This is a Supplemental Specifications document for Hillsborough County, Florida's Bearss Avenue at Florida Avenue Intersection Improvements project (GovTribe ID: 69600103), which outlines detailed construction and material specifications for roadway and traffic signal work. The project encompasses roadway widening to accommodate an exclusive westbound to southbound right turn lane, milling and resurfacing, drainage improvements, ADA-compliant sidewalk and pedestrian curb ramp improvements, earthwork, traffic signal installation with pedestrian features, and signing and pavement marking. The specifications establish workmanship and material standards by incorporating Hillsborough County Public Works Standard Specifications (October 2023 Edition), FDOT FY 2025-2026 Standard Plans and Specifications, Hillsborough County Stormwater Technical Manual (October 2023), Tampa Electric Company Standard Electric Service Requirements (2019), and ANSI-A300 tree care standards. Construction work hours are restricted to 8:00 AM to 5:00 PM for low-volume roadways, 9:00 AM to 4:00 PM for high-volume roadways, and 9:00 PM to 6:00 AM for level "F" congested roadways, with all work requiring 72 hours prior written notice for deviation. The contractor must submit a CPM schedule encompassing the entire construction duration and reflecting specified phasing, coordinate with utility companies and nearby school traffic patterns, provide a Maintenance of Traffic plan approved in writing by the County prior to commencing work, and deliver close-out documentation including signed as-built plans, test reports, and warranty assurances.

The contract establishes that the contractor is responsible for all quality control testing performed by an FDOT-qualified testing laboratory approved by the County, with the County conducting Quality Assurance testing solely for its benefit. Permits including Hillsborough County Right of Way Use Permit and NPDES Notice of Intent (ranging from $250 to $400 depending on acreage) are the contractor's responsibility, with a $250.00 allowance included in the bid proposal for reimbursement. The contractor must provide six mobile project identification signs, coordinate with residential and business owners with three weeks' notice prior to modifications, manage existing residential irrigation system repairs at its own expense, and remove all millings from the project site if no County entity accepts them. The project is estimated at $1,263,856.86, with payment structured as lump sums for Mobilization and Maintenance of Traffic items, and per-unit pricing for other line items. Traffic signal specifications are comprehensive, requiring TS2 Type 1 Advanced Traffic Controllers in TS2 Type 1 cabinets, controller cabinets meeting NEMA TS2 specifications with detailed configuration requirements including GPS dome, UPS integration, fiber optic or copper networking capabilities, dual 19-inch racks, emergency preemption capability, and extensive grounding and surge protection requirements. The contractor must coordinate new or modified signal timing with Hillsborough County Traffic Engineering, provide two weeks' notice prior to signal activation, and maintain responsibility for all existing traffic signal maintenance and repairs from project commencement until all punch list items are corrected and the signal is deemed acceptable.

View the file

Other files

File Type Posted
8-Change Order Form.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
25-Attachment F - TrafficControlOfficer 6.10.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
17-Attachment B - Roadway Soil Survey Rpt.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
31-1. Terms and Conditions1.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
24-Attachment E - Final DrainRpt.pdf PDF
14-Bid Bond.pdf PDF
18-Attachment C - 69600103 Bearss at Florida Crown Castle URS.pdf PDF
28-Attachment J - Insurance Requirements.pdf PDF
20-Attachment C - 69600103 Bearss at Florida Spectrum URS.pdf PDF
23-Attachment D - SWFWMD Minor Mod Approval.pdf PDF
16-Attachment B - Miscellaneous Structures Geotech Rpt.pdf PDF
26-Attachment G - Project Map.pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
15-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
33-Performance Bond.pdf PDF
29-Agreement - Construction - Stand Alone.docx.docx DOCX document
4-Application for Payment.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
32-Payment Bond.pdf PDF
9-Insurance Certificate.doc.doc DOC document
19-Attachment C - 69600103 Bearss at Florida Frontier Comm URS.pdf PDF
22-Attachment C - 69600103 Bearss at Florida Zayo URS.pdf PDF
21-Attachment C - 69600103 Bearss at Florida TECO URS.pdf PDF
30-Attachment H - BearssAtFlorida Final RdwyPlan.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

69600103 Bearss Avenue at Florida Avenue Intersection Improvements

1 January 1, 2017

Supplemental Specifications

Section 1 - Specifications

1.01R Workmanship And Materials:

This project is to be constructed utilizing Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition; FDOT FY 2025-2026 (or most current Edition) of Standard Plans for Road and Bridge Construction; FDOT Standard Specifications for Road and Bridge Construction FY 2025-2026 (or Latest Edition); with the exception of Division I and Division II Sections 100 through 103 and 105; Hillsborough County Public Utilities Water, Wastewater and Reclaimed Water Technical Specifications October 2023 (or most current) Edition; Hillsborough County Stormwater Technical Manual October 2023; Hillsborough County October 2021 Transportation Technical Manual; Tampa Electric Company Standard Electric Service Requirements 2019 (or Latest Edition); and ANSI-A300 American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management-Standard Practices (Root Management), and its companion publication Root Management, Best Management Practices by the International Society of Arboriculture, and the Supplemental Specifications herein. Any conflict between the documents shall be resolved in accordance with the requirements of the Hillsborough County General Terms and Conditions.

With the exception of the Specifications contained herein and the Hillsborough County Public Utilities Water, Wastewater and Reclaimed Water Technical Specifications October 2023 (or most current) Edition, Hillsborough County Public Works has adopted the FDOT FY 2019-20, FDOT FY 2020-21 Standard Plans for Road and Bridge Construction, and FDOT FY 2022-23 (or most current Edition) of Standard Plans for Road and Bridge Construction for use on Public Works Construction Projects, with the following exceptions/clarifications:

A. FDOT Standard Specifications for Road and Bridge Construction Division I, Sections 1 through 9 and Division II Sections 100 through 103 and 105 are omitted from this contract and replaced in their entirety by Hillsborough County’s General Terms and Conditions and Standard Specifications 01010 through 01700. References contained in Division II and Division III of the FDOT Standard Specifications related to Division I shall be replaced with the appropriate corresponding Article(s) or Technical Specifications referenced above. References to FDOT Division I Specification(s) that do not have a corresponding Article(s) or Technical Specification shall be clarified by the COUNTY’s Project Manager.

B. Paragraph Not Applicable.

C. The following FDOT Standard Specifications for Roadways and Bridges are replaced and/or modified with the corresponding Hillsborough County Standard Specification sections contained herein:

204 Graded Aggregate Base 283 Reclaimed Asphalt Pavement Base 320 Hot Bituminous Mixtures; Plant, Methods and Equipment, 327 Milling of Existing Asphalt Pavement, 330 Hot Bituminous Mixtures General Construction Requirements, 334 Superpave Asphalt Concrete, 336 Asphalt Rubber Binder, 337 Asphalt Concrete Friction Courses, https://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2023/standard-specifications-for-construction.pdf https://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2023/standard-specifications-for-construction.pdf https://www.fdot.gov/design/standardplans/2026/standard-plans-fy-2025-26 https://www.fdot.gov/design/standardplans/2026/standard-plans-fy-2025-26 https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/ebook/2025-26-ebook-compressed.pdf?sfvrsn=a07d3f95_2 https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/ebook/2025-26-ebook-compressed.pdf?sfvrsn=a07d3f95_2 http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications https://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2023/stormwater-management-technical-manual.pdf https://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2021/transportation-technical-manual-for-subdivision-and-site-development-projects.pdf https://www.hillsboroughcounty.org/library/hillsborough/media-center/documents/public-works/ttm/ttm-2021/transportation-technical-manual-for-subdivision-and-site-development-projects.pdf https://www.tampaelectric.com/files/content/sesr.pdf https://www.tampaelectric.com/files/content/sesr.pdf http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications http://www.hillsboroughcounty.org/en/businesses/land-development/technical-publications/public-utilities-technical-specifications https://www.fdot.gov/design/standardplans/2020/default.shtm https://www.fdot.gov/design/standardplans/2021/default.shtm https://www.fdot.gov/design/standardplans/2023/default.shtm https://www.fdot.gov/design/standardplans/2024/24.shtm https://www.fdot.gov/design/standardplans/2024/24.shtm

2 January 1, 2017

341 Asphalt Rubber Membrane Interlayer, 600 Traffic Signal Overview 603 General Requirements for Installation and Evaluation of Traffic Control

Equipment and Material 611 Signal Installation Acceptance Procedures 620 Signal Installation Grounding 630 Conduit 632 Signal and Interconnect Cable 634 Span Wire Assembly 635 Pull and Junction Boxes 639 Electrical Power Service Assemblies 650 Vehicular Signal Assemblies 652 24/7 Solar Flashing Beacon Assembly 653 Pedestrian Signal Assemblies 660 Inductive Loop Detectors 662 3-M Opticom™ Priority Control Preemption Detection 665 Pedestrian Detector Assembly 670 Traffic Controller Assembly 676 Controller Cabinets 699 Internally Illuminated Signs 901 Coarse Aggregate, 902 Fine Aggregate, 916 Bituminous Materials, and 919 Ground Rubber Tire.

The CONTRACTOR Quality Control requirements outlined in these Sections are required as described herein.

D. CONTRACTOR Quality Control (CQC) program requirements referenced within the

FDOT Standard Specifications are not required on Hillsborough County projects.

However, the CONTRACTOR is responsible for constructing the project in accordance with the contract documents and ensuring compliance with the specifications. Therefore, the CONTRACTOR is responsible for scheduling and performing testing as required to ensure contract compliance. All testing performed by the CONTRACTOR must be performed by a FDOT qualified testing laboratory approved by the COUNTY. The COUNTY will perform Quality Assurance testing to ensure CONTRACTOR compliance with the contract documents. This testing is solely for the COUNTY’s benefit. The COUNTY’s testing is not intended to relieve the CONTRACTOR of performing testing and they are not permitted to rely on this testing to ensure their contract compliance. Quality Assurance testing by the COUNTY in no way relieves the CONTRACTOR or their Subcontractors of their responsibility to provide quality materials and workmanship on the project. No act or omission on the part of the COUNTY, Professional, any inspector(s), or representative of the COUNTY shall be construed as relieving CONTRACTOR of this responsibility.

E. If the CONTRACTOR desires to utilize materials, means, or methods which in accordance with the FDOT specifications requires Quality Control testing and approval by the Engineer, the testing shall be performed at the expense of the CONTRACTOR, and reviewed for acceptance by the COUNTY. The COUNTY also reserves the right to require testing above and beyond the FDOT specified LOT testing in situations when the testing of LOT quantities will not provide a reasonable assurance of the quality of the

3 January 1, 2017 work. This additional testing by the CONTRACTOR will be at no additional cost to the

COUNTY.

F. At the CONTRACTOR’s option he may submit a Value Engineering Change Proposal, also know as a Cost Savings Initiative Proposal (CSIP), or hereinafter referred to as a VECP or CSIP in accordance with FDOT Standard Specifications for Road and Bridge Construction, Section 4-3.9, Value Engineering Incentive, or Cost Savings Initiative Proposal. The COUNTY reserves the right to reject at its discretion any VECP or CSIP submittal and the CONTRACTOR shall remain obligated to perform the WORK in accordance with the terms of the existing Contract.

G. Paragraph Not Applicable.

H. The use of the term “Department” in the FDOT Specifications is replaced by COUNTY except in those instances where the FDOT is the controlling organization.

I. The terms Engineer, Project Manager and Project Representative are interchangeable between the various Contract Documents.

J. Control of Materials: The County will accept approved FDOT Quality Product List

(QPL) products and materials unless stated to the contrary herein.

1.02R Project Sign – Attachment A

Six (6) mobile project identification signs shall be provided, placed, and removed by the CONTRACTOR. The sign(s) shall be maintained in good working condition and shall be replaced by the CONTRACTOR when damaged. The cost to provide the project identification signs shall be included in the Maintenance of Traffic pay item(s). At the commencement of construction, the CONTRACTOR shall display the signs and relocate the signs as required by the COUNTY PROJECT REPRESENTATIVE. The CONTRACTOR is responsible for the care and custody of the project identification signs. Damage to, or theft of, the project identification signs shall be reported to the COUNTY PROJECT REPRESENTATIVE by the CONTRACTOR within 24 hours. The Cost of relocating and maintaining the signs shall be considered incidental to the project. The signs will be fabricated per the specifications provided as Attachment A.

1.03R Schedule The CONTRACTOR’s project schedule shall encompass the project’s entire construction duration specified in the CONTRACT and may not indicate a shorter duration. Additionally, the schedule shall reflect the construction phasing specified in the CONTRACT and shall include all WORK, including work to be performed by others such as coordination, material acquisition, utility relocation, COUNTY submittal reviews, permit reviews and approvals, etc.

Bar Chart: The bar chart schedule as described in Section 01310 of the Standard Specifications shall be required under this contract for each specific/individual project when assigned.

CPM: The CPM schedule as described in Section 01311 of the Standard Specifications shall be required under this contract.

Provide schedule in the format as requested by County Project Manager.

4 January 1, 2017

1.04R Special Working Hours The Standard work site operation hours within Hillsborough County to be considered by Bidders in preparing their bids shall be as follows:

8:00AM to 5:00PM - Low volume roadways such as subdivisions or any similar locations.

9:00AM to 4:00PM - High volume roadways (collector and arterial roadways) congested areas, and any similar locations.

9:00PM to 6:00AM - High volume roadways (level “F” roadways) congested areas, and any similar locations.

Monday through Friday, excluding County-observed holidays and weekends. No work shall proceed outside these hours without 72 hours prior notice (minimum) and written authorization by the County PROJECT MANAGER. However; the COUNTY reserves the right to establish work hours based on traffic volumes, congestion, or other situations that will interfere with the normal flow of traffic.

Temporary Traffic Control Permits will be issued by the COUNTY, as described later in these Supplemental Specifications. The TTC Permits indicate the allowable hours for operation within the actual roadway limits for each road or portion thereof in each project’s work order(s). The CONTRACTOR may request alternative work hours, based on the allowable hours established by the TTC Permit(s). The approval of alternate work hours for each project is subject to the same authorization described above and will be based on a standard 8-hour shift as provided by the normal work hours. These provisions allow daytime and night time shifts, based on the allowable hours indicated by the TTC Permit. Further changes to the approved work hours require a formal request by the CONTRACTOR for the TTC Permit to be amended by the COUNTY and the aforementioned written authorization by the County PROJECT MANAGER.

If approved, an amended TTC Permit will be issued to the CONTRACTOR.

As long as the work is on schedule, the County PROJECT MANAGER is not obliged to consider a shift longer than 8 hours or additional work days beyond those described above.

However, if the work is deemed to be behind schedule, the County PROJECT MANAGER may approve longer shifts and/or additional shifts based on the approval of a recovery schedule submitted by the CONTRACTOR. At the discretion of the County PROJECT MANAGER, additional costs incurred by the COUNTY for overtime wages and/or employing additional staff are subject to reimbursement by the CONTRACTOR to the COUNTY.

1.05 Clearing & Grubbing

Clearing & Grubbing shall be performed in accordance with FDOT Specification Section 110.

Additionally, specified plowing of the surface shall include the removal of the top layer of organic material beginning from the original ground line and if applicable stockpiling of the material for future use on the project. No additional compensation shall be provided for this WORK or associated WORK.

1.06 Pedestrian Facilities

A. All pedestrian facilities shall be constructed in accordance with the Americans with Disabilities Act (ADA) and the Department of Transportation Regulation 49 CFR, Part 37.

5 January 1, 2017

B. Sidewalks and curb ramps shall be constructed in accordance with the FDOT Design Standards FY2020-21 (or the latest edition at time of bid opening) Standard Plan 522-001 and 522-002. Residential sidewalks adjacent to driveways shall be six (6) inches depth up to the first construction joint, which shall be a distance of five (5) feet measured from the edge of the driveway. Sidewalks/Ramps adjacent to roadways shall be six (6) inches in depth up to the first construction joint which shall be a minimum distance of six (6) feet measured from the edge of pavement, or back of curb. The construction joint may not transect the detectable warning surface.

C. Detectable warning surfaces, as defined by the latest edition of FDOT Standard

Specifications for Road and Bridge Construction - Specification 527, will be utilized in lieu of tactile surfaces. Detectable warning surfaces must be capable of supporting vehicular traffic and no waivers to the warranty are acceptable. All references to tactile surfaces in the Hillsborough County Standard Specifications for construction shall be interpreted as referring to detectable warning surfaces. In order to meet ADA visual contrast requirements, the standard color for application on Hillsborough County maintained roads is red, unless otherwise directed by the County Project Manager. If field conditions exist in which red would not create sufficient contrast, the County Project Manager should be notified in order to determine if another color should be utilized. On FDOT maintained roads, the color requirements may vary and should be confirmed with FDOT prior to placement.

Acceptable Materials for Detectable Warning Surfaces:

1. Top Guard Detectable Warning by Roadway Concepts

2. Proprietary epoxy-based system supplied and installed by Vanguard of Florida.

3. Alternate materials and methods which fully meet contract specifications, and which have been approved for the FDOT Qualified Products List, may be used if approved by the County Project Manager. Only those materials and methods which are compatible with traffic loads (including warranty) will be considered.

D. Typical Layout of Ramp Pay Item is below:

6 January 1, 2017

7 January 1, 2017

1.07R Traffic Signals A. The following are Hillsborough County’s additions to Section 603 of the FDOT Standard

Specifications for Road and Bridge Construction:

603-3.3 Substantial Completion: Installation is substantially complete when there are only minor discrepancies. These minor discrepancies will have no effect on the operation of the signal. All signals, markings, and signs will have been installed to be considered at substantial completion.

B. The following are Hillsborough County’s additions to Section 611-2 of the FDOT

Standard Specifications for Road and Bridge Construction:

611-2.4.1.1 New Signal Installations: New signals (no signal previously at intersection) will be inspected when the signal is at substantial level of completion. All signals, pedestrian signals and signs, markings, wiring, loops, and video detection will be in place. Minor requirements such as duct seal on conduits, advance signal ahead signs, and overhead illuminated signs may still be outstanding if the reason for lack of completion is significantly justified. The electrical service release will not be sent to the power company until the signal is determined to be at substantial completion by the traffic signal inspector or a deviation is granted by the Manager of Traffic Operations.

C. Replace the existing language of Section 611-3 of the FDOT Standard Specifications for

Road and Bridge Construction with the following:

611-3 Signal Timing: The signal timing will typically be provided by the County. In the case of updated signal installation, the Engineer of Record will provide signal timings when any phasing changes have occurred from the old traffic signal to the new traffic signal. If no changes in phasing have occurred, the existing time sheet may be implemented at the time the signal is swapped over. In the case where a new traffic signal (no signal previously existed) is being installed in a coordinated corridor, the Engineer of Record will provide basic timings and Hillsborough County Traffic Engineering (Timings Section) will provide the coordinated timing plan. The contractor, in all cases, will provide a minimum of 2-week notice prior to activation of new or modified signals to allow sufficient time to review and/or create new timings for the traffic signal. The timings will be reviewed and/or created by Hillsborough County Traffic Engineering or their applicable consultant.

D. The following are Hillsborough County’s additions to Section 611-5 of the FDOT

611-5.2.1 Responsibility for maintenance of existing traffic signal during construction:

The contractor is responsible for all maintenance of the traffic signal at commencement of the project. The maintenance of the traffic signal is defined as repair and/or replacement of any equipment or hardware failures which cause the traffic signal to operate abnormally. This will include any damages caused by accident or criminal behavior to any underground or aboveground traffic signal related facility. Once the replacement signal is operational, the responsibility for maintenance of the new traffic signal will continue to be the responsibility of the contractor until all of the discrepancies or punch list items have been corrected and the traffic signal is deemed “acceptable”. The contractor will be required to respond to any traffic signal complaints from citizens, law enforcement and/or Hillsborough County’s call center.

8 January 1, 2017

611-5.2.2 Responsibility for maintenance of a new traffic signal: The contractor is responsible for all maintenance of the new traffic signal from the moment the construction starts until all discrepancies or punch list items have been corrected and the traffic signal is deemed “acceptable”. The contractor will be required to respond to any traffic signal complaints from citizens, law enforcement and/or Hillsborough County’s call center.

E. The following are Hillsborough County’s additions to Section 620 of the FDOT Standard

Specifications for Road and Bridge Construction:

620-3.1 General: Meet all local electrical codes. Install insulated green No. 4 AWG copper wire for electrical or lightning protection ground from the system ground (electrical service ground rod) to all elements of the traffic signal (pedestrian poles, mast arms, steel pull box lids, etc.). No. 4 AWG insulated green copper wire will be used from the electrical service disconnect to the traffic signal controller ground. The main ground wire from the meter panel to the ground rod will be #4 AWG solid copper wire.

All connections to ground rods and connections where multiple ground wires intersect will be exothermically welded. Connections in the meter can, electrical service disconnect, pedestrian poles, mast arms, traffic signal controller cabinet, etc. will be made with a crimped lug that is bolted to a grounding point or direct connection to a ground buss (usually found in the electrical service disconnect and controller cabinet).

All separately grounded elements at an intersection will be bonded together (exothermically) to form an intersection grounding network and all will be tied back to the primary ground on the electrical service meter panel. The intersecting point for all ground wires in the grounding network will be a pull box adjacent to the electric service meter panel. Refer to the Typical 240/120 VAC Service drawing in the construction plans.

A pull box adjacent to the electrical service meter/disconnect pole will be installed to provide an intersecting point for all the grounding network grounds. The ground wires from all ground network components (i.e., signal poles, pedestrian poles, pull boxes, etc.)

will be brought into this one pull box to be tied to the main ground from the electrical service ground.

Refer to the Hillsborough County Typical 240/120 VAC Service drawing in the construction plans for further guidance on grounding and surge protection device.

F. The following is Hillsborough County’s addition to Section 630-3.2 of the FDOT

630-3.2 Conduit Sizes: All pedestrian signal bases will have two (2) each 2” PVC conduits (one (1) each high voltage and one (1) each low voltage) along with one (1) each 1” PVC conduit (ground) installed. The conduits will be routed to the nearest associated pull box. All mast arm and steel strain pole foundations will have a minimum of 4-2” and 1-1” PVC conduits installed in the foundation. All traffic signal controller foundations will have 13-2” and 2-1” conduits installed in the controller foundations.

9 January 1, 2017

A greater than forty per cent fill of any conduit will not be allowed. The Engineer of Record will show additional conduit runs if the less than forty per cent fill cannot be achieved.

G. The following are Hillsborough County’s additions to Section 632 of the FDOT Standard

632-3.1 Number of Conductors: The contractor will determine the number of conductors required for each signal and interconnect cable by utilizing the Contract Documents or contacting the County traffic signal inspector.

For span wire installations using trunk cables, there will be a minimum of three spare conductors for each signal trunk cable used at all signal installations. Install the three spare conductors from the controller cabinet through each signal head disconnect hanger to the furthermost disconnect hanger. Each direction or approach will have its own neutral. Double (2-way) signal heads will not be allowed as this would cause two separate directions to share one neutral. The white conductor in the signal cable will be used for the neutral. For span wire installation using individual cables to each signal head, there will be a minimum of two spare conductors to each signal head (except for potential future 5-section locations). Where the potential exists for a future 5-section, a minimum of three spare conductors will be made available.

For mast arm installations, there will be two spare conductors to each signal head. Each signal head will have an individual cable from the mast arm hand hole to the signal head without any splices or breaks. All mast arms will have a hand hole terminal compartment provided by the manufacture unless specifically deleted by the Engineer of Record. If equipped with a terminal block, a trunk cable will be run to the hand hole continuously from the controller cabinet with at least three spare conductors. If no hand hole exists in the mast arm, each signal head will have a continuous signal cable from the signal head to the controller cabinet with no splices.

For box span wire installations where a pole mounted junction box is stipulated, a trunk cable will be run continuously from the controller cabinet to the junction box. Individual cables will be run from the junction box to the individual signal heads. Each direction will have a separate junction box. The number of spares will be the same as previously stipulated for mast arm installations.

For pedestrian signals, there will be two spare conductors for all pedestrian signals.

Pedestrian poles with a single pedestrian signal will have a minimum of a 5-conductor signal cable. Pedestrian poles with a double (2-way) pedestrian signal will have a minimum of a 9-conductor cable. Double (2-way) pedestrian signals will only be installed with the approval of Traffic Engineering to ensure compliance with ADA requirements. The cables for the pedestrian signals will be a continuous run from the pedestrian signal to the controller cabinet with no splices. All pedestrian buttons will have a separate 2-conductor cable (belden) run from the button to the controller cabinet with no splices. The bare wire for the belden will be tied to ground in the controller cabinet.

All spare signal cable conductors will be terminated on the ground bus in the controller cabinet. The spares in a signal disconnect will be terminated on the terminal strip inside the disconnect. Any other spares (mast arm, signal heads, pedestrian heads) will be

10 January 1, 2017 individually capped or taped. All spares routed from the overhead mast arm signals to the hand hole (terminal compartment) or span wire with junction boxes will be grounded in the hand hole (terminal compartment).

All spare signal cable conductors in the controller cabinet will be labeled as spare and of sufficient length to be utilized for future use anywhere in the controller cabinet. Spare signal cable conductors within the controller cabinet will be terminated to the ground buss.

632-3.2 Protection of Cable: Bell ends must be installed on all conduit ends prior to pulling cable in PVC conduit. Rigid conduit will have a grounding bushing (if appropriate) or a PVC bushing on the rigid conduit end. Grommets must be installed on all metal poles where cable passes through a drilled or manufactured hole unless the opening has been manufactured in such a manner that cable will not be damaged by pulling it through the opening or by the cable laying on the pole opening.

632-3.3.1 Cabling for Span Wire Installations Stipulated to have Junction Boxes: The cables running across a span wire installation will be lashed to the messenger wire using appropriately sized lashing rods. Cable ties will be used only in the area of the drip loops.

NEMA approved water-tight enclosures (junction boxes) will be mounted on each strain pole at each corner of the intersection near the weather head or span wire attachment point. An appropriately sized trunk cable will be run from the NEMA enclosure to the controller cabinet. Individual cables, with appropriate spares, will be installed between the NEMA enclosure and individual signal heads. All terminations in the NEMA enclosure will be terminated on a terminal strip in the NEMA enclosure. The terminal strip will be sized to ensure that no more than three fork terminals will be installed on any one terminal position of the terminal strip. Spare conductors from each signal head will be tied to ground in the NEMA enclosure. All entries into the NEMA enclosure will be with water-tight connectors.

H. The following are Hillsborough County’s additions to Section 634 of the FDOT Standard

634-1 Description. Follow 634-1 adding the following: fiberglass insulators will be installed on the upper span (catenary) at all locations where the span will be underneath an energized power line. This is regardless of the vertical clearance to the power line.

634-3.4 Span Wire Guidance: The 2014 FDOT Design Standard 17727 removed single point attachment as an option for spanning an intersection. Single point attachment is not allowed in Hillsborough County for new installations.

I. The following are Hillsborough County’s additions to Section 635 of the FDOT Standard

635-2 Materials: All communication/ITS pull box lids or pull box bodies will be provided with electronic markers. The electronic markers will either be encased in the pull box cover or the marker will be a drop-in device that will be inside the actual pull box enclosure. The markers will be the standard telephone marker (orange) (101.4Khz) for any communication or fiber optic pull boxes.

11 January 1, 2017

J. The following are Hillsborough County’s additions to Section 639 of the FDOT Standard Specifications for Road and Bridge Construction:

639-4.1 General: Hillsborough County Traffic Operations will obtain the electrical service address from the County’s 911 Streets and Address’ office. All traffic signals’ addresses will end with “1/8” per Tampa Electric Company’s (TECO) direction. All other electrical services (cameras, DMS, lighting load centers, etc.) will not have a fraction after the address.

The traffic signal subcontractor installing the electrical power service assembly will be required to obtain a layout number from TECO by submitting a Commercial Service Application prior to installation of the electrical power service. Once the layout number is obtained the traffic signal subcontractor will arrange to meet the assigned TECO field engineer on sight to confirm exact location and type of feed (overhead or underground).

If the location of the electrical service is required to be changed by TECO, the traffic signal contractor will immediately advise Hillsborough County Traffic Operations so a new, corrected address can be obtained from the County’s 911 Streets and Address’ office.

The contractor will be responsible for any additional costs associated with the installation of the electrical power service.

639-4.5 Meter Base: The meter will be securely fastened to the pole. The service meter/disconnect will not be mounted on the traffic controller cabinet. The meter will be mounted on the nearest traffic signal concrete strain pole, nearest mast arm pole, or separate (specific for electric service) concrete pole. The height of the meter will be based on the requirements of the power company (TECO). The meter will be a bypass type meter that is rated between 100 and 200 amps and approved by the electrical power company. The meter will have the address of the electrical service attached as directed by the electrical power company. The pole, meter, and disconnect will be installed within 15 feet of the point of service. If that point of service is in excess of 50 feet from the controller cabinet, the meter, disconnect and service pole will be installed in close proximity to the point of service and a separate pole and electrical disconnect will be mounted in close proximity or at least within 15 feet of the controller cabinet.

K. The following are Hillsborough County’s additions to Section 650 of the FDOT Standard

650-3.5 Wiring Connections: Each approach will have its own neutral.

For mast arm installations, each signal will have its own signal cable which will terminate in the mast arm hand hole (if so equipped) on a stainless steel equipped terminal strip. If, in the absence of a hand hole and terminal strip, each signal’s cable will be continuous from the traffic signal to the controller cabinet. In cases where there is a terminal strip in the hand hole, the trunk cable will be of sufficient size to allow for at least three spare wires available in the hand hole terminal strip.

For span wire installations with disconnects, each direction will have a separate cable (four cables for a cross intersection and three cables for a T-intersection). There will be no double signal head configurations. Each direction will have a minimum of a 12-conductor cable terminated in the disconnects. For this installation, there will be a

12 January 1, 2017 minimum of 5 spare wires in each cable. The signal cable will be terminated on the bottom portion of the terminal strip inside the disconnect. The signal will be hard-wired to the top portion of the terminal strip inside the disconnect.

L. The following Section 652 is a Hillsborough County supplement to the FDOT Standard Specifications for Road and Bridge Construction. There is not currently a Section 652 within the FDOT specifications:

652-1 Description: Install 24/7 solar flashing beacon assembly.

652-2 Materials: The 24/7 flasher assembly will be on the FDOT APL list. It will be furnished with the necessary mounting hardware to mount on a 4-1/2” OD aluminum pole. The 24/7 flasher may be a single head design or a dual head design (wig/wag). The 24/7 solar flashing beacon will be designed to operate for extended periods of time with minimal sunlight. Hillsborough County Traffic Engineering or Engineer of Record will determine whether the single head or dual head design is utilized.

652-3 Installation: The 24/7 flasher will be mounted on a 4-1/2” OD aluminum pole. All installations will require a transformer (T-base) breakaway device as shown in FDOT Design Standard Index 11862.

652-4 Method of Measurement: Furnish and Install: The contract unit price for a 24/7 Solar Flashing Beacon Assembly will include all materials, equipment, and labor necessary to furnish and install the complete assembly.

652-5 Basis of Payment: Price and payment will be full compensation for all work specified in this Section.

Payment will be made under:

Pay Item Number 652 Solar Flashing Beacon Assembly – per assembly

M. The following Section 660 is a Hillsborough County supplement to the FDOT Standard

660-3.2.11 Loop Position: All loops will be positioned in the center of the lane. Check with the Hillsborough County Signal Inspector prior to cutting the loop to ensure proper placement. If the final placement of the stop bar results in the loop position being incorrect, the signal contractor will have to re-cut the effected loop at no cost to the County.

660-3.6 Video or Microwave (radar) Installations: Follow the specification requirements directed by the manufacturer.

All cameras will be located on the lane line between the left turn lane and thru lane except in cases where there is more than one camera per approach. If the video equipment being installed is a single ultra-wide angle video system with only one camera, the contractor will install the camera based on the manufactures recommendations. If there is no left turn lane, the camera will be located in a position that centers the camera with the approaching lanes. The microwave unit will be mounted to obtain the best detection results. If necessary, the contractor will liaison with the vendor’s factory representative to determine the best mounting location.

13 January 1, 2017

The contractor installing the video or microwave (radar) detection will liaison with the vendor’s factory representative to determine the best cable to use. The contractor will ensure the correct cable is installed from the camera or microwave (radar) to the interface panel or terminating point in the controller cabinet. The cable will be continuous from the camera or microwave (radar) to the interface panel in the controller cabinet with no splices. Connections to the video or microwave (radar) will be per the manufacturers’ instructions (directions).

The signal contractor will be responsible for the initial set up of the video or microwave (radar) detection. This can be achieved through the use of the contractor’s own trained employees or with a factory field technician. If the video or microwave (radar) detection was initially set up for MOT, a final video detection set up will be performed by the contactor prior to final acceptance.

N. The following are Hillsborough County’s additions to Section 671 of the FDOT Standard

671-2 Materials: For Hillsborough County, use a TS2 Type 1 Advanced Traffic Controller (ATC) controller in TS2 Type 1 controller cabinet and a currently specified TS2 Type 2 ATC controller in TS1 cabinets. Both TS2 Type 1 and TS2 Type 2 controllers will be ATC controllers fully capable of operating with Hillsborough County’s current central traffic management system (ATMS.now).

O. The following Hillsborough County addition is to be inserted to the end of Section 676-

2.2 of the FDOT Standard Specifications for Road and Bridge Construction:

Cabinet Assembly: This specification sets forth the minimum requirements for a control cabinet assembly. The cabinet assembly shall meet, as a minimum, all applicable sections of the NEMA TS2 Traffic Controller Assemblies requirements, 1998, the current version of the FDOT Minimum Specifications for Traffic Control Signal Devices (MSTCSD) and be listed on the FDOT Approved Products List (APL).

The Hillsborough County controller cabinet will be provided with a standard 4- port TS2 Type 1 controller compatible with the Hillsborough County Traffic Management Center ATMS.now central operating system.

Cabinet Design and Construction General: The cabinet and door will be constructed from type 5052-H32 aluminum with a minimum thickness of 0.125 inches. All welds shall be neatly formed and free of cracks, blowholes and other irregularities.

The cabinet dimensions will be approximately 26” to 28” deep, 44” wide, and 74” to 77” tall. All dimensions will be + or – 2”.

The cabinet shall be provided with a front and rear door. Both doors shall be the same size and design. Both doors shall be hinged on the same side of the cabinet as such:

14 January 1, 2017

All inside and outside edges of the cabinet shall be free of burrs. All sharp edges shall be made smooth.

The cabinet shall be designed and manufactured with materials that will allow for base mounting.

A rain channel shall be incorporated on all four (4) sides of the main door opening to prevent liquids from entering the enclosure. Cabinet door openings shall be double flanged outward on all four (4) sides to produce the rain channel.

The top of the cabinet shall incorporate a minimum of 1/2 (inch) slope toward the rear to prevent rain accumulation.

Lifting tabs shall be provided on each side of the top portion of the cabinet.

The cabinet exterior shall be supplied with a natural aluminum finish. Sufficient care shall be taken in handling to ensure that scratches are minimized. All surfaces shall be cleaned of all oil residues and shall be free from weld flash.

The cabinet interior shall have a powder coated gloss white finish. All interior seams shall be sealed with weatherproof sealant material.

All type 6 cabinets shall have dual 19” racks in upper quadrant portion of the cabinet.

All cabinets shall be supplied with a minimum of two removable shelves manufactured from 5052-H32 aluminum having a minimum thickness of 0.125 inches. Shelves shall have a minimum depth of 10.0 inches. Lower shelf shall have a pull-out drawer.

There shall be a minimum of four continuous C channels mounted on each interior wall or a similar mounting method. No bolts, screws, or rivets shall protrude through the outside walls, top, bottom, or sides of the cabinet.

Door and Hardware: The lower section of the cabinet door shall be equipped with a louvered air entrance. The air inlet shall be large enough to allow sufficient airflow per the rated fan capacity. A removable fiberglass, high density, air filter shall be supplied with each cabinet. The filter shall be secured to the air entrance in such fashion as to maintain close contact, at all times, to the louvered air entrance. The filter retainer shall be a sufficient design to secure the filter to the door opening. The filter retainer will be manufactured to accept a filter size of 14” X 20”. The back door shall not have an air inlet or filter.

15 January 1, 2017

The roof of the cabinet shall incorporate an exhaust plenum with a vent screen.

Perforations in the vent screen shall not exceed 0.125 inches in diameter. The cabinet will be supplied with two thermostatically controlled exhaust fans.

Both the front and rear doors shall be equipped with a three-point draw roller type latching mechanism or equivalent method. The push rods shall be turned edgewise at the outward supports and shall be 0.250 inch by 0.750-inch aluminum, minimum.

The handle on the main door shall include a hasp type design for the attachment of an optional padlock. The handle shall not extend beyond the perimeter of the main door at any time. The lock assembly shall be positioned so that the handle shall not cause any interference with the key when opening the cabinet door. When the door is closed and latched, the door shall automatically lock. It shall not be necessary to use a key in order to lock the door.

Both doors shall be equipped with a mechanism to automatically hold the door open at approximately 90, 125, and 150 degrees, in windy conditions. Both doors shall be equipped with a #2 tumbler lock number. The lock shall be of brass construction and shall have a swing away cover. Two No. 2 keys shall be supplied and attached to each cabinet door upon shipment.

Main Panel Configuration: The main panel shall be fully wired in the following configuration: sixteen load switch sockets, eight flash transfer relay sockets, one flasher socket and two main panel BIU rack positions (expandable to four (4) TF BIUs).

The main panel shall be located a minimum of six inches from the bottom of the cabinet to provide sufficient clearance for conduits and cabling.

All panels shall be black anodized with white silk-screen lettering.

Sufficient wire length shall be readily available at the front of the main panel to allow for any required flash color rewiring without having to access the rear of the main panel.

All load switch sockets, flasher sockets, and flash transfer sockets shall be mounted on the main panel only.

The main panel shall be designed to support the bottom of the load switches.

All field output circuits shall be terminated on a non-fused terminal block with a minimum rating of 20 amps.

BIU #1 and #2 inputs and outputs shall be terminated and labeled on terminal blocks for possible programming use and troubleshooting. At a minimum, all available alarms will be terminated to allow external programming.

There will be a Coord/Free Switch installed and labeled to allow the controller to be in coordination mode (in Coord position) if the controller is so programmed but to force the controller into free condition if the switch is placed in the Free position.

Each controller cabinet will be supplied with a full complement of load switches, flash transfer relays, flashers, BIUs, and any other ancillary equipment regardless of

16 January 1, 2017 intersection configuration. A minimum of 12 red tie off jumpers shall be provided with each cabinet. The red tie off jumpers shall be made of solid copper or equivalent and properly insulated.

Permanent alphanumerical color labels are preferred to identify all field input/output (I/O) terminals and all AC and DC power connections. All labels shall use standard nomenclature per the NEMA TS 2 Specification. The following are potential example labels that identify the appropriate termination points:

• Logic ground terminations points:

• 24VDC termination points:

• 12VAC termination points:

• AC+ termination points:

• AC- (neutral) termination points:

• Earth Ground termination points:

• Signal Field Wire Terminations:

If the above color labeling is not used, the manufacturer will ensure all terminations and connections are sufficiently identified so their purpose is clear to the technician. All other wire termination points will be sufficiently labeled to clearly identify their purpose or identity relative to the cabinet drawing.

All flash color selection shall be accomplished at the field terminals with the use of a screwdriver only or a plug-in jumper connector. It shall also be possible to select, through terminal connections, which of the two flasher circuits is connected to each phase. All cabinets shall be wired so that flasher circuit output #1 shall be wired for phases 1,2,5,6 and channels 11 and 12. Flasher output circuit #2 shall be wired for phases 3,4,7,8 and channels 9 and 10. All cabinets shall be pre-wired to flash phases 2 and 6 yellow and all other phases and overlaps red.

17 January 1, 2017

Signal output terminals shall be screw type. All termination screws shall accept both a Phillips or flat blade screwdriver as the example below depicts:

AC- and earth ground buss bars which will be flat blade type screws similar to what is shown below:

All Controller Unit and Malfunction Management Unit cables shall be of sufficient length to allow the units to be placed at any location on the bottom shelf. The power cable for the controller will be for a TS2 Type-1 controller and will be of sufficient length to attach to the back of a TS2 Type 1 controller. An adapter cable will be provided to allow a TS1Type2 controller to be powered up off the “A” connector. Connecting cables shall be jacketed or sleeved in a braided nylon mesh. It is preferred that the MMU cable jacket or sleeve shall be red in color. The use of exposed tie-wraps or interwoven cables is unacceptable.

The controller cabinet will be provided with a GPS dome mounted on the top of the controller cabinet and properly sealed to prevent water intrusion. This GPS dome will be compatible with the existing Hillsborough County controller and central operating system and wired to provide a DB-9 male connector available in the cabinet to allow it to be plugged into the front of the controller. This GPS dome is utilized by the controller to ensure an accurate time of day.

An SDLC Port 1 Interface panel shall be provided and shall include a minimum of ten D subminiature female 15 pin (DB 15) connectors. It shall be feasible to connect the SDLC cables from any device communicating over the Port 1 into any of these ten connectors.

No additional hardwiring shall be required to add SDLC cables. The panel shall be manufactured from aluminum. Cabinet configuration shall be provided with a minimum requirement plus three spares RS-85 Port 1 communication cables (SDLC) to (with plug mounted connectors) allow full capabilities of that cabinet. Each communication cable connector shall be a 15-pin metal shell D sub-miniature type. The cable shall be a shielded cable suitable for RS-485 communications.

All main panels shall be pre-wired for a Type-16 Malfunction Management Unit capable of flashing yellow arrow (FYA) operation using NEMA Configuration G and H as identified in the NEMA Amendment 4-2012 for the Flashing Yellow Arrow (FYA).

All wiring shall be neat in appearance. All cabinet wiring shall be continuous from its point of origin to its termination point. Butt type connections/splices are not acceptable.

All cabinet back panel conductors shall be soldered at its destination point as specified.

18 January 1, 2017

Printed circuit boards should not be used on main panels (except for BIU rack, detector rack & MOV/CAP modules).

The front door of the cabinet shall be equipped with a switch for providing cabinet door open status. The switches shall be normally closed type. The switches shall be wired to place an input to Alarm 1 (TF BIU # 2 pin 23B) as defined by the NEMA TS 2 specifications. The alarm shall be activated if the cabinet door has been opened.

All connecting cables and wire runs shall be secured by mechanical clamps. Stick-on type clamps are not acceptable.

A pedestrian button isolation unit (PIU) will be installed in the controller cabinet. The PIU panel/circuit card shall be installed in each cabinet. The PIU circuit card will be a removable to allow for easy replacement of that circuit card in case of failure. The PIU shall prevent any voltage back-feeding to the cabinet from pedestrian poles or push buttons. The PIU circuit board will be made available for separate purchase in case of failure.

Power Panel Design and Construction: The power panel shall consist of a separate, fully enclosed module, securely fastened to the lower right-side wall of the cabinet. The power panel shall be wired to provide the necessary power to the cabinet, controller, Malfunction Management Unit, cabinet power supply and auxiliary equipment. Means shall be provided to allow access to the main and auxiliary breakers without removing the front cover. All components of the power panel shall be accessible for ease of replacement without removing any other components or equipment. Adequate space between components shall be provided for the tightening of all terminals. The power panel will be provided with an easily removable plexi-glass cover.

The power panel shall house the following components:

• All circuit breakers shall be single pole breakers. One single pole 30-amp breaker shall supply main power to the cabinet. One single pole 15-amp breaker shall supply power to the “light, fan, and GFI”. One single pole 15-amp breaker labeled "Equipment” shall supply power to the “Controller, MMU”.