This is a bid items document for the East Golf Course Road at Midland Draw Project (T21-06) in Texas, detailing the specific work items and quantities required for the construction project. The project involves replacing an existing low water crossing with a cul-de-sac on Golf Course Road immediately west of the channel, removing the existing low water crossing, and extending Scharbauer Draw from Fairgrounds Road southeast along the north side of Midland Draw to connect to the end of Golf Course Road immediately east of the channel. The bid items are organized into five major categories: Miscellaneous Items (7 items including mobilization, erosion control, traffic control, job site safety, and seeding), Demolition Items (8 items including right-of-way preparation, roadway excavation, channel excavation, pavement removal, fence and gate removal totaling quantities ranging from 5 acres to 7,935 square yards), Storm Drain Items (5 items including concrete box culvert, headwall, scupper, flume, and rip-rap with quantities up to 184 square yards), Paving Items (23 items including concrete and asphalt work, curb and gutter installation, sidewalks, and related appurtenances with quantities ranging from 2 to 7,935 square yards), and Traffic Control Items (6 items including pavement markings and delineators with quantities from 4 to 6,325 linear feet).
Bidders are required to submit unit prices and total amounts for each line item, with subtotals calculated for each category and a final total project price. The document provides designated pay notes (M1-M7 for miscellaneous, D1-D7 for demolition, SD1-SD5 for storm drain, P1-P15 for paving, and T1-T5 for traffic control) to facilitate price tracking and contract administration. No specific pricing terms, set-asides, contract duration, response deadlines, or award information are provided in this bid items document, as it serves solely as the pricing schedule template for contractor bidding purposes.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Quantity Unit Pay Note Unit Price Total Amount
Seeding & Stabilization, furnished, installed, complete and in place.
(See Proposal sheet for additional information.)
Description
BID ITEMS
Project Name: East Golf Course Road At Midland Draw Project Number: T21-06
Miscellaneous Items
1)
Total Miscellaneous Items 1 - 7 $___________________________________________________________
Mobilization, furnished, installed, complete and in place.
Erosion/Sediment Control, furnished, installed, complete and in place.
5) Seeded Erosion Control Mats, furnished, installed, complete and in place.
6)
3) Traffic Control, furnished, installed, complete and in place.
MO
3192 SY
2)
MO
M1
M2
4 MO
4) Job Site Safety, furnished, installed, complete and in place. 4 MO
16460 SY
7) Spray Watering, furnished, installed, complete and in place. 1 LS
M3
M6
M4
M5
M7
6) Removal & Disposal of Existing Barbed-Wire Fence, complete and in place. 978 LF D6
7) Removal & Disposal of Existing Post & Cable Fence, complete and in place. 212 LF D6
Description
Total Demolition Items 1 - 8
Demolition Items
7935 D2SY
D3
D4
D7
D5
CY
SY
LF
LF
2) Unclassified Roadway Excavation (Depth ≤ 18”), complete and in place.
3) Unclassified Channel Excavation, complete and in place.
4) Removal & Dispose of Existing Unclassified Pavement, complete and in place.
5) Removal & Disposal of Existing Concrete Curb & Gutter, complete and in place.
8) Removal & Disposal of Existing Swing Gate, complete and in place.
1) Preparation of Right-of-Way, furnished, installed, complete and in place. 5 ACRE D1
Total Storm Drain Items 1 - 5
2)
LF
Reinforced Concrete Headwall, furnished, installed, complete and in place.
SD1
EA SD2
Storm Drain Items
Description
1) 6’x2’ Reinforced Concrete Box Culvert furnished, installed, complete and in place. 171
3) Concrete Scupper, furnished, installed, complete and in place. 4 SY SD3
184 SY SD4
4) 6” Concrete Flume, furnished, installed, complete and in place.
5) 6” Concrete Rip-Rap, furnished, installed, complete and in place. 127 SY SD5
7) 8” Flexible Base (Type A, Grade 4), furnished, installed, complete and in place. 3024 SY P6
11) 6” Residential Concrete Driveway Approach, furnished, installed, complete and in place. 66 SY P9
12) 6” Flexible Base Driveway Approach, furnished, installed, complete and in place. 226 SY P10
Paving Items
Description
14) Type C Concrete Curb & Gutter, furnished, installed, complete and in place. 1257 LF P11
15) Type D Concrete Curb & Gutter, furnished, installed, complete and in place. 56 LF P11
SY7935
P9
13) Type A Concrete Curb & Gutter, furnished, installed, complete and in place. 1222 LF P11
16) Type F Concrete Curb & Gutter, furnished, installed, complete and in place. 48 LF P11
2” Type D HMAC Asphalt Pavement Surface Course (PG70-22, 110 LBS / SY @ 1” Thick), furnished, installed, complete and in place.
17) Transition Concrete Curb & Gutter, furnished, installed, complete and in place. 40 LF P11
3” Type C HMAC Asphalt Pavement Surface Course (PG64-22, 110 LBS / SY @ 1” Thick), furnished, installed, complete and in place.
10)
6” Commercial Concrete Driveway Approach, furnished, installed, complete and in place.
CY
SY
SY
SY
SY
SY
GAL
GAL
P1
P2
P3
P4
P5
P6
P7
P8
1)
2)
3)
4)
5)
6)
8)
9)
Subgrade Preparation (Depth ≤ 8”), furnished, installed, complete and in place.
Unclassified Embankment (Density Controlled), furnished, installed, complete and in place.
8” Continuously Reinforced Concrete Pavement, furnished, installed, complete and in place.
12” Flexible Base (Type A, Grade 4), furnished, installed, complete and in place.
Bituminous Prime Coat (MC-30, 0.20 Gal / SY), furnished, installed, complete and in place.
Tack Coat (MC-30, 0.10 Gal / SY), furnished, installed, complete and in place.
19) 4” Concrete Sidewalk, furnished, installed, complete and in place.
SY7
22) Flowable Fill / 2-Sack Backfill, furnished, installed, complete and in place.
Total Paving Items 1 - 22
SY P12
P15
18) Concrete Pedestrian Access Ramp, furnished, installed, complete and in place. 23
SY P13
EA P14
20) Manhole Ring & Cover Adjustment, furnished, installed, complete and in place. 2 EA P14
21) Water Valve Box Ring & Cover Adjustment, furnished, installed, complete and in place.
No. Quantity Unit Pay Note Unit Price Total AmountDescription
6) Flexible Delineator Post, furnished, installed, complete and in place. 12 T5
5) Type III Barricades (Permanent), furnished, installed, complete and in place. 4 EA T4
4) Small Sign Assembly, furnished, installed, complete and in place. 5 EA T3
$___________________________________________________________Total Traffic Control Items 1 - 6
LF
LF
LF
EA
T1
T2
T2
1)
2)
3)
Traffic Control Items
Eliminate Existing Pavement Markings and Markers (Line Markings), furnished, installed, complete and in place.
Retroreflectorized Pavement Markings, TxDOT Item 666 (6” White, Solid), furnished, installed, complete and in place.
Retroreflectorized Pavement Markings, TxDOT Item 666 (6” Yellow, Solid), furnished, installed, complete and in place.
Price For:
1. Miscellaneous Items
2. Demolition Items
4. Paving Items $___________________________________________________________________________________________
$___________________________________________________________________________________________Total Price
3. Storm Drain Items $___________________________________________________________________________________________
5. Traffic Control Items $___________________________________________________________________________________________
Proposal-Pvng
File details come from the government source that posted it. Updated .