4-2-CR27015-23029310 Unit Cost Sheet.pdf
PDF 176 KB Posted
- Solicitation number
- CR27015
- Issued by
- Utah County, Utah
About this file
This is a Unit Cost Sheet for the Utah Division of Facilities Construction and Management (DFCM) Provo Regional Building Basement Level Abatement Project, dated August 23, 2026. The document is designed for prequalified abatement contractors to submit unit pricing for potential unforeseen asbestos-containing building materials and related hazardous materials that may be encountered during the project. The sheet lists 35 line items covering additional mobilizations, labor rates, various hazardous materials removal (fluorescent light ballasts, PCB ballasts, radioactive emergency exit signs, refrigerant units), e-waste disposal, building material demolition (drywall, raised floors, ducting, insulation, piping, ceiling panels), and fireproofing removal. Contractors are required to provide unit prices for each item to establish rates should these unforeseen materials require removal during the abatement work.
The project, identified as Project #23029310, involves abatement of fireproofing on the 4th floor of the Provo Regional Building with a construction cost estimate of $130,000.00. This is a Stage II Invitation to Bid limited exclusively to contractors who have been prequalified under DFCM's Stage I Prequalification process and currently appear on the DFCM Prequalified Contractors list as of the solicitation date. The unit cost pricing structure allows the state to manage costs for contingent work that may arise during the abatement process, with pricing to be applied only if those specific items are encountered and removal becomes necessary during the project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTAH DFCM PROVO REGIONAL BUILDING
BASEMENT LEVEL ABATEMENT PROJECT
August 23, 2026 Company Name:
Unit Pricing: Bidding abatement contractors are to submit their base bid along with the following unit costs for any unforeseen asbestos-containing building materials using the Unit Pricing Cost Sheet which is posted separately.
Item No.
Description
Unit
Unit Price
1 Additional Mobilizations Each $ 2 Hourly Supervisor Rate Hr $ 3 Hourly Worker Rate Hr $ 4 Fluorescent light ballast Each $ 5 Fluorescent light tubes 2’ to 8’ long Each $ 6 PCB Ballast Each $ 7 Batteries Each $ 8 Auto Door Closer Units Each $ 9 Thermometers Each $ 10 Chemicals gal $ 11 Paints gal $ 12 Glycol gal $ 13 Fire Extinguisher Each $ 14 Gas Cylinder Each $ 15 Radioactive Emergency Exit Signs Each $ 16 Refrigerant unit CFC evacuation Each $ 17 Refrigerant unit CFC evacuation (<50 lbs) Each $ 18 Refrigerant unit CFC evacuation (>50 to 300 lbs) Each $ 19 Refrigerant unit CFC evacuation (>300 lbs) Each $ 20 E-waste (Small) Each $ 21 E-waste (Med) Each $ 22 E-waste (Large) Each $ 23 TV/Monitor/Laptop Each $ 24 Oil gal $ 25 60 gal containers of lead containing items gal $ 26 Fireproofing (Ceiling) SF $ 27 Fireproofing (Beam) SF $ 28 Drywall Demo SF $ 29 Raised Floor Demo SF $ 30 Ducting Demo SF $ 31 Insulation Demo SF $ 32 Piping Demo LF $ 33 Ceiling Panel Grid Removal SF $ 34 Ceiling Panel Grid Demo SF $ 35 Ceiling Demo SF $
File details come from the government source that posted it. Updated .