8-RFSQ Prerequisites Document.pdf

PDF 140 KB Posted

Attached to
USBE - Continuous Improvement Experts Prequalification List (add vendors and recertify current vendors)
Solicitation number
USBE-MI26069-RFSQ
Issued by
Utah

About this file

This is a Prerequisites Document and submission guidance for a Request for Statement of Qualifications (RFSQ) issued by the Utah State Board of Education to establish a prequalified vendor list for Continuous Improvement Experts (CIE) to serve USBE-designated Elevate and Springboard schools. The RFSQ seeks to add new vendors to the approved vendor list and recertify current vendors who must submit complete responses to verify continued compliance with minimum mandatory requirements and evaluation criteria. All proposals must be submitted electronically through Utah Public Procurement Place (U3P) by the published closing date and time; proposals submitted through other means will not be considered. Offerors may modify or withdraw proposals prior to the established closing date. The approved vendor list operates on an indeterminate term, with USBE conducting verification that vendors continue to meet applicable requirements no less frequently than every 18 months. USBE retains the right to reopen the solicitation to add additional vendors at any time during the term. Individual Elevate and Springboard local school boards will be responsible for contracting directly with vendors on the approved list.

The document establishes that all proposal preparation and submission costs are the responsibility of Offerors and will not be reimbursed. Offerors must comply with the Utah Procurement Code and applicable state regulations and warrant that they comply with all federal and state laws, licensure, and certification requirements. Pricing information may not be classified as confidential and will be considered public; however, other proposal components may be protected through submission of a Claim of Business Confidentiality form with appropriately redacted versions. The evaluation process includes multiple stages: Stage 1 (Initial Review for responsiveness and mandatory minimum requirements), Stage 2 (Statement of Qualifications evaluation against published criteria with minimum score thresholds), and potentially Stage 3 (interviews or presentations if requested by USBE). Proposals meeting minimum score thresholds will proceed to the Final Stage and be added or recertified to the open-ended approved vendor list. The award does not guarantee that selected vendors will be requested to provide services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTAH STATE BOARD OF EDUCATION

Request for Statement of Qualifications (RFSQ) Prerequisites

PART 1: REQUIREMENTS AND SUBMISSION INSTRUCTIONS

Submitting Proposals: Proposals must be submitted electronically through Utah Public Procurement Place (“U3P”) by the close date and time published. Proposals not submitted through U3P will not be considered. Any exceptions to the content of this RFSQ, including the specifications and minimum requirements, must be addressed prior to the Q&A Submission Close Date. A proposal may be modified or withdrawn prior to the established closing date and time. All materials submitted with Offeror proposals become the property of USBE.

When submitting a proposal or modification electronically, Offerors must allow sufficient time to complete the online forms and upload documents. If an Offeror is in the middle of uploading a proposal when the closing time arrives, U3P will stop the process, and the proposal or modification will not be accepted. The issuing procurement unit may not accept a proposal after the solicitation closes.

It is the Offerors' responsibility to ensure that they have completed all requirements, read and reviewed all documents, submitted all required information, uploaded all required forms, and submitted their proposals prior to the closing time.

Document Submission: Submit the required documentation under the designated sections that can be found in Requested Information.

Costs of Submitting Proposal: All costs incurred by an Offeror in the preparation and submission of a proposal, including any costs incurred during interviews, oral presentations, and/or product demonstrations are the responsibility of the Offeror and will not be reimbursed.

Addenda: Offerors are encouraged to check U3P for addenda. Any modification to this RFSQ will be made by addendum published on U3P. Addenda to this RFSQ may change the Scope of Work, the schedule, the qualification requirements, the criteria, or other requirements of this RFSQ. After the due date and time for submitting a proposal to this RFSQ, at the discretion of the issuing procurement unit, addenda to this RFSQ may be limited to Offerors that have submitted proposals, provided the addenda does not make a substantial change to this RFSQ.

Restrictions on Communications: Offerors shall direct all communications regarding this RFSQ to the Procurement Officer overseeing the RFSQ. Offerors are prohibited from communicating about this RFSQ with the conducting procurement unit’s staff, evaluation committee members, or other associated individuals until a contract or purchase order is awarded and the award is published. Failure to comply with this requirement may result in the Offeror’s disqualification.

PART 2: PREREQUISITES

Governing Law: All purchases made under this RFSQ are subject to the Utah Procurement Code and the applicable State of Utah Administrative Code. By submitting a proposal, the Offeror warrants that it and the procurement items purchased under this RFSQ comply fully with all applicable federal and state laws and regulations, including applicable licensure and certification requirements.

Price Guarantee Period: If applicable, Offeror must guarantee its pricing for the period described in this RFSQ. If price adjustments are allowable under this RFSQ, a request for a price adjustment must be made at least thirty (30) days prior to the adjustment's effective date. A request for a price adjustment must include sufficient documentation (market analysis) supporting the request. Any price adjustment will not be effective unless approved by USBE's Director of Purchasing. A price adjustment will be guaranteed for the same length of time as the original price guarantee. The conducting procurement unit will be given the immediate benefit of any decrease in the market, or allowable discount.

Protected Information: An Offeror may request that part of its proposal be protected by submitting a Claim of Business Confidentiality Form. See the Files section for a blank copy of the form. Pricing may not be classified as confidential or protected and will be considered public.

Process for Requesting Non-Disclosure: To protect information under a Claim of Business Confidentiality, an Offeror must complete the Claim of Business Confidentiality form, submit the form with the Offeror's proposal, and include the following information:

A concise statement of reasons supporting the claim of business confidentiality (see UCA § 63G- 2-309). An electronic, “redacted” (excluding protected information) copy of the proposal (in addition to the non-redacted original). The copy must be clearly marked “Redacted Version.”

The Claim of Business Confidentiality form may be accessed at:

https://purchasing.utah.gov/wp-content/uploads/Claim-of-Business-Confidentiality-Updated.pdf OR attached in the Files section of this solicitation.

An entire proposal cannot be identified as “PROTECTED”, “CONFIDENTIAL” or “PROPRIETARY”.

Redacted Copy: If an Offeror submits a proposal that contains information claimed to be confidential or protected, the Offeror MUST submit two separate proposals: one redacted version for public release, with all protected business confidential information either blacked-out or removed, clearly marked as "Redacted Version"; and one non-redacted version for evaluation purposes clearly marked as "Protected Business Confidential."

All materials submitted become the property of USBE. Materials may be reviewed by anyone designated by USBE as part of the evaluation committee or a consultant to the evaluation committee. Materials submitted may be returned only at the USBE's option.

https://purchasing.utah.gov/wp-content/uploads/Claim-of-Business-Confidentiality-Updated.pdf

Question and Answer Period: The Question and Answer period closes on the date and time specified in U3P. All questions must be submitted through U3P during the Question and Answer period. Answers from USBE will be posted on U3P. Questions may be submitted to notify USBE of any ambiguity, inconsistency, scope exception, excessively restrictive requirement, or other errors in this RFSQ. Questions are encouraged. Questions may be answered individually or may be compiled into one document.

Questions may also be answered via an addendum. An answered question or an addendum may modify the specifications or requirements of this RFSQ. Answered questions and addenda will be posted on U3P. Offerors should periodically check U3P for answered questions and addenda before the closing date. It is the responsibility of the Offerors to submit their proposals as required by this RFSQ, including any requirements contained in an answered question and/or addenda.

Ambiguity, inconsistency, scope exception, excessively restrictive requirement or other error: All notifications of an ambiguous, confusing, contradictory, or otherwise clearly erroneous solicitation provision must be submitted before the close of the RFSQ.

By failing to notify USBE of an ambiguous, confusing, contradictory, or otherwise clearly erroneous solicitation provision in this RFSQ before the close of the RFSQ Offeror waives the ability to notify USBE after close of this RFSQ or to protest the RFSQ based on an ambiguous, confusing, contradictory, or otherwise clearly erroneous solicitation provision.

Offerors must provide notice of an ambiguous, confusing, contradictory, or otherwise clearly erroneous solicitation provision during the Question and Answer period through asking a question in the Question and Answer board for this RFSQ. Offerors can notify the procurement official after the Question and Answer period has ended by emailing the procurement officer;

however, the email must be sent before the close of the RFSQ.

Time Zone: You must ensure you have selected the appropriate time zone for your vendor profile.

It is the responsibility of each Offeror to ensure their response is submitted by the closing date and time indicated in U3P. In order for dates and times to display correctly in U3P, you must select the appropriate time zone for your region in your profile. It is your responsibility to make sure you submit your response by the date and time indicated in this solicitation.

Modifications for New Technology and Technological Upgrades: Any contract or purchase order resulting from this solicitation may be modified to include new technology or technological upgrades associated with the procurement item.

Pursuant to Utah Administrative Rule R33-112-502, any contract or purchase order resulting from this solicitation may be modified to include new technology or technological upgrades associated with the procurement item, including new or upgraded:

1. Systems;

2. Apparatuses;

3. Modules;

4. Components; and

5. Other supplementary items;

A maintenance or service agreement associated with the procurement item under contract may be modified to include any new technology or technological upgrades.

Any modification incorporating new technology or technological upgrades must be specific to the procurement item being solicited and substantially within the scope of the original procurement or contract.

Any modification incorporating new technology or technological upgrades must be agreed upon by all parties and executed using the process set forth in the contract or purchase order for other modifications.

A modification for new technology or technology upgrades may not extend the term of the contract or purchase order except as provided in the Utah Procurement Code.

Unlawful Conduct Prohibited and Reportable: Offerors shall not engage in unlawful conduct.

UCA § 63G-6a-2407 requires a procurement professional with actual knowledge that a person has engaged in unlawful conduct to report the person’s unlawful conduct to the state auditor or the attorney general or other appropriate prosecuting attorney.

Unlawful conduct includes bid rigging, improperly steering a contract to a favored vendor, exercising undue influence on an individual involved in the procurement process, or participating in collusion or other anticompetitive practices made unlawful under other applicable law.

Utah Administrative Rule R33-101-101 defines "bid rigging" as an agreement among potential competitors to manipulate the competitive bidding process, for example, by agreeing not to bid, to bid a specific price, to rotate bidding, or to give kickbacks, and defines "collusion" as two or more persons act together to achieve a fraudulent or unlawful act. Collusion inhibits free and open competition in violation of law.

The proposal of any Offeror found to have participated in any of the unlawful conduct described above is subject to immediate rejection, and such conduct shall, as required by law, be reported to the appropriate authorities.

Cancellation Before Award: The Utah State Board of Education may cancel this solicitation before award. In accordance with USBE Administrative Rule R277-122-7, this solicitation may be cancelled prior to a contract award if: (a) the Board does not receive any responsive responses to the solicitation; or (b) the head of the procurement unit determines the cancellation is: (i) in the best interest of the Board; and (ii) supported by a reasonable and good faith justification.

PART 3: PROPOSAL EVALUATION & AWARD

Evaluation of Proposals: All proposals will be evaluated in a manner consistent with the Utah Procurement Code, Administrative Rules, and policies. Offerors bear sole responsibility for the items included or not included within the proposal submitted by the Offeror. Each area of the evaluation criteria must be addressed in detail in the proposal.

Stage 1: Initial Review: The conducting procurement unit will review all proposals timely received.

Non-responsive proposals not conforming to RFSQ requirements or unable to meet the mandatory minimum requirements will be eliminated from further consideration and will not proceed to Stage

2. USBE may request additional information from vendors to clarify responses.

Stage 2: Statement of Qualifications Evaluation: Responsive proposals will be evaluated by an evaluation committee against the evaluation criteria provided in the Files section. Proposals that achieve any minimum score thresholds stated on the score sheet will proceed to the next stage. Offerors with a score of less than the minimum required technical points will be deemed non-responsive and ineligible for further consideration.

The Evaluation Score Sheet has been attached to this RFP and states the relative weight that will be given to each evaluation criterion. The evaluation committee will average the sum of the committee members' individual scores for each criterion to arrive at a final consensus score for each criterion.

If interviews/presentations are not requested by USBE, those Offerors that achieve the minimum score threshold for each criterion for which a minimum threshold has been identified (if applicable) and achieve the minimum total technical score threshold identified in the Evaluation Score Sheet will proceed to the Final Stage: Approved Vendor List. Offerors with technical scores that are below the minimum score threshold for each criterion for which a minimum threshold has been identified (if applicable), or below the minimum total score threshold, will be deemed non-responsive and ineligible for further consideration.

If interviews/presentations are requested by USBE, Offerors will proceed to Stage 3:

Interview/Presentation Evaluation.

Stage 3: Interview/Presentation Evaluation, if applicable: If requested by USBE, following Stage 2, the Offerors may be invited to interview or give a presentation to the evaluation committee. If held, USBE will set a date and time for the interviews or presentations and notify eligible Offerors of the procedures. These interviews and presentations may be held in person or virtually but will be mandatory, and Offerors who decline or fail to participate will be deemed non-responsive and ineligible for further consideration.

Representations made by an Offeror during interviews or presentations shall become an addendum to the Offeror's original proposal. Representations must be consistent with the Offeror's original proposal and may only be used to explain, illustrate, or interpret the contents of the Offeror’s original solicitation response. Interviews or presentations shall be evaluated in accordance with the requirements and criteria included in this RFSQ.

Offerors with scores that are below the minimum score threshold will be deemed non-responsive and ineligible for further consideration.

After calculation of interview/presentation points, all remaining Offerors' points will be added together to obtain a Total Combined Score for each Offeror. Any Offeror with a Total Combined Score that meets or exceeds the threshold identified in the Evaluation Score Sheet will proceed to the Final Stage: Approved Vendor List.

Final Stage: Approved Vendor List

Offerors that met the minimum score threshold in Stage 2 (or Stage 3, if applicable) will be added or recertified to the open-ended approved vendor list.

Service Selection: The award is not a guarantee that the Offeror(s) will be requested to provide any services.

UTAH STATE BOARD OF EDUCATION
PART 1: REQUIREMENTS AND SUBMISSION INSTRUCTIONS
PART 2: PREREQUISITES
PART 3: PROPOSAL EVALUATION & AWARD

File details come from the government source that posted it. Updated .