7a Anzalduas Dam Admin Bldg Area Conceptual Drawing.pptx

PPTX presentation 543 KB Posted

Attached to
ANZALDUAS DAM STORAGE BUILDING CONVERSION TO SECURITY OFFICE WITH EMERGENCY GENERATOR
Solicitation number
191BWC26R0007
Issued by

About this file

This file is a conceptual drawing presentation for the Anzalduas Dam Administrative Building Area project. The document contains visual layouts depicting the conversion of an existing storage building and identifies the approximate location for a new generator installation to support the proposed security office and emergency power requirements.

The drawing provides spatial context for the design-build project being solicited by the United States Section of the International Boundary and Water Commission (USIBWC) under Solicitation Number 191BWC26R0007. The project involves converting the Anzalduas Dam Storage Building into a Security Office and installing emergency generator capacity to serve both the new Security Office and the Anzalduas Dam Headquarters buildings. The conceptual layout assists potential bidders in understanding the physical scope and site configuration, supporting their preparation for the required prebid site visit and design-build proposals. Contractors must be aware of operational constraints including working hours restricted to 7:00 a.m. to 3:30 p.m., Monday through Friday, security protocols for accessing the facility through USIBWC levees where Border Patrol operates, and adjacency to US Fish and Wildlife property that must remain undisturbed.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Storage Bldg to be converted

Approx location of New Generator image1.jpg

File details come from the government source that posted it. Updated .