10-3.2- Attachment D Bid Evaluation R1 Fencing.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- UDOT260088JB
- Issued by
- Utah
About this file
The file is a bid evaluation spreadsheet for the Utah Department of Transportation (UDOT) Region 1 Fence Repair, Replacement and Installation contract. The solicitation covers fence-related services across six Utah counties: Box Elder, Cache, Davis, Morgan, Rich, and Weber. The contract is designed as a five-year agency contract for fence repair, replacement, and installation services. The bid evaluation template requires bidders to submit costs for specific project scenarios, including mobilization and fence removal/installation for different fence types (wood post, metal post, chain link) in areas with and without livestock. The basis of award will be determined by the lowest total cost across the six sample projects.
The bid document outlines a competitive procurement process for a comprehensive fence maintenance contract, with each county project requiring identical quantities of 500 linear feet for fence removal and installation. The pricing structure allows bidders to input their unit costs in blue fields, with an automatic calculation of total project costs. The solicitation is issued under the State of Utah Procurement Code and Utah Administrative Code, with UDOT Procurement Services Division serving as the issuing procurement unit and UDOT Region 1 as the conducting procurement unit. The solicitation number UDOT260088JB must be referenced on all submitted documentation, and bidders are required to demonstrate compliance with specified requirements and specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Insert company Name: | |
| UDOT cost submittal: Bid evaluation of most common projects | Enter Bid Values in Blue Fields Only |
| Bid Item # | Item Description | UoM | Estimated Quantity | Submited Cost per UoM | Cost |
| Sample Project #1 | |||||
| 34 | Mobilization – Box Elder County | Lump | 1 | $ - 0 | |
| 2 | Existing Fence Removal (Field Fence) | Linear foot (LF) | 500 | $ - 0 | |
| 16 | New Fence Installation Wood Post (Type E, livestock present) | Linear foot (LF) | 500 | $ - 0 | |
| Sample Project #2 | |||||
| 35 | Mobilization – Cache County | Lump | 1 | $ - 0 | |
| 2 | Existing Fence Removal (Field Fence) | Linear foot (LF) | 500 | $ - 0 | |
| 5 | New Fence Installation Metal Post (Type A, NO livestock present) | Linear foot (LF) | 500 | $ - 0 | |
| Sample Project #3 | |||||
| 32 | Mobilization – Davis County | Lump | 1 | $ - 0 | |
| 1 | Existing Fence Removal (Chain Link) | Linear foot (LF) | 500 | $ - 0 | |
| 28 | New Fence Installation (Type 4) Chain Link | Linear foot (LF) | 500 | $ - 0 | |
| Sample Project #4 | |||||
| 33 | Mobilization – Morgan County | Lump | 1 | $ - 0 | |
| 2 | Existing Fence Removal (Field Fence) | Linear foot (LF) | 500 | $ - 0 | |
| 17 | New Fence Installation Metal Post (Type E, NO livestock present) | Linear foot (LF) | 500 | $ - 0 | |
| Sample Project #5 | |||||
| 36 | Mobilization – Rich County | Lump | 1 | $ - 0 | |
| 2 | Existing Fence Removal (Field Fence) | Linear foot (LF) | 500 | $ - 0 | |
| 4 | New Fence Installation Wood Post (Type A, livestock present) | Linear foot (LF) | 500 | $ - 0 | |
| Sample Project #6 | |||||
| 31 | Mobilization – Weber County | Lump | 1 | $ - 0 | |
| 1 | Existing Fence Removal (Chain Link) | Linear foot (LF) | 500 | $ - 0 | |
| 27 | New Fence Installation (Type 1) Chain Link | Linear foot (LF) | 500 | $ - 0 | |
| Total Project Cost Summary Table | Total | ||||
| Total cost of Sample project 1-6 | $ - 0 | ||||
| Fields in this table will automatically populate based on bids. |
| Basis of Award: |
| UDOT will award Contract to Contractor with the lowest total cost of the 6 sample porject |