This is Addendum No. 3 to the procurement documents for the Hurricane City Sky Mountain Golf Clubhouse Remodel project (Project No. 2503-066), issued by Campbell Architecture on August 31, 2026. The addendum modifies the original procurement documents dated August 11, 2026, and must be acknowledged by prospective bidders on the bid form to avoid disqualification. The project is located in Hurricane, Utah, with bidding documents available at https://contractors.jonesanddemille.com/. A mandatory pre-bid conference is scheduled for September 1, 2026, with questions due by September 3, 2026 at 5:00 PM MT directed to Kim Campbell (kim.c@campbelldesign.us) and Emily Hansen (emily.h@jonesanddemille.com). Bid submissions are due by September 10, 2026 at 11:00 AM MT to the Office of Hurricane City at 147 North 870 West, Hurricane, Utah 84737.

The addendum includes eight substantive changes to the procurement, contracting, and technical specifications. Changes include adding Section 07 54 19 (Single-Ply Membrane Roofing) to the table of contents, incorporating a geotechnical report and new concealed conditions clause to supplementary conditions, and adding SUNFLEX Wall Systems LP SF55e as an acceptable manufacturer for multipanel folding aluminum-framed glass doors. Additional modifications include extending the six-inch fire suppression line to the water main with associated concrete curb and gutter and asphalt pavement repairs, clarifying the origin point of a new buried power conduit from a four-way switch on the west side of Sky Mountain Boulevard, adding a four-inch waterline connection to a Remote FDC, and adding a Hurricane Valley Fire Special Service District Remote FDC Detail to the construction drawings. The addendum consists of two pages and eight attachments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 91 13.03

ADDENDUM NO. 3

August 31, 2026

RE:Hurricane City – Sky Mountain Golf Clubhouse Remodel Project No. 2503-066
FROM:Campbell Architecture

46 North 200 East St. George, Utah 84770 TO: Prospective Bidders This addendum forms a part of the Contract Documents and modifies the original Procurement Documents, dated August 11, 2026. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of 2 pages and 8 attachments. Attachments to this Addendum can be found at https://contractors.jonesanddemille.com/.

CHANGES TO PROCUREMENT REQUIREMENTS:

1. Document 00 01 10 – Table of Contents, add Section 07 54 19. See attached revised document.

CHANGES TO CONTRACTING REQUIREMENTS:

2. Document AIA – Supplementary Conditions, add paragraph for SC-3.7.4. Concealed or Unknown Conditions and attach geotechnical report. See attached revised document.

CHANGES TO SPECIFICATIONS:

3. Section 07 54 19 – Single-Ply Membrane Roofing, add section. See attached Section.

4. Section 08 35 13.13 – Multipanel Folding Aluminum-Framed Glass Doors, Article 2.2, Paragraph A.1, add the following manufacturer as acceptable: SUNFLEX Wall Systems LP, SF55e.

5. Section 10 21 13.19 – Plastic Toilet Compartments, Article 2.1, Paragraph B, add approved equal.

CHANGES TO DRAWINGS:

6. Sheet C101 – Overall Site Plan, add a 4-inch waterline to connect to the Remote FDC. Delete sheet and replace with attached revised sheet. Extend the 6-inch fire

Hurricane City Sky Mountain Golf Clubhouse Remodel (2503-066) 00 91 13.03 Addendum No. 3 suppression line to the water main in the road; concrete curb and gutter and asphalt pavement repair will be required. Clarify origin point of new buried power conduit from 4-way switch on west side of Sky Mountain Boulevard, south of site.

7. Sheet C102 – Site & Utility Plan, extend the 6-inch fire suppression line to the water main in the road; concrete curb and gutter and asphalt pavement repair will be required. Clarify origin point of new buried power conduit from 4-way switch on west side of Sky Mountain Boulevard, south of site.

8. Sheet C503 – Details, add Hurricane Valley Fire Special Service District Remote FDC Detail.

Signed: Kim Campbell, Architect

08/31/26

END OF ADDENDUM