8. MascotHeat Conversion Submittal Register.pdf

PDF 256 KB Posted

Attached to
Furnish and Install brand specific heat pump syste
Solicitation number
140P9721Q0042
Issued by

About this file

This submittal register is for a project to convert the heating system at the Mascot Saloon to a brand specific heat pump system. It lists over 50 items requiring submittal to the owner for review and approval, including product data, samples, test reports, certificates, and operation and maintenance documentation. Items cover mechanical, plumbing, and electrical components for the new hydronic radiant heating system and associated heat pumps, pumps, manifolds, valves, fittings, piping, insulation, seismic supports, identification labels, and other mechanical, control, and balancing equipment. The contractor must submit items by the scheduled dates and address any review comments or revisions in order to receive return status of approval before proceeding with purchase or installation of the listed components.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Printed on:

12/16/2020

It em

N o

Tr a n sm it ta l N o

Sp ec Se ct io n o r D ra w in g N o

Su b m it ta l

D es cr ip ti o n

Sp ec P ar ag ra p h o r

D ra w in g D et a il N o

Su b m it ta l D a te

R et u rn D a te

20 05 29 Hangers and Supports for Mechanical

1 1.2.A SD‐03 2.2.A Non Insulated Pipe Hangers 2 1.2.A SD‐03 2.2.B Insulated Pipe Hangers 3 1.2.A SD‐03 2.3 Hanger Rods 4 1.2.A SD‐03 2.4 Channel Struts 5 1.2.B SD‐01 Application Schedule

20 05 48 Seismic Controls for Mechanical

1 1.2.A SD‐08 Concrete Anchor Bolts 2 1.2.B SD‐06 Test Reports and Certificates 3 1.2.C Standard Form for Special Inspection 4 1.2.D Substantial Deviations

20 05 53 Identification for Mechanical

1 1.2.A SD‐03 2.1 Equipment Labels

20 07 00 Insulation for Mechanical

1 1.2.A SD‐03 2.1.C Lagging Fabric 2 1.2.A SD‐03 2.1.D Thermal Insulation Coatings 3 1.2.A SD‐03 2.1.E Insulating Cement 4 1.2.A SD‐03 2.1.F Vapor Barrier Coatings 5 1.2.A SD‐03 2.1.G Plastic Insulation Covers 6 1.2.A SD‐03 2.1.H Metal Jackets 7 1.2.A SD‐03 2.2.A Interior, Above Grade, Piping System Insulation 8 1.2.A SD‐03 2.3.A Refrigerant Suction and Hot Gas Piping Insulation 9 1.2.B SD‐01 Application Schedule

22 11 16 Domestic Water Piping

1 1.2.A SD‐03 2.1.A Interior, above ground, three inches and smaller

2 1.2.B SD‐01 Application Schedule

3 1.2.C SD‐03 NSF 61 Data

23 05 00 Common Work Results for HVAC

1 1.2.A SD‐03 2.2 Thermometers 2 1.2.A SD‐03 2.3 Pressure Gauges 3 1.2.A SD‐03 2.4 Drain Valves 4 1.2.A SD‐03 2.5 Balancing Cocks 5 1.2.A SD‐03 2.6 Air Vents 6 1.2.A SD‐03 2.7 Dielectric Pipe Protection 7 1.2.A SD‐03 2.8 Escutcheons 8 1.2.B SD‐01 Balancing Cock Schedule 9 1.2.C SD‐02 Substantial Deviations

Review Comments

Owner:

Item Description

SD‐01 Preconstruction; SD‐02 Shop Drawings; SD‐03 Product Data; SD‐04 Samples; SD‐05 Design Data; SD‐06 Test Report; SD‐07 Certificates; SD‐08 Manufacturer's Instructions; SD‐09 Manufacturer's Report; SD‐10 O&M Data; SD‐11 Closeout; SD‐12 LEED

1=No Exception Taken; 2 = Accepted as Noted; 3 = Revise & Resubmit; 4 = Submit Specified Item; 5 = Rejected

Actual

Contractor:

Consultant:

C o n tr a ct o r' s

Sc h ed u le d S u b m it ta l

D a te

St a tu s

Project: Mascot Saloon Heating System Conversion

Corrections or comments do not relieve Contractor from compliance with Contract Documents. Submittals are reviewed only for general conformance with the design concept of the project and general compliance with the Contract Documents. The Contractor is responsible for confirming compliance with the Contract Documents, confirming & correlating all quantities & dimensions, selecting fabrication processes, techniques of construction, coordinating his work with that of other trades, and existing conditions; and performing his work in a safe and satisfactory manner.

Reviewed By1 1

Date1 1

Printed on:

12/16/2020

It em

N o

Tr a n sm it ta l N o

Sp ec Se ct io n o r D ra w in g N o

Su b m it ta l

D es cr ip ti o n

Sp ec P ar ag ra p h o r

D ra w in g D et a il N o

Su b m it ta l D a te

R et u rn D a te

Review Comments

Owner:

Item Description

SD‐01 Preconstruction; SD‐02 Shop Drawings; SD‐03 Product Data; SD‐04 Samples; SD‐05 Design Data; SD‐06 Test Report; SD‐07 Certificates; SD‐08 Manufacturer's Instructions; SD‐09 Manufacturer's Report; SD‐10 O&M Data; SD‐11 Closeout; SD‐12 LEED

1=No Exception Taken; 2 = Accepted as Noted; 3 = Revise & Resubmit; 4 = Submit Specified Item; 5 = Rejected

Actual

Contractor:

Consultant:

C o n tr a ct o r' s

Sc h ed u le d S u b m it ta l

D a te

St a tu s

Project: Mascot Saloon Heating System Conversion Project No:

Corrections or comments do not relieve Contractor from compliance with Contract Documents. Submittals are reviewed only for general conformance with the design concept of the project and general compliance with the Contract Documents. The Contractor is responsible for confirming compliance with the Contract Documents, confirming & correlating all quantities & dimensions, selecting fabrication processes, techniques of construction, coordinating his work with that of other trades, and existing conditions; and performing his work in a safe and satisfactory manner.

23 05 23 General Duty Valves for HVAC

1 1.2.A SD‐03 2.2.A.1 Valves 3 Inches and Smaller: Ball Valves 2 1.2.A SD‐03 2.2.A.2 Valves 3 Inches and Smaller: Check Valves 3 1.2.B SD‐01 Application Schedule

23 05 93 Testing, Adjusting and Balancing for HVAC

1 1.2.A SD‐01 1.2.A.1 Contractors Balance Report

23 21 13 Hydronic Piping

1 1.2.A SD‐03 2.1 Above Grade Pipe and Fittings

2 1.2.A SD‐03 2.2 Heating System Fluid 3 1.2.A SD‐03 2.3 Heating System Chemical Cleaning Compound 4 1.2.A SD‐03 2.4 Glycol Concentration Testing Device 5 1.2.B SD‐01 Application Schedule

23 21 14 Radiant System 1 1.2.A SD‐03 2.4 Radiant Manifolds

23 21 16 Hydronic Piping Specialties

1 1.2.A SD‐03 2.1 Pressure Relief Valves 2 1.2.A SD‐03 2.2 Air Separators 3 1.2.A SD‐03 2.3 Air Separators 4 1.2.A SD‐03 2.4 Air Eliminator 5 1.2.A SD‐03 2.5 Diaphragm Expansion Tanks 6 1.2.A SD‐03 2.6 Glycol Mixing Tanks

23 21 23 Hydronic Circulating Pumps

1 1.2.A SD‐03 2.2.A In‐Line Pump

23 81 40 Heat Pumps

1 1.2.A SD‐03 2.1 Air Source Heat Pump 2 1.2.A SD‐03 2.2 Water Source Heat Pump 3 1.2.A SD‐03 2.3 Buffer Tanks

26 05 10 Basic Materials and Methods

1 1.11.A SD‐03 2.1 Conduit and Tubing 2 1.11.A SD‐03 2.2 Conductors and Cables 3 1.11.A SD‐03 2.3 Grounding and Bonding 4 1.11.A SD‐03 2.4.B Branch Circuit Panelboards 5 1.11.A SD‐03 2.5.A Circuit Breakers 6 1.11.A SD‐03 2.5.B GFCI Circuit Breakers

Reviewed By1 1

Date1 1

File details come from the government source that posted it. Updated .