8-3.0- R1 Fencing Procurement Measurment and Payment.pdf
PDF 232 KB Posted
- Solicitation number
- UDOT260088JB
- Issued by
- Utah
About this file
This document is a Measurement and Payment Line Item Descriptions document from the Utah Department of Transportation (UDOT) for a contractual fencing project covering multiple counties. The contract covers various fencing-related tasks including existing fence removal (chain link and field fence), new fence installations of multiple types (A through G and Type 1 and 4) with variations for wood and metal posts, and considerations for areas with and without livestock present. Each line item specifies linear foot measurements, installation requirements, and detailed specifications referencing the UDOT 2025 Standard Drawings and Specifications, with particular emphasis on proper installation techniques, vegetation management, and equipment cleaning.
The payment structure is comprehensively detailed, with each line item measured in linear feet and payments contingent upon UDOT inspector verification and compliance with installation instructions from both UDOT and manufacturers. Additional line items include traffic control (lump sum), brace posts (per each), and mobilization costs for specific counties (Weber, Davis, Morgan, Box Elder, Cache, and Rich Counties), all to be paid as lump sum payments. The contract includes strict compliance requirements, with potential payment reductions for non-compliance, such as a $500 reduction for inadequate traffic control. The document provides extensive technical guidance on fence installation, post spacing, and specific requirements for different fence types and environments, indicating a detailed and structured approach to the fencing project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-3.2- Attachment D Bid Evaluation R1 Fencing.xlsx | XLSX spreadsheet | |
| 6-2.1 FG Standard Drawings 2025.pdf | ||
| 2-5. Submittal Form- Business Confidentiality- check fields (3).doc | DOC document | |
| 5-1. IFB-General Bid Information.doc | DOC document | |
| 7-2.0- R1 Fencing Procurement Scope of Work.pdf | ||
| 3-7. TC-9.16.pdf | ||
| 4-4. Submittal Form- Vendor Set Up Form 2024-06-27.pdf | ||
| 1-6. Submittal Form- Standard PO Terms and Conditions- with Check Fields (2).docx | DOCX document | |
| 9-3.1 R1 Attachment F Price Sheet 2025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Measurement and Payment Line Item Descriptions
The Department will measure and pay based on each of the following criteria. Payment is contingent upon acceptance by the Department.
Section 00895: Contractual Fencing
Bid Item # Section Number Bid Item Name Unit of Measurement
1 00895 Existing Fence Removal (Chain Link) Linear Foot (LF)
The unit of measure and payment for Existing Fence Removal (Chain Link) will be per Linear Foot (LF) of removal. This removal of existing fence includes removing all fence structures according to the UDOT 2025 Standard Specifications Section 02221: Remove Structure and Obstruction. The fence removal operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. Compliance with Section 02221 is a contract requirement and will be field-verified by the UDOT Inspector and payment for Existing Fence Removal (Chain Link) will be withheld until the Remove Structure and Obstruction condition is met.
2 00895 Existing Fence Removal (Field Fence) Linear Foot (LF)
The unit of measure and payment for Existing Fence Removal (Field Fence) will be per Linear Foot (LF) of removal. This removal of existing fence includes removing all fence structures according to the
UDOT 2025 Standard Specifications Section 02221: Remove Structure and Obstruction. The fence removal operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. Compliance with Section 02221 is a contract requirement and will be field-verified by the UDOT Inspector and payment for Existing Fence Removal (Field Fence) will be withheld until the Remove Structure and Obstruction condition is met.
3 00895 New Fence Installation Wood Post (Type A, no livestock present) Linear Foot (LF)
The unit of measure and payment for New Fence Installation (Type A) will be Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type A fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type A fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type A fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type A fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
4 00895 New Fence Installation Wood Post (Type A, livestock present) Linear Foot (LF)
The unit of measure and payment for New Fence Installation (Type A) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type A fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type A fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822:
Right-of-Way Fence and Gate. The Type A fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type A fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
5 00895 New Fence Installation Metal Post (Type A, NO livestock present) Linear Foot (LF)
The unit of measure and payment for New Fence Installation (Type A) will be Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type A fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type A fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type A fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type A fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
6 00895 New Fence Installation Metal Post (Type A, livestock present) Linear Foot (LF)
The unit of measure and payment for New Fence Installation (Type A) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type A fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type A fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type A fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type A fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
7 00895 New Fence Installation Wood Post (Type B, The unit of measure and payment for New Fence Installation (Type B) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type B fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type B fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type B fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type B fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
8 00895 New Fence Installation Wood Post (Type B, The unit of measure and payment for New Fence Installation (Type B) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type B fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type B fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type B fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type B fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
9 00895 New Fence Installation Metal Post (Type B, The unit of measure and payment for New Fence Installation (Type B) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type B fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type B fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type B fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type B fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department
10 00895 New Fence Installation Metal Post (Type B, The unit of measure and payment for New Fence Installation (Type B) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type B fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The
11 00895 New Fence Installation Wood Post (Type D, The unit of measure and payment for New Fence Installation (Type D) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type D fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type D fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type D fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department
12 00895 New Fence Installation Wood Post (Type D, The unit of measure and payment for New Fence Installation (Type D) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type D fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type D fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type D fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
13 00895 New Fence Installation Metal Post (Type D, The unit of measure and payment for New Fence Installation (Type D) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type D fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type D fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type D fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
Type B fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type B fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type B fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
14 00895 New Fence Installation Metal Post (Type D, The unit of measure and payment for New Fence Installation (Type D) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type D fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type D fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type D fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
15 00895 New Fence Installation Wood Post (Type E, The unit of measure and payment for New Fence Installation (Type E) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type E fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type E fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type E fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type E fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department
16 00895 New Fence Installation Wood Post (Type E, The unit of measure and payment for New Fence Installation (Type E) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type E fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type E fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type E fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
17 00895 New Fence Installation Metal Post (Type E, The unit of measure and payment for New Fence Installation (Type E) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type E fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
18 00895 New Fence Installation Metal Post (Type E, The unit of measure and payment for New Fence Installation (Type E) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type E fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type E fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type E fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
19 00895 New Fence Installation Wood Post (Type F, The unit of measure and payment for New Fence Installation (Type F) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type F fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type F fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type F fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type F fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department
20 00895 New Fence Installation Wood Post (Type F, The unit of measure and payment for New Fence Installation (Type F) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type F fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type F fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct
2025 Standard Drawings. The Type E fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type E fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type E fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department
21 00895 New Fence Installation Metal Post (Type F, The unit of measure and payment for New Fence Installation (Type F) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type F fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT
2025 Standard Drawings. The Type F fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate. The Type F fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type F fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department
22 00895 New Fence Installation Metal Post (Type F, The unit of measure and payment for New Fence Installation (Type F) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than the 16 feet for when livestock is not present. The Type F fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type D fencing shall also be installed according to the UDOT 2025 Standard Specifications Section
02822: Right-of-Way Fence and Gate. The Type F fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated
UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type F fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
23 00895 New Fence Installation Wood Post (Type G, The unit of measure and payment for New Fence Installation (Type G Wildlife Fence) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type
G Wildlife Fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings.The Type G Wildlife Fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate.
The Type G Wildlife Fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT
Representative for further instructions on how to proceed with the installation. The correct installation of the Type G Wildlife Fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
24 00895 New Fence Installation Wood Post (Type G, The unit of measure and payment for New Fence Installation (Type G Wildlife Fence) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation installation of the Type F fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
25 00895 New Fence Installation Metal Post (Type G, The unit of measure and payment for New Fence Installation (Type G Wildlife Fence) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type
G Wildlife Fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings.The Type G Wildlife Fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate.
The Type G Wildlife Fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT
Representative for further instructions on how to proceed with the installation. The correct installation withheld if installation is contrary to the instruction given by both the Department and manufacturer.
26 00895 New Fence Installation Metal Post (Type G, The unit of measure and payment for New Fence Installation (Type G Wildlife Fence) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type
G Wildlife Fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type G Wildlife Fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate.
The Type G Wildlife Fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT
Representative for further instructions on how to proceed with the installation. The correct installation withheld if installation is contrary to the instruction given by both the Department and manufacturer.
27 00895 New Fence Installation (Type 1) Linear Foot (LF)
The unit of measure and payment for New Fence Installation (Type 1) will be per Linear Foot (LF) of installation. The fence installation operation may also include some incidental vegetation cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type 1 fence shall be installed according all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type 1 fencing shall also be installed according to the UDOT 2025 Standards Specifications Section 02821: Chain Link Fencing and Gates. The Type 1 fencing shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type 1 fencing will be field-verified by the cutting or trimming, and also the subsequent cleaning of all cutting and trimming equipment. The Type G Wildlife Fence shall be installed according to all applicable exhibits in the Fence and Gate section
(FG) in the UDOT 2025 Standard Drawings.The Type G Wildlife Fencing shall also be installed according to the UDOT 2025 Standard Specifications Section 02822: Right-of-Way Fence and Gate.
The Type G Wildlife Fence shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT
Representative for further instructions on how to proceed with the installation. The correct installation withheld if installation is contrary to the instruction given by both the Department and manufacturer.
28 00895 New Fence Installation (Type 4) Linear Foot (ft) The unit of measure and payment for New Fence Installation (Type 4) will be per Linear Foot (LF) of installation. The Type 4 fence shall be installed according to all applicable exhibits in the Fence and Gate section (FG) in the UDOT 2025 Standard Drawings. The Type 4 fencing shall also be installed according to the UDOT 2025 Standards Specifications Section 02821: Chain Link Fencing and Gates.
The Type 4 fencing shall also be installed per the manufacturer’s instructions for proper installation of their product. In the event that the installation instructions from UDOT and the manufacturer contradict each other then the Contractor shall contact their designated UDOT Representative for further instructions on how to proceed with the installation. The correct installation of the Type 4 fencing will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
29 00895 Traffic Control Lump The unit of measure for Traffic Control is a “lump sum”. Traffic Control Plans must be submitted by the Contractor to the Department with their initial bid package. This Traffic Control Plan is required to be implemented according to the current FHWA 2009 Manual on Uniform Traffic Control Devices Utah Edition (Utah MUTCD Manual), the UDOT 2025 Standard Drawings Section “Traffic Control” (TC exhibits), and the Department’s current Traffic Control Plans. Traffic Control Plans shall be implemented and enforced by the Contractor for the entire duration of the contracted removal and/or fencing operation. Failure by the Contractor to provide adequate Traffic Control or to deviate from the Traffic Control Plans submitted to the Department will result in a reduction in payment of $500 per occurrence.
30 00895 Brace Post Each The unit of measure for Brace Posts is “each”. When livestock is present the Contractor shall install brace posts and line posts with a spacing of 10 feet rather than 16 feet as the UDOT 2025 Standard
Drawings instruct. When livestock is NOT present the Contractor shall install the brace posts and line posts at the 2025 UDOT Standard Drawings distance of 16 feet. The Contractor shall install the Brace Posts according to the UDOT 2025 Standard Specifications Section 02823: Right-of-Way Pole Fence.
The correct installation of the Brace Posts will be field-verified by the UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by the Department and manufacturer.
31 00895 Mobilization to Weber County Lump The unit of measure for Mobilization to Weber County will be “lump”. This mobilization includes the transport of ALL equipment, personnel, and supplies to the area where removal and/or installation of fencing is to be done. This payment will be made at the end of the contract.
32 00895 Mobilization to Davis County Lump
The unit of measure for Mobilization to Davis County will be “lump”. This mobilization includes the
UDOT Inspector and payment will be withheld if installation is contrary to the instruction given by both the Department and manufacturer.
33 00895 Mobilization to Morgan County Lump The unit of measure for Mobilization to Morgan County will be “lump”. This mobilization includes the
34 00895 Mobilization to Box Elder County Lump The unit of measure for Mobilization to Box Elder County will be “lump”. This mobilization includes the
35 00895 Mobilization to Cache County Lump The unit of measure for Mobilization to Cache County will be “lump”. This mobilization includes the
36 00895 Mobilization to Rich County Lump The unit of measure for Mobilization to Rich County will be “lump”. This mobilization includes the
| Measurement and Payment |
| Line Item Descriptions |
Section 00895: Contractual Fencing
File details come from the government source that posted it. Updated .