25-Attachment F - TrafficControlOfficer 6.10.pdf

PDF 154 KB Posted

Attached to
Bearss Ave at Florida Ave Intersection Improvements
Solicitation number
IFB-26-00354
Issued by
Hillsborough County, Florida

About this file

This is a time sheet form used by the Hillsborough County Engineering and Operations Department in Tampa, Florida for tracking off-duty officer work related to traffic control and construction projects. The form is designed to record individual officer compensation for services rendered on specific job assignments. The document provides fields for the deputy's name, badge number, date of service, job number, work location, start and stop times, total hours worked, hourly rate, and total compensation amount. The form requires signatures from the trooper, deputy, supervisor approval, and the MOT (maintenance of traffic) foreman to authenticate the hours and authorize payment.

The form serves as an internal accounting and payroll document for the Hillsborough County Board of County Commissioners and supports project billing and contractor management. This particular form is associated with the Bearss Avenue at Florida Avenue Intersection Improvements project, which is a $1,263,856.86 construction initiative involving roadway widening, milling and resurfacing, drainage improvements, ADA sidewalk and curb ramp upgrades, earthwork, traffic signal installation, and signing and pavement marking. The time sheet documentation allows the county to accurately track labor costs and allocate expenses to the appropriate construction contract and job codes for budget management and contractor payment processing.

View the file

Other files

File Type Posted
8-Change Order Form.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
17-Attachment B - Roadway Soil Survey Rpt.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
23-Attachment D - SWFWMD Minor Mod Approval.pdf PDF
16-Attachment B - Miscellaneous Structures Geotech Rpt.pdf PDF
26-Attachment G - Project Map.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
15-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
33-Performance Bond.pdf PDF
29-Agreement - Construction - Stand Alone.docx.docx DOCX document
31-1. Terms and Conditions1.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
24-Attachment E - Final DrainRpt.pdf PDF
14-Bid Bond.pdf PDF
18-Attachment C - 69600103 Bearss at Florida Crown Castle URS.pdf PDF
28-Attachment J - Insurance Requirements.pdf PDF
27-Attachment I - Supplemental Specifications.pdf PDF
20-Attachment C - 69600103 Bearss at Florida Spectrum URS.pdf PDF
4-Application for Payment.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
32-Payment Bond.pdf PDF
9-Insurance Certificate.doc.doc DOC document
19-Attachment C - 69600103 Bearss at Florida Frontier Comm URS.pdf PDF
22-Attachment C - 69600103 Bearss at Florida Zayo URS.pdf PDF
21-Attachment C - 69600103 Bearss at Florida TECO URS.pdf PDF
30-Attachment H - BearssAtFlorida Final RdwyPlan.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING & OPERATIONS

PO Box 1110, Tampa, FL 33601-1110 813-635-5400 | Fax: (813) 272-5811

OFF DUTY OFFICERS

PLEASE PRINT

HCFL.GOV

BOARD OF COUNTY

COMMISSIONERS

Chris Boles Donna Cameron Cepeda

Harry Cohen Ken Hagan

Christine Miller Gwendolyn "Gwen" Myers

Joshua Wostal

COUNTY ADMINISTRATOR

Bonnie M. Wise

COUNTY ATTORNEY

Julia Mandell

COUNTY INTERNAL AUDITOR

Melinda Jenzarli

ASSISTANT COUNTY ADMINISTRATOR

Kimberly A. Byer

NAME OF DEPUTY: ________________________________ DATE: ____________

BADGE NUMBER: _______________ JOB NUMBER: _______________________

LOCATION WORKED: ________________________________________________

START TIME: _____________AM/PM STOP TIME: ________________AM/PM

TOTAL HOURS: _________________ X $_______________ = $______________

TROOPER SIGNATURE: ______________________________________________

DEPUTY SIGNATURE: ________________________________________________

APPROVED BY: ______________________________________________________

MOT FORMAN SIGNATURE: ___________________________________________

CONTRACTOR: ______________________________________________________

File details come from the government source that posted it. Updated .