About this file

This is DFCM Addendum #002 issued by the Utah Division of Facilities Construction and Management (DFCM) on September 11, 2026, for the Provo Regional Center Building Wide Upgrades project (DFCM Project #23029310, U3P Event #CR27015). The addendum provides clarification and specifications for abatement work on the basement level of the Provo Regional Center located at 150 E Center Street, Provo, Utah. The scope of work includes removal of existing walls, doors, frames, hardware, ceiling tile, ceiling grid, lighting fixtures, and duct insulation within designated areas of the basement. The general contractor must visually inspect all conditions, coordinate with the architect regarding outstanding demolition issues, remove all existing conduit and wiring not in use, salvage light fixtures for reuse, and ensure proper debris removal and site cleanup. Specific demolition notes identify areas marked in red dashed lines for wall and door removal, with annotations distinguishing between full demolition and partial demolition around columns. The contractor is responsible for replacing any base building finishes damaged during demolition and must maintain safe egress from the south portion of the building throughout construction. The addendum specifies that no asbestos or lead-based paint is known to be present; however, if hazardous materials are suspected, work must stop immediately and the materials must be fully abated according to applicable law.

The construction cost estimate for this project is $130,000.00. This is a Stage II Invitation to Bid, and only contractors who have been prequalified under Stage I Prequalification for Contractors and appear on the DFCM Prequalified Contractors list as of the solicitation date are eligible to bid. The addendum does not reference changes to the solicitation schedule and requires bidders to acknowledge receipt of the addendum with their bid submission, with failure to do so potentially resulting in disqualification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DFCM Addendum Cover Page, 9.2.2026

DFCM Addendum #002

Reference: Provo Regional Center Building Wide Upgrades- Abatement DFCM Project #23029310 U3P Event #CR27015

Date: September 11, 2026

To: Prequalified Hazmat Contractors

From: The Division of Facilities Construction and Management

Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.

Addendum Items

Solicitation Schedule Changes: There are no changes to the Solicitation Schedule in this addendum.

DFCM Addendum Items: Additional Clarification for the Scope of Work

Click to enter text Click to enter text Click to enter text

A/E Addendum Items: N/A Click to enter text

Total Attached Pages: 1

ELEVATORS 1 & 2 (E)

ELEVATOR 3 (E)

ELEC (E)

JANITOR

MEN (E)

TOILET (E)

SOUTH STAIR (E)

WOMEN (E)

ELECTRICAL (E)

NORTH STAIR (E)

CHASE (E)

FACILITIES

OPEN OFFICES

AUSTIN'S

OFFICE

ERIC'S OFFICE

FACILITIES

RECEPTION

FACILITIES

BREAK ROOM

RECEIVING

MAIL ROOM

FACILITIES

SHOP

SERVER

ROOM

ELECTRICAL

ROOM

VACANT

KEY ROOM

UNIFORM

ROOM

BUILDING &

TENANT

STORAGE

CONFERENCE

ROOM?

VALVE ROOM

ELEVATOR

LOBBY

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE EVIDENCE

STORAGE

SECURE

STORAGE

OFFICE

OPEN OFFICE

OPEN OFFICE

OFFICE

OFFICE

STORAGE

COMM

TOILET /

SHOWER

NORTH

CORRIDOR

SOUTH

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

RECEPTION

WAITING

OFFICEOFFICE

QUIET

ROOM?

OPEN OFFICE

HOUSEKEEPING

AA

BB

CC

DD

EE

FF

1111111111

1 1

111 1

1 1

1 1 1 1

1 1

1 1

11 1

1 1

1 1 1 1 1 1 1 1

1 1 1 1 1 11

11 1 111111 22222

2 2 2 2

2 22 2 2

3333333

3 33

333333

3 33

444444444

4 44

4 4 4 4 4

4 4 4

4 4 4 4 4 4

5 5

E1

1. THE GENERAL CONTRACTOR SHALL VISUALLY INSPECT ALL CONDITIONS AND SHALL COORDINATE ANY OUTSTANDING DEMO ISSUES WITH THE ARCHITECT PRIOR TO BEGINNING WORK. ALL BASE BUILDING FRAMES, WINDOW SILLS, AND CORE PARTITIONS TO BE FREE FROM MASTIC OR OTHER BUILDING RESIDUE AND READY TO RECEIVE FINISH.

2. CONSULT ENGINEERING NOTE FOR EXTENT OF EXISTING BUILDING SYSTEMS TO BE REMOVED OR TO BE RELOCATED. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED BUILT-IN ITEMS SUCH AS ELECTRICAL/DATA OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC. REFER TO MEP DRAWINGS FOR PROCEDURES CONCERNING THESE TRADES IN DEMOLITION AREAS

3. G.C. IS RESPONSIBLE FOR THE REPLACEMENT OF ANY BASE BUILDING FINISHES THAT ARE DAMAGED AS A RESULT OF DEMOLITION. G.C. IS TO INCLUDE IN THE PRICING A CONTINGENCY FOR ALL BASE BUILDING REPAIRS THAT MAY OCCUR. G.C. TO COORDINATE ALL BASE BUILDING FINISHES WITH THE BUILDING MANAGEMENT. PROTECT ALL INTERIOR WALLS, CEILING AND FLOORS TO REMAIN FROM DAMAGE

DURING DEMOLITION AND CONSTRUCTION.

4. G.C. SHALL REMOVE ALL EXISTING CONDUIT AND ASSOCIATED WIRING NOT USED, U.O.N. BACK TO PANEL. ALL EXISTING DATA WIRING TO BE REMOVED. ALL MECHANICAL DEVICES TO BE EVALUATED AND REPORT SUBMITTED PRIOR TO THE START OF DEMOLITION NOTING CONDITIONS OF EQUIPMENT.

5. G.C. SHALL REMOVE ANY INCOMPLETE OR PARTIALLY CONSTRUCTED OR DEMOLISHED WALLS & CEILINGS BACK TO PRIMARY BUILDING STRUCTURE. REMOVE EXISTING WALLS AND DOORS WITHIN THE AREAS

OF CONSTRUCTION IN COMPLIANCE WITH THE DRAWINGS.

6. SAVE EXISTING DOORS AND FRAMES FOR REUSE. EXISTING DOORS, FRAMES, AND HARDWARE SHALL BE CAREFULLY REMOVED AND STORED PRIOR TO INSTALLATION. REINSTALLED DOORS AND FRAMES SHALL BE CLEANED, FILLED, SMOOTHED AND REFINISHED AS NEEDED TO MATCH FINISH OF NEW DOORS AND FRAMES.

7. PROVIDE DUMPSTER FOR DEBRIS REMOVAL. COORDINATE LOCATION WITH BUILDING OWNER. REMOVE DEMOLITION MATERIALS EACH DAY AND VACUUM PUBLIC/COMMON AREAS BEFORE LEAVING SITE.

8. THE CONTRACTOR SHALL SALVAGE ALL EXISTING LIGHT FIXTURES TO BE REUSED PER THE REFLECTED CEILING PLAN. ANY SURPLUS FIXTURES SHALL BE RETURNED TO BUILDING OWNER. ALL EXISTING

FIXTURES AND MECHANICAL DEVICES TO BE CLEANED AND REPAIRED OR REPLACED TO PROVIDE A FULLY FUNCTIONING SPACE. LIGHTS - REPLACE CRACKED LENSES, DEFECTIVE BALLASTS, RE-LAMP.

MECHANICAL - REPLACE BENT/DAMAGED GRILLES, DEFECTIVE EXHAUST FANS. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION. REFER TO DEMOLITION AND REFLECTED CEILING PLAN DEMOLITION

NOTES FOR ADDITIONAL REQUIREMENTS.

9. THERE IS NO PRESENCE OF ASBESTOS AND LEAD BASED PAINT IN THE EXISTING BUILDING TO THE BEST OF THE OWNER'S AND ARCHITECT'S KNOWLEDGE. IF A MATERIAL IS FOUND WHICH MAY BE SUSPECTED OF CONTAINING HAZARDOUS MATERIAL, WORK SHALL STOP AND THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND BUILDING OWNER IMMEDIATELY. IF IT IS DETERMINED THAT THE MATERIALS

ARE HAZARDOUS, THE MATERIAL SHALL BE FULLY ABATED ACCORDING TO APPLICABLE LAWS.

10. PROVIDE SAFE EGRESS FROM SOUTH PORTION OF BUILDING TO THE ELEVATOR BANK THROUGHOUT THE PROCESS OF DEMOLITION AND CONSTRUCTION.

11. REMOVE/DISCARD EXISTING CARPET AND LVT IN SPACES WHERE WALLS ARE BEING DEMOLISHED.

DEMOLITION GENERAL NOTES

5403169-0301

BRUCE T.

FALLON

o f UTA H

S T

ATE

T C

E

TI

HC

RADES

N E

C I

L

T h e se p la n s, d ra w in g s, a n d d e si g n s a re t h e e xc lu si ve p ro p e rt y o f W

P A

A rc h it e ct u re a n d s h a ll n o t b e r e p ro d u ce d in a n y fo rm w it h o u t w ri tt e n c o n se n t.

A ll ri g h ts r e se rv e d

1535 n. freedom blvd. suite 360 provo, utah 84604

801.374.0800 | wpa-architecture.com milestone issue date milestone issue description latest revision date latest revision description revision information

no. date description

A2.1

BASEMENT DEMO PLAN

PHASE II - BASEMENT

REMODEL

150 E CENTER ST.

PROVO, UTAH 84606

06.25.2026

PROVO

REGIONAL

CENTER

100% CONSTRUCTION DOCUMENTS

1/8" = 1'-0"1 BASEMENT LEVEL DEMO PLAN

DEMOLITION NOTES

1 REMOVE EXISTING WALL

2 REMOVE EXISTING FURRING. PRESERVE FIRE RETARDANT COATING

ON COLUMNS.

3 REMOVE EXISTING DOOR, FRAME AND HARDWARE

4 PATCH & REPAIR WALL AS NEEDED WHERE WALL REMOVED

5 REMOVE & REPLACE OUTER LAYER OF GYPSUM BOARD. TAPE, MUD &

PAINT.

6 REMOVE EXISTING BUILT UP FLOOR, SALVAGE MATERIAL TO BE USED

TO REINFORCE REMAINING BUILT-UP FLOOR

wallpaper

X annotation is NO DEMOLITION to drywall or fireproofing

Circle annotation is for full demo of drywall and fireproofing around the column

Purple Circle annotation is where the shop side of the drywall and fireproofing can be removed.

*NO DEMOLITION in Server Room.

All red dashed lines that represent walls and doors, will be removed by the awarded abatement contractor. All of the ceiling tile, ceiling grid and lighting will also be removed. All the duct insulation will be removed too.