6. MascotHeatConversion SitePhotos Notes.pdf
PDF 330 KB Posted
- Solicitation number
- 140P9721Q0042
About this file
This document contains notes related to an existing federal contract opportunity for heating system installation. The notes describe existing boiler, chimney stack, glycol tank and piping at the Mascot Saloon that will be removed by National Park Service Day Labor. Piping from the existing boiler serving the Hern and Clipper Buildings will also be removed by NPS Day Labor. Heating zone 1 and 2 piping will be cut off below the floor to connect to a new heating system installed in the Mascot Mechanical Room. A new Panel M will be installed prior to the contractor arriving and is responsible for connecting circuits from Panel M to the new heating equipment, which can be surface mounted or run through the crawlspace.
The related federal contract opportunity is solicitation number 140P9721Q0042 to furnish and install a brand specific heat pump system in a historic building in Skagway, Alaska. The solicitation is from the Department of the Interior National Park Service Alaska Region to provide this heating system installation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing Mascot Saloon Boiler, chimney stack, glycol tank and piping to be removed by NPS Day Labor. Extent of piping removal/demo will be decided up with contractor during initial site visit.
Existing boiler for the Hern/Clipper Buildings to be removed by NPS Day Labor. Extent of demo will be coordinated with contractor during initial site visit. Heating Zone 1 and 2 piping to be cut off below the floor to be connected to new heating system installed in the Mascot Mechanical Room.
Zone 1 & 2 Supply and Return lines.
Planned location of new Panel M. Panel will be installed prior to contractor arriving to install new heat pump equipment.
Contractor is responsible for connecting circuits from Panel M to new heating system equipment. Panel will be surface mounted. Equipment circuits can be surface mounted and/or run through the crawlspace.