8-Change Order Form.pdf.pdf

PDF 201 KB Posted

Attached to
Bearss Ave at Florida Ave Intersection Improvements
Solicitation number
IFB-26-00354
Issued by
Hillsborough County, Florida

About this file

This is a Change Order Form template utilized by Hillsborough County, Florida for modifying existing contracts. The form provides a standardized mechanism for documenting authorized changes and modifications to contracts, capturing essential project information including the contract number, bid number, contractor name, and project number. The form accommodates various types of changes through checkboxes for time changes, extra work, credits, and other modifications, with designated sections for describing the nature of changes, documenting cost impacts, and establishing revised final completion dates. The document requires signatures and approvals from the County's Board of County Commissioners, Clerk of Circuit Court, departmental fiscal representatives, and County Attorney, along with contractor authorization and notarization as applicable based on the contractor's legal structure.

The form tracks the original contract sum, cumulative impact of previous change orders, and the current contract sum prior to the subject change order, calculating the new total contract sum reflecting the proposed modification. The change order mechanism includes provisions for time extensions or reductions measured in calendar days and requires contractor waiver of claims for additional compensation or time beyond those explicitly addressed in the change order. The document includes consent of surety provisions, acknowledging adjustments to performance and payment bonds corresponding to changes in contract amount and completion date. All approvals require documentation of BOCC approval dates and must comply with legal requirements including notarization by authorized county personnel and contractor representatives.

View the file

Other files

File Type Posted
29-Agreement - Construction - Stand Alone.docx.docx DOCX document
28-Attachment J - Insurance Requirements.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
16-Attachment B - Miscellaneous Structures Geotech Rpt.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
18-Attachment C - 69600103 Bearss at Florida Crown Castle URS.pdf PDF
14-Bid Bond.pdf PDF
25-Attachment F - TrafficControlOfficer 6.10.pdf PDF
4-Application for Payment.pdf.pdf PDF
19-Attachment C - 69600103 Bearss at Florida Frontier Comm URS.pdf PDF
23-Attachment D - SWFWMD Minor Mod Approval.pdf PDF
15-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
17-Attachment B - Roadway Soil Survey Rpt.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
22-Attachment C - 69600103 Bearss at Florida Zayo URS.pdf PDF
21-Attachment C - 69600103 Bearss at Florida TECO URS.pdf PDF
32-Payment Bond.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
33-Performance Bond.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
26-Attachment G - Project Map.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
30-Attachment H - BearssAtFlorida Final RdwyPlan.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
9-Insurance Certificate.doc.doc DOC document
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
24-Attachment E - Final DrainRpt.pdf PDF
27-Attachment I - Supplemental Specifications.pdf PDF
31-1. Terms and Conditions1.pdf PDF
20-Attachment C - 69600103 Bearss at Florida Spectrum URS.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 01.29.2025

HILLSBOROUGH COUNTY

CHANGE ORDER FORM

CONTRACT: CHANGE ORDER NO.:

BID NO:

CONTRACTOR: PROJECT NO:

CPA NO:

TIME CHANGE EXTRA WORK CREDIT OTHER

The Contractor is hereby authorized and directed to make the following changes and modifications to the aforesaid Contract in accordance with all requirements applicable thereto.

DESCRIPTION OF CHANGE:

COST

IMPACT

FINAL

COMPLETION

DAYS

REASON FOR CHANGE:

The original Contract Sum (TOTAL GMP) was . . . . . . . . . . . . $____________ Net change by previous Change Orders . . . . . . . . . . . . . . . . $____________ The Contract Sum prior to this Change Order was . . . . . . . . . . . . . $____________ The Contract Sum will be by this Change Order. . . . . . $ ____________ (increased, decreased or unchanged) The new Contract Sum including this Change Order will be . . . . . . . . . . $ ____________

The Final Completion Milestone prior to this Change Order was .

The time for Final Completion Milestone will be ______________ by __________( )days.

(extended, reduced or unchanged) The Final Milestone for this change order therefore is therefore

The Contractor waives any and all claims to additional time extension and/or additional monetary compensation resulting from these changes and all cost associated with the change order as herein addressed.

Excepting those terms and provisions conflicting with this Change Order which are hereby changed to conform hereto, the aforesaid Contract as amended by all previous change orders hereto is otherwise reaffirmed in its entirety.

IN WITNESS WHEREOF, this Change Order No. _______ to __________________________________ has been executed by the parties hereto or their duly authorized representatives.

ATTEST: VICTOR D. CRIST COUNTY: HILLSBOROUGH COUNTY FLORIDA

Clerk of Circuit Court

BY: BY:

Deputy Clerk Chair, Board of County Commissioners

BOCC Document Number Date of BOCC approval

ATTEST: CONTRACTOR:

BY:

Witness Authorized Signature (SEAL)

TITLE:

DATE:

BOCC Staff Approval Date

Department Fiscal Department Director Procurement County Attorney:

Approved as to Form and Legal Sufficiency

(ACKNOWLEDGMENT OF CONTRACTOR, IF A CORPORATION)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ______________________ (Name of person) as____________________________ for ___________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

(ACKNOWLEDGMENT OF CONTRACTOR, IF A PARTNERSHIP OR INDIVIDUAL)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by .

(Name of person acknowledging)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount (increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person) ________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public) (Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

File details come from the government source that posted it. Updated .