This is Addendum No. 4 to the procurement documents for the Sky Mountain Golf Clubhouse Remodel project (Project No. 2503-066) issued by Hurricane City, Utah, prepared by Campbell Architecture on September 5, 2026. The addendum modifies the original procurement documents dated August 11, 2026, and consists of 18 substantive changes to specifications and drawings that bidders must acknowledge on their bid forms or risk disqualification. Key changes include modifications to tiling specifications (Section 09 30 00), solid wood ceiling panel slat widths and infill information (Section 09 51 26), and food service equipment specifications with a shift to natural gas, addition of an ice maker, and new gas hose requirements (Section 11 40 00). The addendum also revises 13 drawing sheets across structural, architectural, mechanical, and electrical disciplines, including foundation plans, framing plans, stair details, room finish schedules, mechanical specifications, and electrical power plans. Prospective bidders were required to submit questions by September 3, 2026, at 5:00 p.m. MT to Kim Campbell and Emily Hansen, with final submissions due by September 10, 2026, at 11:00 a.m. MT to Hurricane City's office at 147 North 870 West, Hurricane, Utah 84737. A mandatory pre-bid conference was held on September 1, 2026.
The addendum establishes specific approved manufacturers and product substitutions for mechanical and electrical equipment, including allowed brands for make-up air units (Cambridge), exhaust fans (Aerovent, CaptiveAire), gas-fired unit heaters (Modine), kitchen equipment (CaptiveAire), and various lighting and control fixtures. One substitution—a Cas/DX Rooftop Unit 3-27.5 Ton by Rheem—was specifically rejected. All bidders must acknowledge receipt of this four-page addendum with 11 attachments, available at https://contractors.jonesanddemille.com/, to remain eligible for consideration. No pricing, funding amounts, or contract term information is specified in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hurricane City 00 91 13.04 Addendum No. 4 Sky Mountain Golf Clubhouse Remodel Page 1 of 3 (2503-066)
DOCUMENT 00 91 13.04
ADDENDUM NO. 4
September 5, 2026
RE: Hurricane City – Sky Mountain Golf Clubhouse Remodel Project No. 2503-066
FROM: Campbell Architecture 46 North 200 East St. George, Utah 84770
TO: Prospective Bidders
This addendum forms a part of the Contract Documents and modifies the original Procurement Documents, dated August 11, 2026. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 3 pages and 11 attachments. Attachments to this Addendum can be found at https://contractors.jonesanddemille.com/.
CHANGES TO SPECIFICATIONS:
1. Section 09 30 00 – Tiling, remove Article 2.1 Paragraph C. Delete Section and replace with attached revised Section.
2. Section 09 51 26 – Solid Wood Ceiling Panels, revise slat widths and infill information in Article 2.2 Paragraphs A.6 and A.7. Delete Section and replace with attached revised Section.
3. Section 11 40 00 – Food Service Equipment, change to natural gas in Article 2.2 Paragraph D, add ice maker in Article 2.4 Paragraph A, and add gas hose requirements in Article 2.6 Paragraph C. Delete Section and replace with attached revised Section.
CHANGES TO DRAWINGS:
4. Sheet C-102 – Site & Utility Plan, add 6-foot water valve at tie-in to existing water.
5. Sheet S-001 – Structural Notes, revise notes. Delete sheet and replace with attached revised sheet.
6. Sheet S-101 – Foundation Plan, move foundation footing down for more coverage and more step downs. Delete sheet and replace with attached revised sheet.
7. Sheet S-102 – Framing Plan – Level 1, move beam from stair well. Delete sheet and replace with attached revised sheet.
https://contractors.jonesanddemille.com/
Sky Mountain Golf Clubhouse Remodel Page 2 of 3 (2503-066)
8. Sheet S-103 – Framing Plan – Lower Roof, change framing to make opening for AC units. Delete sheet and replace with attached revised sheet.
9. Sheet S501 – Structural Details, remove all references to A9/S-702.
10. Sheet S-504 – Structural Details:
a. 5 & H, revise callouts “vertical steel tube steel – see Arch” to “vertical steel tube, HSS 6x2x0.25”.
b. H, add callouts “connection plates, 7x4x0.25”, “continuous plates at bottom of fins, 0.25x7, welded to top of HSS 12x4x0.25 beam with 3” flare bevel welds spaced at 12” OC each side of beam. Flare bevel weld, filled flush to HSS surface. Fin bottoms welded to continuous plate with surrounding 3/16” fillet.
11. Sheet S-505 – Structural Details, remove all references to A9/S-702.
12. Sheet S-601 – Structural Schedules, change schedule notes. Delete sheet and replace with attached revised sheet.
13. Sheet A-411 – Enlarged Stair Plans/Sections, update callout to provide Johnsonite ribbed stair treads with visual impaired contrasting strip, provide riser material to match treads, and change to not paint risers.
14. Sheet A-501 – Architectural Details, Detail 5, update callout “steel grid system, painted” to add “3/16-inch metal rods at 2 inches on-center in a weave pattern.”
15. Sheet A-603 – Room Finish Schedule – Main Level:
a. Clarify W-2 finish measurement is 12-inch-by-24-inch.
b. Add callout “Provide 12-inch-by-12-inch thin set specified floor tile at alcove recess on west side of corridor 101 at electric water cooler in pro shop 114.
Install 12-inch-by-24-inch thin set wall tile in these two locations including side walls of alcove recess. Tile extends up the wall 5 feet 0 inches above floor with metal trim.”
16. Sheet A-604 – Room Finish Schedule – Basement, clarify w-2 finish measurement is 12-inch-by-24-inch.
17. Sheet M601 – Mechanical Schedules, adjust make up air schedule. Delete sheet and replace with attached revised sheet.
(Remainder of page intentionally left blank.)
Sky Mountain Golf Clubhouse Remodel Page 3 of 3 (2503-066)
18. Sheet M702 – Mechanical Specifications, revise make up air unit, 2.16. Delete sheet and replace with attached revised sheet. Adjust equal materials and substitutions, 2.17:
a. Add allowed manufacturers, trade names, and products on provision that they completely satisfy all and every requirement of the drawings, specifications and all addenda conforming to the design, quality and standards specified, established and required for the complete and satisfactory installation and performance of the building and all its respective parts:
i. Make Up Air Unit: Cambridge.
ii. Exhaust Fan: Aerovent.
iii. Gas Fired Unit Heaters: Modine.
iv. Kitchen Equipment: CaptiveAire.
v. Exhaust Fans: CaptiveAire.
vi. GRDs: MetalAire.
vii. K1/K1E: ALW/ALCON.
viii. O1: ALW/LIRON.
ix. P1/P1E/P2: PORT/ATLANTIC.
x. R1/R1E/R2/R3/R4E: HALO/ELCO.
xi. S1/S2/S2E: META/LIRON.
xii. W1/W1E: LUMOUTDOOR/SURE/ELCO.
xiii. Y1: META/LIRON.
xiv. X1: SURE/EMERGENSEE.
b. Rejected Substitutions: Cas/DX Rooftop Unit 3-27.5 Ton, Rheem.
19. Sheet E111 – Power & Systems Plan – Main Level, add electrified door hardware for doors 101A and 101B. Delete sheet and replace with attached revised sheet.
Signed: Kim Campbell, Architect
END OF ADDENDUM