8_Attachment A - Cost Breakdown by Division.pdf
PDF 189 KB Posted
- Attached to
- Asphalt Repair and Replacement Federal contract opportunity
- Solicitation number
- 47PB0025R0005
About this file
Attachment A is a cost breakdown template for a GSA solicitation (47PB0025R0005) for asphalt repair and replacement at the Van Buren Land Port of Entry in Maine. The document provides a comprehensive division-by-division cost breakdown template with separate columns for labor and material costs across 36 construction divisions, ranging from Procurement and Contracting Requirements (Division 00) to Electrical Power Generation (Division 48).
The solicitation is an unrestricted procurement with a construction cost between $200,000 and $600,000, targeting highway, street, and bridge construction (NAICS 237310) with a small business size standard of $45.0 million. The project has a 120-day performance period, with a pre-proposal conference and site visit scheduled for March 27, 2025, and proposals due around April 18, 2025. The source selection will evaluate proposals based on past performance, experience, project management plan/approach, and price, with non-price factors being more important than price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| T10_02_SF30.pdf | ||
| T10_01_SF30.pdf | ||
| 15_Drawings_Images.pdf | ||
| 9_Attachment B - Sample Letter.pdf | ||
| 13_Scope of Work.pdf | ||
| 16_Maine DOT Standards.pdf | ||
| 4_SF1442.pdf | ||
| 7_Wage Determination.pdf | ||
| 6_GSA527.pdf | ||
| 14_Specifications.pdf | ||
| 11_Attachment C - GC Experience Summary.pdf | ||
| 10_Attachment B.1 - Past Performance Questionnaire.pdf | ||
| 2_Solicitation.pdf | ||
| 5_SF24.pdf | ||
| 3_Reps and Certs.pdf | ||
| 12_Agreement.pdf | ||
| 1_Solicitation Cover Page.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Number:
Division Labor Material
Division 00 - Procurement and Contracting Requirements $ $
Division 01 - General Requirements $ $
Division 02 - Existing Conditions $ $
Division 03 - Concrete $ $
Division 04 - Masonry $ $
Division 05 - Metals $ $
Division 06 - Wood, Plastics, Composites $ $
Division 07 - Thermal and Moisture Protection $ $
Division 08 - Openings $ $
Division 09 - Finishes $ $
Division 10 - Specialties $ $
Division 11 - Equipment $ $
Division 12 - Furnishings $ $
Division 13 - Special Construction $ $
Division 14 - Conveying Equipment $ $
Division 21 - Fire Suppression $ $
Division 22 - Plumbing $ $
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) $ $
Division 25 - Integrated Automation $ $
Division 26 - Electrical $ $
Division 27 - Communications $ $
Division 28 - Electronic Safety and Security $ $
Division 31 - Earthwork $ $
Division 32 - Exterior Improvements $ $
Division 33 - Utilities $ $
Division 34 - Transportation $ $
Division 35 - Waterway and Marine Construction $ $
Division 40 - Process Integration $ $
Division 41 - Material Processing and Handling Equipment $ $
Division 42 - Process Heating, Cooling, and Drying Equipment $ $
Division 43 - Process Gas and Liquid Handling, $ $
Division 44 - Pollution and Waste Control Equipment $ $
Division 45 - Industry-Specific Manufacturing Equipment $ $
Division 46 - Water and Wastewater Equipment $ $
Division 48 - Electrical Power Generation $ $
Total $ $
Attachment A - Cost Breakdown by Division
47PB0025R0005
Total
File details come from the government source that posted it. Updated .