This document is a Scope of Work and Special Provision for a five-year requirements contract issued by the Utah Department of Transportation (UDOT) for fence repair, replacement, and installation services in Region One. The contract covers fencing services within UDOT Right of Way across six counties: Weber, Davis, Morgan, Box Elder, Cache, and Rich. A UDOT Region One Maintenance Representative will direct the contractor on fence removal, repair, or installation at 12 specific maintenance stations throughout the region. The work involves removing damaged fence-related items and replacing them with new fence components to create a complete functioning fence system. The contract is structured as an on-call, as-needed service to supplement UDOT's own personnel.

The contract specifies various fence types for installation, including Type A, B, D, E, F, G Wildlife Fence, Type I, II, III, and IV Chain Link. The contractor is required to provide all necessary equipment, labor, and materials, with mobilization costs varying depending on the county. The contractor must carry liability insurance of $1,000,000 per accident occurrence and $2,000,000 in aggregate, along with worker's compensation insurance. Payment will be made based on work orders, with invoices submitted after completion of each assigned area. The contract emphasizes strict adherence to UDOT standards, traffic control requirements, and safety protocols, including specific guidelines for equipment placement, debris management, and personal protective equipment for workers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Region One Fence Repair, Replacement and Installation

This contract is a requirements contract for five years to provide fencing services for the repair and replacement of damaged Right of Way fence within UDOT Right of Way. The work is to include removing all damaged fence related items and replacing them with new fence items to make a complete functioning fence system. The location of work is throughout Region One, to include the following counties; Weber, Davis, Morgan, Box Elder, Cache and Rich. A UDOT Region One Maintenance Representative will give direction to the contractor as to where the new fencing needs to be installed and/or if old fencing needs to be removed, or if repair only is needed.

Supply and services are for the following Maintenance stations:

1421 – Hooper 5690 West 5500 South Hooper, Utah 84315

1422 – Ogden 1445 Wall Ave.

Ogden, Utah 84404

1423 – Brigham 1325 E Power Plant Rd.

Brigham City, Utah 84302

1424 – Clearfield 1800 East 700 South Clearfield, Utah 84015

1425 – Huntsville 9900 East Highway 39 Huntsville, Utah 84317

1426 – Morgan

605 East 100 North Morgan, Utah 84050

1427 – Centerville 1100 North 1250 West Centerville, Utah 84014

1431 – Snowville/Park Valley 38525 West 25600 North Snowville, Utah 84336

1432 – Bothwell 8769 West 12000 North Bothwell, Utah 84337

1433 – Riverside 15400 North 6000 West Riverside, Utah 84334

1435 – Wellsville 1050 South Center Street Wellsville, Utah 84339

1436 – Logan/Richmond 790 West 200 North Logan, Utah 84321

1437 – Laketown/Randolph 390 East Bear Lake Blvd.

Laketown, Utah 84038

Contractual Fencing 00895 – Page 1 of 8

9/23/2025 Special Provision

SECTION 00895

CONTRACTUAL FENCING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Procedures and requirements for contracted fencing, including removal and installation services, in the UDOT (the Department) Right of Ways along State of Utah maintained roadways.

1.2 RELATED SECTIONS

A. Section 01554: Traffic Control B. Section 02221: Remove Structure and Obstruction C. Section 02231: Site Clearing and Grubbing D. Section 02821: Chain Link Fencing and Gates E. Section 02822: Right-of-Way Fence and Gate F. Section 02823: Right-of-Way Pole Fence G. Section 02827: Wildlife Escape Ramps

1.3 REFERENCES

A. UDOT 2025 Standard Specifications B. UDOT 2025 Standard Drawings C. FHWA 2009 Manual on Uniform Traffic Control Devices Utah Edition (Utah

MUTCD)

D. AASHTO 2011 Roadside Design Guide

1.4 DEFINITIONS

The State: The State of Utah acting through its designated representative.

The Department: The Utah Department of Transportation (UDOT).

Contractor: The individual or legal entity contracting with the Department for performance of prescribed work.

00895 – Page 2 of 8

Inspector: The Engineer’s authorized representative assigned to inspect work and materials.

Engineer: The UDOT Deputy Director, acting directly or through a duly authorized representative, usually the Resident Engineer or Consultant Engineer, responsible for engineering and administrative of the contract. A Consultant Engineer hired by the Department for construction project management is considered an extension of the Department and has the same responsibility and authority as a Resident Engineer.

UDOT Representative: An authorized representative, usually the Resident Engineer or Consultant Engineer, responsible for engineering and administrative of the contract. A Consultant Engineer hired by the Department for construction project management is considered an extension of the Department and has the same responsibility and authority as a Resident Engineer.

1.5 SUBMITTALS

A. Traffic Control Plan submitted in the original bid package for approval by the Department.

B. Certificate of Compliance for all fencing materials.

C. Manufacturer’s product data, specifications, and recommended installation instructions for all materials related to a fully functional fence system, including gates, foundations, etc.

D. Manufacturer’s labeling for all fence materials.

1.6 EXTENT OF WORK

A. Work will be ordered by the Department on an as-needed, on-call basis to supplement work done by its own personnel.

B. The Department will provide a written description to the Contractor indicating areas where fencing is to be removed and/or installed.

C. Work performed contrary to the Department’s instructions, work beyond plan limits, or extra work performed without permission is excluded from pay consideration.

1.7 NOTICE TO PROCEED

A. For fence removal and/or installation that is required to correct major safety deficiencies or any other immediate safety concerns, the Contractor will proceed with the work within 24 hours of being notified by the Department.

00895 – Page 3 of 8

B. For general purpose fencing removal and/or installation, proceed with the work within 7 days of being notified by the Department.

1.8 LIMITATION OF OPERATIONS

A. Perform work with no impact to traffic.

B. Do not remove and/or install fencing on State holidays or 3 day weekends associated with State holidays. Variations to these standards can only be changed, in writing, by a UDOT District Engineer.

C. Work will take place during daylight hours only, which are defined as one- half hour after sunrise to one-half hour before sunset.

1.9 CHARACTER OF WORKERS

A. Provide sufficient resources to complete all work according to the contract.

Employ workers with the skills and experience necessary to perform the prescribed work.

B. Remove from the project any employee who performs the work in an improper, unsafe, or unskilled manner or who is intemperate or disorderly.

Return these employees to the project only with the UDOT Representative’s written permission.

C. The UDOT Representative may suspend work for the Contractor’s failure to remove any employee or furnish suitable and sufficient personnel to perform the work.

1.10 PERSONAL PROTECTIVE EQUIPMENT

A. All Contractor personnel must wear Personal Protective Equipment (PPE) at all times when on UDOT Right of Ways, in accordance with UDOT Policy 06E-02:

1. Class 3 ANSI certified vest for upper body.

2. ANSI certified safety boots with safety toes.

3. Shirt with sleeves (absolutely no tank tops, no cut off sleeves, and no workers shirtless).

4. Full length pants.

5. Hearing protection (required as needed).

6. ANSI certified safety glasses.

7. ANSI certified hard hats.

00895 – Page 4 of 8

1.11 INSURANCE

A. The Contractor is required, during the entire length of the contract, to hold the following types of complete Liability Insurance in the following amounts: 1.

$1,000,000 payable per accident occurrence

2. $2,000,000 in aggregate fund

3. Worker’s Compensation Insurance for all workers

B. This complete Liability Insurance certificate shall state that no cancellation or decrease in coverage shall be made without giving the State at least 30 days prior written notice. The Utah Department of Transportation (UDOT) shall be listed as an additionally insured party.

1.12 RESPONSIBILITY FOR DAMAGE CLAIMS

A. Protect, indemnify, and hold the State of Utah, the Department, and their officers, agents, and employees harmless from and against all claims, demands, damages, and causes of action of every kind or character on account of bodily injuries, death, or damage to property arising out of, resulting from, or in any way connected with the performance of the contract to the extent allowed by law.

B. Provide insurance as defined in this Section, Article 1.11 from reliable insurance companies authorized to do business in Utah, rated “A” or better, and with a financial size category of Class VII or larger by A.M. Best Company, at the time of contract execution.

1.13 DAMAGES

A. Do not damage the roadway, any features within UDOT Right of Way, or adjacent property.

B. Repair all damages at no cost to the Department.

C. For damage done to the Public (i.e. vehicle damage, personal injury or death, damage done to ANY publicly or privately owned property) that can be traced back to the removal and/or installation of fencing operations the cost of un-repaired damages will be withheld from payment.

1.14 ACCEPTANCE AND PAYMENT

00895 – Page 5 of 8

A. The designated UDOT representative will perform the inspection of the new fencing work and the inspection of the existing fence’s removal.

B. The designated UDOT representative shall conduct an inspection upon receiving notice from the Contractor of work-order completion. If the work-order is satisfactorily completed, that inspection shall constitute the final inspection. The designated UDOT representative will provide notification in writing to the Contractor indicating the job number and date the inspection was accepted.

C. The designated UDOT Representative will field-verify that the entire fencing operation has been conducted per the Department instruction which includes instruction from all of the manuals referenced in Section 1.3 “References”.

This includes the fence installation being done according to this Department instruction.

D. Other criteria for Inspection and Acceptance will be based on the manufacturer’s instructions for proper installation of their product.

1.15 PAYMENT PROCEDURES

A. Compensation includes:

1. Mobilization and transport of equipment, personnel, and supplies to the area where removal and/or installation of fencing is to be done.

2. Mobilization costs will vary depending on whether the work is to be done in Weber, Davis, Morgan, Box Elder, Cache and Rich counties and should be bid as such.

3. All labor, materials, and equipment required to meet provisions of this section.

B. Submit invoices to the Department at the very end of the removal and/or installation of fencing operation for the assigned area. If the invoice contains more than one work-order, the amount of each work-order shall be identified separately. Include:

1. Work-order number (referenced to the written estimate and work authorization)

2. Location and date of the work that was performed.

3. Contract number.

PART 2 PRODUCTS

2.1 EQUIPMENT

00895 – Page 6 of 8

A. Provide equipment designed to perform and produce the specified work in a timely and efficient manner. This includes all equipment and vehicles used in the entire execution of the contract.

B. Use fence removal and/or installation equipment that meets the following requirements:

1. Fence removal and/or installation equipment shall never at any time promote thrown objects or debris.

2. Fence removal and/or installation equipment shall never be in such an operational status that it poses any danger to the general Public, UDOT personnel, or to the Contractor personnel using the equipment.

PART 3 EXECUTION

3.1 PREPARATION

A. Prior to performing the operations of “Removing of Old Fence” and “Installing New Fence” the Contractor is required to call Blue Stakes of Utah (1-800- 662-4111) to verify that there are no underground utilities or considerations that may cause installation conflicts.

B. The Contractor shall Protect In-Place all existing utilities unless marked for relocate or abandon.

3.2 REMOVING OLD FENCE

A. The Contractor, upon direct instruction from the Department, will remove the existing fence per the instruction of Section 02221 “Remove Structure and Obstruction” in the UDOT 2025 Standards and Specification Manual:

1. Prevent people or livestock from entering work site from adjacent properties during removal and installation procedures.

2. Remove fence, posts, and foundations to at least 2 feet below subgrade or finished ground lines.

3. Do not damage vegetation and ground cover during removal operations.

B. The Contractor must adhere to this policy as it will be strictly enforced and will be field verified by the Inspector.

3.3 INSTALLING NEW FENCE

A. The Contractor will install the new fencing per the Department instruction which includes instructions from all of the manuals referenced in Section 1.3 “References”.

00895 – Page 7 of 8

B. Particular attention needs to be placed on the UDOT 2025 Standard Drawings for fence installation and spacing requirements of all fencing components. This will be field verified by the UDOT Inspector and payment may be withheld if the fencing is incorrectly installed.

1. See UDOT 2025 Standard Drawings for the fence types that the

Department is seeking installation for.

2. The types of fencing that UDOT is currently installing are as follows:

Type A, Type B, Type D, Type E, Type F, Type G Wildlife Fence, Type I , Type II, Type III and Type IV Chain Link.

a. For Type A and D fencing the UDOT Standard Drawings show that 16 feet is the required spacing in between line posts and/or brace posts. When livestock is present in the area where Type A or D fencing is to be installed UDOT requests that the Contractor install the line posts (and/or brace posts) spaced at 10 feet to prevent the livestock from excessively damaging the fence with pushing.

C. The manufacturers of the fencing materials generally give installation instructions and/or special advisements along with their product. These special instructions need to be followed as well.

1. In the event that there is a discrepancy between the manufacturer instructions and the UDOT instructions contact the designated UDOT Representative for further instruction on how to proceed.

3.4 TRAFFIC CONTROL

A. The Contractor is responsible for providing traffic control (in the form of a shoulder closure) for their workers and their equipment during the entire fencing and clearing/grubbing (only required if necessary) operation, including mobilization, if any part of the operation is located on the shoulder of the roadway. This shoulder closure is required to be implemented according to the current FHWA 2009 Manual on Uniform Traffic Control Devices Utah Edition (Utah MUTCD Manual), the UDOT 2025 Standard Drawings Section “Traffic Control”, and the Department’s current Traffic Control Plans.

B. The Contractor is still required to provide traffic control even if the fencing and mobilization of equipment is entirely off of the shoulder and beyond the edge of pavement. This traffic control is required to be implemented according to the current FHWA 2009 Manual on Uniform Traffic Control Devices Utah Edition (Utah MUTCD Manual), the UDOT 2025 Standard Drawings Section “Traffic Control”, and the Department’s current Traffic Control Plans.

00895 – Page 8 of 8

C. If any type of fencing equipment or other related equipment is left out in the field over night it must be clear of the UDOT specified “Clear Zone”. This will be defined by UDOT as all equipment must be at least 46 feet from the edge of the travel lane to be considered out of the clear zone (per 2011 AASHTO Roadside Design Guide, pg 3-1 through 3-4).

3.5 FINAL CLEANUP

A. The Contractor will sweep and/or blow shoulders clear of any and all debris caused by the removal of existing fencing and the installation of new fencing.

This debris will be relocated to the area between the edge of pavement (EOP) and the UDOT owned Right of Way line and NOT into the travel lanes of the roadway or beyond the UDOT owned Right of Way line.

END OF SECTION