions of the Armstrong PWS.

– T&M labor rates shall be provided and will only be evaluated for reasonableness.

– Government may determine that an offer is unacceptable if the option price or fully burdened hourly rates are significantly unbalanced.

– The evaluated price will be the sum of:

• Phase-In, Base Period, Options 1 through 4, and the

Option to Extend Services.

18Armstrong Flight Research Center

Technical

• Flight Crew Branch – Code 410

19Armstrong Flight Research Center

AFRC Ramp/Flightline Area

20Armstrong Flight Research Center

AircraftAircraft

Research Pilot Section

• Provides Highly Experienced and Capable Flight Crew to

Support Flight Research, Science Platform, Program Support, and FAA Certified Aircraft

– Research Testing

– Heavy Aircraft Operations (Transports and Bombers)

– High Performance Aircraft Operations (F-15, F-18,T-34, GIII) including Chase

– High Altitude Scientific Operations (ER-2)

– Remotely Piloted Aircraft Operations (Global Hawk, Predator, sUAS (small unmanned aircraft systems))

– TG-14 motorglider

– Aircrew flexibility among varied platforms

– Worldwide deployment capability

22Armstrong Flight Research Center

Support Aircraft Section

• Provides aircrew support for F-15, F-18, G-III, T-34, B-200, Support mission flights

• Safety chase for Research missions

• Photo and Video chase for Research and Science flights

• Worldwide deployment capability

23Armstrong Flight Research Center

Management

• The Contractor also shall be required to interface, as required, with various NASA organizations, other NASA Contractors, and appropriate regulatory bodies.

24Armstrong Flight Research Center

Safety

• Safety Involvement

– The Contractor shall participate in Center and Flight Operations level safety meetings, forums and initiatives as communicated by the COTR.

Participation includes both activity related to, preparation for, attendance at, and responses to such activities.

• Safety Management System

– The contractor shall develop and maintain a system to manage risks to AFRC operations in accordance with NPR 8000.4, Agency Risk Management Procedural Requirements that are associated with their statement of work.

• Mishap Investigation Support

– Where mishaps will be investigated by NASA (either solely or in parallel to another organization), the Contractor and their employees will participate in providing data, information, hardware, software, firmware, etc. that are deemed by NASA to be pertinent to the mishap investigation.

25Armstrong Flight Research Center

Closing Remarks

• All questions asked during this Pre-Proposal Conference must be submitted to Angela Stinchfield angela.t.stinchfield@nasa.gov and James Williams james.g.williams-1@nasa.gov by 2:00p.m. PT February 5, 2018.

• Pre-proposal charts, list of attendees, and answers to questions will be provided as an amendment to the solicitation.

• Any changes made to the RFP will be done through a formal amendment.

• In the event of a conflict between the solicitation and the Pre-Proposal Conference, the solicitation shall have precedence.

• Thank you for attending this Pre-Proposal Conference.

26Armstrong Flight Research Center

List of Attendees

• In-Flight Crew Connections, LLC

• AAR Corp.

• Integration Innovation, Inc.

• MAG Aerospace

27Armstrong Flight Research Center