About this file
This is a technical specification document for the Bergen County Utilities Authority (BCUA) in New Jersey for BCUA Contract No. 25-10, a rebid for turbine generator maintenance, inspection, and as-needed repair and replacement parts services. The contract seeks a fully authorized Original Equipment Manufacturer (OEM) vendor to provide technical service, maintenance, repairs, and OEM replacement parts on an as-needed basis for three Siemens/Rolls Royce 501 KB Engines (Serial #ASP-652 Engine #2, Serial #ASP-654 Engine #3, and Serial #ASP-583 Engine #4). The scope of work includes performing complete mechanical and electrical inspections, internal engine borescope inspections, fuel nozzle and combustion liner inspections, thermocouple and electrical harness checks, magnetic chip detector inspection, air bleed system checks, fuel plumbing and air filter inspections, exhaust system inspections, test runs, functional testing of control systems and annunciators, and normal turbine starts. Service technicians must arrive onsite within five (5) work days of email notification. The contract has a two-year initial term with two optional one-year renewal periods at the Authority's discretion or upon reaching the awarded contract amount.
All replacement parts must be new, unused OEM parts or approved equivalents and carry a minimum 30-day warranty. Parts are not considered readily available, and contractors must provide detailed quotes with estimated lead times within five business days at no cost to the Authority. Billing prices equal the contractor's cost price plus a material markup not to exceed 15%, with documentation required to verify actual costs. All shipments must be freight prepaid and F.O.B. destination using standard shipping methods; overnight or expedited shipping requires specific Authorization. Service technicians must have documented manufacturer training on the specified equipment. The regular hourly labor rate applies to Monday through Friday work from 7:00 AM to 5:00 PM and includes all associated costs such as travel time, mileage, tool usage, and environmental charges, with overtime billed at 1.5 times the hourly rate if authorized. Service work initiated beyond the five-day response window incurs a 5 percent billing rate reduction for each work day late. Contractors must maintain detailed job tracking records and provide daily activity reports verified by an Authority representative before payment can be made. The contract does not guarantee a specific number of parts orders, labor hours, or total expenditures; payment is made only for parts actually ordered and received, freight costs actually expended, and hours actually worked.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-1
SECTION 01000
SCOPE OF WORK
1.0 SCOPE OF WORK
The intent of this bid is to secure a vendor who will provide technical service, maintenance and repairs, on an "as needed" basis, various new and unused Original
Equipment Manufacturers (OEM) replacement parts and components for the
Authority's Siemens/Rolls Royce 501 KB Engines. Vendors must be a fully authorized vendor of the OEM and able to supply all replacement parts, materials and supplies as listed in the manufacturer parts books of the equipment listed below, as well as to provide service on an "as needed" basis.
2.0 EQUIPMENT
Siemens/Rolls Royce 501 KB Engines:
Serial #ASP-652 - Engine #2
Serial #ASP-654 - Engine #3
Serial #ASP-583- Engine #4
3.0 PARTS
A. QUALITY
All parts must be OEM replacement parts or approved equivalent. Equivalent means parts that are equal or superior in every aspect including, but not limited to, criteria of performance, reliability, serviceability, and interchangeability.
All parts shall carry a minimum of thirty (30) day warranty for defects in materials and workmanship. Any standard Manufacturer's warranty, if longer than thirty
(30) days, shall apply.
In the case of rebuilt or reconditioned component OEM parts that may customarily carry a longer term of guarantee for workmanship or materials, the usual terms and conditions shall apply.
B. BILLING AND DELIVERY TIME
All parts shall be considered not readily available. Upon request, the Contractor shall provide a detailed quote that includes the estimated lead time for the required parts within five (5) business days. All requests for quotes for as-needed services shall be
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-2 provided at no additional cost to the Authority. The Authority may or may not authorize the work proposed in the quote at its sole discretion.
For parts that are authorized by the Authority, deliveries must be made within the lead time specified in the approved quote. Parts shall be billed at the Contractor's cost, plus the % Material Markup agreed upon under this Contract (not to exceed 15%). That is:
BP = CP + (CP x MM)
Or equivalently:
BP = CP x (1 + MM)
Where:
BP = Billing Price (amount charged to the Authority)
CP = Cost Price (actual cost paid by the Contractor for the part)
MM = % Material Markup (expressed as a decimal, e.g., 15% = 0.15)
For all invoices relating to the furnishing and delivery of replacement parts, the
Contractor shall attach documentation providing proof of the actual cost paid by the
Contractor for said parts. This documentation may include, but is not limited to, supplier invoices, purchase orders, or receipts. This requirement is to enable the
Authority to verify the accuracy of the % Material Markup applied in accordance with the terms agreed upon under this Contract.
C. FREIGHT COSTS
All parts shipments must be F.O.B. destination, freight prepaid and charged back.
The vendor must utilize standard shipping methods and all charges shall be in accordance with the area's customary freight charges. Overnight, air freight, or next day shipment must be specifically authorized by the Authority.
Freight costs shall be considered a direct expense to the vendor that will be reimbursed to the vendor with no mark up. Freight costs must be substantiated with written freight invoices and will be charged against the freight allowance given in the bid proposal. The Authority will only pay what is listed on the supplied freight invoice. The amount of the freight allowance given in the bid proposal is neither a maximum nor a minimum of what may be charged for freight costs. It is an arbitrary allowance that was assigned for the purpose of obtaining consistency in the bids received.
4.0 SERVICE TECHNICIANS
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-3
A. QUALIFICATIONS
Repair and service technicians performing requested work shall have documented manufacturer training on the types and kind of equipment listed and proof of such documented training shall be requested from time to time. The vendor shall provide all necessary tools, equipment, parts and materials incidental to the performance of the required work. All work performed on Authority equipment or component parts shall be guaranteed as customary and usual for the services provided.
B. REGULAR HOURLY RATE
The vendor shall provide a fixed per man-hour labor rate for the duration of this contract for such technical service, maintenance or repair work that may be requested beyond that covered by the unit warranty at the Authority's facility
The regular hourly rate shall be the cost of a single technician working onsite
Monday through Friday. excluding holidays, during the hours of 7:00 AM through
5:00 PM or up to eight (8) hours daily and shall include all costs for performing the requested work along with all associated costs for tool usage and/or rental costs, travel time to and from site, mileage, and environmental or casual charges that may result from the performance of the requested task. Payment will be made only for the number of hours onsite working at the bid amount. No separate payment will be made for associated costs such as travel time, vehicle mileage costs, tolls, tool usage and/or rental costs etc. If overtime is required and authorized by an Authority representative, then the hourly rate paid will be 1.5 times the hourly rate bid. Any and all invoices submitted for requested work shall include time of arrival and time of egress, with work order signed by Authority representative.
C. BILLING AND SERVICE RESPONSE TIME
The vendor's qualified technician must arrive onsite within five (5) work days
(calendar days excepting Saturdays, Sundays, and Authority holidays) of e- mail notification. Service work that is initiated within five (5) work days of notification is to be billed at the hourly rate bid. Service that is initiated beyond the five (5) work day response time shall be provided at a unit rate reduced by an amount of five percent (5%) for each and every work day beyond the five (5) work day response time that service work begins. This is:
• For service work that is started within the specified five (5) work day response time:
BR=HR
• For service work that is started beyond the specified five (5) work day response time:
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-4
BR=HR-(HR x 0.05 x DW)
Where:
BR = Billing Rate
HR = Hourly Rate given in the bid proposal
DW = Work days that the start of service work is late beyond the specified five (5) work day response time.
Note also that it is the intention of this contract that, once begun, service work is to be provided, until completed, on consecutive work days (calendar days excepting
Saturdays, Sundays and Authority holidays). After starting work, should the responding technician vacate the site for more than two (2) consecutive work days
(calendar days excepting Saturdays, Sundays and Authority holidays), the technician's return shall be treated, for billing purposes, as a separate service request subject to the billing reduction given below.
BR=HR-(HR x 0.05 x DA)
Where:
BR = Billing Rate
HR= Hourly Rate given in the proposal
DA= Work days that the vendor's technician is absent from the site once work had been started, beyond two (2) consecutive work days.
Performance of Work - To be limited to that included in service request.
D. WORK RECORDS
The vendor shall maintain a job tracking system that, at a minimum, records:
i. The date and time a request was received by the Contractor;
ii. The date and time a crew was dispatched to the site;
iii. The date and time the crew arrived at the site;
iv. A description of the problem and corrective work required;
v. The amount of time spent on the site by the Contractor's personnel;
vi. The materials and spare parts used by the contractor; and
vii. The date and time the work or repair was accepted by the Authority.
The vendor shall provide the Authority with a report that summarizes all such activity on a daily basis or prior to any payment being made. No payments can be made without said report signed as verified by an
Authority representative.
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-5
5.0 BID QUANTITIES
This contract does not guarantee that a specific number of parts will be ordered, or that a specific number of labor hours will be requested, or that a specific total dollar amount will automatically be expended. The parts value and labor hours listed on the Bid Form will be used in the evaluation of the bids.
All parts, quantities, freight, and labor will be ordered on an "as needed" basis only.
Payment will only be made for the parts that are ordered and received, for freight costs actually expended and for hours actually worked onsite to complete the requested repairs.
6.0 SUBMITTALS (WITH BID)
A. APPROVED EQUIVELANT (ONLY IF APPLICABLE)
Vendors shall submit a copy of the nationally published retail parts price listing for the corresponding Siemens/Rolls Royce Engines catalog which is in effect on the date that bids for this contract is due. This price list may be in the form of a printed hard copy or a CD and must be clearly dated.
In the event price lists utilize part numbers that have been superseded in more recent catalogs, the vendor shall provide a minimum of two (2) new corresponding print catalogs, and/or one (1) digital CD catalog (if available) as to determine and follow such changes. The successful vendor shall also agree to supply the
Authority updated parts listing as they become available.
Vendor shall identify any parts deemed as "not readily available" on the parts price list for review and subsequent approval by the Authority.
B. CONTACT INFORMATION
The vendor shall provide the name, telephone number and e-mail address of the person(s) responsible for satisfying parts and service requests. Parts delivery and service response times shall be marked as beginning once the Authority makes contact with the given person(s). Should the submitted contact information change, the Authority must be immediately provided with the updated Authority information.
7.0 BID ITEM 1 - ANNUAL SERVICE
The intent of this annual service is to have qualified technicians inspect all aspects of our Rolls-Royce® 501KB Turbine Power System Allison Power Generators, as follows:
1. Unit #2 501K-722 ASP-652
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-6
2. Unit #3 501K-723 ASP-654
3. Unit #4 501K-724 ASP-583
4. (Note Unit #1 is not currently installed)
The work under this contract consists of performing all work required for the evaluation, analysis and service of the Gas Turbine Generator in accordance with the scope of work detailed below.
The Scope of Work for this contract consists of the following:
7.1 Annual Inspection
1. Perform a complete mechanical and electrical inspection of the Gas Turbine
Generator System.
2. If the inspection reveals the need for additional parts and/or labor, promptly notify and provide a quotation (including lead-time) to the Authority Engineer or his designated contact for the additional work. Owner must authorize any additional work prior to any provision of work.
3. Perform an internal engine borescope inspection of the engine compressor and turbine section in accordance with applicable OEM specifications. Provide photographs in the Inspection Report.
4. Remove and inspect all fuel nozzles, check combustion liner components.
Provide photographs in the Inspection Report.
5. Visual check of all thermocouples, igniter/exciter leads & electrical harnesses.
Provide photographs in the Inspection Report.
6. Check magnetic chip detector for debris, clean as required. Provide photographs in the Inspection Report of the chip detector prior to cleaning.
7. Check, air bleed system & filter, manifold drain valve, G/T Low Pressure Fuel
Filter (supply and change filters as required).
8. Visually inspect fuel plumbing.
9. Inspect air filter and intake system (supply and change filters as required).
10. Inspect complete exhaust system.
11. Perform test run and turbine crank.
12. Record and verify the unit is running with proper temperature, pressure and engine speed. Provide documentation of the values in the Inspection Report.
13. Check engine operation noting any unusual conditions or performance in the
Inspection Report.
14. Functional testing of annunciator.
15. Functional testing of the turbine engine generator control system, including shutdowns, alarms and crank cycling.
16. Perform normal start of the turbine.
8.0 PAYMENT
Turbine Generator Maintenance, Inspection, and As-Need Repair & Replacement Parts Services (REBID) BCUA Contract No. 25-10
01000-7
Payment shall only be made after the submittal of properly executed Purchase Order, Voucher, and the corresponding Service Reports by the contractor.
9.0 DELIVERY
Products shall be delivered to the Authority after the contractor's receipt of a Purchase
Order to:
Bergen County Utilities Authority
98 Empire Blvd., Moonachie, NJ 07074
Delivery shall be between the hours of 6:30 AM and 2:00 PM, Monday through
Friday, except Authority holidays.
10.0 CONTRACT DURATION
This contract will commence upon the execution of the Agreement by both parties and shall continue in effect for a two (2) year period with two (2) one-year options to renew at the sole discretion of the Authority or when expenditures reach the awarded contract amount.
11.0 SAFETY
The vendor shall provide the Authority with their Health and Safety Plan.
Contractor must submit the Health and Safety Plan to the Authority's Safety
Director. The contractor is responsible for safety and security precautions during any work performed at the Authority.
END OF SECTION